MOHAMMED ABDI OMER GENERAL CONTRACTOR AND

06/23/2021
WATER WORKS CONTRACTOR

SUBCONTRACT AGREEMENT
This Agreement is made this February day of 15, 2021between Mohammed Abdi Omer
General Contractor and Water Works Contractor (Contractor) and Abebe (Subcontractor).

The work described in Section 1 below shall be performed in accordance with the prime contract
between Contractor and Mohammed Abdi Omer General Contractor and Water Works
Contractor (Owner) and in accordance with all plans, specifications and other contract
documents attached to or incorporated into the prime contract for the project known as Bike
Water Supply and Sanitation Project

The Construction Lender (if applicable) is: Somali Regional State Water Bureau

SECTION 1. SCOPE. Subcontractor agrees to furnish all labor, materials, equipment and other
facilities required to complete the following work in two phases:
 Construction of 200m3 Underground Reservoir #1
 Generator, Guard House & Toilet at BH #1
 Artificial Well at 200m3 Underground RCC #1
 Rectangular Water Cooling Tank #1
 Chlorination Room at 200m3 Reservoir #1
 Ground Reservoir of 1000m3 #1
 Ground Reservoir of 500m3 #1
 Generator, Guard House & Toilet at 500m3 #2
 Construction of Guard House & Toilet at 1000m3 #1
 Artificial Well at Booster Station 500m3 #1

REVISED PRICE FOR BIKE WATER SUPPLY AND SANITATION PROJECT SUB
CONTRACT

1
MOHAMMED ABDI OMER GENERAL CONTRACTOR AND
06/23/2021
WATER WORKS CONTRACTOR

As you have recalled it the total volume of works for the following items of works during our
contract signing period and the actual executed are as follows

Item Item Description Contract Quantity Actual


1 No Hardcore 126M3 143M3
Quantity
2 Lean Concrete 100M2 509.6M2
3 Masonry 355M3 302M3
4 C30 Reinforced Concrete 27.4M3 201.1M3
5 Fix Formwork 0M2 247.8M2
6 Cut, Bend And Fix Re Bars 2600kg 17,066kg
7 Plastering 720M2 843 M2
8 Cement Screed 200M2 483M2
9 Rendering 360M2 298 M2
10 RHS Roof Truss & Purlin 0 347ML
11 EGA Roof Covering 0 601ML

Hence I request you to take those works in to consideration and adjust the total price for
Rectangular Cooling Tank asper the actual volume of works.

Asper the actual Volume of works the Revised labor cost is as shown in the below table

Rectangular Cooling Tank


Item No Item Description Labor Cost
1 Rectangular Cooling Tank 507,116
2 Generator and Guard House and Toilet at BH & 500M3 460,011

2
MOHAMMED ABDI OMER GENERAL CONTRACTOR AND
06/23/2021
WATER WORKS CONTRACTOR

3 River Crossing 75,000


The overall revised cost for the project will be as shown below

D-0.1 CIVIL WORK SUB CONTRACT SUMMARY


Total Variations
S.No Item Description No Rate
Amount
C-1 Ground Reservoir Of 1000m3 1 900,000 900,000
C-2 Ground Reservoir Of 500m3 1 500,000 500,000
Construction Of 200m3 Underground At
C-3 1 400,000 400,000
Cooling Basin
Generator, Guard House & Toilet At BH 100,000
C-4 2 200,000 400,000
And 500m3
Construction Of Guard House & Toilet
C-5 1 139,989 139,989
At 1000m3
Artificial Well At Booster Station 500m3
C-6 2 116,981 233,962
And At 200m3 Underground RCC
C-7 Rectangular Water Cooling Tank 1 507,116 507,116 217,116
C-8 Chlorination Room At 200m3 Reservoir 1 73,946 73,946
 C-9 River Crossing 3 25,000 75,000 75,000
TOTAL ALL 3,230,013 392,116

SECTION 15 SPECIAL PROVISIONS (Includmg unit pricing if applicable) the unit price of
this sub contract is attached at the end of this document.

CONTRACTOR: SUBCONTRACTOR:

________________________________ ______________________________
(Name) (Name)

______________________________ ________________________________

3
MOHAMMED ABDI OMER GENERAL CONTRACTOR AND
06/23/2021
WATER WORKS CONTRACTOR

(Sign) (Sign)

________________________________ ________________________________
(Date) (Date)
NOTE: This document has important legal consequences. Consultation with an attorney prior to
execution of this document is encouraged. Some construction prime contracts may require the
use of specialized provisions not included in this form.