WORK METHODOLOGY STATEMENT

Contractor: MAGLEV AIR CONDITIONING CORP. Analog Project In Charge:


Contractor Safety Officer: KIM NASSORADA Project Time Table:
Project Description: REPLACEMENT OF VTT COMPRESSOR OF CH#4

HAZARDS COUNTER MEASURE


(Describe what action or procedure will be taken to
POTENTIAL HAZARDS eliminate or minimize the risk of injury or damage. Use
(Personnel & Equipment) the Hierarchy of Controls below as a guide) Isulat ang
(Identify the hazards associated with POTENTIAL INJURY mga dapat gawin upang maiwasan o mawala ang
ACTIVITIES (In Steps) each step. Examine each to find
(Which may result due to ineffective
Risk posibling pagkasugat o pinsala. Gamitin ang gabay ng
(Break the activity into steps or detailed tasks. Tasks/steps possibilities that could lead to an Rating kontrol sa ibaba.
should be narrated into chronological order.) Isulat ang mga accident or potential harm.) Alamin control measures). Isulat kung ano (See 1. Eliminate the hazard
gagawin ayon sa pagkakasunod sunod ang mga panganib na pwedeng ang pwedeng mangyaring pinsala Below) 2. Substitute the material or equipment
kung hindi epektibo ang kontrol
harapin habang gumagawa na 3. Isolate the hazard
posibleng makasakit at magdulot ng
aksidente 4. Implement Engineering Control
5. Implement Administrative Control
6. PPE

1. Close the suction liquid and discharge the Slippery (due to wet or Body parts fracture and Eliminate the hazard; implement
valves to isolate the refrigerant gas passing greasy floor) injury engineering control; use of PPE
through the compressor L

2. Assemle the gantree support with I-Beam Unexpected falling object Body injury and fracture of Eliminate the hazard; implement
that can hold for the compressor hauling back, leg, arms E engineering control; use of PPE
and installation.

3. Loosen up all the bolts and nuts on each Slippery and sharp edges Body parts fracture and Eliminate the hazard; implement
valve of compressor injury E engineering control; use of PPE
4. Hauling and remove the deffective Unexpected falling object Body injury or death if Eliminate the hazard; implement
compressor and lift up the new compressor severely injured engineering control; use of PPE
to be replaced and installed. E

5. Cleaning of any flange coupling surface Sharp edges Body parts fracture and Eliminate the hazard; implement
by using the steel brush. injury L engineering control; use of PPE
6. Tighten up any bolts and nuts of new Pinch and Slippery Body parts fracture and Eliminate the hazard; implement
compressor up to 100ft. Lbf by using torque injury L engineering control; use of PPE
wrench

7. Start-up and commissioning of newly Electrecution Electric shock or death if Eliminate the hazard; implement
installed compressor VTT severely injured E engineering control; use of PPE
8. Dismantle the gantree support and I- Pinch and unexpected Body injury or death if Eliminate the hazard; implement
Beam. falling object severely injured E engineering control; use of PPE
9. General cleaning of the whole working Slippery due to wet or Body parts fracture and Eliminate the hazard; implement
area greasy floor injury L engineering control; use of PPE

E-Extreme Risk: The hazard has the potential to be fatal or permanently disable a person M-Medium Risk: The hazard has the potential to cause a Non Lost Day Case (NLDC)
or damage to the enviroment. ( Ang panganib ay posibleng magdulot ng kamatayan o pagkasira ng kalikasan) or Notice of Violation (NOV) from DENR. ( Panganib na higit pa sa First Aid- gaya ng xray)
H-High Risk: The hazard has the potential to cause a Lost Day Case (LDC) or pollution to the Environment L-Low Risk: The hazard has the potential to cause a minor injury or minor spill
(Panganib na pwedeng mgdulot ng pagliban o polusyon sa kalikasan) (Panganib na pwedeng magdulot ng FirstAid at konting patak gaya ng kemikal)
KIM NASORRADA
Contractor Safety Officer Area/Project Owner
Signature Over Printed Name Signature Over Printed Name
ENGR. DARWIN A.
1-2 WEEKS

Person in charge of Implementation.


Taong intasan upang ipatupad ang mga
gawaing pangkaligtasan

Safety Officer - Kim Nasorrada

Safety Officer - Kim Nasorrada

Safety Officer - Kim Nasorrada

Safety Officer - Kim Nasorrada

Safety Officer - Kim Nasorrada

Safety Officer - Kim Nasorrada

Safety Officer - Kim Nasorrada

Safety Officer - Kim Nasorrada


Safety Officer - Kim Nasorrada

se a Non Lost Day Case (NLDC)


higit pa sa First Aid- gaya ng xray)
minor injury or minor spill
patak gaya ng kemikal)