1. Close the suction liquid and discharge the Slippery (due to wet or Body parts fracture and Eliminate the hazard; implement
valves to isolate the refrigerant gas passing greasy floor) injury engineering control; use of PPE
through the compressor L
2. Assemle the gantree support with I-Beam Unexpected falling object Body injury and fracture of Eliminate the hazard; implement
that can hold for the compressor hauling back, leg, arms E engineering control; use of PPE
and installation.
3. Loosen up all the bolts and nuts on each Slippery and sharp edges Body parts fracture and Eliminate the hazard; implement
valve of compressor injury E engineering control; use of PPE
4. Hauling and remove the deffective Unexpected falling object Body injury or death if Eliminate the hazard; implement
compressor and lift up the new compressor severely injured engineering control; use of PPE
to be replaced and installed. E
5. Cleaning of any flange coupling surface Sharp edges Body parts fracture and Eliminate the hazard; implement
by using the steel brush. injury L engineering control; use of PPE
6. Tighten up any bolts and nuts of new Pinch and Slippery Body parts fracture and Eliminate the hazard; implement
compressor up to 100ft. Lbf by using torque injury L engineering control; use of PPE
wrench
7. Start-up and commissioning of newly Electrecution Electric shock or death if Eliminate the hazard; implement
installed compressor VTT severely injured E engineering control; use of PPE
8. Dismantle the gantree support and I- Pinch and unexpected Body injury or death if Eliminate the hazard; implement
Beam. falling object severely injured E engineering control; use of PPE
9. General cleaning of the whole working Slippery due to wet or Body parts fracture and Eliminate the hazard; implement
area greasy floor injury L engineering control; use of PPE
E-Extreme Risk: The hazard has the potential to be fatal or permanently disable a person M-Medium Risk: The hazard has the potential to cause a Non Lost Day Case (NLDC)
or damage to the enviroment. ( Ang panganib ay posibleng magdulot ng kamatayan o pagkasira ng kalikasan) or Notice of Violation (NOV) from DENR. ( Panganib na higit pa sa First Aid- gaya ng xray)
H-High Risk: The hazard has the potential to cause a Lost Day Case (LDC) or pollution to the Environment L-Low Risk: The hazard has the potential to cause a minor injury or minor spill
(Panganib na pwedeng mgdulot ng pagliban o polusyon sa kalikasan) (Panganib na pwedeng magdulot ng FirstAid at konting patak gaya ng kemikal)
KIM NASORRADA
Contractor Safety Officer Area/Project Owner
Signature Over Printed Name Signature Over Printed Name
ENGR. DARWIN A.
1-2 WEEKS