Task utility Work type Issue Area of Requested Description of work Jop Start Date Finish Date Work

ork Jop Start Date Finish Date Work Status


It was done
No# work by priority by

Installation Admin Facility Closing the administrative


1 Workshop Work Order work bulding manegar building air conditioning gap normal 20/01/2021 23/01/2020 Completed Emad/Tahsin

İnstallation Ups room cooling water


2 Workshop Work order work
Ups room Utility
pipeline insulation normal 20/01/2021 30/01/2021 Completed utility team

Installation Opening the area where the Mustafa /


3 Workshop Work order work
Ups room Gshassan Ups room ventilation pipes normal 23/01/2021 25/01/2021 Completed
will pass Halid

Arrangement of factory
4 Workshop Work order Arrangement Security Security
security door normal 23/01/2021 Countines Emad/Tahsin

The resin tank with


treatment, the chrome filter Tahsin/ sidal
5 Workshop Work order Maintenance Aro utility tank after the carbon filter critial 23/01/2021 25/01/2021 Completed
tank, all filters were changed team
and maintained.

heat exchanger connection


İnstallstion Facility
6 Workshop Work order work utility manegar between chiller and cooling critial 23/01/2021 26/01/2021 Completed
tower utility team
Machine 5 raw material silos Mustafa /
7 Workshop Work order Arrangement Machine 5 production flow pipe revised critial 25/01/2021 25/01/2021 Completed
Halid
chiller and cooling tower mustafa /
8 Workshop Work order cleaning utility utiltiy cleaning normall 26/01/2021 26/01/2021 Completed
Halid
Chiller and tower water
9 Workshop Work order Maintenance production production adjustments were made for critial 24/01/2021 26/01/2021 Completed
all machines.
utility team
İnstallation Facility
10 Workshop Work Order work Ups room manegar ups room fire fitting system critial 26/01/2021 30/01/2021 Completed utility team

Forklift ramp construction to


11 Workshop Work Order İnstallation warehouse Bulent be used in raw material normal 27/01/2021 2/2/2021 Contunies Emad/Tahsin
work Cetinkaya
container unloading

12 preform machine paint


Workshop Work Order Broken item production Mehdi Koc apparatus argon welding critial 30/01/201 30/01/2021 Completed Mustafa

13 Bulent Transport of mobile crane in


Workshop Work Order warehouse Cetinkaya warehouse area normal 30/01/2021 30/01/2021 Completed utility team
Wheeled platform
14 installation Ahmet construction for the cover
Workshop Work Order work production Gurbay machine area normal 30/01/2021 31/01/2021 Contunies Emad/Tahsin