DISTRIBUTION LIST

Copy Destination Name & Surname Date Signature


No

1 Project Manager

2 Site Manager

3 QC Manager

4 Technical Manager

5 Electrical Engineer

6 H&S Engineer

7 Labor

2|P age
Table of Contents

1--PORPUSE ........................................................................................................................... 4
2--SCOPE OF WORK…………………………………………………………………….......4
3--FIELD OF APPLICATIONFIELD ....................................................................................5
4--REFERENCEREFERENCES ............................................................................................. 5
5--RENPONSIBILITY .............................................................................................................5
6--RESOURCE..........................................................................................................................5
7--EXECUTION ................................................................................................................ …….5
 7.1-CONTINUIT TEST PROCEDURE………………………………………….....…5
 7.2-INSULATION TEST PROCEDURE…………………………………………..….7
8--TEST REPORT FORMATE………………………………………………………………...7
9--HEALTH &SAFETY RISKS AND CONTROLS ................................................................................8
 9.1-FORESEEABLE HAZARDS ...................................................................................8
 9.2 - PRECAUTIONS ………………………………………………………………......8
 9.3-PPE RECORD……………………………………………………………………....8
 9.4-RISK MATRIX…………………………………………………………………......9
 9.5-HAZARD CHECKLIST………………………………………..………………….10
 9.6-RISK ACCESSMENT……………………………………………………………...12
10--RESPONSIBILITYS……………………………………………………………………….13
11--TTACHMENTS…………………………………………………………………………….13

3|P age
1- PURPOSE

The purpose of method statement is to explain the scope of work for each activity and on this
method statement we are elaborating testing before energizing electrical supply for guest
rooms. It aims to ensure the integrity of electrical appliances and cables in sites and the safety
of personnel who use them,
Electrical installation testing should only be carried out by the qualified professional team
with the relevant equipment.

2- SCOPE OF WORK

The scope of this document is to describe the methodology for Dead Testing in order to ensure that
cable installation passed insulation and continuity tests. All provisions of the specifications and other
contract documents shall continue to apply. Where there is a conflict between this method statement
and the contract documents, the contract documents shall prevail and the construction manager will
have final authority

Testing instrument

4|P age
3 - Field of Application

This Method Statement shall be applicable to the Dead Testing for BWC Hotel Project.

4 – References
Approved Construction Shop Drawings #AEA-1305-WC-EL-S62,63,64-P99-L99-0201,0205.

5 – Responsibilities
Special testing group will be responsible for ensuring all testing result will be in the bound of allowed
values.

6 - Resources
The following typical instrument is used for testing

Name of instrument: Electrical installation tester

Make: fluke

Model no: 1653B

7 - Execution

7.1-Continuity Test

 Outgoing circuit which is going to be tested will be found on the panel side.
 5cm part of the cable insulation will be removed.
 Find the furthest point of the outgoing circuit which is going to be tested.
 Connect the grounded and phase cores by using crocodile type connector or wire.
 Again find outgoing circuit on the panel side which is going to be tested.
 Arrange the test device as follows.

5|P age
 Turn the rotary switch to the RLO Position
 Use the L and P (red and green) terminal for this test.
 Before making a continuity test, use the Zero adapter to zero the test lead.
 Connect the respective leads to test wire.
 Press and hold TEST button until the reading settles .if continuity beeper is enabled ,the tester
beeps continuously
 For measured value less than 2 ohm and there is no stable reading beep for measured values
greater than 2 ohm.
 Revised the procedure for other circuit.
 We can see the result as below.

6|P age
7.2-Insulation Test
 Before supply any voltage, arrange the test device as seen from the picture.

 Be sure the tested circuit is open from both end


 Turn the rotary switch to the RISO position
 Use the L and P (red nd green) terminal for this test.
 Use F4 to select the test voltage 500 V.
 Press and hold TEST until the reading settles and the tester beeps.
 For P/P,P/N,P/E,N/E select information with F1 and revise the test.
 We can see the result as below.

7|P age
8-Test Reports formate
Test report format is attached.

9-HEALTH &SAFETY RISKS and CONTROLS

9.1 - Foreseeable Hazards


In order to minimize potential hazards on site, the following actions should be taken by management prior to
Lighting & small power testing on site.
 We aware of that nobody touch the cable when insulation test is being held.

9.2 - Precautions
According to the safety regulations and Quantity Control Procedures following conditions are provided.
 All equipment and tools are checked for they are free of errors and fully operational
 All equipment and tools with defects are to be removed from the working area
 All defects with electric and electrical equipment will be corrected
9.3-PPE Record

PPE Assessment Record

AE ARMA-ELECTROMANIC
Project: BWC HOTEL

Activity: Dead Testing

Location: BWC Hotel Guest rooms

Nature of Risk: Hand & Eye Injury

Length of Exposure to Risk: Daily

Hand Foot Eye Hand Hearing Hi-Viz Vest Respiratory Fall Arrest
YES / NO YES / NO YES / NO YES / NO YES / NO YES / NO YES / NO YES / NO

8|P age
Is Training Required in Use of PPE? Yes No 

Other Control Measures Implemented:


Following and abided by task specific risk assessments

PPE Inspection / Maintenance Arrangements:


Weekly by Construction Manager

Position Date
Produced By
Signature Name
Received By Position Date

Signature name Date

9.4-Risk Matrix
Increasing Probability
A B C D E
Never heard of Has occurred Incident has Happens Happens
in in occurred several times several times
Construction Construction during per year in per year on
Works Works operations during location
industry industry operations

1 None

2 Slight
Consequence

3 Minor

4 Localized
5 Major

6 Massive

Categories
Manage for continuous Incorporate risk reduction Intolerable
improvement measures

9|P age
Potential Impact Definition

People (P)
0 No Injury No injury or damage to health
1 Slight Injury Not detrimental to individual employability or to the performance of
present work
2 Minor Injury Detrimental to the performance of present work, such as curtailment of
activities or some days absence to recover fully up to a maximum of
one week.
3 Major Injury Leading to permanent partial disablement or unfitness to work or
detrimental to performance of work over an extended period, such as
long-term absence
4 Single Fatality Single fatality or victim with permanent total disablement or unfitness
for work. Also includes the possibility of multiple fatalities (maximum of
3) in close succession due to the incident, e.g. explosion
5 Multiple Fatalities May include four fatalities in close succession due to the incident, or
multiple fatalities (four or more) each at different points and/or with
different activities
Assets (A)
0 No Damage No damage to equipment
1 Slight Damage No disruption to process. Minimum cost of repair.
2 Minor Damage Possible brief disruption to the process. Isolation of equipment for
repair.
3 Localized Damage Construction site/building partly down. Process can (possibly) be
restarted.
4 Major Damage Partial loss of construction site/building. Construction site/building shut
down.
5 Extensive Damage Total loss of construction site/building. Extensive damage.
Environment/Society-cultural (E)
0 No Effect No financial consequences. No environmental risk
1 Slight Effect Negligible financial consequences. Local environmental damage within
the fence and within systems.
2 Minor effect Contamination. Damage sufficiently large to affect the environment.
Single exceedance of statutory or prescribed criteria. Single complaint.
No permanent effect on the environment.
3 Localized Effect Limited loss of discharges of known toxicity. Repeated exceed of
statutory or prescribed limit and beyond fence/neighborhood.
4 Major Effect Severe environmental damage. SE required to take extensive
measures to restore the contaminated environment to its original state.
Extended exceedance of statutory or prescribed limits.
5 Massive effect Persistent severe environmental damage or severe nuisance
extending over a large area. In terms of commercial or
recreational use or nature conservancy, a major economic loss for
SE. Constant high exceedance of statutory or prescribed limit.
Reputation (R)
0 No Impact No public awareness
1 Slight impact Public awareness of the incident may exist. There is no public concern.
2 Limited effect Some local public concern. Some complaints received. Slight media
and/or local political attention with potentially negative aspects for SE
operations.
3 Considerable Impact
Regional public concern. Numerous complaints. Extensive negative
attention in local media. Slight national media and/or local/
regional/national policies with potentially restrictive measures and/or
impact on grant of licenses. Mobilization of action groups.
4 National Impact National public concern. Continuing complaints. Extensive negative
attention in the national media and/or regional/national policies with
potentially restrictive measures and/or impact on grant of licenses.
Mobilization of action groups.

10 | P a g e
5 International impact international impact – international public attention. Extensive negative
attention in international media and national/international politics.
Potential to harm access to new areas, grants of licenses and/or tax
legislation. Concerted pressure by action groups. Adverse effects to SE
operations in other countries.

9.5-Hazard Checklist

No. Hazard Description No. Hazard Description


H-01 Machinery H08 Hot Surfaces

H-01/01 Equipment with Moving or H-08.01 Process piping equipment


Rotating Parts 60-150°C
H-01.02 Equipment Maintenance H-09 Cold Surfaces

H-01.03 Special tools H-09.01 Process piping -25 to -80°C

H-01 Working at hight H-10 Electrical Installation

H-02.01 Personnel at height H-10.01 Cable Pulling

H-02.02 Overhead equipment H-10.02 Cable Drum Handling

H-02.03 Scaffolding / Ladders H-10.03 Cable Laying / Termination

H-02.04 Personnel Below Grade H-11 Environmental Hazards

H-02.05 Falling Objects H-11.01 Weather

H-03 Material Handling H-12 Biological Hazards

H-03.01 Falling Objects H-12.01 Disease transmitting insects

H-03.02 Cranes / Rigging H-120.2 Cold & flu virus

H-02.03 Ground Stability H-12.03 HIV

H-04 Walking / Working


Surfaces
H-04.01 Slips / Trips / Falls H-13 Ergonomic Hazards

11 | P a g e
H-04.02 Housekeeping H-13.01 Manual materials handling

H-04.03 Egress / Access Means H-13.02 Damaging noise

H-040.4 Sharp Objects H-13.03 Heat stress

H-05 Ignition Sources H-13.04 Cold stress

H-05.01 Grinding H-13.05 Work stations

H-05.02 Gas cutting H-130.6 Poor organization/job design

H-05.03 Welding H-14 Psychological Hazards

H-05.04 Smoking H-14.01 Living on the job/away from family

H-05.05 Power tools H-15 Medical

H-06 Pressure H-15.01 Medical unfitness

H-06.01 Water under high pressure H-16 Security Related Hazards

H-06.02 Air under high pressure H-16.01 Theft, pilferage

H-07 Fire / Explosion H-17 Testing

H-07.01 Explosive Gases H-17.01 Electrical testing

H07.02 Flammable materials

H07.03 Powder Actuated Hand Tools

9.6-Risk Assessment

REF. TASK HAZARDS RISKS CONTROLS

12 | P a g e
Equipment Major or lost Heavy and unsafe
Dead testing of guest rooms
falling from time injury to equipments like
height head, legs, arms drills will be cord to
or internal prevent falls.
organs

Improper use of Eye injury, cuts, PPE will be used


tools Hand injury Tools must be used
in accordance with
manufacturer's
instructions

Suitable eye
Eye injury protection to be
worn where there is
Dust, Particles a risk of eye injury,
Goggle when
H-17.01

drilling.

PPE will be used as


Ear injury and appropriate, i.e.
Noise hearing problems

Scaffold to be
constructed to avoid
gaps where materials
Injury to may fall through
persons, During erection,
Falling objects
working or
dismantling of the
scaffold workers
shall not be worked
in the area directly
below the

Adverse weather Injury to If there is high wind


conditions persons, and storm work to
be suspended

13 | P a g e
Only trained
Major or lost .
Unauthorized time. Injury to
access head, legs, arms
or internal
organs

Injury, Shock Un authorised not


effect allowed, when press
TEST be sure
Shock
nobody can touch
the wire.

10- RESPONSIBILITIES

Trade Contractor Electrical Works Chief Engineer will be responsible for ensuring that the workers involved in the
task are familiar with the requirements of this method statement. A site H&S Inspector will be assigned to check
on the work in order that the correct safe working practices are being followed and that all necessary precautions
have been fully implemented.

11-ATTACHMENT

Electrical shop drawing

14 | P a g e