Risk Assessment/JHA Form

: SheetPile Driving and uninstalling Project / Site location: RWI

work: Involved: civil


Depatment
of steelsheetpileslnstallation/uninstallation
Job Supervisor: Ali Yawiz 07818835709
Localized Shutdown: n Requiredn NotRequired H&s Supervisor: Mohammed zeki o7go3g4g2oo
Date: 7-10-2018 Sub-contractor: I MpD scop] Ref No: KRP_HSE_JHA_2018_
actor supervisor: Han-sung Jung Mobile: 07809150316 Rev No:
HDGSK HSE Plan and safety procedures are to be followed at all times.

Minimum PPE to be worn at all times,

l-his JHA to be available at all points of work - operatives must be informed of this JHA and
understand the risks involved in the works.
safety condition
irements: Tool box talk / pre-job brief to be given at the staft of each work shift and before starting a new task
or activity.

Summer and Ramadan working hours changes are to be observed and details posted at worksite.

Paramedical or ambulance facilities to be available.


Minimum PPE required: Hard hat, safety glasses or goggles, hi-viz jacket, overalls, gloves, safety shoes
LSlikelihood/Frequency E - Environmental
Consequence: H - Health
CSSeverityofconsequence S _ Safety

is criteria:
.Severky'
. Insignificant (1) Minor (2) Moderate (3) Major (4) Catastrophic (5)
2 '3 4 5
1 ' 8,r.i r,::r - r 1$:.: q. ,..
I 4 6 ':',,

6 9, 12, ',,:

4 8 ,12,
5 10
ffi Extreme Risk (E) Activity must not proceed in current form.
Activity must be modified to include further control measures and be subject to detailed
2 Hish Risk (H)
HSE dept. assessment.
Activity can proceed subject to appropriate direct and continuous supervision and/or
Moderate Risk (M)
task modification.
No action required. Activity can proceed subject to compliance with the specified control
Low Risk ((L)
measures.
tor Likely- Frequency Probability
Environment ,,,,
Health and Safety,. 1. ,.. :
nt Continuous or will happen frequently. Occurs several times a year at location. 5
Occurs several times a year in slmilar
n 5 - 12 times per year.
industries in Iraq
4

Y 1 - 5 times per year. Has occurred at least once in Iraq 3


le Once every 5 years. Has occurred in industry (Worldwide), 2
Less than once every five years Never encountered in industry. 1
Cohsequence Seveiity
Environment r, Flealth ahd Safety
i
t , ,,,,
Long term severe / permanent impact on
phic Multiple fatalities
ecosystem 5

Significant widespread impact on


r Fatality 4
ecosystem
ate Signifi cant localized impact on ecosystem Serious injuries - off site medical treatment 3
r Minor changes to ecosystem Injuries - on site medical treatment 2
Insignifi cant occasional changeto
cant Minor injuries -first aid 1
ecosystem

Consequence 1't Risk Assessment 2"a Risk Assessment


Activities Hazards Control Measures
(E/H/S) (High/Moderate/Low) (High/Moderate/Low)
(Due
Preparation towork Hand & leg injuries Injuries M l.Issuing permitto L HSE
work(PTW).
at steel part Propefi
damage 2.All workers involved in
the work operation to
wear the approved PPE.
3. Checkground Supe
condition
before work. Fore

4. Use competent
rigger, flagman
and operator (
have ceftificate
3,a party ).

5. Check lifting
gear

6, Ensure the area


must be cleared

7, Fire extinguisher
to be near of
working area

8. Make properand
good barricade
for lifting zone
il ConductTBM

l!All workers
involved in the
workoperation
to wear the
approved PPE.

S Training workers in
manual techniques

E Injury during boom E Goodcommunication&


mounting coordination system to be HSE
established
C
Machinery/Equipment ii Injury during erecting
Personal
Mounting Operations level bracing system High U Rigger shall attained to
Injuries Supe
and guide installation ware all PPE, be ceftified
U Injury or fatality due to
and distinguished from
sliding or fall down of Fore
the other workers.
the driving machine
E Visuallycheck hydraulic
hoses for damage
deterioration as start of
each shift

14 Special care shall be


takenduring cutting &
welding, correctand
efficient PPE must be
used
W Personnel awareness of
objects that could strike
the body or result in a
whole body pinch point
type ofinjury
Body Injury
M To conductvisual
Lifting Sheet Pile il Steel Pile fall off due Machine and High checks to ensure all loose M
Pieces to a mechanicalfail property materials are removed
damage and for possible
mechanical fails

S Lifting gear must


frequently be checked
undamaged

DriveSheetPiles il Injury/fatality due to Body Injury High - All workers M HSE


driving machine works involved in the
Machine and workoperation C
id Falling off steel casing property to wear the
during installation. damage approved PPE Supe

fi oitspitl Fore
Il Extreme wind conditions. Hearing - Qualified Workerto
impairment be required.
ll Simultaneous
activities(Inteface) fire and - Inspect tool priorto
of other workers in explosion process
area which
- Set up barrier and
exposes additional
warning signs.
danger of workers
being injured - communicating with
crane by qualified
rigger only.

- Fire extinguisher
to be near of
working area

-Workers around the


driving machine wear
ear protection kit
- Set up barrier and
warning signs.

- Inspected & certified


Crane and liftlng gear
with color coded

- Licensed &
authorized operator &
Crane to be
confirmed.

- Rigging with
communicating for
crane by qualified
rigger only.

- Conducted TBM and


sharing information
with direct involved
workers.

- All workers involved Supe


Injury Inthe work operation
H
- Health Hazards/Heat to wear the approved
Fatality Eng
WorkArea M PPE.
Stress (if required)
Damage Com
- Area around the
steel part
working operation Ri
and the lifting activity
to weld to be properly
barricaded.

- No one will be
allowed under
suspended unload.

- Lifting will be
closely supervised by

competent people in
attendance.

- Assigned
Competent Rigging
Supervisor and
Riggers.

- Follow relevant
HDGSK-JV HSE
procedure
Using PowerTools Electrical shock 1-Multiple M S Proper cable Cons
fatality management such as
Sparks electric proof type of
2- fire and hanger
Noise explosion
3- Hearing E Do not use supe
impairment damaged tool and
cable

E Fire extinguisher tobe


near of workingarea

E Tool and cable shall be


inspected andcolure
code

I only trained /
competent persons will
be authorized to work on
power tools

8lr/earing full PPE

I Hearing protection

E follow relevant HDGSK-


JV HSE procedure
Work at height Fall of person from height Injury .Conduct TBM prior M Cons
to startwork
Fall of materials from Multiple
height Fatality E Issuing permit to work.
supe
fi Install edge protection

ft Secured harness to be
worn

fi Ensure staffs have been


adequately trained

ft Installed fall protection


for working at heightsuch
like a guard rail or life line

I follow relevant HDGSK-


JV HSE procedure
Trauma FootInjury Injury M 1) Situational
awareness,
Inhalation Health gloves,
hazards protective
clothing.

2) Wearsafety
shoes.

3) Weardust
mask if
needed.

B Notice:

i, This JHA/RA developed as a standardized example .discipline engineer/ supervisor should review the JHA,/M for each specific work and add additional
applicable hazard , control measures before issue the final JHA/RA .