@ The daily target according to Afpm in April 2021 is 976,500.00 kWh.
@ CFK#1 & #2 Stop (Forced Outage) because the coal stock is not enough
Page |2
2. CFK #3
Unit CFK #3
NOTE :
Export Target kWh 32,750,000.00
AFpm % 90.97222
• Achievement of
Ea kWh 18,108,974.00
Qi kWh 18,107,311.00 AFa is lower than
DCH kWh 14,864,909.00 AFpm so DCH is
AFa % 91.58950
calculated
• if the results of
calculations with
DCH, the
achievement of
AFa is greater
than AFpm then
AFa is equal to
AFpm
NOTE :
@ The daily target according to Afpm in April 2021 is 1,091,666.67 kWh
@ at 06:01 WITA April, 21 CFK #3 Stop (Forced Outage) because the coal stock is not enough
@ at 12:13 WITA April, 22 CFK #3 synchronized back to the PLN grid
@ Derating because the coal stock is not enough
- from 08:00 WITA 20 April to 06:01 WITA 21 April, and
- from 17:00 WITA 29 April to 17:00 WITA 30 April
@ Daily target not achieved on April because load decreasing by PLN