Correct

s Question ans1 ans2 ans3 ans4 Answer Type

Projects, Plant, Workshop,


The Operational Control procedure applies for? Projects Projects, Plant, Workshop Departments, Stores, Yard, Projects, Plant, Workshop, 3 MCQ
Camp Stores, Yard, Camp
1
Who is responsible to ensure that operational control procedures are
identified for all operations and activities associated with significant Project Managers / HOD QHSE Manager Project Managers, Head of Projects managers 4 MCQ
department or his designate
2 HSE aspects.
The purpose of this procedure is to ensure all significant HSE issues
that relate to a particular operation or activity are being t f 1 TFQ
3 appropriately managed

Who is responsible to identify the procedures for the control of Operations Manager QE Manager QHSE Manager Site Project Manager 3 MCQ
processes and activities of operational departments?
4
Who is accountable for the improvements and evaluations of the
QHSE Manager QE Manager Operations Manager HSE Officer 2 MCQ
5 operational procedure?

What ensures the steps and activities for controlling risks are
completed correctly at the right time by right person consistently Operational Control Risk Management HSE Policies Documented Procedure 4 MCQ
6
Operating criteria for PPE requirements, scaffolding requirements etc
should be included in the operational procedure as their absence t f 1 TFQ
leads to increased HSE risks
7
A documented procedure ensuring limitation to specified conditions
or performance standards is referred as? Legal Compliance document Risk Assessment document Contracts document Method Statement document 4 MCQ
8
Project specific method statements should include risk assessment
covering hazards, probability and impacts in specified formats ONLY? t f 1 TFQ
9
What is the content that reflects to be the part of an EIA
a. Impacts, Effects, Receptors
b. Significance ratings
c. Residual Impacts a and c b and d All of the above a and d 3 MCQ
d. Control Measures
10
The intention to conduct quality trainings is to ensure that the
operations they involved are carried out in a controlled manner t f 2 TFQ
without resulting in any risk to health?
11
Who is responsible for managing the maintenance of vehicles and
equipments? Plant department Operations department Both a and b None of above 1 MCQ
12
The purchasing control procedure explains the control measures
when procurement of materials, equipments and services are t f 1 TFQ
involved.
13
Suppliers and sub contractors when involved on project activities
holds the responsibility to provide all procedural documents for t f 2 TFQ
operational control for APC?
14
Expected or Usual state such as day-to-day operating conditions are
referred as? Standard Conditions Working Conditions Normal Conditions Abnormal Conditions 3 MCQ
15
Who is responsible for providing resources required for effective
management of operational control? Project Manager Human Resource Operations Manager Top Management 4 MCQ
16
Select the APC documented procedure that explains the maintenance Maintenance and Control Equipment Management Control Measures for Equipment Maintenance and
procedure procedure procedure Maintenance procedure Control procedure 4 MCQ
17
To check the operations are performed under the controlled
conditions as specified which activity ensures this is followed Preventive Maintenance
Programme Control Measures for Suppliers Inspections and Audits Trainings 3 MCQ