Package 1 & 2
Contract nos. 6600041347 & 6600042398
A. All Department Managers / Chief Mechanical Construction Manager Adib Raslan 1-Apr-21
should coordinate to Machinery Electrical Construction Manager Essam Dawood 1-Apr-21
and Maintenance Chief to solve
The use of Screw-type this issue.
(“Jubilee”) hose clamps on Concrete work chief Hasan Yilmaz 1-Apr-21
5 Open &
Oxygen/Acetylene hoses Earthwork Chief Efe Berk Kop 1-Apr-21
Repeated
(Unresolved). B. Machinery & maintenance Chief
shall assign competent person to Warehouse Chief Burhanedttin Ozbilen 1-Apr-21
this concern. Machinery and Maintenance Chief Murat Ozenalf 1-Apr-21
Laboratory Chief Ahmet Oz 1-Apr-21
Logistics Department Serdar Atlibatur 1-Apr-21
Deputy of Project Managers Mesut Tesar 1-Apr-21
Civil Construction Manager Yesar Kemal 1-Apr-21
Mechanical Construction Manager Adib Raslan 1-Apr-21
Electrical Construction Manager Essam Dawood 1-Apr-21
Survey Manager Suat Engin Ozkan 1-Apr-21
A. All Department Managers and QA/QC Manager Marwan Abboud 1-Apr-21
Chief should advise to his entire
team to follow the site speed limit HSE Manager Pkg 1 Lee Bueno 1-Apr-21
and other safety driving
Open &
6 SPEEDING (Unresolved). requirements. HSE Manager Pkg 2 Ronnie Dablo 1-Apr-21 Repeated
B. All Department Managers, Chief, Concrete work chief Hasan Yilmaz 1-Apr-21
and site engineers must be a role Earthwork Chief Efe Berk Kop 1-Apr-21
model of the safe driving practices.
Warehouse Chief Murat Ozenalf 1-Apr-21
Machinery and Maintenance Chief Burhanedttin Ozbilen 1-Apr-21
Laboratory Chief Ahmet Oz 1-Apr-21
Logistics Department Serdar Atlibatur 1-Apr-21
Transport Department Abdullah Albalushi 1-Apr-21