Name of Employee: JUAN DELA CRUZ Name of Rater: ESTELA B. SUSVILLA, Ph.D
Position: PSDS Position: Assistant Schools Division Superintendent
Review Period: JUNE 2016-MARCH 2017 Date of Review: MAY 2017
School/Division: MANDAUE CITY DIVISION
To ensure full implementation of the articulated curriculum towards improvement in the quality of learning outcomes, provision of quality learning and teaching resource materials; and PROVIDE Technical assistance to schools in the areas of curriculum implementation and instructional supervision, SIP implementation and access to basic/functional literacy skills
To provide strategic and technical inputs towards the full implementation of the articulated basic education curriculum to suit the conditions and context of the locality; and direct and manage the work of the CID team and provide technical assistance to the schools in line with the curriculum and learning management.
Library/Mini-library/
a. Library/Mini-library/ Reading Nook
Reading Nook
o. Signages Signages
School perimeter
p. School perimeter fence
fence
a.teacher porfolio containing observation
Teachers' Portfolio
reports
b. School Professional Plan for
SPPD
Development (SPPD) 5-Indicator was performed
excellently with complete
c. LAC Activities supporting documents for a LAC Report
1. Provided
technical specific indicator/ task
June to March 7.5% 4- With 5-100% of the IL Task was Peer Mentoring and
assistance to d. Peer Mentoring and Coaching
complete supporting provided/given to teachers Submitted reports of Coaching Report
teachers
documents for a specific 4- 80-99% of accomplishments:
indicator/ task but quality is the IL Task was 5- In-Set Records and
e. In-Service Training (IN-SET)
from 80-99% provided/given to teachers submitted days ahead of Reports
3-With complete 3- time/schedule CI Records,
III. HUMAN
f. CI Activities supporting documents for a 60-79% of the IL Task was Outputs and
RESOURCE
specific indicator/ task but provided/given to teachers 4- submitted a day before Reports
MANAGEMENT
Performed RPMS processes among quality is from 60-79% schedule time
AND
school personnel with the following as 2- 40- 3- Submitted on
DEVELOPMENT Performance
evidences: 2- With 59% of the IL Task was time/schedule
1. performance contract incomplete supporting provided/given to teachers 2. submitted after the Contract
documents for a specific 1- deadline
2.. performance evaluation results in indicator/ task and quality is below 40% of the IL Task 1- Did not
RPMS Evaluation
2. Performed prescribed tools from 40-59% was provided/given to submit report
Report
RPMS processes 1-With teachers
June to March 7.5%
among school incomplete supporting
personnel documents for a specific Performance
3. Performance feedback and results indicator/task and quality is Feedback Results
below 40%
Scholl Form 9
Scholl Form 10
a. Checked daily
lesson plans of all the 5 - Achieved specific
teachers. Cat 5 4 3 2 1 objective
Cat 5 with
4 97.50
3 2to 1 Cat 5 4 3 2 1
Pts. Pts. Pts. Pts. Pt. Pts. Pts. Pts. Pts. Pt. Pts. Pts. Pts. Pts. Pt.
ExS 30 25 20 15 10
100% complete
ExS 30 25 20 15
and 10 ExS 30 25 20 15 10
b. Observed classes BS 25 20 15 10 5 accurate
BS 25 supporting
20 15 10 5 BS 25 20 15 10 5
monthly MS 15 12 9 6 3 documents
MS 15 12 9 6 3 MS 15 12 9 6 3
S 10 8 6 4 2 SS 10 8 6 4 2 SS 10 8 6 4 2
5-
c. Checked implementation Submitted reports 6 to
of the remedial instruction 4 - 5- Utilized 50% and below 10 days ahead of
every quarter across Achieved specific objective of the alloted resources time/schedule
learning area. with 86.26 to 97.49%
complete and accurate
Performed 4- Utilized 51% to 4-
supporting documents
99% of the alloted Submitted 1 to 5 day
instructional 3- Achieved resources 3- Utilized before schedule time
supervision to 15.0% specific objective with
the alloted resources 3-
achieve learning 75.00 to 86.24% complete
and accurate supporting 2 - Utilized 1- Submitted on
outcomes 25% more than the alloted time/schedule
documents
documents
5-
Submitted reports 6 to
4 - 5- Utilized 50% and below 10 days ahead of
PERFORMANCE INDICATORS (Quality, Efficiency, Timeliness)
TIMELIN WEIGHT Achieved specific objective of the alloted resources time/schedule
KRA's OBJECTIVES SPECIFIC OBJECTIVES
E PER KRA with 86.26 to 97.49%
complete QUALITY
and accurate EFFICIENCY TIMELINESS
Performed 4- Utilized 51% to 4-
d. Provided CGs, TGs, LMs, supporting documents
99% of the alloted Submitted 1 to 5 day
instructional to all teachers and learners 3- Achieved resources 3- Utilized before schedule time
supervision to across all learning areas. 15.0% specific objective with
the alloted resources 3-
achieve learning 75.00 to 86.24% complete
and accurate supporting 2- Utilized 1- Submitted on
outcomes 25% more than the alloted time/schedule
documents
e. Recommended localized resources 2-
curriculum (Mother Tongue 2- Achieved specific
objective with 37.50 to 1 - Utilized more than 25% Submitted after the
based for instruction) across of the alloted resources schedule/deadline
all laerning areas. 74.99% complete and
accurate supporting
documents 1- Did not submit
f. Formulated intervention report
programs for learners 1- Achieved specific
g. Practiced equitable
development across all objective with below
distribution of teaching
learning areas. 37.50% complete and
loads. accurate supporting
documents
Provided safe and child-friendly learning and school environment for students/le
Established a functional: 5 - Achieved specific
objective with 97.50 to 100%
complete and accurate
a. supporting documents
Library/Mini-library/ Reading 5-
Nook Submitted reports 6 to
4 - 5- Utilized 50% and below 10 days ahead of
Achieved specific objective of the alloted resources time/schedule
with 86.26 to 97.49%
complete and accurate 4- Utilized 51% to 4-
Established facilites for supporting documents 99% of the alloted Submitted 1 to 5 day
5 - Achieved specific
objective withPERFORMANCE
97.50 to 100% INDICATORS (Quality, Efficiency, Timeliness)
TIMELIN WEIGHT
KRA's OBJECTIVES SPECIFIC OBJECTIVES
E PER KRA
complete and accurate
supporting documents
QUALITY EFFICIENCY 5-
TIMELINESS
Submitted reports 6 to
b. School Canteen 4 - 5- Utilized 50% and below 10 days ahead of
Achieved specific objective of the alloted resources time/schedule
with 86.26 to 97.49%
complete and accurate 4- Utilized 51% to 4-
Established facilites for c. School Clinic supporting documents 99% of the alloted Submitted 1 to 5 day
safe and child-friendly 3- Achieved specific
II. LEARNING
learning and school
June to
objective with 75.00 to
resources 3- Utilized before schedule time
ENVIRONMENT
environment for d. Guidance Office March
86.24% complete and the alloted resources 3-
students/learners accurate supporting 2- Utilized 1- Submitted on
documents 25% more than the alloted time/schedule
e. Principal's Office 2- Achieved specific resources 2-
objective with 37.50 to 1- Utilized more than 25% Submitted after the
74.99% complete and of the alloted resources schedule/deadline
f. Handwashing Facilities accurate supporting
documents 1- Did not submit
1- Achieved specific
objective with below 37.50%
report
g. Comfort Rooms
complete and accurate
supporting documents
h. HE Rooms 5 - Achieved specific
objective with 97.50 to
10.0% 100% complete and
i. ICT Facilities/ workshop accurate supporting
rooms with utilization plan documents
5-
Submitted reports 6 to
j. Safe playground 4 - 5- Utilized 50% and below 10 days ahead of
Achieved specific objective of the alloted resources time/schedule
k. Interactive Park (Math with 86.26 to 97.49%
park, Science park and complete and accurate
4- Utilized 51% to 4-
Established facilites for others. supporting documents
99% of the alloted Submitted 1 to 5 day
safe and child-friendly 3- Achieved
II. LEARNING
learning and school
June to resources 3- Utilized before schedule time
l. Print rich environment specific objective with
ENVIRONMENT
environment for
March the alloted resources 3-
75.00 to 86.24% complete
students/learners and accurate supporting 2- Utilized 1- Submitted on
documents 25% more than the alloted time/schedule
m. Gulayan sa Paaralan
resources 2-
2- Achieved specific
objective with 37.50 to 1 - Utilized more than 25% Submitted after the
n. Waste segragation (3Rs) of the alloted resources schedule/deadline
74.99% complete and
accurate supporting
documents 1- Did not submit
o. Signages report
1- Achieved specific
objective with below
37.50% complete and
p. School perimeter fence accurate supporting
documents
Established facilites for safe and child-friendly learning and school environment for students/le
Provided technical assistance in the
establishment/ conduct/ preparation of:
5-
a.teacher porfolio containing 5 - Achieved specific objective with
observation reports 97.50 to 100% complete and Submitted reports 6 to
accurate supporting documents 5- Utilized 50% and below 10 days ahead of
b. School Professional Plan for
of the alloted resources time/schedule
Development (SPPD) 4 - Achieved specific
objective with 86.26 to 97.49%
complete and accurate supporting
4- Utilized 51% to 4-
III. HUMAN c. LAC Activities documents 99% of the alloted Submitted 1 to 5 day
3- Achieved
RESOURCE Provided technical June to
7.5% specific objective with 75.00 to
resources 3- Utilized before schedule time
MANAGEMENT AND assistance to teachers March 86.24% complete and accurate the alloted resources 3-
DEVELOPMENT d. Peer Mentoring and
Coaching
supporting documents
2- Utilized 1- Submitted on
2- Achieved specific objective with 25% more than the alloted time/schedule
37.50 to 74.99% complete and resources 2-
accurate supporting documents
e. In-Service Training (IN- 1- Utilized more than 25% Submitted after the
SET) 1- Achieved specific objective of the alloted resources schedule/deadline
with below 37.50% complete and
accurate supporting documents
1- Did not submit
report
RESOURCE Provided technical June to
7.5% specific objective with 75.00 to
resources 3- Utilized before schedule time
MANAGEMENT AND assistance to teachers March 86.24% complete and accurate the alloted resources 3-
DEVELOPMENT supporting documents
2- Utilized 1- Submitted on
2- Achieved specific objective with 25% more than the alloted time/schedule
PERFORMANCE INDICATORS (Quality, Efficiency, Timeliness)
KRA's OBJECTIVES SPECIFIC OBJECTIVES
TIMELIN WEIGHT 37.50 to 74.99% complete and resources 2-
accurate supporting documents
E PER KRA
1- Utilized more than 25% Submitted after the
1- Achieved
QUALITY specific objective of the alloted resources
EFFICIENCY schedule/deadline
TIMELINESS
with below 37.50% complete and
accurate supporting documents
1- Did not submit
f. CI Activities
report
5 - Achieved specific
1. With clear financial objective with 97.50 to
management system for the 100% complete and
school supported by accurate supporting
evidences such as reports, documents
account logs, database 5-
system Submitted reports 6 to
4 - 5- Utilized 50% and below 10 days ahead of
2. Achieved specific objective of the alloted resources time/schedule
Allocated/prioritized funds for with 86.26 to 97.49%
Performed data-based programs and school complete and accurate
4- Utilized 51% to 4-
strategic planning and facilities improvement and supporting documents
V. SCHOOL 99% of the alloted Submitted 1 to 5 day
performed School maintenance 3- Achieved
LEADERSHIP
Leadership and 3. Reported
June to
10.0% specific objective with
resources 3- Utilized before schedule time
MANAGEMENT AND
Management and sources and uses of funds
March the alloted resources 3-
OPERATIONS 75.00 to 86.24% complete
Operations functions with and accurate supporting 2- Utilized 1- Submitted on
school supported by accurate supporting
evidences such as reports, documents
account logs, database 5-
system
PERFORMANCE INDICATORS (Quality, Efficiency,Submitted
Timeliness)reports 6 to
KRA's OBJECTIVES SPECIFIC OBJECTIVES
TIMELIN WEIGHT 4- 5- Utilized 50% and below 10 days ahead of
2. E PER KRA Achieved specific objective of the alloted resources time/schedule
Allocated/prioritized funds for with 86.26QUALITY
to 97.49% EFFICIENCY TIMELINESS
Performed data-based programs and school complete and accurate
4- Utilized 51% to 4-
strategic planning and facilities improvement and supporting documents
V. SCHOOL 99% of the alloted Submitted 1 to 5 day
LEADERSHIP
performed School maintenance
June to
3- Achieved resources 3- Utilized before schedule time
Leadership and 3. Reported 10.0% specific objective with
MANAGEMENT AND
Management and sources and uses of funds
March the alloted resources 3-
75.00 to 86.24% complete
OPERATIONS 2- Utilized 1- Submitted on
Operations functions with and accurate supporting
evidences: 25% more than the alloted time/schedule
documents
resources 2-
2- Achieved specific
4. Ensured quality objective with 37.50 to 1- Utilized more than 25% Submitted after the
standards for facilities given of the alloted resources schedule/deadline
74.99% complete and
to the school accurate supporting
5. documents 1- Did not submit
Coordinated with report
1- Achieved specific
stakeholders on resource objective with below
mobilization 37.50% complete and
accurate supporting
documents
5 - Achieved specific
objective with 97.50 to
100% complete and
accurate supporting
10.0% documents
5-
Submitted reports 6 to
4 - 5- Utilized 50% and below 10 days ahead of
Achieved specific objective of the alloted resources time/schedule
with 86.26 to 97.49%
Performed data-based complete and accurate
4- Utilized 51% to 4-
strategic planning and supporting documents
V. SCHOOL 6. Maintained school EMIS 99% of the alloted Submitted 1 to 5 day
performed School 3- Achieved
LEADERSHIP
Leadership and
and regularly submit SMEA June to resources 3- Utilized before schedule time
specific objective with
MANAGEMENT AND
Management and
reports to the Division Office March the alloted resources 3-
OPERATIONS on time 75.00 to 86.24% complete
Operations functions with and accurate supporting 2- Utilized 1- Submitted on
evidences documents 25% more than the alloted time/schedule
resources 2-
2- Achieved specific
objective with 37.50 to 1 - Utilized more than 25% Submitted after the
of the alloted resources schedule/deadline
74.99% complete and
accurate supporting
documents 1- Did not submit
report
1- Achieved specific
with 86.26 to 97.49%
Performed data-based complete and accurate
4- Utilized 51% to 4-
strategic planning and supporting documents
V. SCHOOL 6. Maintained school EMIS 99% of the alloted Submitted 1 to 5 day
performed School 3- Achieved
LEADERSHIP
Leadership and
and regularly submit SMEA June to PERFORMANCE resources (Quality,
INDICATORS 3- Utilized
Efficiency,before schedule time
Timeliness)
specific objective with
MANAGEMENT
KRA's AND OBJECTIVES
Management and
reports to theOBJECTIVES
SPECIFIC Division Office TIMELIN
March WEIGHT the alloted resources 3-
OPERATIONS on time
E PER KRA 75.00 to 86.24% complete
Operations functions with and accurate supporting 2- Utilized 1- Submitted on
QUALITY EFFICIENCY TIMELINESS
evidences documents 25% more than the alloted time/schedule
resources 2-
2- Achieved specific
objective with 37.50 to 1 - Utilized more than 25% Submitted after the
of the alloted resources schedule/deadline
74.99% complete and
accurate supporting
documents 1- Did not submit
report
1- Achieved specific
objective with below
37.50% complete and
accurate supporting
documents
Performed data-based strategic planning and performed School Leadership and Management and Operations functions with ev
a. Performed additional functions
(Technical Committee/
Chairmanship)
Performed tasks / functions that lead to the attainment of higher learning out
OVERALL RATING
DESCRIPTIVE RATING
PERFORMANCE INDICATORS (Quality, Efficiency, Timeliness)
TIMELIN WEIGHT
KRA's OBJECTIVES SPECIFIC OBJECTIVES
E PER KRA
QUALITY EFFICIENCY TIMELINESS
learning and teaching resource materials; and PROVIDE Technical assistance to schools in the areas of curriculum
ons and context of the locality; and direct and manage the work of the CID team and provide technical assistance to the schools
TARGET
ACTUAL
MOV'S Q E T AVERAGE RATING SCORE
From To
NAT/ GSA
Results
LIS Generated
Report
LIS Generated
Report
LIS Generated
Report
Lesson Plan
Monitoring Report
Cat5 4 3 2 1
Pts. Pts. Pts. Pts. Pt.
ExS 30 25 20 15 10
Class
BS 25 20 15 10 5
Observation
MS 15 12 9 6 3
Report
SS 10 8 6 4 2
Remedial
Instruction Report
TARGET
ACTUAL
MOV'S Q E T AVERAGE RATING SCORE
From To
Report of Learning
Resources Provided
to Teachers
Localization Reprt
(All Learning
Area)
Intervention Report
for Learners
development
Form 7
Child-Friendly
School Survey
CRPU
Cat 5
Manual
4 3 2 1
Pts. Pts. Pts. Pts. Pt.
ExS 30 25 20 15 10
BS 25 20 15 10 5
MS 15 12 9 6 3
SS 10 8 6 4 2
Anti-Bullying
Policy
DRRM
Mobilization Plan
Security Log
Book
School Clubs
Monitoring Report
Advocacy
campaign
materials
CPC Accomplishment
Reports and Records
Library/Mini-
library/ Reading
Nook
TARGET
ACTUAL
MOV'S Q E T AVERAGE RATING SCORE
From To
School Canteen
School Clinic
Guidance Office
Principal's Office
Handwashing
Facilities
Comfort Rooms
HE Rooms
Functional ICT
Facilities/
workshop rooms
with utilization
plan
Safe playground
Interactive Park
(Math park,
Science park and
others.
Print rich
environment
Gulayan sa
Paaralan
Waste
segragation (3Rs)
Signages
School perimeter
fence
Teachers'
Portfolio
SPPD
LAC Report
Peer Mentoring
and Coaching
Report
In-Set Records
and Reports
TARGET
ACTUAL
MOV'S Q E T AVERAGE RATING SCORE
From To
CI Records,
Outputs and
Reports
Performance
Contract
RPMS Evaluation
Report
Performance
Feedback Results
Development
Plan
Mobilization Plan
Brigada Eskwela
Report and
Records
Adopt-A-School
Program
Accomplishment
Report
MOOE
Liquidation
PTA Liquidation
TARGET
ACTUAL
MOV'S Q E T AVERAGE RATING SCORE
From To
Other Funds
Liquidation
(Canteen, Income-
Generating Project
Fund)
School
Improvement
Plan (SIP)
Accomplishment
Report
APP-PPMP
Report
School Form 1
School Form 2
School Form 3
School Form 4
School Form 5
School Form 6
School Form 7
TARGET
ACTUAL
MOV'S Q E T AVERAGE RATING SCORE
From To
School Form 8
School Form 9
School Form 10
Memo/Designation
Order ✘
Memo/Designation
Order
Certification duly
signed by the PSDS
Certificate of
Recognition/
Appreciation
Appropriate
supporting
documents
Certification as
Presenter
Certificate of
Recognition/
Appreciation
OVERALL RATING
DESCRIPTIVE RATING
TARGET
ACTUAL
From To
Part II. C O M P E T E N C I E S
Indicator 1 Self Management
RM CD MD SD RD Rating
1 1. Sets personal needs, goals, and directions toward personal development. ✘
2 2. Undertakes personal actions and behaviors that are clear and purposive and takes into account personal goals and values congruent to that of the organization.
3 3. Displays emotional maturity and enthusiasm for and is challenged by higher goals. 0.0
4 4. Prioritizes work tasks and schedules (through ghantt charts, checklists, etc.) to achieve goals.
5 5. Sets high quality, challenging, realistic goals for self and others.
###
Indicator 2 Professionalism and Ethics ###
RM CD MD SD RD Rating
1 1. Demonstrates the values and behavior enshrined in the Norms of Conduct and Ethical Standards for public officials and employees (RA 6713).
2 2. Practices ethical and professional behavior and conduct taking into account the impact of his/her actions and decisions on others.
3 3. Maintains a professional image: being trustworthy, punctual and regular in attendance, well-groomed and a good communicator. 0.0
4 4. Makes personal sacrifices(reporting to school on Saturdays and Holidays) to meet the organization’s needs.
5 5. Acts with a sense of urgency and responsibility to meet the organization’s needs, improve systems and help others improve their effectiveness.
###
Indicator 3 Result Focus ###
RM CD MD SD RD Rating
1 1. Achieves results with optimal use of time and resources most of the time.
2 2. Avoids rework, mistakes and wastage through effective work methods by placing organizational needs before personal needs.
3. Delivers error-free outputs most of the time by conforming to standard operating procedures correctly and consistently. Able to produce very satisfactory quality of work In terms of usefulness/acceptability and completeness with no supervision
3 required. 0.0
4 4. Expresses desire to do better and frustration at waste or inefficiency. May focus on new or more precise ways of meeting goals set.
5 5. Makes specific changes in the system or in own work methods to improve performance. Examples may include doing something better, faster, at a lower cost, more efficiently; or improving quality, customer satisfaction, morale, without setting any specific goal.
###
Indicator 4 Teamwork ###
RM CD MD SD RD Rating
1 1. Willingly does his/her share of responsibility.
2 2. Promotes collaboration and removes barriers to teamwork and goal accomplishment across the organization.
3 3. Applies negotiation principles in arriving at win-win agreements. 0.0
4 4. Drives consensus and team ownership of decisions.
5 5. Works constructively and collaboratively with others and across organizations to accomplish organizational goals and objectives.
Indicator 5 Service Orientation ###
RM CD MD SD RD Rating
1 1. Can explain and articulate organizational directions, issues and problems
2 2. Takes personal responsibility for dealing with and/or correcting customer service issues and concerns.
3 3. Initiates activities that promotes advocacy for men and women empowerment. 0.0
4 4. Participates in updating of office vision, mission, mandates and strategies based on DepEd strategies and directions.
5 5. Develops and adopts service improvement programs through simplified procedures that will further enhance service delivery.
###
Indicator 6 Innovation ###
H S F L L Rating
1 1. Examines the root cause of problems and suggests effective solutions. Fosters new ideas, processes, and suggests better ways to do things (cost and/or operational efficiency).
2 2. Demonstrates an ability to think “beyond the box”. Continuously focuses on improving personal productivity to create higher value and results.
3 3. Promotes a creative climate and inspires co – workers to develop original ideas or solutions. 0.0
4 4. Translates creative thinking into tangible changes and solutions that improve the work unit and organization.
5 5. Uses ingenious methods to accomplish responsibilities.Demonstrates resourcefulness and the ability to succeed with minimal resources.
###
Indicator7 Leading People ###
RM CD MD SD RD Rating
1 1. Uses basic persuasion techniques in a discussion or presentation e.g., staff mobilization, appeals to reason and/or emotions, uses data and examples, visual aids
2 2. Persuades, convinces or influences others, in order to have a specific impact or effect.
3 3. “Sets a good example”, is a credible and respected leader; and demonstrates desired behavior. 0.0
4 4. Forwards personal, professional and work unit needs and interests in an issue.
5. Assumes a pivotal role in promoting the development of an inspiring, relevant vision for the organization and influences others to share ownership of DepEd goals, in
5
order to create an effective work environment. ###
Indicator 8 People Performance Management ###
RM CD MD SD RD Rating
1Makes specific changes in the performance management system or in own work methods to improve performance (e.g. does something better, faster, at lower cost, more
1
efficiently; improves quality, customer satisfaction, morale, revenues).
2 2. Sets performance standards and measures progress of employees based on office and department targets.
3 3. Provides feedback and technical assistance such as coaching for performance improvement and action planning. 0.0
4 4. States performance expectations clearly and checks understanding and commitment.
5 5 Performs all the stages of result-based performance management system supported by evidence and required documents/forms.
###
Indicator 9 People Development ###
RM CD MD SD RD Rating
1 1. Improves the skills and effectiveness of individuals through employing a range of development strategies.
2 2 Facilitates workforce effectiveness through coaching and motivating/developing people within a work environment that promotes mutual trust and respect.
3 3 Conceptualizes and implements learning interventions to meet identified training needs.
4 Does long-term coaching or training by arranging appropriate and helpful assignments, formal training, or other experiences for the purpose of supporting a person’s
0.0
4
learning and development.
5 Cultivates a learning environment by structuring interactive experiences such as looking for future opportunities that are in support of achieving individual career goals.
###
Tick only one box provided for in each of the objective. Untick item is colored Gray. If correctly done, it will be colored Green and if more than one box were ticked, it will be colored Red. If all the ROWS are colored Green,
you may print this sheet.
Republic of the Philippines
DEPARTMENT OF EDUCATION
Date Date
DEPARTMENT OF EDUCATION
Employee Feedback
1. The RPMS is a tool in improving teachers' quality performances and productivity towards his commitment in teaching.
2. The competencies are designed to help improve perspective towards personal and professional growth, students' quality performances and community linkages.
DEPARTMENT OF EDUCATION
Date CRITICAL INCIDENCE DESCRIPTION OUTPUT IMPACT ON JOB/ ACTION PLAN SIGNATURE OF (RATEE/
RATER)