Bidding Document
Content Requiring
QUERY NO. Reference(s) (Section Clarification Points of Clarification Required
Number/Page Number)
General Is the project LEED coodinated? Do we need to use LEED approved materials
1 Requirements/Page 1 LEED and consumables.
2 General Temporary Utilities Provision of Tapping points for temporary power supply/water supply for the
Requirements/Page 1 use of Contractor.
General
3 Requirements/Item /Page Permits Mechanical Permit, PTO Permit
1
General Requirements / Do we need Material Submittals for GI Sheets, Grilles & Diffusers and others
4 Material Submittals
Material Requirement for approval?
5 Equipment Installation Electrical Works Electrical Contractor shall provide Wiring and Circuit Breaker (for Tapping
/Fans & Blowers Point) within two (2) meters from Mechanical Equipments
Equipment Installation
Does the Mechanical Contractor will provide Loose Controller/VFD to
6 /Fans & Blowers / Electrical Works Mechanical Equipments including wirings, roughing-ins, consumables.
Bid 1 & 2
- The first proposal is for the horizontal ducting works for FAD, TEAD & EAD at
9th Floor, EAD works for 12th Floor at Organic Chem Lab, Genchem 1&2 only.
Based on plan April 28, 2023
- There are no risers available on site except FAD & EAD near Elevator so
Mechanical Works/ another proposal is made for vertical ducting works which are 10 Risers from
8 Ducting Works / Ducting Works 9th floor to Roofdeck and 2 Riser from 12th Floor to Roofdeck. This include
Bid 1 & 2 the new four (4) risers included in the release plan dated July 27, 2023
- Work not included are as follows; FAD works for 10th Floor Dent Tech Lab
- Is this correct?
Mechanical Works/
9 Architectural Works Ceiling Height - The ceiling height for all areas?
Mechanical Works/Page 1
10 Testing and Commissioning Is there any Third Party involved?
/ Bid 1 & 2
General
11 Requirements/Page 1 / Elevator Is it ok to use elevator for hauling of materials?
Bid 1 & 2
Equipment Installation / -Is the fumehood for 12th Floor Organic Chem Lab 3 Owner Supplied?
12 Fumehood
Bid 2 '- If it is then will just be connecting it at the duct installed