8m
300
200
1
M σ E I
= = M =σmax =σmaxZ
I y R ymax.
bd 3 d
Z=2x106 I= ; ymax . = ;
12 2
I bd 2
z= =
ymax . 6
For a S.S. Beam with u.d.l, max.
2 2
wL w×8
BM = = = 8w Nm= 8000w Nmm
8 8
2
BM = σ max . Z = 8000 w
120 × 2000000 = 8000 w
w = 30 , 000 N / m = 30 kN / m
WL W ×8
120 × 2000000 = =
4 4
= 2W Nm = 2000 W Nmm
W = 120 kN 3
• A beam is of square section of side ‘a’.
bending stress is σ
• Find the moment of resistance when the
beam section is placed such that(i) two sides
are horizontal,(ii) one diagonal is vertical. Find
also the ratio of the moment of resistance of
the section in two positions
a/ 2
a a/ 2
a
4
bh 3 a
bd 3 d I = 2× ; ymax . = ;
I= ; ymax . = ; 12 2
12 2 a 3
I bd 2 a 3 2a( )
z= = = 2× 2
3
ymax . 6 6 I 12 a
z= = =
a3 ymax . a 6 2
M1 = σ 2
6
a3
M2 =σ
6 2
M1
= 2
M2
5
Composite beam(Flitched beam)
• Consists of two different materials---eg. Timber
beam reinforced with steel plates at top and bottom
or on sides
timber
steel
Stress distribution
Stress distribution for steel
for timber
In the stress diagram for timber the allowable stress is 9
N/mm2 (maximum in joist)
9
at the level of steel, stress in timber = ×100 = 6N / mm2
150
σ s σ w
We know that =
Es Ew
Es
∴σ s = σ w = 6 × 20 = 120 N / mm 2
Ew
This is the maximum stress in steel
M = M S + M W = σ sZ s + σ wZ w
bd 2 15 × 200 2 5 3
Zs = = = 10 mm
6 6
2 2
bd 200 × 300 6 3
Zs = = = 3 ×10 mm
6 6
M = M S + M W = σ sZ s + σ wZ w
5 6 6
= 120 × 10 + 9 × 3 × 10 = 39 × 10 Nmm
9
BEAM OF UNIFORM STRENGTH
10
• A simply supported beam with symmetrical loading,
BMmax occurs at midspan.
11
A beam is designed in such that every extreme fibre
along the span is loaded to its maximum permissible
stress by varying the cross section, then it is known
as beam of uniform strength
A.
Bending moment at x distance from free end,
2
wx
M = = σ .Z
2 3
20 × 10
w = 20 kN / m = 3
= 20 N / mm
10
14
20kN/m
2.5 m X
176.77 mm
88.38 mm
2 2 2
20 x bd 2 120 × 100 × d
= 120 × → 10 x =
2 6 6
60 x 2 1
d = = x.
12000 200
16
X 20 kN
X 6m
plan
20 kN
300 mm
elevation
17
18
X 20 kN
X 6m
250 mm
plan
20 kN
300 mm
elevation
19
20
260 mm
12
A: Since, the section is 20
unsymmetrical, first the position
N A
of neutral axis has to be found out. 500 mm
8 460
y
180 mm
Portion y, mm Ay
Bottom flange 180 x 20 10 36000
Web 460 x 8 250 920000
Top flange 180 x 20 490 1764000
Top plate 260 x 12 506 1578720
21
22
wl 2
8
23