You are on page 1of 1

PROJECT NUMA (NU Mall of Asia)

LOCATION Pasay City


SUBJECT MECHANICAL WORKS (DUCTING) - QUERIES
CONTRACTOR Lenwon Air Systems Corp.
DATE: July 31, 2022

Bidding Document
Content Requiring
QUERY NO. Reference(s) (Section Clarification Points of Clarification Required
Number/Page Number)

General Is the project LEED coodinated? Do we need to use LEED approved materials
1 Requirements/Page 1 LEED and consumables.

2 General Temporary Utilities Provision of Tapping points for temporary power supply/water supply for the
Requirements/Page 1 use of Contractor.
General
3 Requirements/Item /Page Permits Mechanical Permit, PTO Permit
1

General Requirements / Do we need Material Submittals for GI Sheets, Grilles & Diffusers and others
4 Material Submittals
Material Requirement for approval?

5 Equipment Installation Electrical Works Electrical Contractor shall provide Wiring and Circuit Breaker (for Tapping
/Fans & Blowers Point) within two (2) meters from Mechanical Equipments

Equipment Installation
Does the Mechanical Contractor will provide Loose Controller/VFD to
6 /Fans & Blowers / Electrical Works Mechanical Equipments including wirings, roughing-ins, consumables.
Bid 1 & 2

Is there BMS for the building,


Equipment Installation BMS/FDAS for Equipments will not be in the scope of Mechanical Works
7 /Fans & Blowers / Electrical Works
Bid 1 & 2 but Contractor provided Loose Controller/VFD should be BMS Ready for
Auxiliary and Monitoring

- The first proposal is for the horizontal ducting works for FAD, TEAD & EAD at
9th Floor, EAD works for 12th Floor at Organic Chem Lab, Genchem 1&2 only.
Based on plan April 28, 2023

- There are no risers available on site except FAD & EAD near Elevator so
Mechanical Works/ another proposal is made for vertical ducting works which are 10 Risers from
8 Ducting Works / Ducting Works 9th floor to Roofdeck and 2 Riser from 12th Floor to Roofdeck. This include
Bid 1 & 2 the new four (4) risers included in the release plan dated July 27, 2023

- Work not included are as follows; FAD works for 10th Floor Dent Tech Lab

- Is this correct?

Mechanical Works/
9 Architectural Works Ceiling Height - The ceiling height for all areas?

Mechanical Works/Page 1
10 Testing and Commissioning Is there any Third Party involved?
/ Bid 1 & 2

General
11 Requirements/Page 1 / Elevator Is it ok to use elevator for hauling of materials?
Bid 1 & 2

Equipment Installation / -Is the fumehood for 12th Floor Organic Chem Lab 3 Owner Supplied?
12 Fumehood
Bid 2 '- If it is then will just be connecting it at the duct installed

- Is the item will be done by the Mechanical Contractor?


Mechanical Works/Page Block-out and Restoration
13 Works including - if it will be by the Mechanical Contractor, Cost for all Concreting Works
5/ Bid 2 Waterproofing (Chipping, Restoration, including Waterproofing) will be added in the Bill of
Quantities

Prepared by:

Lenwon Air System Corp.