You are on page 1of 26

RBS 6102/6101 &

BBS/BBU/GBF
6102/6101 Installation

Site Installation
Preparation

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 1 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Course Agenda
 Introduction
 RAN System Description and RBS 6000 Survey
 RBS 6102/6101 Technical Data
 BBS/BBU/GBF 6102/6101 Technical Data
 Installation Safety Precautions and Tools
 Site Installation Preparation
 RBS 6102/6101 Installation
 BBS/BBU/GBF 6102/6101 Installation
 Concluding Routines
 Practical Exercises
 Theoretical Assessment and Course Summary

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 2 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Course Objectives
At the end of this module, you will be able to:
 Know some of the requirements for
installing RBS 6102.
 Know some of the requirements for
installing RBS 6101.
 Learn how to interpret Site
Installation Documentation (SID).

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 3 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
RBS 6201 Installation Requirements

NOTE:

* For earthquake installation ** For climate requirements

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 4 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
RBS 6201 Site layout

* For earthquake installation ** For climate requirements *** For maintenance requirements

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 5 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
BBS 6201 Installation Requirements

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 6 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
RBS 6101 Installation Requirements

NOTE:

* For earthquake installation ** For climate requirements

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 7 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
RBS 6101 Site layout

* For earthquake installation ** For climate requirements *** For maintenance requirements

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 8 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Site Installation Documentation

http://internal.ericsson.com/page/hub_globalservices/products/delivery/site_engineering/tools_siteengineering.jsp

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 9 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Site Installation Documentation

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 10 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Site Installation Documentation

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 11 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Site Installation Documentation

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 12 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Site Installation Documentation

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 13 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Site Installation Documentation

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 14 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Site Installation Documentation

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 15 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Site Installation documentation

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 16 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
RBS Site Installation Example

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 17 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Ring Conductor Arrangement

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 18 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Outdoor Grounding System

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 19 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
External Grounding Bar

MBL (>Outdoor Antenna Network Installation)


6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 20 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Running of Feeders on Rubber
Ducts

MBL (Installation of RBS 3106)


6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 21 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Site Conduct

Here are a few small, but essential, matters that we want you
to think of when representing Ericsson in ”the field”;

• When arriving on site, it is good manners to introduce


yourself to the site owner, or an appointed contact person.
Present yourself, co-workers, your mission and the expected
duration of your visit.

Link to the MBL Manners and Etiquette


6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 22 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
WEAR IDENTITY BADGE DON’T SMOKE AT SITE

DON’T EAT OR DRINK AT KEEP THE SITE CLEAN


SITE

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 23 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
Concluding routines
• When you finish the installation, turn on the power to
make the climate units working, to avoid corrosion

• Before leaving site, inform the site owner that you are
leaving. If you need to revisit the equipment then tell the
owner.

• When returning to your office, or depot, report progress to


your manager. If you found faults outside your area of
responsibility, then pass on this information.

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 24 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
There are three keywords that should be reflected in all work done
by Ericsson staff, or Ericsson representatives.

Availability
Social Awareness
Professionalism

Please help us to maintain a good reputation with our customers.


Our business is your business!

6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 25 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05
6/038 13-LZU 108 7642 Uen, Rev C © Ericsson AB 2010 26 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-05