1.0 Purpose: The purpose of this procedure is to explain the process to be followed in CSG during service call from customer.
CSG
We promise to deliver a Gold standard Customer Service
3.0 Abbreviations
CSG
We promise to deliver a Gold standard Customer Service
Start
Yes
2 3.2 4
1 No
CCO receive complaint from customer , SDE assign the channel partner SDE/CP CRO call back the customer to Reschedule
confirm appointment and update in system Appointment ?
determine type of complaint & log service (Dealer/SA/ESA) for queued calls, if
ticket. ST is auto assigned to concerned it's not assigned by CCO in StarServ
stakeholders as per product registered portal Yes
data (SDE/CP) for all departments.
4.2 4.3
For product not registered cases, ST is No 4.1 Yes
auto assigned to concerned stakeholders OTP is sent to Customer. CP CRO First Time ? CP authorized
based on department masters. receive OTP & enters in the system change
*Refer StarServ Call management
process manual for more details
5.2
5 6
Yes Customer Appointment Technician/CE is assigned based
OTP Verified ?
time updated on the appointment time
No
5.1 7.2 7
No changes done No
Technician/CE is re- Technician/CE
assigned by Dealer accepts?
CRO/Manager/SDH
Yes
7.1
Technician/CE visits site, responds to the
customer request and update the ST status to
‘Work started’ in StarServ Mobile App/web
CSG
We promise to deliver a Gold standard Customer Service
10
No
CCO Receive cancellation request in 8.3
StarServ Technician/CE completes work at site
12.2 System initiates product registration for not 2. Provision for adding a additional
12 mob no(Temporary), on which the
No Notification to SDE along registered products
Customer OTP will be sent, same will be
Confirmation ? with reason for non
recorded for analysis
cancellation
Yes Not reachable
3. ESA Payout to be generated based
12.3
12.1 Update Customer Not
Call Cancellation SMS to be Reachable and then cancel
sent to Customer the call. Send SMS to
customer on call cancellation
13
SDE validate 5# of FSR reports randomly of
each channel partner in a month for
End
compliance. CSQA also verify FSR reports
randomly. Refer Penalty guideline for Fake
reports for actions on Fake/incorrect
closures.
14
SDE reviews call tickets daily and monitor
CP performances for CSI, RT, TAT, Call
closure as per SLA & initiate appropriate
actions if required.
End
5.2. Breakdown Calls - Compressor replacement / Gas Charging Approval Process for Room AC’s, Refrigeration products & Cold rooms
CSG
We promise to deliver a Gold standard Customer Service
Post call closure by CP/CE, SDE/SC/SDH check closed call in StarServ, verify and approve these claims by
updating below remarks by EOD.
CCO re-open the ST if work is not completed or work done For Gas Leakage call: I have verified Gas leakage via On-line Video chat with Technician from customer
but problem not resolved / customer not satisfied. Fake place. Gas leakage was from Flare nut/Pipe Joint/Coil, as diagnosed by Soap bubble method. Attached
claim (Work not completed) details is shared daily to Video clearly shows Gas leakage joint diagnosed by Soap Bubble method, along with Machine Model
SDE/SC/SDH/AM in email. Number/Serial no. This claim is approved or rejected (Rejection reason can be mentioned as Poor
SDH/AM verify and revert same
day with action plan for work not workmanship/Repeat issue etc.)
completed ST’s. Warning cum For Compressor replaced call: I have verified Defective Compressor parameters via On-line Video chat
penalty letter is issued from with Technician from customer place. Compressor Diagnosis Format is attached, and it clearly shows that
SDH/AM to Channel partner with Compressor has poor pumping/High Amp/Noise/Earth etc. (mention which defect is there). Attached Video
penalty of Rs. 5000 for Fake claim clearly shows defective compressor parameters along Model no/Serial of old and New compressor and
cases (Work not completed). Machine Model Number/Serial no. This claim is approved or rejected.
*It’s responsibility of AM to deduct the compressor claim during ESA monthly pay-out for video not attached
*Claims will be processed for CCO ST’s in StarServ portal.
confirmed/validated cases & * Refer process flow 5.3 Compressor Testing Process with Jig - Room AC’s & Refrigeration Products
rejected claims will be removed
from ESA pay-out
5.3. Breakdown Calls : Compressor replacement Approval Process for Chillers & CAD products - SCROLL-SY 300, SCROLL-SM 185-4RM, SCROLL 3
Ph/50Hz ZR72KC-TFD-52E & SCROLL ZR144KF-TFD-522 Compressors
End
Channel Partner (CP)/ Chiller Engineer (CE) SDE/ SDH / AISDH MCO
CSG
We promise to deliver a Gold standard Customer Service
Start
2
1 Yes Scroll comp. No
CP Technician/CE diagnose Compressor defect as per Scroll
failure - SY 300 /
2.1
7 4
SDE visit customer site & verify as 3
per Scroll compressor diagnosis MCO receive material requests
checklist / 5 points validation (5PV) in StarServ portal
3
CP Technician/CE upload recorded online video call chat /
video, compressor Diagnosis report against StarServ Service 6
ticket.
8
*Refer 6.3 Procedure & Annexure 8.0 for video 8
uploading screenshot
5 MCO process MR as per StarServ MR/RMR process
4 Post Online Video Chat / Site visit for SY300/SM 185 failure, only after verifying SDE & branch SDH/AISDH
CP/CE request compressor / required SDE approve compressor claim/request by providing approval comments in ST for scroll compressor
material in StarServ as per MR process requests - ZR72KC-TFD-52E / ZR144KF-TFD-522 & 9
comments in StarServ ST as mentioned in 6.3 procedure
SDE & AISDH approval comments in ST for scroll
compressor requests - SY300 / SM 185-4RM
6.2
6.1 Branch SDH verify & approve
AISDH verify & approve compressor claim/request by
compressor claim/request by providing comments in StarServ ST
providing comments in
StarServ ST *AISDH verify & approve during
branch SDH not reachable/leave etc.
9
CP Technician/CE receive required materials, rectify
the call & close the service ticket through StarServ
Mobile App
5.4. Compressor Testing Process with Jig - Room AC’s & Refrigeration Products (Single Phase compressors only with Electrical Failures)
End
AM /SDE / Channel Partner ( Dealer/SA/ESA ) AM/SSG/Div
CSG
We promise to deliver a Gold standard Customer Service
Compressor testing Jig is issued to branch Area Manager (AM). AM will allocate it to respective SDE/Service
Co-ordinator (SC) for verification purpose of single phase compressors only with Electrical failures
2
Area Manager will select Top 5 no’s of highest compressor consumption CP(ESA’s/Dealers). Concerned SDE will
visit to these ESA/Dealers/SA as per journey cycle to verify 100% defective compressors of these channel
7
partners by using compressor testing jig, before dispatching to RPC or SDE will visit RPC and check the
If Senior technician of any ESA, hired to support in this activity, WO
defective compressor with compressor testing jig. SDE can take help of any senior technician from any other
to be issued to ESA @ Rs 20/- per compressor based on report
ESA for this activity. *Refer Compressor testing SOP using Jig & back to back vendor wty. Claim process.
shared with SSG/Div/RM.
*SDE & Technician will be trained by SSG for compressor diagnosis.
3
SDE will note down all parameters of all defective compressor as per attached Diagnosis format
& also verify the Compressor format attached by ESA in StarServ at time of Call closure. End
4.1
4 SDE/SC will educate ESA & concerned Technician for correct
Yes fault diagnosis of compressor. SDE/SC will take support of
Defective comp. SSG to re-train ESA/Dealer Technician if required. SDE/SC
is found OK ? will make consolidated report as per attached format and get
this signed by ESA/Dealer owner.
No
4.2
SDE/SC will inform ESA to send all defective compressor to RPC with proper packing along with
properly filled Defective tag. Compressor ports should be sealed properly so that compressor oil
should not come out during transportation from ESA place to RPC. With Defective compressor
relay/OLD/Capacitor need to send to RPC.SDE will ensure this activity is completed during his visit.
* Defective compressor received at RPC will be scrapped as per policy.
6.0 Procedure
CCO receive complaint from customer , determine type of complaint & log service ticket. ST is auto assigned to concerned stakeholders as per product registered data (SDE/CP) for all
departments. For product not registered cases, ST is auto assigned to concerned stakeholders based on department masters. *Refer StarServ Call management process for more details.
SDE assign the channel partner (Dealer/SA/ESA) for queued calls, if it's not assigned by CCO in StarServ portal
If CP/SDE accepts ST, SDE/CP CRO call back the customer to confirm appointment and update in system. If CP/SDE not accept ST, ST reassigned to Branch / Division wise SDH/SDE to
CSG
We promise to deliver a Gold standard Customer Service
6.2 Breakdown Call - Compressor replacement / Gas Charging Approval Process for Room AC’s, Refrigeration products & Cold rooms
CP Technician diagnose Gas leakage/Compressor defect w.r.t. the ST and will show to SDE/Service Co-ordinator(SC) via On-line Video Chat & also confirm to SDE/SC/SDH that these
Defects are shown to customer.
* Gas leakage joint (coil,Valve,Pipe) is diagnosed thru Bubble soap method.
* Compressor defect like Compressor high Amp reading, Poor pumping reading, Earthing resistance, High sound readings measured in DB meter and parameters to be mentioned in
Compressor diagnosis Format
Post Video Chat, SDE/SDH/SC approve gas leakage / compressor claim. SDE/SDH/SC can also verify with customer on-spot (If required).
CP request compressor / required material in StarServ as per MR process.
MCO receive material requests in StarServ portal.
MCO call & verify with customer for the Compressor requests received in 52 & 58 dep’t for confirmation before MR processing.
*Monthly report shall be published from MCO Head once in a month in branch/dep’t wise.
If conformed, MCO process MR’s as per StarServ MR/RMR process. If not conformed, MCO reject the compressor requests for non-conformed cases and inform to the concerned SDE/SDH
with cc to AM/Regional CSQA for actions.
CP Technician rectify the call with required materials, capture gas leakage/Compressor defect in Video along with product and compressor model/serial no and attach this Video in StarServ
during closing of Service ticket. *Refer Annexure 8.0 for video uploading screenshot. Technician also attach compressor Diagnosis format in StarServ portal for compressor replacement
calls. CP/CE fill in Compressor failure data collection format (Excel sheet format attached) for each compressor failure and share the data on a weekly basis to SDE/SDH/SC.
CP Technician collect payment (If applicable) from customer as per rate card and give payment receipt mentioning break up different components. While call closing CCO/Technician will
mention same amount in StarServ.
Post call closure by CP, SDE/SDH check closed call in StarServ, verify and approve these claims by updating below remarks by EOD.
For Gas Leakage call: I have verified Gas leakage via On-line Video chat with Technician from customer place. Gas leakage was from Flare nut/Pipe Joint/Coil, as diagnosed by Soap bubble
method. Attached Video clearly shows Gas leakage joint diagnosed by Soap Bubble method, along with Machine Model Number/Serial no. This claim is approved or rejected (Rejection reason
can be mentioned as Poor workmanship/Repeat issue etc.)
CSG
We promise to deliver a Gold standard Customer Service
CCO do happy calling within 24 hr of call closing and take appropriate action based on VOC
CCO re-open the ST if work is not completed or work done but problem not resolved / customer not satisfied. Fake claim (Work not completed) details is shared daily to SDE/SDH/AM in
email.
SDH/AM verify and revert same day with action plan for work not completed ST’s. Warning cum penalty letter is issued from SDH/AM to Channel partner with penalty of Rs. 5000 for Fake
claim cases (Work not completed).
*Claims will be processed for CCO confirmed/validated cases & rejected claims will be removed from ESA pay-out
6.3 Breakdown Call: Compressor replacement Approval Process for Chillers & CAD products - SCROLL-SY 300, SCROLL-SM 185-4RM, SCROLL 3 Ph/50Hz ZR72KC-TFD-52E &
SCROLL ZR144KF-TFD-522 Compressors
CP Technician/CE diagnose Compressor defect as per Scroll compressor diagnosis checklist / 5 points validation (5PV) and will show to SDE/SDH via On-line Video Chat (What’s up Video
call) along with unit model and serial number for approval.
Online Video Chat approval process for compressor replacement:
i. CP Technician / Chiller Engineer give video call through What’s up to SDE/SDH.
ii. CP Technician / Chiller Engineer record the Online video call chat if option available in mobile phone. (If option not available, post online video call chat to capture Compressor defect
in Video along with product and compressor model/serial no, 5PV check).
iii. CP Technician / Chiller Engineer show the Unit serial number to SDE (Outdoor in case of DSA & VRF & Indoor in case of DPA) which should match with service ticket.
iv. CP Technician / Chiller Engineer show the below mentioned 5 point validation (5PV) check to SDE & it needs to be captured / covered during online video chat.
1. Incoming supply voltages (RY, YB, BR, RN, YN & BN)
2. Continuity between Compressor's terminals and between terminal & ground / body
3. Condition of safety protections like LP, HP, SPPR, CCH. Exp Valve (Thermal bulb location)
4. Suction & Discharge pressure while idle condition & compressor starting time along with current measurement
5. Conditions of Evaporator & Condenser coils
V. CP Technician / Chiller Engineer show the Compressor defect like Compressor high Amp reading, Poor pumping, Earthing resistance, Pressures, High sound readings measured in DB
meter and parameters to be recorded in Compressor diagnosis Format. Also confirm to SDE/SDH that compressor Defects are shown to customer.
If Scroll compressor failure is SY 300 & SM 185-4RM, SDE visit customer site & verify as per Scroll compressor diagnosis checklist / 5 points validation (5PV) as above mentioned.
CP Technician/CE upload recorded online video call chat / video, compressor Diagnosis report against StarServ Service ticket.
*Refer Annexure 8.0 for video uploading screenshot
CP/CE request compressor / required material in StarServ as per MR process.
Post Online Video Chat / Site visit for SY300/SM 185 failure, SDE approve compressor claim/request by providing below comments in StarServ ST .
CSG
We promise to deliver a Gold standard Customer Service
For SY300 & SM 185-4RM, AISDH verify & approve compressor claim/request by providing comments in StarServ ST.
For ZR72KC-TFD-52E / ZR144KF-TFD-522, Branch SDH verify & approve compressor claim/request by providing comments in StarServ ST
*AISDH verify & approve during branch SDH not reachable/leave etc. based on request from SDE.
CP Technician/CE receive required materials, rectify the call & close the service ticket through StarServ Mobile App.
Scroll Compressor Online Video Chat / SDE Site Visit SDE Approval Branch SDH Approval AISDH Approval MCO Verification for
Scroll compressor for SDE, Branch
diagnosis report verification SDH/AISDH approval
comments in ST
No
ZR72KC-TFD-52E / (*To approve if branch
Yes No Yes Yes Yes
ZR144KF-TFD-522 SDH is in leave/not
reachable)
6.4 Compressor Testing Process with Jig for Room AC’s & Refrigeration Products (Single Phase compressors only with Electrical Failures)
Comp testing Jig is issued to branch Area Manager (AM). AM will allocate it to respective SDE/Service Co-ordinator (SC) for verification purpose of single phase compressors only with
Electrical failures
CSG
We promise to deliver a Gold standard Customer Service
Sl. No. Document / Record Name Format No. /Doc. Owner Retention Period
CSG
We promise to deliver a Gold standard Customer Service
Compressor
Check sheet 1.pdf
8.0 Annexure:
i) Compressor Video upload in ST_Attachments
CSG
We promise to deliver a Gold standard Customer Service
Sl.
Revision details Rev.no Date Effective from
No.
1 New SOP release 0 13.03.13
Process flow update on StarServ processes,
2 Compressor replacement & Gas charging process 1 01.03.21 3.03.21
based on CFT recommendation for UPSD
Process flow update on StarServ processes,
3 Compressor replacement & Gas charging process 2 30.03.21 10.04.21
based on CFT recommendation for CPSD