26 Weekly Rep MEW 4
26 Weekly Rep MEW 4
on Mechanical Equipment of Boiler 12B and Distiller D3 Executed Contract No.: ME/EW/MC/3495/2006-2007
29-Nov-2009 - 25-Dec-2009 Planned 12B/D3
% Nov'09 Dec'09 Jan'10
No. Task description Remarks
done 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6
Page No.: 1
Shuwaikh Water Production Station - Annual Maintenance Works 17 March 2023
on Mechanical Equipment of Boiler 12B and Distiller D3 Executed Contract No.: ME/EW/MC/3495/2006-2007
29-Nov-2009 - 25-Dec-2009 Planned 12B/D3
% Nov'09 Dec'09 Jan'10
No. Task description Remarks
done 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6
DISTILLER VALVES
No. Location of Distiller Valves Valve Details Nos. Prog Remarks No. Location of Distiller Valves Valve Details Nos. Prog Remarks
3 Isol. Stop S-11 4" GT g g 46 Dist. Rec. to 22nd Stage HC-422V 10" BFL g g
PIC-624V Ejector Steam Press.
4 Isol. Stop S-13 4" GT g g 47 Dist. Rec. to 23nd Stage HC-423V 10" BFL g g
Secondary Red.
5 By-pass S-15 4" GT g g 48 Isol. 18" BFL g g
6 Stop S-6 6" GT g g 49 Level to Distillate LRC-425 Isol. 18" BFL g g replaced
Atomizing Steam
7 Stop S-7 6" GT g g 50 By-pass 16" BFL g g
8 Stop S-8 6" GT g g 51 Isol. 6" BFL g g
9 Stop S-8 6" GT g g 52 Isol. 6" BFL g g replaced
10 Stop S-9 6" GT g g 53 Distillate Pump Minimum Flow FC-423V By-pass 4" BFL g g
Atomizing Steam Strainers
11 Stop S-9 6" GT g g 54 Drain 2" GLB g g
12 Strainer STR 6" ST g g 55 Drain 2" GLB g g
13 Strainer STR 6" ST g g 56 Outlet of Distillate Pump NRV 14" NRV g g
14 Stop S-10 4" GT g g 57 Outlet of BBDPp/Disch. NRV B-6 20" NRV g g
15 Stop S-10 4" GT g g 58 Outlet of BRPp/Disch. NRV 62" NRV g g
Stop valves for Control Valve HC-625V
16 Stop S-14 4" GT g g 59 Drain B-122 4" GLB g g
Brine Heater
17 By-pass S-12 4" GLB g g 60 Drain B-122 4" GLB g g
18 Stop C11 4" GT g g 61 Inlet to Heater Drain Pump Isolating 10" BFL g g
19 Stop valves for Control Valve TRC-602V Stop C-12 4" GT g g 62 Isolating C-15 6" BFL g g
20 By-pass C-13 4" GT g g 63 Condensate to Blow Down HRC-701V Isolating C-15 6" BFL g g
21 By-pass C-8 4" GT g g 64 By-pass 4" GLB g g
22 Stop C-9 4" GT g g 65 Isolating D-9 18" BFL g g
Distillate to Blow Down, AIRC-425V
23 Stop C-9 4" GT g g 66 Isolating D-9 18" BFL g g
24 Desuperheater Water Strainers Stop C-10 4" GT g g 67 Distillate to Blow Down D-91 18" BFL g g
25 Stop C-10 4" GT g g 68 Condensate Blow Down C-16 6" GT g g
26 Strainer STR 4" ST g g 69 Drain B-1 6" GLB g g
27 Strainer STR 4" ST g g 70 Flash Chamber Drains Drain B-2 6" GLB g g
28 Drain B-124 2" GB 27 g g 71 Drain B-3 6" GLB g g
29 Water Box Valves Vent B-125 1" GB 27 g g 72 Stop 30" BFL g g
30 Sampl. 1/2" GT 27 g g 73 Stop 30" BFL g g
31 Isol. S-17 6" GT g g repaired 74 Stop 30" BFL g g
Make Up Strainers
32 Isol. S-17 6" GT g g repaired 75 Stop 30" BFL g g
33 Vent to 2nd Stage Ejector HC-633V, HC- Isol. S-17 6" GT g g 76 Strainer STR 30" ST g g
34 634V Isol. S-17 6" GT g g 77 Strainer STR 30" ST g g
35 Strainer STR 6" ST g g 78 Stop S-18 4" GT g g
Starting Ejector
36 Strainer STR 6" ST g g 79 Strainer STR 4" ST g g
37 Isol. Stop EJE1 12" GT g g 80 Ejector Condenser Drain trap g g
38 Isol. Stop EJE2 12" GT g g 81 Stop Valve before Desuperheater HC-605V 44" GT c c During C-S/D
39 Stop S-16 6" GT g g 82 Stop 8" GT g g
Primary Ejector
40 Stop S-16 6" GT g g 83 Valves for LC-602 Stop 8" GT g g
41 Strainer STR 6" ST g g 84 By-pass 6" GT g g
42 Strainer STR 6" ST g g 85 Isolating D-8 18" BFL g g
Distillate line
43 HC-624V 6" GT g g 86 NRV D-7 18" NRV g g
Steam to Main Ejector
44 Strainer STR 6" ST g g 87 V7 10" GT g g
45 Brine Heater Vent Evap. Vent HC-607V 4" GT g g 88 V8 12" GT g g
Vent system
89 V14 14" GT g g
90 V15 12" GT g g
Total Unit 6 ( 3 Boiler 12 A,12 B,12 C & 3 distiller D1, D2,D3)with this
recarbonate plant Emu tank ,gas scurruber ,Culvert area intake and
out take , Jetty Area,( Time period - 11 hour / day - 120 day )( 2
Engineer and 29 labours involved in this work by arvind human
resources )
Page No.: 2