1. DIMENSIONS ARE TO BE READ NOT TO BE SCALED.

A B C D E F G H I 2. CONTRACTOR IS TO CHECK ALL DIMENSIONS BEFORE


EXECUTION OF WORK.
STIRRUPS DETAIL 3. Ø INDICATES THE DIA OF HYSD BARS OF GRADE Fe 500
REFER TO IS: I786,2008
4. FOR CENTER LINE DIMENSIONS REFER ARCH.DRG'S.
5. NOT MORE THAN 50% BARS ARE TO BE LAPPED AT ONE
LOCATION.
6. LAP LENGTH / ANCHORAGE LENGTH:
Strps'A';8mm dia. 2L 12Nos. @ 4"c/c
11'-521" 5'-421" 3'-821" 3'-821" 5'-421" 11'-521"
(i) 50d IN CASE OF FOUNDATION,BEAM & SLAB
7'-4" 7'-5" + rest @ 8" c/c
(ii)45d IN CASE OF COLUMNS
WHERE 'd ' IS DIA OF BARS.
7. CLEAR COVER TO REINF.:
(i) FOUNDATION=60mm(BOTTOM),30mm(SIDE),25mm(TOP)
Strps'B';8mm dia. 2L @ 6"c/c. (ii) COLUMN = 40mm
(iii) BEAM = 30mm

C1 C8 B1 C9 B1 C8 C1 Strps'C';10mm dia. 2L 12Nos. @ 4"c/c (iv) SLAB = 25mm


B1 B1 8. a) EXTRA BARS TO BE EXTENDED 0.3L ON EITHER SIDE
+ rest @ 8" c/c OF SUPPORTING BEAM OR COLUMN STRIP EDGE LINE

1 2'-6" Strps'D';10mm dia. 2L @ 6"c/c.


JOINING COLUMNS.
b) BENDING OF CRANK BARS WHERE EVER REQUIRED

B3
c

c
a

a
c OPEN AREA OPEN AREA
SHALL BE AT 0.15L-0.2L FROM EDGE LINE OF

b
SUPPORTING BEAMS.

B3
9. CONC. USED IS M-25
b

B1
c

c
a

a
10. ALL DIMENSIONS ARE IN FEET &INCHES OTHERWISE

z z SPECIFIED.

b
a 11. CEMENT MORTAR USED IN;
2'-0"

2'-0"
B1
a) 9"thk. Walls;- CM 1:6
b) 412"thk. Walls;- CM 1:4
12. SBC OF SOIL IS 10 t/m²
13'-7"

B2 2'-0"
3'-6" 3'-6" 3'-6" 3'-6"
2'-0"
B2
c c c c

B1
c

c
a

a
b b b b
B1
Overlap / Anchorage / Development Length 'L'(mm)
b

b
3'-6" 3'-6" 7to9
Dia of Bar Steel Reinforcement of Grade Fe 500

5"
c a a a c Concrete M25.

b
Beam/Slab Foundation Columns/Lifts
10to12
B1

B1
a

a
4'-6"

4'-6"
b b (mm)

c
(Tension Member) (Compression Member)

12"
b

b
C7 C7
a

a
4to6 400 350
c

c
8
a B1 C10 B1 a 10 500 400

2 1to3 12 600 500


9" 16 800 650
LIVING /DINNING
b

b
5'-7"

20 1000 800
16'-0" X15'-6" (BEAM) B1-(9"x17")
4'-6"

4'-6"
a

a
c

c
25 1200 1000
Bars:1to9=16mm dia.(Throught out)

c
a

a
28 1350 1125

b
B3 B3 10to12=16mm dia.(Extra 0.3L at supports) 32 1500 1250

C2 C2
B1

3 Strps:'C'
c

c
a

a
3'-6" 5'-0" 5'-0" 5'-0" 5'-0" 7to9
b

b
6'-0"

NOTE;
c c c

5"
(T) = TOP
(B) = BOTTOM
b b b 10to12

12"
a C6 a a C6
2'-6"

2'-6"
4to6
4 1to3
b

b
B3 B3 9"
a

a
c

c
5'-0"

5'-0"
(BEAM) B2-(9"x17")
B1

B1
c

c
a

a
B1 Bars:1to9=16mm dia.(Throught out)
B1
b

b
LIFT
10to12=16mm dia.(Throught out)
13'-9"

3'-6" 3'-6" Strps:'C'


c c 3'-0" B3 c 3'-0" c
c

PROJECT
b

b
b b b 4to6
B1

5"
a a UP. a a
B1

B1
B1

12"
b

b
4'-6"

4'-6"
a

a
b

b
c

c
a

a
c

c
C5 C5 1to3
5 9"
C3 C3
B1 C4 B1 STB-1 B1 C4 B1 (BEAM) B3- (9"x17")

B1
(AT MID LANDING) Bars:1to6=16mm dia.(Throught out)
B3
B1

z z
B3

Strps:'A'
S T R U C T U R E

TYPICAL FLOOR ROOF SLAB TYPICAL FLOOR ROOF


SLAB AND BEAMS DETAIL

CONSULTANT
SCHEDULE OF BARS IN SLAB
SLAB THICKNESS = 5''THK. M25 SEC SG & ASSOCIATES
SCO. 1017A, Top Floor, New Sunny Enclave, Sector 125,
a = 10 mm dia.@ 12'' c/c. (B) 0.3L 0.3L
Net spacing Distt.- Mohali
M. 7988372259 | sgassociates.chd@gmail.com
b = 10 mm dia.@ 12'' c/c. (C) @6''c/c Land Surveying, Geographical Investigation,
c = 10 mm dia.@ 12'' c/c. (T) Structure Designing, Quantity Surveying
and PMC

Distt/Holding Bar (z) = 8mm dia.@ 8'' c/c.(T&B) 0.1L 0.1L PROJECT No: ----
T=TOP, B=BOTTOM, C= CRANK SEC
Strps: DRAWN BY:
SCALE : N.T.S
DATE : 10.064.2021
TYPICAL BEAM SECTION DRG No. S-106