Tol Kapal Betung - Pier Head Jejawi: I. Technical Data
Tol Kapal Betung - Pier Head Jejawi: I. Technical Data
I. TECHNICAL DATA
CP
CP
GIRDER GT 24 :
b 8 cm
Ax 24 cm2
Ix 8000 cm4
Wx 700 cm3
Sx 525 cm3
Δ max L/500
E 100,000 kg/cm2
σ ijin 70000 kg.cm2
τ ijin 1400 kg
b 15.2 cm
Ax 23 cm2
Ix 372 cm4
Wx 74 cm3
Sx 43.38 cm3
Δ max L/400
E 2,100,000 kg/cm2
σ ijin 1,600 kg/cm2
τ ijin 928 kg/cm2
Pembebanan :
Concrete Area
Concrete + ML : 2,500 kg/m3 x 3.85 m x 107.5% = 10346.8 kg/m2
Live Load : 100 kg/m2 = 100 kg/m2
Formwork : 100 kg/m2 = 100 kg/m2 +
Total = 10546.8 kg/m2
KONTROL GIRDER
Beban Max:
Jarak antar girder 25cm = 0.25m
q = 10546.8 kg/m2 x 0.25 m = 2636.7 kg/m
Based on STAAD.Pro 2004 calculation :
LOAD
BENDING MOMENT
SHEAR
DISPLACEMENT
LOAD
BENDING MOMENT
SHEAR FORCE
DISPLACEMENT
KONTROL SHORING PD 8
Signature :
Name : RIN SL MRF
Date : 11/28/2018 11/28/2018