You are on page 1of 2

Constrruction Suppervision CContractor

Xe-PianXXe-Namnoy Hydroelectric PPower Project


  Site Office (Mainn Camp), Pakxong District,
D Champasaak Province, LAO P.D.R
P

Ourr Ref. PN HPP/P1471/O


H OE/20389

Julyy 29, 2020

TRA ACTEBEL Engineering S.A.


Ta-OOdd Villagee (Ban Ta-O
Odd)
Pakkxong Distriict14001
Chaampasak Proovince
LAO O P.D.R

Atteention: M Christian
Mr. n BAUDOU
UX , Chief Resident
R En
ngineer

Subbject: N
No-objection
n for thee As-built Drawingss for 22 kV Power and
C
Communica
ation (Exterrior rev-2)

Refference: EP
PC’s Ref No.
N TSO-AR
RC-090-4-20
019 dated Ju
uly 10, 202 0

Deaar Sir,

Wee received thhe As-built drawings foor 22 kV Po


ower and Co
ommunicatiion (Exterio
or rev-
2), attached to EPC’s letteer referred aabove, We have
h review
wed and hadd no-objectio
on to
thee as-built draawings;

We are submittting our com


mment for yyour consideeration and approval.

In ccase of any queries


q pleaase do not hhesitate to co
ontact us.

Youurs sincerelyy,

Sirichai Aryuwwat
Projject Directoor

Encclosed :

SA//ss

 
Cc: Mr. Joon Seok Park, Chief Operating Officer, PNPC
Mr. Kim Jae-Ki, Civil Team Leader, PNPC
Mr. Dong Seok Song, E&M Team Leader, PNPC
Mr. Kwan Yong Choi, Project Director, SK E&C

You might also like