Professional Documents
Culture Documents
To create the Job Safety Analysis, it should be used the spreadsheet JSA at this doccument. The head of this sheet identifies the job or activitie to be done, as far as the participants of the analysis and the execution of the job.
This sheet contains 9 columns, which are fulfilled as the description presented bellow:
- 1st column: ITEM
This column contains a number for the identification of the basic step, being fulfilled in sequence to make easier to consult any step you want.
- 2nd column: JOB STEPS
This column contains the steps to be executed to the analyzed job. The steps are defined by the teams participating on it, based on the existent procedures and/or identification and local observing.
Describe by clear and specific language the main steps, always beginning the text with a word representing an action (a verb at the infinitive form). Examples: to remove, to put, to turn on, to open, to close, to tight, to loose, and others.
NOTE: If an important step of the job is omitted, it can result in exposure of the workers to potential risks or accidents.
- 3rd column: RISK SITUATION
This column contains the possible risk situations identified for the job task. In general, these risk situations are related to accidental events that have the potential to damage the integrity of the people involved in carrying out the task. Therefore, these risk situations refer to events such
as:
SAFETY
AIRCRAFT FALL
ANIMAL ATTACK (VENOMOUS, WILD, INSECTS ETC.)
BODY PRESSING
BUMP
COLLAPSE: STRUCTURES / EQUIPMENT / BUILDINGS
COLLISION / TIPPING OVER
CONTACT / EXPOSURE TO CHEMICALS
CONTACT WITH - MOBILE OR ROTARY PARTS OF STRUCTURES, MACHINES OR EQUIPMENT
CONTACT WITH ENERGIZED SURFACE
CONTACT WITH... (OTHERS)
CUTTING / DRILLING / ABRASIVE CONTACTS
DAM BREAKING OR LEAKING
DROWNING
ELECTRIC OR SHORT CIRCUIT ARC
EXPLOSION
EXPOSURE TO CONFINED SPACE
FALL / SLIDE (DIFFERENT LEVEL)
FALL / SLIDE (SAME LEVEL)
FIRE
GAS LEAKAGE (FLAMMABLE / TOXIC / POLLUTING)
HIT BY BREAKING OF CABLES / HOSES / FLUIDS UNDER PRESSURE
HIT BY FALLING PARTS / STRUCTURES / EQUIPMENT / TOOLS
HIT BY PROJECTION OF MATERIALS (TOOLS, PARTS, FRAGMENTS, SPARKS)
HIT BY... (OTHERS)
IMPLOSION
LOAD / ORE FALL
ORE PILE EROSION OR SLIDE (ORE, STERILE, AMONG OTHER TYPES OF MATERIALS) OR SLOPES
OVERFLOW OF SILOS (INPUTS OR PRODUCTS)
PANE ON AIRCRAFT
PHYSICAL AGGRESSION
RUN OVER - VEHICLES OR AUTOMOTIVE EQUIPMENT
RUN OVER - VEHICLES OR RAILWAY EQUIPMENT
SOTTERRAMENTO / SWALLOWING
STRIKE AGAINST - STRUCTURE AND EQUIPMENT
STRIKE BY ATMOSPHERIC DISCHARGE
STRIKE BY... (OTHERS)
VEHICLE / EQUIPMENT FALL IN WATER OR SEA
HEALTH
DYNAMIC MUSCLE OVERLOAD
EXPOSURE TO ABNORMAL PRESSURES
EXPOSURE TO BIOLOGICAL AGENTS
EXPOSURE TO DUST / PARTICULATE
EXPOSURE TO EXCESSIVE HUMIDITY
EXPOSURE TO HIGH OR REDUCED LUMINOSITY
EXPOSURE TO HIGH TEMPERATURES
EXPOSURE TO LOW TEMPERATURES
EXPOSURE TO METAL SMOKES
EXPOSURE TO NOISE
EXPOSURE TO OTHERS
EXPOSURE TO SOURCES OF IONIZING RADIATION
EXPOSURE TO SOURCES OF NON-IONIZING RADIATION (SOLAR RADIATION, MAGNETIC FIELDS, ETC.)
EXPOSURE TO VAPORS / FOGS / MIST
EXPOSURE TO VIBRATION (WHOLE OR LOCATED BODY)
MENTAL / COGNITIVE OVERLOAD
STATIC MUSCLE OVERLOAD
in the imperative form) "isolate, block and signal the valve," "use semi-facial mask with filter for organic vapors / Dust", "use wrench ¾ inch" "gloves type vaqueta / PVC", "use PVC boot".
The risk must be rated according to its probability and severity of occurrence considering the controls already implemented. Severity must be made according to the effect (table above) and the probability classification must be made according to the probability table, available in NOR -
0003 - G - Risk Managment Norm.
PNR 000068 - Job Safety Analysis Associated PRO*: SWP no*: Work Order
n°*:
Task description: Date: ___/___/___
Issuer Company/ ID
Job task description: Installation roof truss steel structure for shelter.
Control 1
HIGH EXAMPLE OF STEP EXAMPLE OF RISK Cause1
Control 2
PNR 000068 - Job Safety Analysis
Job task description: Installation roof truss steel structure for shelter.
Item Task Step Risk Situation Causes Effects Control measures Probability Severity Risk
Item Task Step Risk Situation Causes Effects Control measures Probability Severity Risk
Item Task Step Risk Situation Causes Effects Control measures Probability Severity Risk
Item Task Step Risk Situation Causes Effects Control measures Probability Severity Risk
Item Task Step Risk Situation Causes Effects Control measures Probability Severity Risk
#N/A
VERY REMOTE REMOTE POSSIBLE LIKELY VERY LIKELY
1 2 3 4 5
VERY CRITICAL 1 HIGH HIGH VERY HIGH VERY HIGH VERY HIGH
CRITICAL 2 HIGH HIGH HIGH VERY HIGH VERY HIGH
SIGNIFICANT 3 MEDIUM MEDIUM HIGH HIGH VERY HIGH
MODERATE 4 LOW LOW MEDIUM MEDIUM MEDIUM
LOW 5 LOW LOW LOW LOW MEDIUM