You are on page 1of 103

Summary of submission status for documentation certificate

09/Nov/20

Q'ty
ITP Q'ty Remarks MST Q'ty Remarks SDR Remarks
4G1 4C2

CODE A 34 CODE A 41 CODE A 37 31

Cancelled 0 CODE B 0 CODE B 5 7

In-Progress 5 Cancelled 0 CODE C 2 0

Terminated 1 1

Total submission Q'ty 39 Total submission Q'ty 41 Total submission Q'ty 45 39

Q'ty
MAR Q'ty Remarks NCR Q'ty Remarks AS-Built Remarks
4G1 4C2

CODE A 78 Closed 5 UR-FQ 6 4

CODE B 3 UR-F 8 6

CODE C 1 UR-RLD 6 5

Remaining 24 22

Terminated 1 2

Total submission Q'ty 82 Total submission Q'ty 5 Total submission Q'ty 45 39

Q'ty Q'ty
MIR Remarks IR Remarks
4G1 4C2 4G1 4C2

CODE A 232 247 CODE A 1194 1419

CODE B 3 2 CODE B 1 53

CODE C 0 0 CODE C 1 6

Cancelled 4 0

Total submission Q'ty 235 249 Total submission Q'ty 1200 1478
CLIENT

PROJECT CONTRACTOR

RIYADH METRO PROJECT


Package 3 (Lines 4, 5 & 6)
4G1, 4C2 STATION
Sub-Contract Details :GCS_CNTR-CJV-0902 L4_Fit-out works in 2 shallow UG
stations 4C2 4G1 GULF COOPERATION SYMBOLS CONT. CO. LTD

ISSUANCE OF COMPLETION CERTIFICATE

Purpose: Template of Document Provided for review.

Chainage:
Contents: 1. List of Installation Test Plans
2. List of Material Approval Requests Scope: Architectural Works
3. List of Material Inspection Reports
4. List of Method Statements
5. List of Non Conformance Reports
6. List of Inspection Requests & Reports
7. List of Shop Drawings
8. List of As-Built Drawings

CJV/FAST:

Author Checked Reviewed Approved

Document Change Record:


Revision Date Change Description Author
AA First submission Abdul Qayyum

Page 2 of 103
M3 Riyadh Metro Project Construction Joint Venture CODE A 34

Deliverable Package C CmLot ID: N/A Cancelled 0

1. List of Inspection and Test Plans Component: 39 In-Progress 5

# Document No Document Title Revision RAMPED Review Status Discipline Organisation Description Remarks

1 M3-CJV-ITP-EAR00-GEN-000003 Concrete Screed AA Code A Architectural GEGC Inspection and Test Plan Closed

2 M3-CJV-ITP-EARMF-GEN-000001 Fire Stop Application AB Code A Architectural GEGC Inspection and Test Plan Closed

3 M3-CJV-ITP-EAROO-GEN-000027 Raise Floors Access AA Code A Architectural GEGC Inspection and Test Plan Closed

4 M3-CJV-ITP-EAR00-GEN-000005 Door & Frame - Al-kuhaimi AC Code A Architectural GEGC Inspection and Test Plan Closed

5 M3-CJV-ITP-EAR00-GEN-000010 CAT Ladder & Handrail (Stainless & Galvanized) AB Code A Architectural GEGC Inspection and Test Plan Closed

6 M3-CJV-ITP-EAR00-GEN-000002 Waterproofing-Water Tank AA Code A Architectural GEGC Inspection and Test Plan Closed

7 M3-CJV-ITP-EAR00-GEN-000002 Waterproofing Trench-Wet Area AA Code A Architectural GEGC Inspection and Test Plan Closed

8 M3-CJV-ITP-ESTWP-UGS-000003 Bituminous Waterproofing - ITPS 4.1, 4.2 & 4.3 AA Code A Architectural GEGC Inspection and Test Plan Closed

9 M3-CJV-ITP-EARIF-DEP-000001 Metal Stud & Gypsum Boards AA Code A Architectural GEGC Inspection and Test Plan Closed

10 M3-CJV-ITP-EAR00-GEN-000012 Porcelain Tiles AA Code A Architectural GEGC Inspection and Test Plan Closed

11 M3-CJV-ITP-ECI00-GEN-000006 PLASTERING AC Code A Architectural GEGC Inspection and Test Plan Closed

12 M3-CJV-ITP-GQAQC-T11-000003 Plinth & Upstand Work AB Code A Architectural GEGC Inspection and Test Plan Closed

13 M3-CJV-ITP-EAR00-GEN-000008 Roller Shutter Door AB Code A Architectural GEGC Inspection and Test Plan Closed

14 M3-CJV-ITP-EAR00-GEN-000031 Ticketing Counter AA In-Progress Architectural GEGC Inspection and Test Plan Submitted 11. June. 2020.

15 M3-CJV-ITP-GQA00-M50-000002 Concrete Screed-Crack Repair AC Code A Architectural GEGC Inspection and Test Plan Closed

16 M3-CJV-ITP-EAR00-GEN-000017 Fire & Smoke Curtain AA Code A Architectural GEGC Inspection and Test Plan Closed

17 M3-GEG-ITP-EAR00-GEN-000010 Concrete Stair - Repair AA In-Progress Architectural GEGC Inspection and Test Plan

18 M3-GEG-ITP-EAR00-GEN-000011 Entrance Matt (Floor Grilles) AA In-Progress Architectural GEGC Inspection and Test Plan Submitted 07. Nov. 2020.

19 M3-CJV-ITP-EAR00-GEN-000009 Metal Ceiling System AA Code A Architectural GEGC Inspection and Test Plan Closed

20 M3-CJV-ITP-EAR00-GEN-000011 STEEL GRATINGS AB Code A Architectural GEGC Inspection and Test Plan Closed

21 M3-CJV-ITP-EAR00-GEN-000030 Rubber Tiles AA Code A Architectural GEGC Inspection and Test Plan Closed

22 M3-CJV-ITP-EAR00-GEN-000029 MOVEMENT. EXPANSION JOINTS & FIRE BARRIERS AA Code A Architectural GEGC Inspection and Test Plan Closed

23 M3-CJV-ITP-EAR00-GEN-000021 STAIR NOSING AA Code A Architectural GEGC Inspection and Test Plan Closed

Page 3 of 103
24 M3-CJV-ITP-EAR00-GEN-000022 Demountable Panels AA Code A Architectural GEGC Inspection and Test Plan Closed

25 M3-CJV-ITP-EAR00-GEN-000024 Calcium Silicate Board AB Code A Architectural GEGC Inspection and Test Plan Closed

26 M3-CJV-ITP-EAR00-GEN-000019 Access Panel Installation ( Acces Hatch ) AA Code A Architectural GEGC Inspection and Test Plan Closed

27 M3-CJV-ITP-EAR00-GEN-000023 Anti-Static Membrane AB Code A Architectural GEGC Inspection and Test Plan Closed

28 M3-GEG-ITP-EAR00-GEN-000021 Carpet Tiles AA In-Progress Architectural GEGC Inspection and Test Plan Submitted 07. Nov. 2020.

29 M3-CJV-ITP-EAR00-GEN-000009 Acoustic and Metal Ceiling AB Code A Architectural GEGC Inspection and Test Plan Closed

30 M3-CJV-ITP-EARIF-GEN-000001 WALL EMULSION PAINT AB Code A Architectural GEGC Inspection and Test Plan Closed

31 M3-CJV-ITP-EARIF-GEN-000002 ANTI-DUST SEALANT AB Code A Architectural GEGC Inspection and Test Plan Closed

32 M3-CJV-ITP-EAR00-GEN-000001 EPOXY PAINT AB Code A Architectural GEGC Inspection and Test Plan Closed

33 M3-CJV-ITP-EAR00-ELS-000005 Damp Proofing-Nitoproof 10 AA Code A Architectural GEGC Inspection and Test Plan Closed

34 M3-CJV-ITP-ECI00-GEN-000007 Block Works AF Code A Architectural GEGC Inspection and Test Plan Closed

35 M3-CJV-ITP-EAR00-ELS-000003 BREATHER MEMBRANE - DERMABIT AB Code A Architectural GEGC Inspection and Test Plan Closed

36 M3-CJV-ITP-EAR00-ELS-000004 CAVITY TRAY AB Code A Architectural GEGC Inspection and Test Plan Closed

37 M3-GEG-ITP-ESTWP-UGS-000001 Damp Proofing-Polyethelyne AA In-Progress Architectural GEGC Inspection and Test Plan Submitted 07. Nov. 2020.

38 M3-CJV-ITP-EAR00-GEN-000002 EPDM-Roof Waterproofing AA Code A Architectural GEGC Inspection and Test Plan Closed

39 M3-CJV-ITP-EAR00-GEN-000014 Wall Painting-External AA Code A Architectural GEGC Inspection and Test Plan Closed

Page 4 of 103
M3 Riyadh Metro Project Construction Joint Venture CODE A 78

Deliverable Package C CmLot ID: N/A CODE B 3

2. List of Material Approval Requests Component: 82 CODE C 1

# Document No Document Title Revision RAMPED Review Status Discipline Organisation Description Remarks

1 M3-CJV-MAR-EAR00-ELS-000003 Fiberglass Insulation (IN1) with Breather Membrane (ME1) AA Code A Architectural GEGC Material Approval Requests Closed

2 M3-CJV-MAR-GQAQC-CUT-000050 Fire Stopping System @ Viaduct AA Code A Architectural GEGC Material Approval Requests Closed

3 M3-CJV-MAR-EAR00-ELS-000001 Galvanized Steel Coil Sheet AA Code A Architectural GEGC Material Approval Requests Closed

4 M3-CJV-MAR-EAR00-ELS-000003 Breather Membrance (ME1) AC Code A Architectural GEGC Material Approval Requests Closed

5 M3-CJV-MAR-EAR00-ELS-000004 Galvanized Steel Angle Bars AB Code A Architectural GEGC Material Approval Requests Closed

6 M3-CJV-MAR-EAR00-ELS-000005 Polycarbonate (FF3) AA Code A Architectural GEGC Material Approval Requests Closed

7 M3-CJV-MAR-EAR00-ELS-000006 Fire & Smoke Curtains AE Code A Architectural GEGC Material Approval Requests Closed

8 M3-CJV-MAR-EAR00-ELS-000007 Thermal Insulation (IN1) & (IN2) AD Code A Architectural GEGC Material Approval Requests Closed

9 M3-CJV-MAR-EAR00-ELS-000009 3M Holdfast 70 Spray Adhesive AA Code A Architectural GEGC Material Approval Requests Closed

10 M3-CJV-MAR-EAR00-S30-000009 Galvanized Steel Gratings AC Code A Architectural GEGC Material Approval Requests Closed

11 M3-CJV-MAR-EAR00-ELS-000010 Hilti Impact Anchor HPS-1 AC Code A Architectural GEGC Material Approval Requests Closed

12 M3-CJV-MAR-EAR00-ELS-000011 Solid Rubber Floor Tile (FT7) (Rubber Tiles) AA Code A Architectural GEGC Material Approval Requests Closed

13 M3-CJV-MAR-GQAQC-DEP-000089 (DEPOT) Hollow Metal Door & Frames AA Code A Architectural GEGC Material Approval Requests Closed

14 M3-CJV-MAR-GQAQC-CUT-000073 Galvanized CAT Ladder UGS & BOH AA Code A Architectural GEGC Material Approval Requests Closed

15 M3-CJV-MAR-ECI00-S30-000162 Hilti Anchor HLC AA Code A Architectural GEGC Material Approval Requests Closed

M3-CJV-MAR-GQAQC-GEN-000237
16 Screed Cement (Ready Mix) C25 OPC AA Code A Architectural GEGC Material Approval Requests Closed

17 M3-CJV-MAR-ECI00-S30-000251 Screed C20(OPC+1.2kg fiber, 350kg Cement, 220±40) AA Code A Architectural GEGC Material Approval Requests Closed

18 M3-CJV-MAR-ECI00-S30-000252 Screed C20(OPC+1.2kg fiber, 370kg Cement, 220±40) AA Code A Architectural GEGC Material Approval Requests Closed

19 M3-CJV-MAR-GQAQC-DEP-000090 Gypsum Board,Stud, Runner & Accessories AA Code A Architectural GEGC Material Approval Requests Closed

20 M3-CJV-MAR-EAR00-S30-000013 Gypsum Board,Stud, Runner & Accessories AC Code A Architectural GEGC Material Approval Requests Closed

21 M3-CJV-MAR-EAR00-S30-000004 Vandex Super Crystalline Waterproofing AA Code A Architectural GEGC Material Approval Requests Closed

22 M3-CJV-MAR-EAR00-ELS-000013 Aluminum Stair Nosing AA Code A Architectural GEGC Material Approval Requests Closed

23 M3-CJV-MAR-EAR00-S30-000014 Calcium Silicate Board (CB2 & WB2) AA Code A Architectural GEGC Material Approval Requests Closed

Access doors & frames, ACCESS HATCH (Ceiling, Floor, Delivery & wall access
24 M3-CJV-MAR-EAR00-ELS-000020 AA Code A Architectural GEGC Material Approval Requests Closed
panels)

25 M3-CJV-MAR-EAR00-ELS-000021 Galvanized Hand Rail (BOH) AA Code A Architectural GEGC Material Approval Requests Closed

26 M3-CJV-MAR-EAR00-S30-000002 Galvanized Hand Rail (BOH) AC Code A Architectural GEGC Material Approval Requests Closed

27 M3-CJV-MAR-EAR00-ELS-000016 Raised Floor Access by Polygroup AD Code A Architectural GEGC Material Approval Requests Closed

28 M3-CJV-MAR-EAR00-ELS-000015 Non Shrink Grout (Sika Grout 114) AA Code A Architectural GEGC Material Approval Requests Closed

Paint for Steel Door & Frames-Penguard Primer / Hardtop XP / Penguard Topcoat
29 M3-CJV-MAR-EAR00-ELS-000026 AD Code A Architectural GEGC Material Approval Requests Closed
for Steel doors & Frames

30 M3-CJV-MAR-EAR00-ELS-000017 Stainless steel Straight CAT ladder AA Code A Architectural GEGC Material Approval Requests Closed

31 M3-CJV-MAR-GQAQC-DEP-000087 Acoustic Metal ceiling Panel & Grid System AA Code A Architectural GEGC Material Approval Requests Closed

32 M3-CJV-MAR-EAR00-ELS-000018 Sikafloor level 25 (Levelling Compound) AA Code A Architectural GEGC Material Approval Requests Closed

33 M3-CJV-MAR-EAR00-ELS-000049 Stainless Steel Handrail & Balustrade FOH AB Code A Architectural GEGC Material Approval Requests Closed

Page 5 of 103
34 M3-CJV-MAR-EAR00-ELS-000023 Epoxy Anchoring Resin (Weberanc 405 BFX) AA Code A Architectural GEGC Material Approval Requests Closed

35 M3-CJV-MAR-EAR00-ELS-000024 Jotun Epoxy Filler AA Code A Architectural GEGC Material Approval Requests Closed

36 M3-CJV-MAR-EAR00-ELS-000033 Ticketing Counter Office AA Code A Architectural GEGC Material Approval Requests Closed

37 M3-CJV-MAR-EAR00-ELS-000034 Glass Cladding for Ticketing Counter Office AA Code B Architectural GEGC Material Approval Requests Awaiting for IR Mock Up Approval

38 M3-CJV-MAR-EAR00-S30-000022 Carpet Tiles Discovery Eco Series AC Code A Architectural GEGC Material Approval Requests Closed

39 M3-CJV-MAR-EAR00-ELS-000030 Al-Jazeera Green Silk Flexy AC Code A Architectural GEGC Material Approval Requests Closed

40 M3-CJV-MAR-EAR00-ELS-000042 Stainless Steel wall panel (WP1) For Scalator AC Code A Architectural GEGC Material Approval Requests Closed

41 M3-CJV-MAR-EAR00-ELS-000041 4 Hours Fire Rated Hollow Metal Doors & Frame AD Code A Architectural GEGC Material Approval Requests Closed

42 M3-CJV-MAR-EAR00-ELS-000036 HT Light Duty Metal Anchor AB Code A Architectural GEGC Material Approval Requests Closed

43 M3-CJV-MAR-EAR00-ELS-000037 HHD-S light duty metal Anchors AA Code A Architectural GEGC Material Approval Requests Closed

44 M3-CJV-MAR-EAR00-ELS-000039 Al Jazeera Exterior Paint AA Code A Architectural GEGC Material Approval Requests Closed

45 M3-CJV-MAR-EAR00-ELS-000044 Motorized 4 hours Fire Rated Rolling Shutter Door By Ferco AD Code A Architectural GEGC Material Approval Requests Closed

46 M3-CJV-MAR-ECI00-S30-000294 Anti Static Membrane AB Code A Architectural GEGC Material Approval Requests Closed

47 M3-CJV-MAR-EAR00-S30-000020 Access delivery Hatch by Nystrom AC Code A Architectural GEGC Material Approval Requests Closed

48 M3-CJV-MAR-EAR00-UGS-000004 Fire Rated Demountable Access wall panel AF Code A Architectural GEGC Material Approval Requests Closed

49 M3-CJV-MAR-GQAQC-VIA-000025 Bitumen Emulsion Protective Coating - Nitoproof 10 (FOSROC)  AA Code A Architectural GEGC Material Approval Requests Closed

50 M3-CJV-MAR-EAR00-ELS-000071 Tubular Steel (Bulk Head Saupport) AB Code A Architectural GEGC Material Approval Requests Closed

Committed in GCS scope and it was procure


51 M3-CJV-MAR-EAR00-ELS-000069 Stainless Steel Entrance Floor Mat (Model:-GP34S) (MA1) AE Code C Architectural GEGC Material Approval Requests
by fast

52 M3-CJV-MAR-EAR00-ELS-000048 Webertec epo 430 GRT Plus AA Code A Architectural GEGC Material Approval Requests Closed

53 M3-CJV-MAR-EAR00-UGS-000004 Demountable Access Panel- Blast Resistance AF Code A Architectural GEGC Material Approval Requests Closed

54 M3-CJV-MAR-EAR00-ELS-000076 Expansion , Movement & Fire Barrier AA Code A Architectural GEGC Material Approval Requests Closed

55 M3-CJV-MAR-EAR00-ELS-000052 Weber Col Prime AB Code A Architectural GEGC Material Approval Requests Closed

56 M3-CJV-MAR-EAR00-UGS-000008 Exterior Paint (Al Jazeera Matrix EX, Al Jazeera Primex, Al Jazeera Softex, Al Jazeer AB Code A Architectural GEGC Material Approval Requests Closed

AL JAZEERA EPO Mastic, AL JAZEERA Epoxy Finish, Al JAZEERA Polysteel


57 M3-CJV-MAR-EAR00-ELS-000058 AC Code A Architectural GEGC Material Approval Requests Closed
Gloss & JAZ Epoxy Crack Filler ESP. for HANDRAIL

58 M3-CJV-MAR-EAR00-ELS-000065 Penguard HSP, Penguard Midcoat, Hardtop HP(ZAL) EPOXY PAINT-Jotafloor AA Code A Architectural GEGC Material Approval Requests Closed

59 M3-CJV-MAR-EAR00-ANC-000002 Exterior Paint (Al-Jazeera Extreme, Al-Jazeera Primex, AA Code A Architectural GEGC Material Approval Requests Closed

60 M3-CJV-MAR-ECI00-ATG-000011 Gutter Drain Down Pipe and Accessories (ZAL) AB Code A Architectural GEGC Material Approval Requests Closed

61 M3-CJV-MAR-EAR00-ELS-000073 WEBER Jointseal PU MC Sealant Rev. A AA Code A Architectural GEGC Material Approval Requests Closed

62 M3-CJV-MAR-EAR00-ELS-000080 Stainless Steel Porcelain Tile Strip (Stainless Steel Plate 4mm AB Code A Architectural GEGC Material Approval Requests Closed

63 M3-CJV-MAR-EAR00-ELS-000092 Metal Wall PanelL (WP8)- DE SCOPE AA Code A Architectural GEGC Material Approval Requests Closed

64 M3-CJV-MAR-EAR00-GEN-000007 Stainless Steel Corner Beads BOH AB Code A Architectural GEGC Material Approval Requests Closed

65 M3-CJV-MAR-EAR00-GEN-000008 Weber Floor 535 FD Rev. AA AA Code A Architectural GEGC Material Approval Requests Closed

66 M3-CJV-MAR-EAR00-GEN-000009 Stainless Steel U-Bolt [Lifting Hook for Precast Delivery Hatch AA Code A Architectural GEGC Material Approval Requests Closed

67 M3-CJV-MAR-EAR00-GEN-000011 Stainless Steel Skirting (WF7) AT CER AA Code A Architectural GEGC Material Approval Requests Closed

68 M3-CJV-MAR-EAR00-ELS-000089 Movement Joint & Fire Barrier AD Code A Architectural GEGC Material Approval Requests Closed

69 M3-CJV-MAR-EAR00-ELS-000091 Wood Base Skirting for Carpet AC Code A Architectural GEGC Material Approval Requests Closed

70 M3-CJV-MAR-EAR00-GEN-000014 Tactile EXA - Alfana ( PORCELAINE ) FOR FLOOR AA Code A Architectural GEGC Material Approval Requests Closed

71 M3-CJV-MAR-EAR00-ELS-000057 Aluminum Composite Sandwich Panel AA Code A Architectural GEGC Material Approval Requests Closed

To be submitted by line 6 fast and we use MAR


72 M3-CJV-MAR-EAR00-ELS-000056 Corner Beads ( Porcelaine Tile Accessories ) FOH (By Line 6) AA Code B Architectural GEGC Material Approval Requests # M3-CJV-MAR-EAR00-GEN-000007 WF-
267906 in line 4
Page 6 of 103
73 M3-CJV-MAR-EAR00-GEN-000018 PORCELAIN TOILET TILE 1200 X 600-FOR TOILET AA Code A Architectural GEGC Material Approval Requests Closed

74 M3-CJV-MAR-EGE00-GEN-000011 Sikadur 31 CF SLOW AB Code A Architectural GEGC Material Approval Requests Closed

It's resubmitted by Line 5 - coordinated by Line


75 M3-CJV-MAR-ECI00-S30-000233 Door Hardwares AA Code B Architectural GEGC Material Approval Requests
5

76 M3-CJV-MAR-EAR00-GEN-000043 Ceiling Access Panel at Toilet Room Rev. AA (M3-CJV-MAR-EAR00-GEN-000043) AA Code A Architectural GEGC Material Approval Requests Closed

77 M3-CJV-MAR-EAR00-UGS-000010 SE3 Eterno Adjustable Paving Support with Self Levelling Head ( SR1 ) AB Code A Architectural GEGC Material Approval Requests Closed

78 M3-CJV-MAR-EAR00-UGS-000006 Cladding Stone AA Code A Architectural GEGC Material Approval Requests Closed

79 M3-CJV-MAR-EAR00-UGS-000009 Concrete Paver 600MMX600MMX60MM AD Code A Architectural GEGC Material Approval Requests Closed

80 M3-CJV-MAR-EAR00-UGS-000012 Crashed Aggregate ( Ballast ) AB Code A Architectural GEGC Material Approval Requests Closed

81 M3-CJV-MAR-EAR00-GEN-000013 Skirting Cove Cap ( CF1 ) AA Code A Architectural GEGC Material Approval Requests Closed

82 M3-CJV-MAR-EAR00-GEN-000016 Toilet Accessories AA Code A Architectural GEGC Material Approval Requests Closed

Page 7 of 103
M3 Riyadh Metro Project Construction Joint Venture CODE A 232

Deliverable Package C CmLot ID: N/A CODE B 3

3. List of Material Inspection Requests Component 235 CODE C 0

Location-4G1

RAMPED
# Document No Material inspection request for Elec Mortlock FSE RX-12V, Qty. Document
(10 EA Title
), Elec Mortlock FSE RX-F07 12V, Qty. (12 EA ), Mortise Revision Discipline Organisation Remarks
Review Status
passage EO, Qty. (2 EA ), Lockest F04, Qty. (2 EA ), Mort Store RM-EO, Qty. (4 EA ), Hinge 4BB, Qty. (3 EA ), Single sprink hinge,
Qty. ( 60 EA ), Mort Lock Store Less core, Qty. ( 20 EA ), Motise Exit Device, Qty. (1 EA ), Lever Trim for ED, Qty. (1 EA ), Construction
Core, Qty. (21 EA ), Door Closer Cover for N900, Qty. (1 EA ), Construction Keys, Qty. (3 EA ), Construction Core, Qty. (3 EA ), Hinge -
Heavy Weight, Qty. (9 EA ), Hinge - Heavy weight, Qty. (80 EA ), Hinge 4BB (Heavy Weight, Qty. (123 EA ), Manual Flush bolt-metal,
Qty. (16 EA ), Exteneded Fod, Qty. (6 EA ), Dust proof strike, Qty. (12 EA ), Exit Device, Qty. (1 EA ), Construction core, Qty. (40 EA ), M3-CJV-MAR-ECI00-S30-000233-
229 M3-CJV-MIF-041065 AA B Architectural GEGC
High floor stop, Qty. (16 EA ), Floor door Stop, Qty. (10 EA ), Wall stop, Qty. (8 EA ), Construction core, Qty. (6 EA ), Construction CODE-B
Keys, Qty. (6 EA ), W/Filler bar, Qty. (4 EA ), Mortise Exit device, Qty. (2 EA ), Laver Trim for exit device, Qty. (2 EA ), Closer, Qty. (2
EA ), Door Closer for N900, Qty. (2 EA ), As per AL-KUHAIMI METAL INDUSTRIAL LTD. with Delivery note DN # 201038065,
201038066, 201039732 & 201038290.
Material inspection request for Automatic door bottom, Qty. ( 2 EA ), Automatic door bottom, Qty. (1 EA ), Automatic door bottom, Qty.
( 24 EA ), Automatic door bottom, Qty. ( 2 EA ), Automatic door bottom, Qty. ( 20 EA ), Weatherstrip seals, Qty. ( 2.5 M ), Elec.Hinge
Extra Heavy, Qty. ( 1 EA ), Elec.Hinge Heavy 4 wires, Qty. ( 10 EA ), Elec.Hinge, Qty. ( 17 EA ), Exit Device, Qty. ( 1 EA ), Elect. Lvr
Trm W/Rex-12VDC, Qty. ( 1 EA ), Mortise ED W/REX x 12VDC, Qty. ( 5 EA ), Outside trim for Elec, Qty. ( 5 EA ), Hinge 4BB, Qty. ( 2 M3-CJV-MAR-ECI00-S30-000233-
231 M3-CJV-MIF-041067 AA B Architectural GEGC
EA ), Automatic door bottom, Qty. ( 2 EA ), Automatic door bottom, Qty. ( 14 EA ), Automatic door bottom, Qty. ( 1 EA ) As per AL- CODE-B
KUHAIMI METAL INDUSTRIAL LTD. with Delivery note DN # 201037439, 201038291, 201039104 & 201039105.
Material inspection request for Concealed overhead stop, Qty. ( 15 EA ), Concealed overhead stop, Qty. ( 3 EA ), Automatic door
bottom, Qty. (2 EA ), Meeting STILE , Qty. ( 2 EA ), Magenatic switch, Qty. ( 7 EA ), Door Closer (size 1-6), Qty. ( 28 EA ), Door
Closercover for N900, Qty. ( 28 EA ), Auto Flush bolt (metal), Qty. ( 4 EA ), Mortise ED S005 TS, Qty. ( 1 EA ), Mortise ED
ICMRESC9800, Qty. ( 3 EA ), Flush full (auto flush bolt metal), Qty. ( 4 EA ), Closer w/ss cover, Qty. ( 17 EA ), Automatic door bottom,
M3-CJV-MAR-ECI00-S30-000233-
232 M3-CJV-MIF-041068 Qty. ( 2 EA ), KICK PLATE B4E X CSK, Qty. ( 2 EA ), KICK PLATE B4E X CSK, Qty. ( 2 EA ), KICK PLATE B4E X CSK, Qty. ( 10 EA ), AA B Architectural GEGC
CODE-B
KICK PLATE B4E X CSK, Qty. ( 4 EA ), KICK PLATE B4E X CSK, Qty. ( 20 EA ) As per AL-KUHAIMI METAL INDUSTRIAL LTD. with
Delivery note DN # 201037880, 201037975, 201037441 & 201037711.

Page 8 of 103
M3 Riyadh Metro Project Construction Joint Venture CODEA 247

Deliverable Package C CmLot ID: N/A CODE B 2

3. List of Material Inspection Requests Component 250 CODE C 0

Location-4C2

RAMPED Review
# Document No Document Title Revision
Status
Discipline Organisation Remarks

Material Inspection Request for S27-Handrail-01Pc,Bracket for Stringer Compose of


231 M3-CJV-MIF-031393 12mm Th Plate-144Pcs & Double Stringer Compose of 12mm Th Plate*6Ml -31 Pcs (D.no AA B Architectural GEGC SDR NOT APPROVED
SLSTS-DN-12706/19,10006,7006,8706))  for  4C2 Station Architectural Works .

MATERIAL INSPECTION REQUEST FOR TVM GLASS (D No: 11377 ) for  4C2 Station- COMPLY WITH MAR CRS
247 M3-CJV-MIF-041965 AA B Architectural GEGC
Architectural Work COMMENT

Material inspection request for Corain Glacier White Vanity Counter With GI Tubed ST.
250 M3-CJV-MIF-043644 AA D Architectural GEGC
Support and 6mm Mirror with Marine Plywood Backing

Page 9 of 103
M3 Riyadh Metro Project Construction Joint Venture CODE A 41

Deliverable Package C CmLot ID: N/A CODE B 0

4. List of Method Statements Component: 41 Cancelled 0

RAMPED Review
# Document No Document Title Revision Discipline Organisation Description Remarks
Status

1 M3-GEG-MST-EAR00-ELS-000002 Concrete Screed AB Code A Architectural GEGC Method Statements Closed

2 M3-CJV-MST-EARMF-GEN-000001 Fire Stop Application AB Code A Architectural GEGC Method Statements Closed

3 M3-GEG-MST-EARIR-GEN-000001 Raise Floors Access AC Code A Architectural GEGC Method Statements Closed

4 M3-GEG-MST-EARID-GEN-000001 Door & Frame - Al-kuhaimi AB Code A Architectural GEGC Method Statements Closed

5 M3-GEG-MST-EARST-GEN-000001 CAT Ladder & Handrail (Stainless & Galvanized) AB Code A Architectural GEGC Method Statements Closed

6 M3-GEG-MST-ESTWP-GEN-000001 Waterproofing-Water Tank AB Code A Architectural GEGC Method Statements Closed

7 M3-GEG-MST-ESTWP-GEN-000002 Waterproofing Trench-Wet Area AC Code A Architectural GEGC Method Statements Closed

8 M3-GEG-MST-ESTWP-UGS-000003 Bituminous Waterproofing - ITPS 4.1, 4.2 & 4.3 AB Code A Architectural GEGC Method Statements Closed

9 M3-GEG-MST-EAR00-GEN-000001 Metal Stud & Gypsum Boards AB Code A Architectural GEGC Method Statements Closed

10 M3-GEG-MST-EAR00-GEN-000002 Porcelain Tiles AC Code A Architectural GEGC Method Statements Closed

11 M3-GEG-MST-EAR00-GEN-000003 Plastering AB Code A Architectural GEGC Method Statements Closed

12 M3-GEG-MST-EAR00-GEN-000004 Plinth & Upstand Work AB Code A Architectural GEGC Method Statements Closed

13 M3-GEG-MST-EAR00-GEN-000005 Roller Shutter Door AB Code A Architectural GEGC Method Statements Closed

14 M3-GEG-MST-EAR00-GEN-000006 Black Paint - Ceiling AB Code A Architectural GEGC Method Statements Closed

15 M3-GEG-MST-EAR00-GEN-000007 Ticketing Counter AA Code A Architectural GEGC Method Statements Closed

16 M3-GEG-MST-EAR00-GEN-000008 Concrete Screed-Crack Repair AA Code A Architectural GEGC Method Statements Closed

17 M3-GEG-MST-EAR00-GEN-000009 Fire & Smoke Curtain AB Code A Architectural GEGC Method Statements Closed

18 M3-GEG-MST-EAR00-GEN-000010 Concrete Stair - Repair AB Code A Architectural GEGC Method Statements WF-296036

19 M3-GEG-MST-EAR00-GEN-000011 Entrance Matt (Floor Grilles) AA Code A Architectural GEGC Method Statements Closed

20 M3-GEG-MST-EAR00-GEN-000012 Metal Ceiling System AB Code A Architectural GEGC Method Statements Closed

21 M3-GEG-MST-EAR00-GEN-000013 Steel Grating AC Code A Architectural GEGC Method Statements Closed

22 M3-GEG-MST-EAR00-GEN-000014 Rubber Tiles AB Code A Architectural GEGC Method Statements Closed

23 M3-GEG-MST-EAR00-GEN-000015 Movement, Expansion Joint & Fire Barriers AB Code A Architectural GEGC Method Statements Closed

24 M3-GEG-MST-EAR00-GEN-000016 Stair Nosing AB Code A Architectural GEGC Method Statements Closed

25 M3-GEG-MST-EAR00-GEN-000017 Demountable Panels AB Code A Architectural GEGC Method Statements Closed

26 M3-GEG-MST-EAR00-GEN-000018 Calcium Silicate Board AA Code A Architectural GEGC Method Statements Closed

27 M3-GEG-MST-EAR00-GEN-000019 Access Panel Installation ( Acces Hatch ) AA Code A Architectural GEGC Method Statements Closed

28 M3-GEG-MST-EAR00-GEN-000020 Anti-Static Membrane AB Code A Architectural GEGC Method Statements Closed

29 M3-GEG-MST-EAR00-GEN-000021 Carpet Tiles AA Code A Architectural GEGC Method Statements Closed

30 M3-GEG-MST-EAR00-GEN-000022 Toilet Accessories AA Code A Architectural GEGC Method Statements Closed

Page 10 of 103
31 M3-FSA-MST-EAR00-DEP-000007 Acoustic and Metal Ceiling AA Code A Architectural GEGC Method Statements Closed

32 M3-GEG-MST-EARIF-ELS-000001 Wall Emulsion Paint AB Code A Architectural GEGC Method Statements Closed

33 M3-GEG-MST-EARIF-ELS-000002 Anti Dust Sealant AB Code A Architectural GEGC Method Statements Closed

34 M3-GEG-MST-EARIF-ELS-000003 Epoxy Paint AB Code A Architectural GEGC Method Statements Closed

35 M3-GEG-MST-ESTWP-ELS-000002 Damp Proofing-Nitoproof 10 AA Code A Architectural GEGC Method Statements Closed

36 M3-GEG-MST-ESTMA-ELS-000001 Block Works AB Code A Architectural GEGC Method Statements Closed

37 M3-GEG-MST-EAR00-ELS-000001 Breather Membrane - Dermabit AB Code A Architectural GEGC Method Statements Closed

38 M3-GEG-MST-EAR00-ELS-000003 Cavity Tray AB Code A Architectural GEGC Method Statements Closed

39 M3-GEG-MST-ESTWP-UGS-000001 Damp Proofing-Polyethelyne AC Code A Architectural GEGC Method Statements Closed

40 M3-GEG-MST-ESTWP-UGS-000003 EPDM-Roof Waterproofing AB Code A Architectural GEGC Method Statements Closed

41 M3-GEG-MST-EAR00-UGS-000001 Wall Painting-External AB Code A Architectural GEGC Method Statements Closed

Page 11 of 103
M3 Riyadh Metro Project Construction Joint Venture Closed 5
Deliverable Package C CmLot ID: N/A
5. List of Non Conformance Reports Component: 5

RAMPED Review
# Document No Document Title Revision Discipline Organisation Remarks
Status

1. The delivered unapproved "Fosam Renderoc HS & Construction Solution" repairing materials
for sump pit is different from approved MAR / MST. This is a violation to M3-GEG-MST-ESTWP-
GEN-000001, Section: 7.2.1: Grind or power brush concrete surface to remove all loose particles,
any holes appeared after brushing shall be patch-up with Vandex Unimotar No.1
1 NCR-4G1-001 A Closed Architectural GEGC Closed
2. No method statement for leak repair of fire waater tank and the delivered material for leak
repair is not approved in the Project. (Fosam Renderoc Plug).
3. Application of unapproved Materials (Fosam Renderoc HS & Construction Solution and Fosam
Renderoc Plug) without materials receiving inspection.

1.The delivered unapproved "MASTER FIX 770 adhesive and TRC Lap Sealant -LA60" material
for Waterproofing ump pit is difTerent from approved MAR I MST.
2 NCR-4G1-002 A Closed Architectural GEGC Closed
2. Application of unapproved Materials (MASTERFIX
770 adhesive) without materials receiving inspection.

During surveillance @ site it is observed that material (CRASHED AGGREGATE -BALLAST)


3 NCR-4G1-003 A Closed Architectural GEGC Closed
brought at site is unapproved, it is from unapproved supplier.

Construction Team applying of Metal putty on panel and Hollow Metal door frames without
4 NCR-4G1-004 A Closed Architectural GEGC Closed
Materials receiving Inspection and not informing QC Inspector.

1. The Internal Guardrail materials was delivered without MTC, Galv. Certificate (Repeated
Violation) 2. Site Instruction and several verbal instructions, storage of Coated Guardrail are still
5 NCR-4G1-005 not done in accordance with requirement causing excessive coating damages and dirts A Closed Architectural GEGC Closed
(Repeated Violation) 3. Guardrail / Handrails issued and installed without material receiving
Inspection prior to release for installation (Repeated Violation).

Page 12 of 103
M3 Riyadh Metro Project Construction Joint Venture CODE A 1194

Deliverable Package C CmLot ID: N/A CODE B 1

6. List of Inspection Reports Component 1203 CODE C 1

Location-4G1 Cancelled 4
RAMPED Review
# Document No Document Title Revision Discipline Organisation Remarks
Status

48 M3-CJV-IRF-EAR00-UGS-000040 Visual inspection request for mock-up of Handrail, Concourse level Between Grid (15~16) At 4G1 Station. AA Cancelled Architectural GEGC Cancelled

Visual inspection request for general Mock-up sample of Cladding door installation in CLR3 (B.01),
674 M3-CJV-IRF-EAR00-UGS-001702 AA Cancelled Architectural GEGC Cancelled
Concourse level, 4G1 station for 4G1 and 4C2 Shallow underground station.

Visual inspection request for Installation and 1st coat Painting of stair case handrail (Balustrade & wall
985 M3-CJV-IRF-EAR00-UGS-002294 AA Cancelled Architectural GEGC Cancelled
mound Handrails) at Staircase # 3, 6, 7,8, 16 & 17 @ 4G1 station.

Visual Inspection Requested of Aluminium Framing support Installation for Glass cladding and Corian Ticket
1067 M3-CJV-IRF-EAR00-UGS-002480 AA Cancelled Architectural GEGC Cancelled
counter top (As per highlighted attached drawing) at Ticket office (T.O.-F.01) @ Concourse level

Page 13 of 103
M3 Riyadh Metro Project Construction Joint Venture CODE A 1419

Deliverable Package C CmLot ID: N/A CODE B 53

6. List of Inspection Reports Component 1484 CODE C 6

Location-4C2

RAMPED Review
# Document No Document Title Revision
Status
Discipline Organisation Remarks

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block works Setting out and surface preparation/Rebar
1 AB A Architectural GEGC Inspection Reports
000048 anchorage/Kicker formwork prior to casting of Kickers

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block works Setting out and surface preparation/Rebar
2 AB A Architectural GEGC Inspection Reports
000056 anchorage/Kicker formwork prior to casting of Kickers

M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of Laid Masonry Wall from Grid (7~10) Axis S-V Room
3 AB A Architectural GEGC Inspection Reports
000057 no:T.07 (TPS) at concourse level 4C2 Station

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation, Rebar Anchorage, Kicker from Grid (3~6)
4 AB A Architectural GEGC Inspection Reports
000061 Room no: T.06 (SER), T.04 (PP) at concourse level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of Laid Masonry Wall from  Grid(5~8) Room no: T.01
5 AB A Architectural GEGC Inspection Reports
000062 (LPS1), E.09 (LVMDB1) at concourse level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation/Rebar anchorage/kicker at grid (6~9) Room
6 AB A Architectural GEGC Inspection Reports
000063 no: M.05 (ACR5), E.02 ( ER1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for survey of laid masonry wall from grid(3~6) Room no: T.06
7 AB A Architectural GEGC Inspection Reports
000064 (SER), T.04 (PP) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Block wall from concourse level to upto 3Mt height at grid (6~10)
8 AB A Architectural GEGC Inspection Reports
000065 Room no: T.01 (LPS1), T.07 (TPS) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation/Rebar anchorage/kicker at grid(5~7) Room


9 AB A Architectural GEGC Inspection Reports
000066 no: M.23 (ACR10) ,E.08 (IDF1) at concourse level
Inspection request for surface preparation prior to application of Anti-Dust sealant for
M3-CJV-IRF-EAR00-UGS-
10 ceiling  at grid (6~10) Room no: T.01 (LPS1), T.07 (TPS) at 4C2 Station concourse AB A Architectural GEGC Inspection Reports
000071
level
M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation/Rebar anchorage/kicker at grid(10~11)
11 AB A Architectural GEGC Inspection Reports
000072 Room no: T.02 (LPS2) at 4C2 Station concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for survey of laid masonry wall from grid (6~9) Room no: E.02
12 AB A Architectural GEGC Inspection Reports
000073 (ER1), M.05 (ACR5) at 4C2 Station concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work (2ND Stage) from 3m height up to soffit at grid (06-
13 AB A Architectural GEGC Inspection Reports
000078 08) Room No. T.01 (LPS-1) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work (2ND Stage) from 3m height up to soffit at grid (07-
14 AB A Architectural GEGC Inspection Reports
000079 10) Room No. T.07 (TPS) at Concourse level.

Page 14 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation/Rebar anchorage/Kicker at grid (04~11)
15 AB A Architectural GEGC Inspection Reports
000086 Room no: E.12 (UPS1), T.02 (LPS2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of laid masonry wall from  grid (05~07) Room no: E.08
16 AB A Architectural GEGC Inspection Reports
000087 (IDF1), M.23 (ACR10) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid
17 AB A Architectural GEGC Inspection Reports
000088 (05~07) Room no: E.09 (LVMDB1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid (4~5)
18 AB A Architectural GEGC Inspection Reports
000089 Room no: T.04 (pp),at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid (4~5)
19 AB A Architectural GEGC Inspection Reports
000090 Room no: T.06 (SER), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation/Rebar anchorage/Kicker at grid (10~11)


20 AB A Architectural GEGC Inspection Reports
000091 Room no: M.19 (FWR), T.08 (PSDR) at Platform level

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation, rebar anchorage, Kicker at 4C2 Station grid
21 AB A Architectural GEGC Inspection Reports
000096 (10~12) Room no: B.12 (CLR 3)  at Platform level

M3-CJV-IRF-EAR00-UGS- Inspection request for Survey Of Laid Masonry wall from grid [10-11] Room no. M.19
22 AB A Architectural GEGC Inspection Reports
000097 (FWR), T.08 (PSDR), M.20 (TWC) at platform Level

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation, rebar anchorage, Kicker at 4C2 Station grid
23 AB A Architectural GEGC Inspection Reports
000098 (4-6) Room no: E.12 (UPS1)  at Concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation/Rebar anchorage/Kicker at  4C2 Station


24 AB A Architectural GEGC Inspection Reports
000099 grid (08~13) Room no: M.13 (CWT), M.06 (ACR6), at Concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from platform level up to 3m ht at 4C2 Station Grid
25 AB A Architectural GEGC Inspection Reports
000110 10-12 Room No- 20 (TWC), T.08 (PSDR), M.19 (FWR)

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation, rebar anchorage, Kicker at 4C2 Station grid
26 AB A Architectural GEGC Inspection Reports
000111 (11-14) Room no: E.10 (LVMDB2)  at Concourse Level

M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
27 AB A Architectural GEGC Inspection Reports
000112 Grid (5-7) Room No. M.23 (ACR 10), E.08 (IDF1).

M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
28 AB A Architectural GEGC Inspection Reports
000113 Grid (10-11) Room No T- 02 (LPS 2).

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation, Rebar Anchorage, Kicker from Grid
29 AB A Architectural GEGC Inspection Reports
000114 (12~13) Room no: B.01 (CLR1), E.07 (CER) at concourse level 4C2 Station

M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of Laid Masonry Wall from  Grid (11~12) Room no: B.12
30 AB A Architectural GEGC Inspection Reports
000115 (CLR3), P.17 (LOBBY) at Platform level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of Laid Masonry Wall from  Grid (4~12) Room no: M.06
31 AB A Architectural GEGC Inspection Reports
000116 (ACR1), M.13 (CWT), E-12 (UPS1) & E10 (LVMDB2) at concourse level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block wall [2ND Stage] from 3m height up to soffit at grid
32 AB A Architectural GEGC Inspection Reports
000117 (10~11) Room No. T.02 (LPS-2) at Concourse level.

Page 15 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request For Block wall [2ND Stage] from 3m height up to soffit at grid (3~7)
33 AB A Architectural GEGC Inspection Reports
000118 Room No. E.09 (LVMDB1), T-04 (PP) & T-06 (SER)  at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation & Application of Putty Prior to Paint  at grid
34 AB A Architectural GEGC Inspection Reports
000119+B40:F1430 (3~7) Room No. E.09 (LVMDB1), T-049 (PP) & T-06 (SER)  at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for paint application   for Room # (,LVMDB1, PP, SER) at
35 AB A Architectural GEGC Inspection Reports
000120 CONCOURSE level

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation for kicker  for  Room # ACR2, VER2 AT
36 AB A Architectural GEGC Inspection Reports
000121 CONCOURSE LEVEL.

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block wall [2ND Stage] from 3m height up to soffit for  Room
37 AB A Architectural GEGC Inspection Reports
000122 No. PSDR, TWC, FWR  at Platform  level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of Laid Masonry Wall from  Grid (12~13) Room no: B.06
38 AB A Architectural GEGC Inspection Reports
000123 (CLR1), E.07 (CER) at concourse level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grld(11-
39 AB A Architectural GEGC Inspection Reports
000124 14) Room no:E.10 (LVMDB2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for block work Up to 3M Height  @ 4 C2 Station for room#  ACR5 &
40 AB A Architectural GEGC Inspection Reports
000125 ACR 10  at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation & Application of Putty Prior to Paint  at grid
41 AB A Architectural GEGC Inspection Reports
000126 (5~9) Room No.T-07 (TPS) & T-01 (LPS1)  at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for paint at grid (5~9) Room No.T-07 (TPS) & T-01 (LPS1)  at
42 AB A Architectural GEGC Inspection Reports
000127 Concourse level.
Inspection Request for Surface preparation and two coated application of Anti Dust
M3-CJV-IRF-EAR00-UGS-
43 Sealant  for ceiling at Grid (5~9) for  Room No.T-07 (TPS) & T.01 (LPS1)  at AB A Architectural GEGC Inspection Reports
000128
Concourse level.
Inspection Request for Surface preparation and two coated application of Anti Dust
M3-CJV-IRF-EAR00-UGS-
44 Sealant  for ceiling  at Grid (3~7) Room No. E.09 (LVMDB1),T-049 (PP) & T-06 (SER)  AB A Architectural GEGC Inspection Reports
000129
at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
45 AB A Architectural GEGC Inspection Reports
000159 Grid (9-12) Room No. M.06 (ACR 6),

M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of Laid Masonry Wall from  Grid (10~11) Room no:
46 AB A Architectural GEGC Inspection Reports
000160 M.06(LPS2),

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation, Rebar Anchorage, Kicker from Grid(25-
47 AB A Architectural GEGC Inspection Reports
000168 28) Room no: T.09 (SMR), B.09 (AFC) at concourse level 4C2 Station

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation, Rebar Anchorage, Kicker from Grid
48 AB A Architectural GEGC Inspection Reports
000169 (12~14) Room no: B.03 (FWC1), B.04 (MWC1) at concourse level 4C2 Station
Inspection Request for Surface Preparation, Rebar Anchorage, Kicker from Grid (03-
M3-CJV-IRF-EAR00-UGS-
49 28) Room no: B.10 (SSR), B.08 (SAR), B.05 (LSR), P.05 (COR) at concourse level AB A Architectural GEGC Inspection Reports
000170
4C2 Station
M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
50 AB A Architectural GEGC Inspection Reports
000171 Grid (4-7) Room No. E.08 (IDF1), E.02 (ER1) AT CONCOURSE LEVEL

Page 16 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of Laid Masonry Wall from  Grid (3~5) Room no: E.13
51 AB A Architectural GEGC Inspection Reports
000172 (VER), M02 (ACR2), E.11 (UPS1) at

M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
52 AB A Architectural GEGC Inspection Reports
000173 Grid (4-5) Room No. E.12 (UPS1), AT CONCOURSE LEVEL
Inspection request for surface preparation prior to installation to rockwool meterials and
M3-CJV-IRF-EAR00-UGS-
53 fire stop sealant @grid line 3-10) room no ; t.06 (SER), T.04 (PP) AT CONCOURSE AB A Architectural GEGC Inspection Reports
000175
LEVEL
Inspection request for surface preparation prior to installation to rockwool meterials and
M3-CJV-IRF-EAR00-UGS-
54 fire stop sealant @grid line( 4-10) room no ; T.07 (TPS), T.01 (LPS1), E.09 (LVMDB1) AB A Architectural GEGC Inspection Reports
000181
AT CONCOURSE LEVEL
M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
55 AB A Architectural GEGC Inspection Reports
000182 Grid (08-13) Room No. (CLR1), AT CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work [2ND Stage] from 3m height up to soffit at grid(11-
56 AB A Architectural GEGC Inspection Reports
000183 14) Room No. E.10 (LVMDB2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the installation to rockwool meterials prior to fire stop sealant
57 AB A Architectural GEGC Inspection Reports
000184 @grid line( 3-5) room no ; t.06 (SER) AT CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of Laid Masonry Wall from  Grid(13~28) Room no: B.03
58 AB A Architectural GEGC Inspection Reports
000185 (FWC1), B.04 (MWC1), T.09 (SMR), B.09 (AFC)

M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of Laid Masonry Wall from  Grid(03-28) Room no: B.10
59 AB A Architectural GEGC Inspection Reports
000186 (SSR), B.08 (SAR), B.05 (LSR), P.05 (COR)

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work [2ND Stage] from 3m height up to soffit at grid
60 AB A Architectural GEGC Inspection Reports
000187 (06-07) Room No. E.02 (ER1) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the installation to rockwool meterials prior to fire stop sealant
61 AB A Architectural GEGC Inspection Reports
000188 @grid line ( 4-6) room no ; t.04 (PP) AT CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work (2ND Stage) from 3m height up to soffit at grid
62 AB A Architectural GEGC Inspection Reports
000189 (06-09) Room No. M.05 (ACR5) at Concourse level.
Inspection Request for Surface Preparation, Rebar Anchorage, Kicker from Grid
M3-CJV-IRF-EAR00-UGS-
63 (27~29) Room no: P22 (COR), E01 (CBS), M.03 (ACR3), P08 (COR), B11 (TRR) at AB A Architectural GEGC Inspection Reports
000190
concourse level 4C2 Station
M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work [2ND Stage] from 3m height up to soffit at grid
64 AB A Architectural GEGC Inspection Reports
000192 (06-7) Room No. M.23 (ACR10) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
65 AB A Architectural GEGC Inspection Reports
000193 Grid (8-10) Room No. M.13 (CWT), AT CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
66 AB A Architectural GEGC Inspection Reports
000194 Grid (26-28) Room No. T.09 (SMR), B.09 (AFC) AT CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
67 AB A Architectural GEGC Inspection Reports
000195 (10~11) Room no T.02 (LPS2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
68 AB A Architectural GEGC Inspection Reports
000196 Grid (3-4) Room No. E.13 (VER2), M.02 (ACR2) AT CONCOURSE LEVEL

Page 17 of 103
M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to application of anti- dust sealant for
69 AB A Architectural GEGC Inspection Reports
000203 ceiling ROOM LVMDB2 of concourse level

M3-CJV-IRF-EAR00-UGS- Inspection for paint work on concrete and block wall at gridline (10-11) Room no: T.02
70 AB A Architectural GEGC Inspection Reports
000204 (LPS2),

M3-CJV-IRF-EAR00-UGS- Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
71 AB A Architectural GEGC Inspection Reports
000205 sealant Grid (5~7)Room # E.09 (LVMDB1) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
72 AB A Architectural GEGC Inspection Reports
000206 Grid (26-28) Room No. B.08 (SAR), B.10 (SSR), B.05 (LSR) AT CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation and two coated application of Anti-Dust
73 AB A Architectural GEGC Inspection Reports
000212 sealant for ceiling GRID 10-13 LPS2 & LVMDB2 at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
74 AB A Architectural GEGC Inspection Reports
000213 Grid (12-13) Room No. E.07 (CER), AT CONCOURSE LEVEL
Inspection Request for Surface Preparation, Rebar Anchorage, Kicker from
M3-CJV-IRF-EAR00-UGS-
75 Grid(30~32) Room no: M.08 (FPR) ,E.03 (ER2), B.02 (CLR2), E.11 (VER), E.15 AB A Architectural GEGC Inspection Reports
000214
(IDF3), & E.06 (GSM) at concourse level 4C2 Station
M3-CJV-IRF-EAR00-UGS- Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
76 AB A Architectural GEGC Inspection Reports
000215 sealant Grid (7~9) Room # T.01 (LPS1), T.07 (TPS) at Concourse level.
Inspection Request for Survey of Laid Masonry Wall from  Grid(27~29) Room no: P.22
M3-CJV-IRF-EAR00-UGS-
77 (COR), E.01 (CBS), M.03 (ACR3), P.08 (COR), B11 (TRR) at concourse level 4C2 AB A Architectural GEGC Inspection Reports
000216
Station
M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to installation to rockwool meterials and
78 AB A Architectural GEGC Inspection Reports
000217 fire stop sealant grid (10~11) Room # T.02 (LPS2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
79 AB A Architectural GEGC Inspection Reports
000218 sealant grid (10~11) Room # T.02 (LPS2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (7~10) Room # T.07
80 AB A Architectural GEGC Inspection Reports
000219 (TPS) AT CONCOURSE LEVEL
Inspection Request For the application of fire stop sealant grid (SN5) Room # E.09
M3-CJV-IRF-EAR00-UGS-
81 (LVMDB-1) at Movement Joints & Between Block Wall & Roof Slab at Concourse Slab. AB A Architectural GEGC Inspection Reports
000220

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (4-6)Room # T.04 (PP)
82 AB A Architectural GEGC Inspection Reports
000221 at Movement Joints & Between Block Wall & Roof Slab at Concourse Slab,

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (10~11) Room # T.02
83 AB A Architectural GEGC Inspection Reports
000228 (LPS2) at Movement Joints & Between Block Wall & Roof Slab at Concourse Slab

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (6~8) Room # T.01
84 AB A Architectural GEGC Inspection Reports
000231 (LPS1) at Movement Joints & Between Block Wall & Roof Slab at Concourse Slab
Inspection Request For the application of fire stop sealant (4 HOUR) grid (03-05)Room
M3-CJV-IRF-EAR00-UGS-
85 # T.06 (SER) at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000232
Slab
M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work [2ND Stage] from 3m height up to soffit at grid
86 AB A Architectural GEGC Inspection Reports
000233 (10-12) Room No. M.06 (ACR6) at Concourse level.

Page 18 of 103
Inspection Request For the application of fire stop sealant (2 HOUR) grid (03-05)Room
M3-CJV-IRF-EAR00-UGS-
87 # T.06 (SER) at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000241
Slab
Inspection Request for Survey of Laid Masonry Wall from  Grid(30~32) Room no:
M3-CJV-IRF-EAR00-UGS-
88 M.08 (FPR), E.03 (ER2), B.02 (CLR2), E.11 (VER), E.15 (IDF3), & E.06 (GSM) at AB A Architectural GEGC Inspection Reports
000242
concourse level 4C2 Station
M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work [2ND Stage] from 3m height up to soffit at grid
89 AB A Architectural GEGC Inspection Reports
000243 (05-6) Room No. E.08 (IDF1) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work [2ND Stage] from 3m height up to soffit at grid (3-
90 AB A Architectural GEGC Inspection Reports
000244 5) Room No. M.02 (ACR2) at Concourse level.
Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
M3-CJV-IRF-EAR00-UGS-
91 Grid (27-28) Room No. E.01 (CBS), B.01 (TRR), and P.08 (COR) AT CONCOURSE AB A Architectural GEGC Inspection Reports
000245
LEVEL
Inspection Request for block wall from Concourse level up to 3m Height at 4C2 Station
M3-CJV-IRF-EAR00-UGS-
92 Grid (27-28) Room No. E.01 (CBS), B.01 (TRR) , P.08 (COR) PART 2 AT AB A Architectural GEGC Inspection Reports
000246
CONCOURSE LEVEL
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
93 AB A Architectural GEGC Inspection Reports
000247 (06~07) Room no M.23 (ACR10) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
94 AB A Architectural GEGC Inspection Reports
000248 (06~07) Room no E.02 (ER1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
95 AB A Architectural GEGC Inspection Reports
000249 (11~13) Room no E.10 (LVMDB2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation/Rebar anchorage/kicker at gridline(2~4)


96 AB A Architectural GEGC Inspection Reports
000261 Room no: M.01 (ACR1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid(2~3)
97 AB A Architectural GEGC Inspection Reports
000262 Room no: E13( VER2) ,at concourse level

M3-CJV-IRF-EAR00-UGS- (2nd Stage) Inspection Request for Block wall from 3Mt height to upto Soffit at
98 AB A Architectural GEGC Inspection Reports
000263 grid(4~05) Room no: E.12 (UPS1) at concourse level
Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
M3-CJV-IRF-EAR00-UGS-
99 sealant for ceiling GRID LINE (5-7) ROOM NO M.23 (ACR10), E.02 (ER1) at AB A Architectural GEGC Inspection Reports
000264
concourse level
M3-CJV-IRF-EAR00-UGS- Inspection for paint work on concrete and block wall at gridline (06-07) Room no: E.02
100 AB A Architectural GEGC Inspection Reports
000265 (ER1),at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for paint work on concrete and block wall at gridline (11-13) Room
101 AB A Architectural GEGC Inspection Reports
000266 no: E.10 (LVMDB2),at concourse level
Inspection Request For the surface preparation of insulation materials (Rockwool)
M3-CJV-IRF-EAR00-UGS-
102 prior to fire stop sealant grid (11~13)Room # E.10 (LVMDB2) at Movement Joints & AB A Architectural GEGC Inspection Reports
000267
Between Block Wall & Roof Slab at Concourse Slab .
M3-CJV-IRF-EAR00-UGS- Inspection request for paint work on concrete and block wall at grld (5·6) rloom no.
103 AB A Architectural GEGC Inspection Reports
000268 M.23 (ACR 10) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid (2~3)
104 AB A Architectural GEGC Inspection Reports
000269 Room no: E13 (VER2) at concourse level

Page 19 of 103
Inspection Request For the surface preparation of insulation materials (Rockwool)
M3-CJV-IRF-EAR00-UGS-
105 prior to fire stop sealant grid (05~07) Room # M.23 (ACR10), E.02 (ER1) at Movement AB A Architectural GEGC Inspection Reports
000270
Joints & Between Block Wall & Roof Slab at Concourse Slab .
Inspection Request For the surface preparation of insulation materials (Rockwool)
M3-CJV-IRF-EAR00-UGS-
106 prior to fire stop sealant grid (11~13) Room # E.10 (LVMDB2) at Movement Joints & AB A Architectural GEGC Inspection Reports
000271
Between Block Wall & Roof Slab at Concourse Slab .
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
107 AB A Architectural GEGC Inspection Reports
000272 sealant for ceiling GRID LINE (6-10) ROOM NO M.05 (ACR5) , at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
108 AB A Architectural GEGC Inspection Reports
000273 (06~09) Room no M.05 (ACR5), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid
109 AB A Architectural GEGC Inspection Reports
000274 (28~29) Room no: ), M.03 (ACR3) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation/Rebar anchorage/kicker at gridline(2~4)


110 AB A Architectural GEGC Inspection Reports
000286 Room no: M.12 (VR2), P.27 (COR), P.23 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
111 AB A Architectural GEGC Inspection Reports
000293 sealant Grid (6~7) Room # E.02 (ER1) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
112 AB A Architectural GEGC Inspection Reports
000294 (09~10) Room noP.21 (COR), at concourse level
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
113 sealant Grid (11-13) Room # E.10 (LVMDB2) at Movement Joints & Between Block AB A Architectural GEGC Inspection Reports
000295
Wall & Roof Slab at Concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block (2nd Stage)wall from 3Mt height to upto Soffit at
114 AB A Architectural GEGC Inspection Reports
000296 grid(8~10) Room no: M.13 (CWT) at concourse level
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
115 sealant Grid (6-7) Room # M.23 (ACR10) at Movement Joints & Between Block AB A Architectural GEGC Inspection Reports
000297
Wall & Roof Slab at Concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall at c:ridllne (06-09) Room
116 AB A Architectural GEGC Inspection Reports
000298 no: M.05 (ACR 5),at concourse le vel
Inspection Request ror paint work on concrete and block walI at grid (09~10) Room no
M3-CJV-IRF-EAR00-UGS-
117 P.21 (COR) beside TPS at concourse AB A Architectural GEGC Inspection Reports
000299
level
M3-CJV-IRF-EAR00-UGS- inspection request for the application of 2 coat anti dust for ceiling at grid (06-09)
118 AB A Architectural GEGC Inspection Reports
000316 Room no m.05(ACR5) at concourse level
Inspection Request For the application of fire stop sealant (2 HOUR) grid (06-07)Room
M3-CJV-IRF-EAR00-UGS-
119 # E.02 (ER1) at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000317
Slab
M3-CJV-IRF-EAR00-UGS- Inspection request for the application of fire stop sealant at grid 11-13 Room no E.10
120 AB A Architectural GEGC Inspection Reports
000318 (LVMDB2) AT CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of fire stop sealant at grid 11-13 Room no E.10
121 AB A Architectural GEGC Inspection Reports
000319 (LVMDB2) AT CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
122 AB A Architectural GEGC Inspection Reports
000320 (08~10) Room no M.13 (CWT), at concourse level

Page 20 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
123 AB A Architectural GEGC Inspection Reports
000321 (2~3) Room no: E13 (VER2) ,at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for the application fire stop sealant at grid 6-7 M.23 (ACR10) AT
124 AB A Architectural GEGC Inspection Reports
000322 CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall grid (08~10) Room no
125 AB A Architectural GEGC Inspection Reports
000323 M.13 (CWT) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
126 materials and fire stop sealant grid (6~9 Room # M.05 (ACR5) at Movement Joints & AB A Architectural GEGC Inspection Reports
000324
Between Block Wall & Roof Slab at Concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
127 AB A Architectural GEGC Inspection Reports
000325 sealant for ceiling GRID LINE (8-10 ) ROOM NO M.13 (CWT) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid(2~4)
128 AB A Architectural GEGC Inspection Reports
000326 Room no: M.01 (ACR1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
129 AB A Architectural GEGC Inspection Reports
000327 sealant for ceiling GRID LINE (4-5 ) ROOM NO E.12 (UPS1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
130 AB A Architectural GEGC Inspection Reports
000328 sealant for ceiling GRID LINE (5-6 ) ROOM NO E.08 (IDF1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
131 AB A Architectural GEGC Inspection Reports
000329 sealant for ceiling GRID LINE (8-10 ) ROOM NO M.13 (CWT) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
132 AB A Architectural GEGC Inspection Reports
000330 (26~28) Room no: B.09 (AFC) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at
133 AB A Architectural GEGC Inspection Reports
000331 grid(26~28) Room no: T.09 (SMR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at
134 AB A Architectural GEGC Inspection Reports
000332 grid(27~28) Room no:P.22 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at
135 AB A Architectural GEGC Inspection Reports
000349 grid(30~31) Room no: M.08 (FPR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at
136 AB A Architectural GEGC Inspection Reports
000350 grid(31~32) Room no: E.06 (GSM) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at
137 AB A Architectural GEGC Inspection Reports
000351 grid(31~32) Room no: E.15 (IDF3) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
138 AB A Architectural GEGC Inspection Reports
000352 sealant for ceiling GRID LINE (3-5 ) ROOM NO. M.02 (ACR2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at
139 AB A Architectural GEGC Inspection Reports
000353 GRID LINE (5-6 ) ROOM NO. E.08 (IDF1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at
140 AB A Architectural GEGC Inspection Reports
000354 grid(31~32) Room no:B.02 (CLR2) at concourse level

Page 21 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at
141 AB A Architectural GEGC Inspection Reports
000355 grid(27~29) Room no B.11 (TRR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at
142 AB A Architectural GEGC Inspection Reports
000356 grid(26~28) Room no: B.08 (SAR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at
143 AB A Architectural GEGC Inspection Reports
000357 grid(26~28) Room no: B.10 (SSR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at
144 AB A Architectural GEGC Inspection Reports
000358 grid(31~32) Room no: E.11 (VER) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at
145 AB A Architectural GEGC Inspection Reports
000359 grid(12~13) Room no: B.01 (CLR1) at concourse level

M3-CJV-IRF-EAR00-UGS-
146 Inspection Request for the surface preparation PRIOR TO application of Anti-Dust sealant forAB
ceiling GRID LINE
A (3-4 )ROOM
Architectural
NO E.13 (VER2)GEGC
at concourse level
Inspection Reports
000360

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling GRID
147 AB A Architectural GEGC Inspection Reports
000361 LINE (3-5) ROOM NO M.02 (ACR2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling GRID
148 AB A Architectural GEGC Inspection Reports
000362 LINE (3-5) ROOM NO. E.12 (UPS1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling GRID
149 AB A Architectural GEGC Inspection Reports
000363 LINE (5-6) ROOM NO. E.08 (IDF1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling GRID
150 AB A Architectural GEGC Inspection Reports
000364 LINE (8-10) ROOM NO. M.13 (CWT) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop grid 6-9 Room no M.05 (ACR5) at
151 AB A Architectural GEGC Inspection Reports
000365 Movement Joints & Between Block Wall & Roof Slab at Concourse Slab

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall grid (05~6) Room no
152 AB A Architectural GEGC Inspection Reports
000373 E.08 (IDF1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at
153 AB A Architectural GEGC Inspection Reports
000374 grid (09~13) Room no M.06 (ACR6), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at
154 AB A Architectural GEGC Inspection Reports
000375 grid (04~05) Room no E.12 (UPS1), at concourse level
Inspection Request For the application of Rockwool materials prior to fire stop sealant
M3-CJV-IRF-EAR00-UGS-
155 grid (8~10) Room # M.13 (CWT) at Movement Joints & Between Block Wall & Roof AB A Architectural GEGC Inspection Reports
000376
Slab at Concourse level .
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid (2-
156 AB A Architectural GEGC Inspection Reports
000377 4) Room no: M.01 (ACR1)at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
157 AB A Architectural GEGC Inspection Reports
000378 sealant for ceiling at grid(09~13) Room no M.06 (ACR6), at concourse level

M3-CJV-IRF-EAR00-UGS-
158 Inspection Request for surface preparation/Rebar anchorage/kicker at gridline(1~3) Room no:M.11
AB (VR1) at A
concourse level .
Architectural GEGC Inspection Reports
000379

Page 22 of 103
M3-CJV-IRF-EAR00-UGS-
159 Inspection Request for paint work on concrete and block wall grid(09~13) Room no M.06(ACR6),
AB at concourse
A level Architectural GEGC Inspection Reports
000398

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid(3~4)
160 AB A Architectural GEGC Inspection Reports
000399 Room no: P.05 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling GRID
161 AB A Architectural GEGC Inspection Reports
000422 LINE (3-4 ) ROOM NO. E.13 (VER2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at
162 AB A Architectural GEGC Inspection Reports
000423 grid(12~13) Room no: E.07 (CER)at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at
163 AB A Architectural GEGC Inspection Reports
000424 grid(30~31) Room no: E.03 (ER2) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
164 materials and fire stop sealant grid(04~05) Room no E.12 (UPS1), at concourse level AB A Architectural GEGC Inspection Reports
000425
at Movement Joints & Between Block Wall & Roof Slab at Concourse Slab
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at
165 AB A Architectural GEGC Inspection Reports
000426 grid(28~29) Room no: M.03 (ACR3) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
166 materials and fire stop sealant grid(05~6) Room no E.08 (IDF1) at Movement Joints AB A Architectural GEGC Inspection Reports
000403
& Between Block Wall & Roof Slab at Concourse level .
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling
167 AB A Architectural GEGC Inspection Reports
000404 grid(09~13) Room no M.06 (ACR6), at concourse level

M3-CJV-IRF-EAR00-UGS- INSPECTION REQUEST FOR SURVEY LAYED OF CMU WALL AT GRID (32-34)
168 AB A Architectural GEGC Inspection Reports
000402 M.12 (VR2), P.27 (COR)

M3-CJV-IRF-EAR00-UGS- INSPECTION REQUEST FOR SURVEY LAYED OF CMU WALL AT GRID (03-04)
169 AB A Architectural GEGC Inspection Reports
000401 M.01 (ACR1), P.05 (COR)

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall grid(04~05) Room no
170 AB A Architectural GEGC Inspection Reports
000400 E.12 (UPS1), at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
171 materials and fire stop sealant grid (09~12) Room no M.06 (ACR6), at concourse AB A Architectural GEGC Inspection Reports
000429
level at Movement Joints & Between Block Wall & Roof Slab at Concourse Slab
M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop grid (8-10)Room # M.13 (CWT) at
172 AB A Architectural GEGC Inspection Reports
000430 Movement Joints & Between Block Wall & Roof Slab at Concourse Slab .
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
173 sealant grid (05~6) Room no E.08 (IDF1) at Movement Joints & Between Block Wall AB A Architectural GEGC Inspection Reports
000431
& Roof Slab at Concourse level .
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of Anti-Dust sealant
174 AB A Architectural GEGC Inspection Reports
000434 for ceiling GRID LINE (5-6 )ROOM NO. E.07 (CER) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at
175 AB A Architectural GEGC Inspection Reports
000435 grid (03~05) Room no M.02 (ACR2), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at
176 AB A Architectural GEGC Inspection Reports
000436 grid (03~04) Room no E.13 (VER2), at concourse level

Page 23 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request (or paint work on concrete and block wall al grrid line (3-05) Room
177 AB A Architectural GEGC Inspection Reports
000437 no M.02 (ACR 2), at concourse level

M3-CJV-IRF-EAR00-UGS-
178 Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling GRID LINE (5-6
AB )ROOM NO AE.07 (CER)Architectural
at concourse level GEGC Inspection Reports
000438
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
179 sealant grid (04~05) Room no E.12 (UPS1), at Movement Joints & Between Block AB A Architectural GEGC Inspection Reports
000439
Wall & Roof Slab at Concourse LEVEL
M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (05~6) Room no E.08
180 AB A Architectural GEGC Inspection Reports
000440 (IDF1) at Movement Joints & Between Block Wall & Roof Slab at Concourse level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall at grid (03~04) Room no
181 AB A Architectural GEGC Inspection Reports
000441 E.13 (VER2), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
182 AB A Architectural GEGC Inspection Reports
000442 (09~12) Room no: P.24 (COR), P.04 (COR)at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
183 AB A Architectural GEGC Inspection Reports
000443 sealant for ceiling GRID LINE (26-28 )ROOM NO. B.09 (AFC) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
184 AB A Architectural GEGC Inspection Reports
000444 (27~28) Room no: B.05 (LSR), P.22 (COR)at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
185 AB A Architectural GEGC Inspection Reports
000445 (27~29) Room no: E.01 (CBS), at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant grid (03~05) Room no M.02 (ACR2), E.13 (VER2) at
186 AB A Architectural GEGC Inspection Reports
000446 concourse level at Movement Joints & Between Block Wall & Roof Slab at
Concourse Slab
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling GRID
187 AB A Architectural GEGC Inspection Reports
000447 LINE (26-28 ) ROOM NO. B.09 (AFC) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at at gridline
188 AB A Architectural GEGC Inspection Reports
000448 (32-33) Room no: M.12 (VR2), P.27 (COR), P.23 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at gridline (26-29)


189 AB A Architectural GEGC Inspection Reports
000449 Room no: M.25 (ACR11), P.16 (COR) at PLATFORM LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at
190 AB A Architectural GEGC Inspection Reports
000450 grid (03~04) Room no M.01 (ACR1), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at
191 AB A Architectural GEGC Inspection Reports
000451 GRID LINE (26-28 )ROOM NO. B.09 (AFC) at concourse level

M3-CJV-IRF-EAR00-UGS-
192 Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid(30~31) Room
AB no:E.03 (ER2)
A at concourse
Architectural
level . GEGC Inspection Reports
000452

M3-CJV-IRF-EAR00-UGS-
193 Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop sealantAB
grid(03~04) Room
A no E.13Architectural
(VER2), at Movement
GEGC
Joints & Between
Inspection
Block Wall
Reports
& Roof Sla
000453

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
194 AB A Architectural GEGC Inspection Reports
000454 (30~31) Room no: M.08 (FPR), at concourse level

Page 24 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint grid
195 AB A Architectural GEGC Inspection Reports
000455 (12~13) Room no: E.07 (CER)at concourse level
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
196 sealant grid(09~12) Room no M.06 (ACR6), at concourse level at Movement Joints & AB A Architectural GEGC Inspection Reports
000456
Between Block Wall & Roof Slab at Concourse Level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall At grid (03~04) Room no
197 AB A Architectural GEGC Inspection Reports
000457 M.01 (ACR1), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall at GRID LINE (26-28 )
198 AB A Architectural GEGC Inspection Reports
000458 ROOM NO. B.09 (AFC) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall at grid(12~13) Room no:
199 AB A Architectural GEGC Inspection Reports
000459 E.07 (CER)at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
200 materials and fire stop sealant grid (03~04) Room no M.01 (ACR1) at concourse level AB A Architectural GEGC Inspection Reports
000483
at Movement Joints & Between Block Wall & Roof Slab at Concourse Slab
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
201 AB A Architectural GEGC Inspection Reports
000484 sealant for ceiling GRID LINE (27-29 )ROOM NO E.01 (CBS) at concourse level
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
202 sealant grid (03~05) Room no M.02 (ACR2), at Movement Joints & Between Block AB A Architectural GEGC Inspection Reports
000485
Wall & Roof Slab at Concourse LEVEL
M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (04~5) Room no E.12
203 AB A Architectural GEGC Inspection Reports
000486 (UPS1) at Movement Joints & Between Block Wall & Roof Slab at Concourse level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid
204 AB A Architectural GEGC Inspection Reports
000487 (12~13) Room no: B.03 (FWC1), B.04 (MWC1), P.03 (COR) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
205 materials and fire stop sealant grid (27~28) Room no B.09 (AFC) at concourse level AB A Architectural GEGC Inspection Reports
000491
at Movement Joints & Between Block Wall & Roof Slab at Concourse Slab
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling
206 AB A Architectural GEGC Inspection Reports
000492 GRID LINE (27-29 )ROOM NO E.01 (CBS) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
207 materials and fire stop sealant grid (12~13) Room no E.07 (CER) at concourse level AB A Architectural GEGC Inspection Reports
000493
at Movement Joints & Between Block Wall & Roof Slab at Concourse Slab
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at
208 AB A Architectural GEGC Inspection Reports
000502 grid(2~3) Room no: P.05 (COR), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid (1~3)
209 AB A Architectural GEGC Inspection Reports
000503 Room no: M.11 (VR1), at concourse level

M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at gridline ( 24-25)


210 AB A Architectural GEGC Inspection Reports
000504 Room no: (PR) at PLATFORM LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (09~12) Room no M.06
211 AB A Architectural GEGC Inspection Reports
000505 (ACR6) at Movement Joints & Between Block Wall & Roof Slab at Concourse level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint grid
212 AB A Architectural GEGC Inspection Reports
000506 (28~29) Room no: M.03 (ACR3)at concourse level

Page 25 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid( 03~05) Room no M.02
213 AB A Architectural GEGC Inspection Reports
000507 (ACR2) at Movement Joints & Between Block Wall & Roof Slab at Concourse level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid
214 AB A Architectural GEGC Inspection Reports
000508 (11~12) Room no: B.12 (CLR3), B.14 (COR) at platform level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of Laid Masonry Wall from  Grid (28~29) Room no:
215 AB A Architectural GEGC Inspection Reports
000509 M.25 (ACR11), P.16 (COR) at PLATFORM level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of Laid Masonry Wall from  Grid(1-3) Room no: M.11
216 AB A Architectural GEGC Inspection Reports
000510 (VR1) CONCORSE level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid(03~05) Room no E.13
217 AB A Architectural GEGC Inspection Reports
000511 (VER2) at Movement Joints & Between Block Wall & Roof Slab at Concourse leve

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint grid
218 AB A Architectural GEGC Inspection Reports
000512 line (27~29) Room no: E.01 (CBS) at concourse level

M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at gridline (08-10 )


219 AB A Architectural GEGC Inspection Reports
000513 Room no: (ACR9), at PLATFORM LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of Anti-Dust
220 AB A Architectural GEGC Inspection Reports
000514 sealant for ceiling GRID LINE (30-31 )ROOM NO M.08 (FPR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at grid
221 AB A Architectural GEGC Inspection Reports
000515 (02~03) Room no: M.11 (VR1) PART 2, at concourse levell

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at
222 AB A Architectural GEGC Inspection Reports
000516 grid(4~6) Room no: P.04 (COR),at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
223 AB A Architectural GEGC Inspection Reports
000517 (31~32) Room no: E.06 (GSM),at concourse level
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
224 sealant grid (03~04) Room no M.01 (ACR1), at Movement Joints & Between Block AB A Architectural GEGC Inspection Reports
000518
Wall & Roof Slab at Concourse LEVEL
M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall At grid (27~29) Room
225 AA A Architectural GEGC Inspection Reports
000528 no: E.01 (CBS)at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall At grid(28-29) Room no: M.03 (ACR3)
226 AA A Architectural GEGC Inspection Reports
000529 at concourse level
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
227 sealant grid line (26-28) Room no B.09 (AFC), at Movement Joints & Between Block AB A Architectural GEGC Inspection Reports
000530
Wall & Roof Slab at Concourse LEVEL
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling GRID
228 AB A Architectural GEGC Inspection Reports
000531 LINE (30-31 ) ROOM NO M.08 (FPR) at concourse level
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
229 sealant grid line (12-13) Room no E.07 (CER), at Movement Joints & Between Block AB A Architectural GEGC Inspection Reports
000532
Wall & Roof Slab at Concourse LEVEL
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid line
230 AB A Architectural GEGC Inspection Reports
000533 (31-32) Room no: E.15 (IDF3), at concourse level

Page 26 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from platform level to upto 3Mt height at grid line
231 AB A Architectural GEGC Inspection Reports
000549 (27-29) Room no: (ACR11) , at platform level
Inspection Request For the application of fire stop sealant grid line (03-04) Room no
M3-CJV-IRF-EAR00-UGS-
232 M.01 (ACR1), at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000550
LEVEL
M3-CJV-IRF-EAR00-UGS-
233 Inspection Request For the surface preparation prior to installation of Rockwool materials andAB
fire stop sealant
A GRID LINE
Architectural
(27-29 )ROOM NOGEGC
E.01 (CBS) at concourse
Inspection
level.
Reports
000551

M3-CJV-IRF-EAR00-UGS-
234 Inspection Request for Surface preparation and application of putty prior to paint GRID LINE (30-31
AB )ROOM A
NO M.08 (FPR)
Architectural
at concourse level
GEGC Inspection Reports
000552

M3-CJV-IRF-EAR00-UGS-
235 Inspection Request for Survey of Laid Masonry Wall at Grid(24~25 & 8-11) Room no: M.18 (ACR9)
AB at Platform
A level 4C2Architectural
Station GEGC Inspection Reports
000553
Inspection Request For the application of fire stop sealant grid line (26-28) Room no
M3-CJV-IRF-EAR00-UGS-
236 B.09 (AFC), at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000554
LEVEL
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
237 AB A Architectural GEGC Inspection Reports
000555 line (31-32) Room no: B.02 (CLR2), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
238 AB A Architectural GEGC Inspection Reports
000556 (31-32) Room no: B.02 (CLR2), at concourse level
Inspection Request For the application of fire stop sealant grid line (12-13) Room no
M3-CJV-IRF-EAR00-UGS-
239 E.07 (CER), at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000557
LEVEL
M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at gridline (25-29 )
240 AB A Architectural GEGC Inspection Reports
000558 Room no: (ER4), P.29 (COR) at CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall At grid line (28~29) Room no: M.08
241 AB A Architectural GEGC Inspection Reports
000559 (FPR) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
242 materials and fire stop sealant GRID LINE (09-11 ) ROOM NO P.21 (COR) at AB A Architectural GEGC Inspection Reports
000560
concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid line
243 AB A Architectural GEGC Inspection Reports
000561 (12~13) Room no: P.03 (COR), at concourse level
Inspection Request for the surface preparation prior to application of Anti-Dust
M3-CJV-IRF-EAR00-UGS-
244 sealant for ceiling GRID LINE (3-12 ) ROOM NO P.04 (COR), P.05 (COR) & P.24 AB A Architectural GEGC Inspection Reports
000562
(COR)at concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of Anti-Dust
245 AB A Architectural GEGC Inspection Reports
000563 sealant for ceiling GRID LINE (28-29 ) ROOM NO M.03 (ACR3) at concourse level
Inspection Request for the surface preparation prior to application of Anti-Dust
M3-CJV-IRF-EAR00-UGS-
246 sealant for ceiling grid line (3-4 & 31-32) Room no: E.15 (IDF3), M.01 (ACR1) at AB A Architectural GEGC Inspection Reports
000565
concourse level
M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at grid line (1~3)
247 AB A Architectural GEGC Inspection Reports
000566 Room no: M.11 (VR1), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
248 AB A Architectural GEGC Inspection Reports
000567 sealant grid line (27~29) Room no: E.01 (CBS)at concourse level

Page 27 of 103
Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling
M3-CJV-IRF-EAR00-UGS-
249 GRID LINE (3-12 & 28-29 ) ROOM NO P.04 (COR), P.05 (COR) & P.24 (COR), M.03 AB A Architectural GEGC Inspection Reports
000568
(ACR3) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
250 materials and fire stop sealant GRID LINE (28-29 )ROOM NO M.03 (ACR3) at AB A Architectural GEGC Inspection Reports
000569
concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling GRID
251 AB A Architectural GEGC Inspection Reports
000570 LINE (3-4 & 31-32) Room no: E.15 (IDF3), M.01 (ACR1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of Anti-Dust
252 AB A Architectural GEGC Inspection Reports
000571 sealant for ceiling grid line (31~32) Room no: E.06 (GSM),at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request For installation of Insulation materials (Rockwool) prior to fire
253 AB A Architectural GEGC Inspection Reports
000572 stop sealant grid line (9-10) Room no: P.21 (COR)at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paintGRID
254 AB A Architectural GEGC Inspection Reports
000573 LINE (30-31 ) ROOM NO M.08 (ER2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling grid
255 AB A Architectural GEGC Inspection Reports
000574 line (31~32) Room no: E.06 (GSM) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall and concrete wall At GRID LINE (30-
256 AA B Architectural GEGC MEP equipment installation
000575 31 ) ROOM NO M.08 (ER2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of Anti-Dust
257 AB A Architectural GEGC Inspection Reports
000576 sealant for ceiling grid line (11-13) Room no: P.03 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling grid
258 AB A Architectural GEGC Inspection Reports
000579 line (11-13) Room no: P.03 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of Anti-Dust
259 AB A Architectural GEGC Inspection Reports
000580 sealant for ceiling grid line (31-32) Room no: E.11 (VER) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
260 materials and fire stop sealant GRID LINE (30-31 )ROOM NO M.08 (FPR) at AB A Architectural GEGC Inspection Reports
000581
concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
261 materials and fire stop sealant GRID LINE (30-31 )ROOM NO M.08 (ER2) at AB A Architectural GEGC Inspection Reports
000582
concourse level
M3-CJV-IRF-EAR00-UGS- INSPECTION REQUEST FOR SURVEY LAYED OF CMU WALL AT GRID (25-29)
262 AB A Architectural GEGC Inspection Reports
000583 room no E.05 (ER4), P.29 (COR) AT CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling grid
263 AB A Architectural GEGC Inspection Reports
000584 line (31-32) Room no: E.11 (VER) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to painT grid
264 AB A Architectural GEGC Inspection Reports
000585 line (31~32) Room no: E.15 (IDF3) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from platform level to upto 3Mt height at gridline (08-
265 AB A Architectural GEGC Inspection Reports
000599 10 ) Room no: (ACR9), at PLATFORM LEVEL

M3-CJV-IRF-EAR00-UGS-
266 Inspection Request for Surface preparation and application of putty prior to paint at grid(31~32)
ABRoom no:E.06(GSM)
A at concourse level
Architectural GEGC Inspection Reports
000600

Page 28 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from platform level to upto 3Mt height at Gridline (24-
267 AB A Architectural GEGC Inspection Reports
000601 25) Room no: (PR) at PLATFORM LEVEL

M3-CJV-IRF-EAR00-UGS-
268 Inspection Request For Block wall [2ND Stage] from 3m height up to soffit at grid (1~3) RoomAB
no:M.11 (VR1)Aat concourse level.
Architectural GEGC Inspection Reports
000602

M3-CJV-IRF-EAR00-UGS- InspectionRequest for Block wall (2nd Stage) from 3Mt height to upto Soffit at gridline
269 AB A Architectural GEGC Inspection Reports
000603 (32-33) Room no: M.12 (VR2), P.27 (COR), P.23 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid line
270 AB A Architectural GEGC Inspection Reports
000604 (27~28) Room no:P.22 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
271 AB A Architectural GEGC Inspection Reports
000605 line (10-11) Room no P.24 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall a At grid line (31~32) Room no: E.15
272 AB A Architectural GEGC Inspection Reports
000606 (IDF3) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall a At grid(10-11) Room no P.24 (COR)
273 AB A Architectural GEGC Inspection Reports
000607 at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
274 AB A Architectural GEGC Inspection Reports
000608 line (03-06) Room no P.05 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
275 AB A Architectural GEGC Inspection Reports
000609 line (05-08) Room no P.04 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
276 AB A Architectural GEGC Inspection Reports
000610 sealant for ceiling AT GRID LINE (30-31 ) ROOM NO M.08 (ER2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at gridline
277 AB A Architectural GEGC Inspection Reports
000611 (25-29 )Room no: (ER4), P.29 (COR) at CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall from soffit to bellow 3 meter At grldline
278 AB A Architectural GEGC Inspection Reports
000612 (03-06) Room no P.05 (COR) at concourse leve

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall At gridline (05-08) Room no P.04
279 AB A Architectural GEGC Inspection Reports
000613 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling at
280 AB A Architectural GEGC Inspection Reports
000614 GRID LINE (30-31 ) ROOM NO M.08 (ER2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from platform level to upto 3Mt height at Gridline
281 AB A Architectural GEGC Inspection Reports
000615 (28-29) Room no: P.16 (COR) at PLATFORM LEVEL
Inspection Request For the surface preparatIon prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
282 materials and fire stop sealant GRID At grid line (03-08) Room no P.05 (COR), P.04 AB A Architectural GEGC Inspection Reports
000616
(COR) at Movement Joints & Between Block Wall & Roof Slab at Concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid line (27~29) Room no:
283 AB A Architectural GEGC Inspection Reports
000617 E.01 (CBS) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
284 materials and fire stop sealantgrid (08-11) Room no P.24 (COR), P.21 (COR) at AB A Architectural GEGC Inspection Reports
000618
Movement Joints & Between Block Wall & Roof Slab at Concourse level .

Page 29 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall and concrete wall at grid line (31~32)
285 AB A Architectural GEGC Inspection Reports
000619 Room no: E.06 (GSM) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at
286 AB A Architectural GEGC Inspection Reports
000620 GRID LINE (07-10 ) ROOM NO P.21 (COR) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
287 materials and fire stop sealant GRID LINE (28-29 ) ROOM NO M.03 (ACR3) at AB A Architectural GEGC Inspection Reports
000621
concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall at GRID LINE (07-10 )ROOM NO
288 AB A Architectural GEGC Inspection Reports
000622 P.21 (COR) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
289 materials and fire stop sealant GRID At grid line (31-32) Room no E.15 (IDF3), E.06 AB A Architectural GEGC Inspection Reports
000623
(GSM) at concourse level
Inspection Request For Installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
290 sealant grld line (03-06) Room no P.05 (COR) at concourse level at Movement Joints AB A Architectural GEGC Inspection Reports
000624
& Between Block Wall & Roof Slab at Concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation/Rebar anchorage/kicker at gridline (13-14)
291 AB A Architectural GEGC Inspection Reports
000625 Room no: P.13 (PLATFORM), at PLATFORM LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
292 AB A Architectural GEGC Inspection Reports
000626 sealant for ceiling AT GRID LINE (07-10 ) ROOM NO P.21 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at gridline
293 AB A Architectural GEGC Inspection Reports
000634 line (32-33 )Room no: P.23 (COR) at CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at gridline (11-12)


294 AB A Architectural GEGC Inspection Reports
000635 Room no: P.13 (lobby), at concourse level

M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at GRID (A-C)


295 AB A Architectural GEGC Inspection Reports
000636 Room no:M.04(ACR4)P.25(COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at
296 AB A Architectural GEGC Inspection Reports
000637 GRID LINE (10-13 ) ROOM NO P.03 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at GRID (A-C)


297 AB A Architectural GEGC Inspection Reports
000638 Room no: M.04 (ACR4) P.25 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall and concrete wall at GRID LINE (10-
298 AB A Architectural GEGC Inspection Reports
000639 13 ) ROOM NO P.03 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling at
299 AB A Architectural GEGC Inspection Reports
000640 GRID LINE (07-10 ) ROOM NO P.21 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at GRID (A-C)


300 AB A Architectural GEGC Inspection Reports
000641 Room no: E.04 (ER3), R.01 (RETAIL), at concourse level

M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at gridline(11-21)


301 AB A Architectural GEGC Inspection Reports
000642 Room no: P.13 (PLATFORM), E.16 (ER5), at PLATFORM LEVEL

M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at gridline(11-21)


302 AB A Architectural GEGC Inspection Reports
000643 Room no: P.13 (PLATFORM), M.14 (ACR8) at PLATFORM LEVEL

Page 30 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
303 AB A Architectural GEGC Inspection Reports
000644 sealant AT GRID LINE (09-11 ) ROOM NO P.21 (COR) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
304 materials and fire stop sealant at grid line (10--13 ) ROOM NO P.203(COR), (GSM) at AB A Architectural GEGC Inspection Reports
000663
concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
305 AB A Architectural GEGC Inspection Reports
000664 sealant AT GRID LINE (7-10 ) ROOM NO P.21 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at gridline (11-21)


306 AB A Architectural GEGC Inspection Reports
000665 Room no: E.16 (ER5), (IDF2) at PLATFORM LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
307 AB A Architectural GEGC Inspection Reports
000666 sealant AT GRID LINE (10-11 ) ROOM NO P.24 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at
308 AB A Architectural GEGC Inspection Reports
000667 GRID LINE (27-28 ) ROOM NO. P.22 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
309 AB A Architectural GEGC Inspection Reports
000668 sealant AT GRID LINE (11-13 )ROOM NO P.03 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid line (05-08) Room no
310 AB A Architectural GEGC Inspection Reports
000669 P.04 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall and concrete wall at GRID LINE (27-
311 AB A Architectural GEGC Inspection Reports
000670 28 ) ROOM NO P.22 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at gridline
312 AB A Architectural GEGC Inspection Reports
000671 (11-12 )Room no: P.06 (LOBBY) at CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
313 AB A Architectural GEGC Inspection Reports
000676 (25~28) Room no: P.29 (COR), E.05 (ER4)at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid line
314 AB A Architectural GEGC Inspection Reports
000677 (08~12) Room no: M.17 (ACR9) & at platform level

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid at (08-12) Room no
315 AB A Architectural GEGC Inspection Reports
000678 P.21 (COR), P.24 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
316 AB A Architectural GEGC Inspection Reports
000679 ( 32~33) Room no: P.23 (COR), P.06 (LOBBY) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
317 AB A Architectural GEGC Inspection Reports
000680 (24~28) Room no: P.16 (COR), M.18 (PR) at platform level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at
318 AB A Architectural GEGC Inspection Reports
000681 GRID LINE (31-32 ) ROOM NO E.11 (VER) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
319 AB A Architectural GEGC Inspection Reports
000682 (27~29) Room no: M.26 (ACR11) at platform level

M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation/Rebar anchorage/kicker at GRID (15-22)


320 AB A Architectural GEGC Inspection Reports
000683 Room no: P.13 (platform), M.14 (ACR8) at platform level

Page 31 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall and concrete wall at grid line (31-32 )
321 AB A Architectural GEGC Inspection Reports
000693 ROOM NO E.11 (VER) at concourse level.
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
322 sealant AT GRID LINE (30-31 ) ROOM NO M.08 (FPR), E.03 (ER2) at concourse AB A Architectural GEGC Inspection Reports
000694
level
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
323 AB A Architectural GEGC Inspection Reports
000695 (29~31) Room no: P.11 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (28-29) Room no M.03
324 AB A Architectural GEGC Inspection Reports
000696 (ACR3) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (11-13) Room no P.03
325 AB A Architectural GEGC Inspection Reports
000697 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of Anti-Dust sealant
326 AB A Architectural GEGC Inspection Reports
000698 for ceiling at grid line (27-28 ) ROOM NO P.22 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
327 AB A Architectural GEGC Inspection Reports
000699 sealant at grid line (31-32) ROOM NO E.15 (IDF3), E.06 (GSM) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
328 materials and fire stop sealant at grid line (27-28 ) ROOM NO. P.22 (COR) at AB A Architectural GEGC Inspection Reports
000700
concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to up to Soffit grid (26-
329 AB A Architectural GEGC Inspection Reports
000701 30) Room no: P.08 (COR), P.07 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for aplication of antidust sealant (2 coat) for ceiling gridline (27-28)
330 AB A Architectural GEGC Inspection Reports
000702 room no. P.22 (COR) concoures level
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS- sea lant at grid line (27-28 ) ROOM
331 AB A Architectural GEGC Inspection Reports
000703 NO P.22 (COR) at Movement Joints & Between Block Wall & Roof Slab at Concourse
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall at grid line (1"'3) Room
332 AB A Architectural GEGC Inspection Reports
000704 no: M.11 (VR1), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
333 AB A Architectural GEGC Inspection Reports
000705 line (27-29) ROOM NO P.09 (COR) at concourse leve

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
334 AB A Architectural GEGC Inspection Reports
000712 line (27-29 ) ROOM NO P.09 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from platform level to upto 3Mt height gridline (11-
335 AB A Architectural GEGC Inspection Reports
000713 12 ) Room no: E.16 (ERS) at platform level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and appli cation of putty prior to paint at
336 AB A Architectural GEGC Inspection Reports
000714 grid line (11-12 ) ROOM NO E.06 (LOBBY) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
337 AB A Architectural GEGC Inspection Reports
000715 line (09-10 ) ROOM NO 5.02 (STAIR 2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on  block wall and concrete wall at Grid line (27-29 )
338 AB A Architectural GEGC Inspection Reports
000716 ROOM NO  P.09 (COR) at concourse level

Page 32 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation/Rebar anchorage/kicker at grid (22-25)
339 AB A Architectural GEGC Inspection Reports
000717 Room no: F.01 (TO) at concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
340 materials and fire stop sealant at grid line (31-32 ) ROOM NO E.11 (VER) at AB A Architectural GEGC Inspection Reports
000718
Movement Joints & Between Block Wall & Roof Slab at Concourse level
Inspection Request For the application of fire stop sealant grid line (30-31 ) ROOM NO:
M3-CJV-IRF-EAR00-UGS-
341 E.03 (ER2.) at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000719
level.
M3-CJV-IRF-EAR00-UGS- Inspectlon Request for Block wall from concourse level to upto 3Mt height grldline (A-C
342 AB A Architectural GEGC Inspection Reports
000720 ) Room no: E.14 (IDF2), P.2S (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall from soffit to below 3.5 meter at Grid
343 AB A Architectural GEGC Inspection Reports
000721 line (11-12 ) ROOM NO P.06 (LOBBY) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall from soffit to below 3.5 meter at grid
344 AB A Architectural GEGC Inspection Reports
000722 line (09~ 10 ) ROOM NO S.02 (STAIR 2) at concourse level
lnspection Request For the application of fire stop sealant Grid (30~31) room NO:
M3-CJV-IRF-EAR00-UGS-
345 M.08 (FPR) at Movement Joints & Between Block Wall & Roof Slab at Concourse level AB A Architectural GEGC Inspection Reports
000723
including tank and block wall join as shown in drawing
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to up to 3Mt height gridline (A-
346 AB A Architectural GEGC Inspection Reports
000724 C ) Room No: E.04 (ER3), P.12 (LOBBY) & R.01 (Retail) at concourse level
Inspection Request For the surface preparation prior to installation of Rock wool
M3-CJV-IRF-EAR00-UGS-
347 Materials and fire stop sealant at Grid line (27-28) ROOM NO P.09 (COR) at AB A Architectural GEGC Inspection Reports
000725
Movement Joints &Between Block Wall & Roof Slab at Concourse level.
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
348 sealant at grid line (31-32 ) ROOM NO E.11 (VER) at Movement Joi nts & Between AB A Architectural GEGC Inspection Reports
000727
Block Wall & Roof Slab at Concourse level.
Inspection Request For insta llation of Insulation materials (Rockwooll prior to fire stop
'M3-CJV-IRF-EAR00-UGS-
349 sealant at grid line (3 1-32) ROOM NO: E.06 (GSM) at Movement Joints & Between AB A Architectural GEGC Inspection Reports
000738
Block Wall & Roof Slab at Concourse level.
Inspection Request For the application of fire stop sealant grid (31-32) ROOM NO :
'M3-CJV-IRF-EAR00-UGS-
350 E.06 (GSM) at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000739
level.
'M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparatIon and appllcation of putty prior to paint at
351 AB A Architectural GEGC Inspection Reports
000740 grid line (29-31) ROOM NO P.11 (COR) at concourse level

'M3-CJV-IRF-EAR00-UGS- Request for paint work on block wall from soffit to below 3.5 meter at grid line (29-31 )
352 AB A Architectural GEGC Inspection Reports
000760 ROOM NO P.11 (CORlat concourse level
Inspection Request for Block wall (2nd Stage) from 3Mt height to up to Soffi t grid (10
M3-CJV-IRF-EAR00-UGS-
353 12) Room no: P.14 (COR) , P.30 (COR), B.12 (CLR3 ), P.17 ( LOBBY), E.16 (ERS ) at AB A Architectural GEGC Inspection Reports
000761
platform level.
'M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface prepara tion prior to applica tion of Anti-Dust
354 AB A Architectural GEGC Inspection Reports
000762 sealant for ceiling grid line (29-31) ROOM NO P.11 (COR) at concourse level

'M3-CJV-IRF-EAR00-UGS- Inspection Request for Survey of laid masonry wall at grid (22-2S) Room no: F.01 (TO)
355 AB A Architectural GEGC Inspection Reports
000763 at CONCOURSE level

'M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and appllcatlon of putty prior to paint at grid
356 AB A Architectural GEGC Inspection Reports
000764 nne (2-3) ROOM NO P.26 (COR) at concourse level

Page 33 of 103
'M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (27-28 )ROOM NO P.22
357 AB A Architectural GEGC Inspection Reports
000765 (COR) at Movement Joints & Between Block Wall & Roof Slab at Concourse level.

'M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior t application of Anti-Dust sealant
358 AB A Architectural GEGC Inspection Reports
000766 for ceiling grid line (31-31) ROOM NO P.23 (COR) at concourse level

'M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall at grid line (2-3 )ROOM
359 AB A Architectural GEGC Inspection Reports
000774 NO P.26 (COR) at concourse level.

'M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling grid
360 AB A Architectural GEGC Inspection Reports
000775 line (31-32 )ROOM NO P.23 (COR) at concourse level.
Inspection Request For the surface preparation prior to installation of Rockwool
'M3-CJV-IRF-EAR00-UGS-
361 materials and fire stop sealant at grid line (29-31 ) ROOM NO P.11 (COR) at AB A Architectural GEGC Inspection Reports
000776
Movement Joints & Between Block Wall & Roof Slab at Concourse level.
'M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of Anti-Dust sea lant
362 AB A Architectural GEGC Inspection Reports
000777 for ceiling grid line (27-29) ROOM NO P.09 (COR) at concourse level
Inspection Request For installa tion of Insulation materials (Rockwool) prior to fire stop
'M3-CJV-IRF-EAR00-UGS-
363 sealant at grid line (29-31 ) ROOM NO P.11 (COR) at Movement Joints & Between AB A Architectural GEGC Inspection Reports
000778
Block Wall & Roof Slab at Concourse level.
'M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling grid
364 AB A Architectural GEGC Inspection Reports
000779 line (27-29) ROOM NO P.09 (COR) at concourse level

'M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (31-32) ROOM NO:
365 AB A Architectural GEGC Inspection Reports
000780 E.11 (VER) at Movement Joints & Between Block Wall & Roof Slab at Concourse level.

'M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (27-29) ROOM NO P.09
366 AB A Architectural GEGC Inspection Reports
000781 (COR) at Movement Joints & Between Block Wall & Roof Slab at Concourse level.
Inspection Request For the surface preparation prior to installation of Rockwool
'M3-CJV-IRF-EAR00-UGS-
367 materials and fire stop sea lant at grid line (01-03) ROOM NO M.11 (VR1) at AB A Architectural GEGC Inspection Reports
000783
Movement Joints & Between Block Wall & Roof Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspect ion Request for the application o f Anti-Dust sealant (2 COAT) for ceiling grid
368 AB A Architectural GEGC Inspection Reports
000786 line (29-31 ) ROOM NO P.11 (COR) at concourse level.
Inspection Request for Block wall (2nd Stage) from 3Mt height to up to Soffit grid (B-C)
M3-CJV-IRF-EAR00-UGS-
369 Room no: P.12 (Lobby), P.02 (unpaid concourse) & R.01 (Retail) Entrance 1 at AB A Architectural GEGC Inspection Reports
000787
concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
370 AB A Architectural GEGC Inspection Reports
000804 line (29-31 ) ROOM NO P.10 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to up to 3Mt height gridline (22-
371 AB A Architectural GEGC Inspection Reports
000805 25 ) Room no: F.01 (TO) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall from soffit to below 3.5 meter at grid
372 AB A Architectural GEGC Inspection Reports
000806 line (29-31) ROOM NO P.10 (COR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height t o up to Soffit grid (A-B)
373 AB A Architectural GEGC Inspection Reports
000807 Room no: M.04 (ACR4), P.25 (COR) Entrance 1 at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
374 AB A Architectural GEGC Inspection Reports
000808 line (26-30 ) ROOM NO P.05 (COR) at concourse level

Page 34 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (29-31 ) ROOM NO
375 AB A Architectural GEGC Inspection Reports
000809 P.11 (COR) at Movement Joints Between Block Wall & Roof Slab at Concourse level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
376 materials and fi re stop sealant at grid line (28-31 )ROOM NO P.08 (COR) & P.10 AB A Architectural GEGC Inspection Reports
000815
(COR) at Movement Joints & Between Block Wall & Roof Slab at Concourse level.
Inspection Requ est for the surface preparation PRIOR TO application of Anti-Dust
M3-CJV-IRF-EAR00-UGS-
377 sealant for ceiling grid line (28-31) ROOM NO P.D8 (COR) & P.I0(COR) at concourse AB A Architectural GEGC Inspection Reports
000816
level
Inspection Request For insta llation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
378 sealant at grid line (29-31) ROOM NO P.10 (COR) at Movement Joints & Between AB A Architectural GEGC Inspection Reports
000817
Block Wall & Roof Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling grid
379 AB A Architectural GEGC Inspection Reports
000818 line (28-31) ROOM NO P.05 (COR) & P.10 (COR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request For the application of fire stop sealant grid (31-32 )ROOM NO E.15
380 AB A Architectural GEGC Inspection Reports
000819 (IDF3) at Movement Joints & Between Block Wall & Roof Slab at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from platform level to up to 3Mt height gridline(14·16
381 AB A Architectural GEGC Inspection Reports
000820 JRoom no: P.13 (PLATFORM) at platform level
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
382 sealant at grid line (1-3) ROOM NO M.11 (VRl) at Movement Joints & Between Block AB A Architectural GEGC Inspection Reports
000821
Wall & Roof Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
383 AB A Architectural GEGC Inspection Reports
000822 line (32-34 ) ROOM NO M.12 (VR2) at concourse level

M3-CJV-IRF-EAR00-UGS-
384 Inspection Request for the surface preparation PRIOR TO application of Anti-Dust sealant forAB
ceiling at grid line
A (26-28 )ROOM
Architectural
NO P.07 (COR)
GEGC
at concourse level
Inspection Reports
000823

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti -Dust sealant (2 COAT) for ceiling grid
385 AB A Architectural GEGC Inspection Reports
000824 line (26-28) ROOM NO P.07 (COR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall at grid line (32-34)
386 AB A Architectural GEGC Inspection Reports
000825 ROOM NO M.12 (VR2) at concourse level. (SEE ATIACHED HIGHLIGHTED AREA )

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall from soffit to below 3.5 meter at grid
387 AB A Architectural GEGC Inspection Reports
000826 line {26-30 ) RooM NO P.05 (COR)at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
388 AB A Architectural GEGC Inspection Reports
000827 sealant for ceiling grid line (01-03) ROOM NO P.26 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
389 AB A Architectural GEGC Inspection Reports
000830 line (27-29 ) ROOM NO M.25 (ACR11) at platform level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling grid
390 AB A Architectural GEGC Inspection Reports
000831 line (01-03) ROOM NO P.26 (COR) at concourse level.
Inspection Request For the application of fire stop sea lant grid (29-31 ) ROOM NO
M3-CJV-IRF-EAR00-UGS-
391 P.10 (COR) at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000832
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to up to Soffit grid (22-
392 AB A Architectural GEGC Inspection Reports
000833 25) Room no: F.01 (TO) at concourse level

Page 35 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
393 AB A Architectural GEGC Inspection Reports
000834 line {08-10 )ROOM NO M,17 (ACR 09) at platform level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall at grid line {27-291
394 AB A Architectural GEGC Inspection Reports
000835 ROOM NO M.25 {ACR11) at platform level. (SEE ATTACHED HIGHLIGHTED AREA 1

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from platform level to up to 3Mt height grldllne (2D-
395 AB A Architectural GEGC Inspection Reports
000836 22 ) Room no: M.14 (ACR 8) at platform level. (See attached highlighted area.
Inspection Request for Survey of laid masonry wall Gridllne (1l-25) Room no: M.14
M3-CJV-IRF-EAR00-UGS-
396 ( ACR8, E.16 (ER5) & P.13 (PLATFORM) at PLATFORM level.ISEE ATTACHED AB A Architectural GEGC Inspection Reports
000837
HIGHLIGTHTED AREA
Inspection Request For the surface prepara tion prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
397 materials and fire stop sealant at gri d line 34) ROOM NO M.12 (VR2 ) at Movement AB A Architectural GEGC Inspection Reports
000844
Joints & Between Block Wall & Roof Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
398 AB A Architectural GEGC Inspection Reports
000845 line (31-32 ) ROOM NO P.23 (COR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete and block wall at grid line (05-10)
399 AB A Architectural GEGC Inspection Reports
000856 ROOM NO M.l7 (ACR09) at platform level. (SEE ATTACHED HIGHLIGHTED AREA )
Inspection Request for paint work on block wall from soffit to below 3.5 meter at grid
M3-CJV-IRF-EAR00-UGS-
400 line (31-32) ROOM NO P.13 (COR) at concourse level. (SEE ATIACHED AB A Architectural GEGC Inspection Reports
000857
HIGHLIGHTED AREA )
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
401 sealant at grid line (26-30) ROOM NO P.08 (COR) at Movement Joint & Between AB A Architectural GEGC Inspection Reports
000858
Block Wall & Roof Slab at Concourse level.
inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
402 sea lant at grid line (32-34) ROOM NO M.12 (VR2) at Movement Joint & Between AB A Architectural GEGC Inspection Reports
000859
Block Wall & Roof Slab at Concourse level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
403 materials and fire stop sealant at grid line (27-29) ROOM NO M.25 (ACR11) at AB A Architectural GEGC Inspection Reports
000860
Movement Joints & Between Block Wall & Roof Slab at platform level
M3-CJV-IRF-EAR00-UGS-
404 Inspection Request For the application of fire stop sealant at grid (01-03 )ROOM NO M.11 (VR1)
AB at Movement
A Joints & Between
Architectural
Block Wall & GEGC
Roof Slab at Concourse
Inspection
level.
Reports
000861

M3-CJV-IRF-EAR00-UGS-
405 Inspection Request For the surface preparation prior to installation of Rockwool materials andAB
fire stop sealant
A at Grid line
Architectural
(31-32 )ROOM NO GEGC
P.23 (COR) at platform
Inspection
level Reports
at Movement
000862

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to up to Soffi t grid (20-
406 AB A Architectural GEGC Inspection Reports
000863 22) Room no: M.08 (ACR 08) at platform level.

M3-CJV-IRF-EAR00-UGS-
407 Inspection Request for Surface preparation and application of putty prior to paint at grid line (24-29
AB )ROOM NO
A P.29 (COR)
Architectural
at Concourse level.
GEGC Inspection Reports
000865
 Inspection Request For the surface preparation prior to installation of Rockwool 
M3-CJV-IRF-EAR00-UGS- materials  and fire stop sealant at Grid line  (08-10 ) ROOM NO M.17 (ACR09) at
408 AB A Architectural GEGC Inspection Reports
000866 platform level at Movement Joints  & Between Block Wall &  Roof  Slab at platform
level
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation/Rebar anchorage/kicker at gridline(14-16)
409 AB A Architectural GEGC Inspection Reports
000867 Room no: P.01 (paid concourse ) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid GEGC Subcontractor not
410 AA B Architectural GEGC
000870 line (Y-X )Room NO P.02 (unpaid concourse) at beside COR P.29 Concourse level. approved by RAMPED

Page 36 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on  block wall and concrete wall at grid line  (24-29 )
411 AB A Architectural GEGC Inspection Reports
000871 ROOM NO P.29 (COR) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
412 AB A Architectural GEGC Inspection Reports
000872 line (25-28 ) ROOM NO P.16 (COR) at platform level.
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
413 sealant at Grid line  (27-29 ) ROOM NO M.25 (ACR11) at Movement Joints  & AB A Architectural GEGC Inspection Reports
000873
Between Block Wall &  Roof  Slab at platform level.
Inspection Request For the surface preparation prior to installation of Rockwool 
M3-CJV-IRF-EAR00-UGS-
414 materials  and fire stop sealant at Grid line (24-29 ) ROOM NO P.29 (COR) at platform AB A Architectural GEGC Inspection Reports
000874
level at Movement Joints  & Between Block Wall &  Roof  Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint on
415 AB A Architectural GEGC Inspection Reports
000684 concrete wall @ grid line (01-03 ) ROOM NO M.11 (VR1) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on  concrete wall at grid line (03-04 ) ROOM NO
416 AB A Architectural GEGC Inspection Reports
000878 S.01 (stair 1) at Concourse level upto roof slab.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the installation of plastering accessories and level/guide points
417 AB A Architectural GEGC Inspection Reports
000879 prior to plastering work at grid line (26-27) Room No : B.08 (SAR) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on  concrete wall at grid line (01-03 ) ROOM NO
418 AB A Architectural GEGC Inspection Reports
000882 M.11 (VR1) at Concourse level.
Inspection Request For the application of fire stop sealant  at grid (26-30 ) ROOM NO
M3-CJV-IRF-EAR00-UGS-
419 P.08 (COR) at Movement Joints  &  Between Block Wall &  Roof  Slab at Concourse AB A Architectural GEGC Inspection Reports
000883
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  PRIOR TO application of  Anti-Dust
420 AB A Architectural GEGC Inspection Reports
000884 sealant for ceiling at grid line (27-29 ) ROOM NO M.25 (ACR11) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the installation of plastering accessories and level/guide points
421 AB A Architectural GEGC Inspection Reports
000885 prior to plastering work at grid line (27-28) Room No : b.05 (LSR) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
422 AB A Architectural GEGC Inspection Reports
000886 sealant for ceiling at grid line (01-03 ) ROOM NO M.11 (VR1) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at gridline
423 AB A Architectural GEGC Inspection Reports
000887 (14-16 )Room no: P.01 (PAID AREA) at CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from platform level to upto stair soffit at grid line
424 AB A Architectural GEGC Inspection Reports
000888 (17-19 ) area no:P.13(PLATFORM) at platform level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the installation of plastering accessories and level/guide points
425 AB A Architectural GEGC Inspection Reports
000889 prior to plastering work at grid line (26-28) Room No : B.10 (SSR) at Concourse level.
Inspection Request For the application of fire stop sealant at grid (31-32 )ROOM NO
M3-CJV-IRF-EAR00-UGS-
426 P.23 (COR) at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000890
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling at
427 AB A Architectural GEGC Inspection Reports
000891 grid line (27-29 )ROOM NO M.25 (ACR11) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of plastering with SP11 on block wall at grid
428 AB A Architectural GEGC Inspection Reports
000892 line (26-27) Room No : b.08 (SAR) at Concourse level

Page 37 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of plastering with SP11 on block wall at grid
429 AB A Architectural GEGC Inspection Reports
000894 line (27-28) Room No : B.05 (LSR) at Concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling at
430 AB A Architectural GEGC Inspection Reports
000895 grid line (01-03 ) ROOM NO M.11 (VR1) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
431 AB A Architectural GEGC Inspection Reports
000896 line (25-28 ) ROOM NO P.07 (COR) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
432 AB A Architectural GEGC Inspection Reports
000897 line (25-28 ) ROOM NO P.16 (COR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the installation of plastering accessories and level/guide points
433 AB A Architectural GEGC Inspection Reports
000898 prior to plastering work at grid line (25-27) Room No : T.09 (SMR) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall and concrete wall at grid line (25-28 )
434 AB A Architectural GEGC Inspection Reports
000901 ROOM NO P.07 (COR) at Concourse level.
Inspection Request for Surface preparation and application of putty prior to paint on
M3-CJV-IRF-EAR00-UGS-
435 concrete wall in stair 4 area at grid line (31-32 ) ROOM NO S.04 (STAIR) at Concourse AB A Architectural GEGC Inspection Reports
000902
level UPTO ROOF LEVEL.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
436 AB A Architectural GEGC Inspection Reports
000903 sealant for ceiling at grid line (08-10 ) ROOM NO M.17 (ACR09) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the installation of plastering accessories and level/guide points
437 AB A Architectural GEGC Inspection Reports
000904 prior to plastering work at grid line (27-29) Room No : B.11 (TRR) at Concourse level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
438 materials and fire stop sealant at Grid line (25-28 )ROOM NO P.07 (COR) at AB A Architectural GEGC Inspection Reports
000905
Movement Joints & Between Block Wall & Roof Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
439 AB A Architectural GEGC Inspection Reports
000906 (14~16) between the LIFT 01 & LIFT 02 at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint on
440 AB A Architectural GEGC Inspection Reports
000909 block & concrete wall @ grid line (25-27 ) ROOM NO B.08 (SAR) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of plastering with SP11 on block wall at grid
441 AB A Architectural GEGC Inspection Reports
000910 line (25-27) Room No : T.09 (SMR) at Concourse level.
Inspection Request For the application of fire stop sealant at grid (24-29 )ROOM NO
M3-CJV-IRF-EAR00-UGS-
442 P.29 (COR) at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000911
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
443 AB A Architectural GEGC Inspection Reports
000912 sealant for ceiling at grid line (24-29 ) ROOM NO P.29 (COR) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the installation of plastering accessories and level/guide points
444 AB A Architectural GEGC Inspection Reports
000913 prior to plastering work at grid line (31-32) Room No : B.02 (CLR2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of plastering with SP11 on block wall at grid
445 AB A Architectural GEGC Inspection Reports
000914 line (27-29) Room No : B.11 (TRR) at Concourse level.
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
446 sealant at Grid line (25-28 ) ROOM NO P.07 (COR) at Movement Joints & Between AB A Architectural GEGC Inspection Reports
000915
Block Wall & Roof Slab at Concourse level.

Page 38 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the installation of plastering accessories and level/guide points
447 AB A Architectural GEGC Inspection Reports
000916 prior to plastering work at grid line (12-13) Room No : B.01 (CLR1) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint on
448 AB A Architectural GEGC Inspection Reports
000917 concrete wall @ grid line (32-34 ) ROOM NO M.12 (VR2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall and concrete wall at grid line (25-27 )
449 AB A Architectural GEGC Inspection Reports
000918 ROOM NO B.08 (SAR) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete wall in stair 4 area at grid line (31-32 )
450 AB A Architectural GEGC Inspection Reports
000919 ROOM NO S.04 (STAIR) at Concourse level UPTO ROOF LEVEL.

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete wall at grid line (32-34 ) ROOM NO
451 AB A Architectural GEGC Inspection Reports
000893 M.12 (VR2) at Concourse level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line (25-26 )ROOM NO P.02 (unpaid
452 AB A Architectural GEGC Inspection Reports
000920 concourse) at Movement Joints & Between Block Wall & Roof Slab at Concourse
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling at
453 AB A Architectural GEGC Inspection Reports
000921 grid line (24-29 )ROOM NO P.29 (COR)at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint on
454 AB A Architectural GEGC Inspection Reports
000922 block wall @ grid line (27-28) Room No : B.05 (LSR) at Concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on concrete wall at grid line (27-28) Room No : B.05
455 AB A Architectural GEGC Inspection Reports
000941 (LSR) at Concourse level
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
456 materials and fire stop sealant at Grid line (25-27 ) ROOM NO B.08 (SAR) at AB A Architectural GEGC Inspection Reports
000942
Movement Joints & Between Block Wall & Roof Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of plastering with SP11 on block wall at grid line
457 AB A Architectural GEGC Inspection Reports
000943 (31-32) Room No : B.02 (CLR2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the installation of plastering accessories and level/guide points
458 AB A Architectural GEGC Inspection Reports
000944 prior to plastering work at grid line (10-11) Room No : T.08 (PSDR) at platform level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
459 materials and fire stop sealant at Grid line (27-28) Room No : B.05 (LSR) at AB A Architectural GEGC Inspection Reports
000945
Movement Joints & Between Block Wall & Roof Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the installation of plastering accessories and level/guide points
460 AB A Architectural GEGC Inspection Reports
000946 prior to plastering work at grid line (11-12) Room No : B.12 (CLR3) at platform level..

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling at
461 AB A Architectural GEGC Inspection Reports
000947 grid line (08-10 ) ROOM NO M.17 (ACR09) at platform level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line (24-28) Room No : P.02 (public area) the
462 AB A Architectural GEGC Inspection Reports
000948 front of cor p.29 at Movement Joints & Between Block Wall & Roof Slab at
Concourse level.(see the attached highlighted area.
Inspection Request For the application of fire stop sealant at grid (25-28) ROOM NO
M3-CJV-IRF-EAR00-UGS-
463 P.07 (COR) at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000949
level.
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
464 sealant at Grid line (27-28) Room No : B.05 (LSR) at Movement Joints & Between AB A Architectural GEGC Inspection Reports
000950
Block Wall & Roof Slab at Concourse level.

Page 39 of 103
M3-CJV-IRF-EAR00-UGS-
465 Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop sealantAB
at Grid line (25-26)
A Room Architectural
No : P.02 (Unpaid Area)at
GEGC Movement Joints
Inspection
& Between
Reports
Block W
000951

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of plastering with SP11 on block wall at grid line
466 AB A Architectural GEGC Inspection Reports
000952 (12-13) Room No : B.01 (CLR1) at Concourse lev

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of plastering with SP11 on block wall at grid
467 AB A Architectural GEGC Inspection Reports
000953 line (10-11) Room No : T.08 (PSDR) at plarform level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line (25-26 ) ROOM NO P.02 (unpaid area)at
468 AB A Architectural GEGC Inspection Reports
000954 Movement Joints & Between Block Wall & Roof Slab at Concourse level.(see the
attached highlighted area.
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
469 sealant at Grid line (24-28) Room No : P.02 (publick area) the front of cor p.29 at AB A Architectural GEGC Inspection Reports
000955
Movement Joints & Between Block Wall & Roof Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of plastering with SP11 on block wall at grid line
470 AB A Architectural GEGC Inspection Reports
000956 (11-12) Room No : B.12 (CLR3) at plarform level..

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
471 AB A Architectural GEGC Inspection Reports
000957 line (25-27) Room No : T.09 (SMR) at Concourse level.
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
472 sealant at Grid line (25-27 ) ROOM NO B.08 (SAR) at Movement Joints & Between AB A Architectural GEGC Inspection Reports
000959
Block Wall & Roof Slab at Concourse level.
Inspection Request For the application of fire stop sealant at grid (32-34 ) ROOM NO
M3-CJV-IRF-EAR00-UGS-
473 M.12 (VR2) at Movement Joints & Between Block Wall & Roof Slab at Concourse AB A Architectural GEGC Inspection Reports
000960
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of plastering with SP11 on block wall at grid line
474 AB A Architectural GEGC Inspection Reports
000961 (26-28) Room No : B.10 (SSR) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the installation of plastering accessories and level/guide points
475 AB A Architectural GEGC Inspection Reports
000962 prior to plastering work at grid line (22~25) Room no: F.01 (TO) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on block wall and concrete wall at grid line (25-27)
476 AB A Architectural GEGC Inspection Reports
000963 Room No : T.09 (SMR) at Concourse level.
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
477 sealant at Grid line (08-10 ) ROOM NO M.17 (ACR09) at Movement Joints & AB A Architectural GEGC Inspection Reports
000964
Between Block Wall & Roof Slab at platform level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of plastering with SP11 on block wall at grid
478 AB A Architectural GEGC Inspection Reports
000965 line (22~25) Room no: F.01 (TO) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid
479 AB A Architectural GEGC Inspection Reports
000966 (28~29) Room no: P.08 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid (32-
480 AB A Architectural GEGC Inspection Reports
000975 34 ) ROOM NO M.12 (VR2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling at
481 AB A Architectural GEGC Inspection Reports
000976 grid line (02-03 ) ROOM NO M.11 (VR1) at Concourse level.
Inspection request for plenth including surface preparation, formwork & rebar's
M3-CJV-IRF-EAR00-UGS-
482 anchorage prior to casting at grid (07-12) Room no: M.06 (ACR6) & M.05 (ACR5) at AB A Architectural GEGC Inspection Reports
000984
concourse level.

Page 40 of 103
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
483 sealant at Grid line (02-03 ) ROOM NO M.11 (VR1) at Movement Joints & Between AB A Architectural GEGC Inspection Reports
000985
Block Wall & Roof Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS-
484 Inspection Request for Plinth Including Surface Preparations , Formworks & Rebar’s Anchorage
AB Prior to casting
A at grid (03-05) Room no: M.02GEGC
Architectural (ACR2)at concourse level. Reports
Inspection
000986

M3-CJV-IRF-EAR00-UGS- Inspection request for plenth including surface preparation, formwork & rebar's
485 AB A Architectural GEGC Inspection Reports
000987 anchorage prior to casting at grid (07-10) Room no: M.13 (CWT) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to upto 3Mt height at gridline
486 AB A Architectural GEGC Inspection Reports
000988 (32-34 ) ROOM NO behind S.03 (STAIR 3) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to putty & paint work on concrete &
487 AB A Architectural GEGC Inspection Reports
000989 cmu wall at grid line (02-03 ) ROOM NO M.11 (VR1) at Concourse level.part2

M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & paint work on concrete & cmu wall at grid line (02-03 )
488 AB A Architectural GEGC Inspection Reports
000990 ROOM NO M.11 (VR1) at Concourse level.part2

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
489 AB A Architectural GEGC Inspection Reports
000991 line (06-07 ) ROOM NO P.18 (track side walk way) at platform level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line (25-27) Room No : T.09 (SMR) at
490 AB A Architectural GEGC Inspection Reports
000992 Movement Joints & Between Block Wall & Roof Slab at Concourse level.(see the
attached highlighted
Inspection Request Forarea.
the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line (26-28) Room No : B.10 (SSR) at
491 AB A Architectural GEGC Inspection Reports
000993 Movement Joints & Between Block Wall & Roof Slab at Concourse level.(see the
attached
Inspectionhighlighted
Request Forarea.
the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line (27-29) Room No : B.11 (TRR)at
492 AA A Architectural GEGC Inspection Reports
000995 Movement Joints & Between Block Wall & Roof Slab at Concourse level.(see the
attached
Inspectionhighlighted
Request Forarea.
the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line (31-32) Room No : B.02 (CLR2) at
493 AA A Architectural GEGC Inspection Reports
000996 Movement Joints & Between Block Wall & Roof Slab at Concourse level.(see the
attached highlighted area.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to upto Soffit at grid (32-
494 AA A Architectural GEGC Inspection Reports
000997 34 ) ROOM NO behind S.03 (STAIR 3) at platform level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line (12-13) Room No : B.01 (CLR1) at
495 AA A Architectural GEGC Inspection Reports
000998 Movement Joints & Between Block Wall & Roof Slab at Concourse level.(see the
attached highlighted area.
Inspection Request For installation of Insulation materials (Rockwool) prior to fire stop
M3-CJV-IRF-EAR00-UGS-
496 sealant at Grid line (25-27) Room No : T.09 (SMR) at Movement Joints & Between AA A Architectural GEGC Inspection Reports
000999
Block Wall & Roof Slab at Concourse level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line (22~25) Room no: F.01 (TO)at Movement
497 AA A Architectural GEGC Inspection Reports
001000 Joints & Between Block Wall & Roof Slab at Concourse level.(see the attached
highlighted area.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to putty & paint at grid line (05-12 )
498 AA A Architectural GEGC Inspection Reports
001011 ROOM NO P.18 (track side) wall south side at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to putty & paint at grid line (28-30 )
499 AA A Architectural GEGC Inspection Reports
001012 ROOM NO M.07 (ACR7) at CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to putty & paint at grid line (05-12 )
500 AA A Architectural GEGC Inspection Reports
001013 ROOM NO P.18 (track side) wall north side at platform level.

Page 41 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth for Room no: M.02 (ACR2) at Grid (03-
501 AA A Architectural GEGC Inspection Reports
001014 05) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth for Room no: M.06 (ACR6) & M.05
502 AA A Architectural GEGC Inspection Reports
001015 (ACR5) at concourse level..

M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth for Room no: M.13 (CWT) at concourse
503 AA A Architectural GEGC Inspection Reports
001016 level..

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to putty & paint at grid line (08-09 )
504 AA A Architectural GEGC Inspection Reports
001017 ROOM NO P.18 (track side) at platform level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line grid line (08-12 ) ROOM NO P.18 (track
505 AA A Architectural GEGC Inspection Reports
001018 side) at Movement Joints & Between Block Wall & Roof Slab atplatform level.(see
the attached highlighted area.
M3-CJV-IRF-EAR00-UGS- Inspection Request for floor surface preparation prior to concrete screed placement in
506 AA A Architectural GEGC Inspection Reports
001019 room no. B.05 (LSR)at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to putty & paint at grid line (09-12 )
507 AA A Architectural GEGC Inspection Reports
001020 track side wall @ south side platform level.PART 2
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line (28~29) Room no: P.08 (COR) at
508 AA A Architectural GEGC Inspection Reports
001029 Movement Joints & Between Block Wall & Roof Slab at Concourse level.(see the
attached highlighted area.
Inspection Request For the application of fire stop sealant at grid (25-27) Room No :
M3-CJV-IRF-EAR00-UGS-
509 T.09 (SMR) at Movement Joints & Between Block Wall & Roof Slab at Concourse AA A Architectural GEGC Inspection Reports
001030
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint at grid line (08-10 ) ROOM NO
510 AA A Architectural GEGC Inspection Reports
001031 P.18 (track side walkway )south side at platform level.
Inspection Request For the application of fire stop sealant at grid (27-28) Room No :
M3-CJV-IRF-EAR00-UGS-
511 B.05 (LSR) at Movement Joints & Between Block Wall & Roof Slab at Concourse AA A Architectural GEGC Inspection Reports
001032
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint at grid line (08-12 ) ROOM NO
512 AA A Architectural GEGC Inspection Reports
001033 P.18 (track side walkway )north side at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint at grid line (28-30 ) ROOM NO
513 AA A Architectural GEGC Inspection Reports
001034 M.07 (ACR7) at CONCOURSE LEVEL
Inspection Request for floor surface preparation prior to concrete screed placement in
M3-CJV-IRF-EAR00-UGS-
514 Room no: P.22 (COR), P.09 (COR), P.11 (COR), P.07 (COR), E.01 (CBS), E.03 (ER2) AA A Architectural GEGC Inspection Reports
001035
at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to putty & paint at 4C2 Station grid
515 AA A Architectural GEGC Inspection Reports
001036 line (29-30 ) ROOM NO P.19 (track side) east side column at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint at grid line (08-09) ROOM NO
516 AA A Architectural GEGC Inspection Reports
001037 P.18 (track side) wall west and north side at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to putty & paint at grid line(27-29 )
517 AA A Architectural GEGC Inspection Reports
001039 ROOM NO E.05 (ER4) at Concourse level.
Inspection Request For Installation of Rockwool & Application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
518 grid (08-12 ) ROOM NO P.18 (track side walkway ) at Movement Joints & Between AA A Architectural GEGC Inspection Reports
001040
Block Wall & Roof Slab at platform level.

Page 42 of 103
Inspection Request for floor surface preparation prior to concrete screed placement in
M3-CJV-IRF-EAR00-UGS-
519 Room no: T.09 (SMR), B.09 (AFC), P.08 (COR), P.10 (COR), P.23 (COR), E.06 AA A Architectural GEGC Inspection Reports
001041
(GSM), E.15 (IDF3) & E.11 (VER) at concourse level.
Inspection Request for Final Inspection Prior to Concrete Casting & Concrete Screed
M3-CJV-IRF-EAR00-UGS-
520 Placement on the Concourse floor in Room no: P.22 (COR), P.09 (COR), P.11 (COR), AA A Architectural GEGC Inspection Reports
001042
P.07 (COR), E.01 (CBS), E.03 (ER2) & B.05 (LSR) at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for floor surface preparation prior to concrete screed placement in
521 AA A Architectural GEGC Inspection Reports
001052 room no: M.12 (VR2) at concourse level.
Inspection Request for final inspection prior to concrete casting & concrete screed
M3-CJV-IRF-EAR00-UGS-
522 placement on the concourse floor in room no: P.23 (COR), ,E.06 (GSM), E.15 (IDF3), AA A Architectural GEGC Inspection Reports
001053
S.04 (STAIR 4) & E.11 (VER) at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
523 AA A Architectural GEGC Inspection Reports
001054 sealant for ceiling at grid line (32-34) ROOM NO : M.12 (VR2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
524 AA A Architectural GEGC Inspection Reports
001055 screed placement on the concourse floor in room no: M.12 (VR2) at concourse level.
Inspection Request for Plinth Including Surface Preparations , Formworks & Rebar’s
M3-CJV-IRF-EAR00-UGS-
525 Anchorage Prior to casting concrete pouring at grid (28-29) Room no: M.03 (ACR3) at AA A Architectural GEGC Inspection Reports
001056
concourse level.
Inspection Request for floor surface preparation prior to concrete screed placement in
M3-CJV-IRF-EAR00-UGS-
526 Room no AA A Architectural GEGC Inspection Reports
001057
B.09 (AFC), T.09 (SMR). P.08 (COR) & P.10 (COR) at concourse level
Inspection Request For the application of fire stop sealant at grid (25-27 ) ROOM NO
M3-CJV-IRF-EAR00-UGS-
527 B.08 (SAR) at Movement Joints & Between Block Wall & Roof Slab at Concourse AA A Architectural GEGC Inspection Reports
001058
level.
Inspection Request For the application of fire stop sealant at grid (24-29) Room No :
M3-CJV-IRF-EAR00-UGS-
528 P.02 (public area) the front of COR P.29 at Movement Joints & Between Block Wall & AA A Architectural GEGC Inspection Reports
001059
Roof Slab at Concourse level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Grid line (10~11) Room no: P.14 (COR) at
529 AA A Architectural GEGC Inspection Reports
001060 Movement Joints & Between Block Wall & Roof Slab at platform level.(see the
attached Highlighted Area).
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
530 AA A Architectural GEGC Inspection Reports
001061 sealant for ceiling at grid line (28-30 ) ROOM NO : M.07 (ACR7) at Concourse level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
531 screed placement on the concourse floor in room no: B.08 (SAR). P.08 (COR) & P.10 AA A Architectural GEGC Inspection Reports
001062
(COR) at concourse level.
Inspection Request for Surface preparation prior to putty & paint at grid line(20-29 )
M3-CJV-IRF-EAR00-UGS-
532 ROOM NO : track side north & south side as per attached highlighted location at AA A Architectural GEGC Inspection Reports
001063
platform level.
Inspection Request For the application of fire stop sealant at grid (29-27 ) ROOM NO
M3-CJV-IRF-EAR00-UGS-
533 M.25 (ACR11) at Movement Joints & Between Block Wall & Roof Slab at platform AA A Architectural GEGC Inspection Reports
001064
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
534 AA A Architectural GEGC Inspection Reports
001065 line (10-12) ROOM NO P.14 (COR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for floor surface preparation prior to concrete screed placement in
535 AA A Architectural GEGC Inspection Reports
001066 room no: E.10 (LVMDB2) at concourse level.
Inspection Request for Surface preparation prior to putty & paint at grid line (20-26)
M3-CJV-IRF-EAR00-UGS-
536 ROOM NO: track side north & south side as per attached highlighted location at AA A Architectural GEGC Inspection Reports
001067
platform level. PART2

Page 43 of 103
Inspection Request For the application of fire stop sealant  at grid  (08-10 ) ROOM NO
M3-CJV-IRF-EAR00-UGS-
537 M.17 (ACR09) at Movement Joints  &  Between Block Wall &  Roof  Slab at  platform AA A Architectural GEGC Inspection Reports
001068
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint at grid line (09-12 ) track side
538 AA A Architectural GEGC Inspection Reports
001078 wall @ south side platform level. PART 2
Inspection Request For the application of fire stop sealant  at grid  (01-03 ) ROOM NO:
M3-CJV-IRF-EAR00-UGS-
539 M.11 (VR1) at Movement Joints  &  Between Block Wall &  Roof  Slab at concourse AA A Architectural GEGC Inspection Reports
001079
level.part2
M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on  block wall and concrete wall at grid line (10-12)
540 AA A Architectural GEGC Inspection Reports
001080 ROOM NO P.14 (COR) at platform level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
541 screed placement on the concourse floor in room no:  E.10 (LVMDB2 at concourse AA A Architectural GEGC Inspection Reports
001081
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for floor surface preparation prior to concrete screed placement in
542 AA A Architectural GEGC Inspection Reports
001082 room no: M.11 (VR1) at concourse level.
Inspection request for plinth including surface preparation, formwork & rebar's
M3-CJV-IRF-EAR00-UGS-
543 anchorage prior to casting concrete pouring IN Room no: M.07 (ACR7) at concourse AA A Architectural GEGC Inspection Reports
001083
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  prior to application of  Anti-Dust
544 AA A Architectural GEGC Inspection Reports
001084 sealant for Ceiling at grid line (10-12) ROOM NO P.14 (COR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  Anti-Dust sealant (2 COAT)   for Ceiling at
545 AA A Architectural GEGC Inspection Reports
001085 grid line (28-30) ROOM NO M.07 (ACR7) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  Anti-Dust sealant (2 COAT)   for ceiling at
546 AA A Architectural GEGC Inspection Reports
001092 grid line  (10-12) ROOM NO P.14 (COR) & P.30 (COR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  Anti-Dust sealant (2 COAT)   for ceiling at
547 AA A Architectural GEGC Inspection Reports
001093 grid line  (32-34) ROOM NO: M.11 (VR2) at concourse level.
Inspection Request For the surface preparation prior to installation of Rockwool 
M3-CJV-IRF-EAR00-UGS- materials  and fire stop sealant at Grid line   (10~12) Room no: M.19 (FWR), T.08
548 AA A Architectural GEGC Inspection Reports
001094 (PSDR), B.12 (CLR3), M.20 (TWC), E.16 (ER5) at Movement Joints  & Between Block
Wall &  Roof  Slab  at platform level.(see the attached highlighted area.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
549 AA A Architectural GEGC Inspection Reports
001095 line (10-11) ROOM NO M.19 (FWR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to putty & paint at grid line (09-11 )
550 AA A Architectural GEGC Inspection Reports
001096 ROOM NO : P.20 (COR) & P.30 (COR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
551 AA A Architectural GEGC Inspection Reports
001101 screed placement on the concourse floor in room no:   M.11 (VR1) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth for Room no: M.03 (ACR3) at
552 AA A Architectural GEGC Inspection Reports
001102 concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth for Room no: M.07 (ACR7) at
553 AA A Architectural GEGC Inspection Reports
001103 concourse level.
Inspection  Request for floor surface preparation prior to concrete screed placement in
M3-CJV-IRF-EAR00-UGS-
554 room no: E.13 (VER2), E.12 (UPS1), E.08 (IDF1), E.02 (ER1) & E.09 (LVMDB1) at AA A Architectural GEGC Inspection Reports
001104
concourse level.

Page 44 of 103
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
555 screed placement on the concourse floor in room no:   E.13 (VER2), E.12 (UPS1), AA A Architectural GEGC Inspection Reports
001105
E.08 (IDF1), E.02 (ER1) & E.09 (LVMDB1) at concourse level.
Inspection Request For the surface preparation prior to installation of Rockwool 
M3-CJV-IRF-EAR00-UGS- materials  and fire stop sealant at Grid line   (20-29) ROOM NO : track side south side
556 AA A Architectural GEGC Inspection Reports
001106 Movement Joints  & Between Block Wall &  Roof  Slab  at platform level. (see the
attached highlighted area.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
557 screed placement on the concourse floor in room no:   P.05 (COR), P.04 (COR), P.21 AA A Architectural GEGC Inspection Reports
001107
(COR), & P.24 (COR) at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  PRIOR TO application of  Anti-Dust
558 AA A Architectural GEGC Inspection Reports
001108 sealant for ceiling at grid line (10~11) Room no: M.19 (FWR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  Anti-Dust sealant (2 COAT)   for ceiling at
559 AA A Architectural GEGC Inspection Reports
001109 grid line  (10~11) Room no: M.19 (FWR) at platform level.
Inspection request for plinth including surface preparation, formwork & rebar's
M3-CJV-IRF-EAR00-UGS-
560 anchorage prior to casting concrete pouring IN Room no: M.14 (ACR8) at platform AA A Architectural GEGC Inspection Reports
001110
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for floor surface preparation prior to concrete screed placement in
561 AA A Architectural GEGC Inspection Reports
001113 room no: P.05 (COR), P.04 (COR), P.21 (COR), & P.24 (COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection  Request for floor surface preparation prior to concrete screed placement in
562 AA A Architectural GEGC Inspection Reports
001114 room no: P.29 (COR) & E.05 (ER4) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  prior to  application of  Anti-Dust
563 AA A Architectural GEGC Inspection Reports
001115 sealant for ceiling at grid line (25-28 ) ROOM NO : P.16 (COR) at  platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  paint at grid line(25-28 ) ROOM NO : P.16
564 AA A Architectural GEGC Inspection Reports
001117 (COR) at  platform level.
Inspection Request for the application of putty & paint on the walls  at grid line (20-31)
M3-CJV-IRF-EAR00-UGS-
565 ROOM NO track side  north & south side as per attached highlighted location at AA A Architectural GEGC Inspection Reports
001118
platform level
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  Anti-Dust sealant (2 COAT)   for ceiling at
566 AA A Architectural GEGC Inspection Reports
001119 grid line (25-28 )ROOM NO : P.16 (COR) at  platform level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
567 screed placement on the concourse floor in room no:   P.29 (COR) & E.05 (ER4) at AA A Architectural GEGC Inspection Reports
001120
concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint at grid line(24-29) Room no:
568 AA A Architectural GEGC Inspection Reports
001121 E.05 (ER4) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth for Room no: M.07 (ACR8) at platform
569 AA A Architectural GEGC Inspection Reports
001122 level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  prior to  application of putty & paint at
570 AA A Architectural GEGC Inspection Reports
001123 grid line (09-10 ) room no: P.20 (COR) at platform level.
Inspection request for plinth including surface preparation, formwork & rebar's
M3-CJV-IRF-EAR00-UGS-
571 anchorage prior to casting concrete pouring IN Room no: M.17 (ACR9) at platform AA A Architectural GEGC Inspection Reports
001124
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint at grid line(10~11) Room no:
572 AA A Architectural GEGC Inspection Reports
001125 M.19 (FWR) at platform level.

Page 45 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
573 AA A Architectural GEGC Inspection Reports
001126 line (10-12) room no M.20 (TWC) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
574 AA A Architectural GEGC Inspection Reports
001127 line (10-12) room no E.16 (ER5) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for floor surface preparation prior to concrete screed placement in
575 AA A Architectural GEGC Inspection Reports
001128 room no:P.18 (track side walk way) at platform level. As per highlighted location

M3-CJV-IRF-EAR00-UGS-
576 Inspection Request for the application of paint at grid line(20-26 )ROOM NO : P.15 (COR)at platform
AA level A Architectural GEGC Inspection Reports
001129
Inspection Request for the surface preparation  prior to  application of putty & paint at
M3-CJV-IRF-EAR00-UGS-
577 grid line (A-B) room no: P.25 (COR) at concourse  level. (AS PER HIGHLIGHTED AA A Architectural GEGC Inspection Reports
001130
LOCATION)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the  Surface   Preparation &  application of putty  at grid
578 AA A Architectural GEGC Inspection Reports
001131 line(10~11) Room no: T.09 (PSDR) at platform level.
Inspection Request For the installation of Rockwool & application of fire stop sealant
M3-CJV-IRF-EAR00-UGS- for Wall  from concourse slab up to 3.5 meter height at grid (25-26 )ROOM NO P.02
579 AA A Architectural GEGC Inspection Reports
001132 (unpaid area) at Movement Joints at concourse  level. (see the attached highlighted
area).
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
580 grid (25-29 ) room no B.11 (TRR), at Movement Joints  &  Between Block Wall &  AA A Architectural GEGC Inspection Reports
001133
Roof  Slab  at concourse  level.(see the attached highlighted area).
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint at grid line(10~11) Room no:
581 AA A Architectural GEGC Inspection Reports
001134 T.09 (PSDR) at platform level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
582 screed placement on the concourse floor in room no:P.18(track side walk way) at AA A Architectural GEGC Inspection Reports
001135
platform level. As per highlighted location
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
583 screed placement on the concourse floor in room no: P.18 (track side walk way) at AA A Architectural GEGC Inspection Reports
001136
platform level. As per highlighted location
M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth for Room no: M.17 (ACR9) at platform
584 AA A Architectural GEGC Inspection Reports
001137 level.
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
585 grid(10~12) Room no: P.14 (COR), at Movement Joints  &  Between Block Wall &  AA A Architectural GEGC Inspection Reports
001138
Roof  Slab  at platform level .(see the attached highlighted area.
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
586 grid (10~11) Room no: M.19 (FWR), at Movement Joints  &  Between Block Wall &  AA A Architectural GEGC Inspection Reports
001139
Roof  Slab  at platform level .(see the attached highlighted area.
Inspection Request For the surface preparation prior to installation of Rockwool 
M3-CJV-IRF-EAR00-UGS- materials  and fire stop sealant at Grid line  (09-10 ) room no : P.20 (COR) at 
587 AA A Architectural GEGC Inspection Reports
001140 Movement Joints  & Between Block Wall &  Roof  Slab  at platform level. (see the
attached highlighted area.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint at grid line (09-10) room no:
588 AA A Architectural GEGC Inspection Reports
001147 P.20 (COR) at Platform level.
Inspection Request for the application of putty & paint on the walls  at grid line (26-31)
M3-CJV-IRF-EAR00-UGS-
589 room no: track side south side as per attached highlighted location at Platform AA A Architectural GEGC Inspection Reports
001148
level.part2
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  prior to  application of  Anti-Dust
590 AA A Architectural GEGC Inspection Reports
001149 sealant for ceiling at grid line (09-10 ) ROOM NO : P.20 (COR) at Platform level.

Page 46 of 103
M3-CJV-IRF-EAR00-UGS-
591 Inspection request for plinth including surface preparation, formwork & rebar's anchorage prior
AAto casting concrete
A pouring
Architectural
IN Room no: M.04 (ACR4)
GEGC at Concourse
Inspection
level. Reports
001150
Inspection Request For the surface preparation prior to installation of
M3-CJV-IRF-EAR00-UGS- Rockwool materials  and fire stop sealant at Grid line (12-14 ) room no: Beside COR
592 AA A Architectural GEGC Inspection Reports
001151 P.03  at Movement Joints  & Between Block Wall &  Roof  Slab  at concourse level.
(See the Attached Highlighted Area).
Inspection Request for floor surface preparation prior to concrete screed plcacement in
M3-CJV-IRF-EAR00-UGS-
593 room no: P.20 (COR), P.30 (COR), P.14 (COR), M.20 (TWC), E.16 (ER5), T.08 AA A Architectural GEGC Inspection Reports
001152
(PSDR), M.19 (FWR) & Stair 2 at platform level..as per highlighted location
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
594 screed placement on the concourse floor in room no: P.19 (track side walk way) at AA A Architectural GEGC Inspection Reports
001153
platform level(As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  Anti-Dust sealant (2 COAT) for ceiling at grid
595 AA A Architectural GEGC Inspection Reports
001154 line (09-10) room no: P.20 (COR) at platform level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS- screed placement on the concourse floor in room no: P.20 (COR), P.30 (COR), P.14
596 AA A Architectural GEGC Inspection Reports
001155 (COR), M.20 (TWC), E.16 (ER5), T.08 (PSDR), M.19 (FWR) & Stair 2 at platform level.
(As Per Highlighted
Inspection Location).
Request For the surface preparation prior to installation of Rockwool 
M3-CJV-IRF-EAR00-UGS- materials  and fire stop sealant at Grid line   25-30 )ROOM NO : P.16 (COR)&
597 AA A Architectural GEGC Inspection Reports
001156 P.15(COR) at Movement Joints  & Between Block Wall &  Roof  Slab  at platform level
(AS PER HIGHLIGHTED LOCATION).
Inspection Request for floor surface preparation prior to concrete screed placement in
M3-CJV-IRF-EAR00-UGS-
598 room no:P.25 (COR, R.01 (RETAIL 1), E.14 (IDF2) & E.04 (ER3) at concourse level. AA A Architectural GEGC Inspection Reports
001157
(As per Highlighted Location)
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS- screed placement on the concourse floor in room no:P.25 (COR, R.01 (RETAIL 1),
599 AA A Architectural GEGC Inspection Reports
001159 E.14 (IDF2), P.12 (LOBBY) & E.04 (ER3) at concourse level. (As per highlighted
location)
M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for  Plinth for Entrance- 1 Room no: M.04
600 AA A Architectural GEGC Inspection Reports
001160 (ACR4) at concourse Level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for floor surface preparation prior to concrete screed placement in
601 AA A Architectural GEGC Inspection Reports
001161 room no:M.11 (VR1) & M.12 (VR2) at concourse level. (As per highlighted location)

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  paint at grid line (20-26 )ROOM NO: P.15
602 AA A Architectural GEGC Inspection Reports
001162 (COR)at  platform level (As Per Highlighted Location ) .
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
603 screed placement on the concourse floor in Room no: M.11 (VR1) & M.12 (VR2) at AA A Architectural GEGC Inspection Reports
001163
concourse level. (As Per Highlighted Location )
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
604 AA A Architectural GEGC Inspection Reports
001164 & block out)   prior to concrete screed placement in room no. P.01 (PAID
CONCOURSE) at concourse level 4C2 Station.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
605 screed placement on the concourse floor in Room no: P.01 (PAID CONCOURSE) at AA A Architectural GEGC Inspection Reports
001167
concourse level. (As per highlighted location) .
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  prior to  application of putty & paint on
606 AA A Architectural GEGC Inspection Reports
001168 CMU wall at grid line (20-22) ROOM NO : P.15 (COR) at platform level.
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
607 grid(10-12)ROOM NO M.20 (TWC)  at Movement Joints  &  Between Block Wall &  AA A Architectural GEGC Inspection Reports
001189
Roof  Slab  at platform level.(See the Attached Highlighted Area.)
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
608 grid(10-12)ROOM NO E.16 (ER5) at Movement Joints  &  Between Block Wall &  Roof  AA A Architectural GEGC Inspection Reports
001190
Slab  at platform level .(See the Attached Highlighted Area.)

Page 47 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to up to Soffit on grid 15
609 AA A Architectural GEGC Inspection Reports
001191 ,Room no: LIFT 01 & LIFT 02 at platform level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
610 AA A Architectural GEGC Inspection Reports
001194 & block out)   prior to concrete screed placement in room no. P.02 (UNPAID
CONCOURSE) in Entrance 1 at concourse level (As Per Highlighted Location).
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
611 screed plcacement on the concourse floor in room no: P.02 (UNPAID CONCOURSE) AA A Architectural GEGC Inspection Reports
001195
in Enterance 1 at concourse level.as per highlighted location
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
612 AA A Architectural GEGC Inspection Reports
001196 & block out) prior to concrete screed placement in room no. P.02 (UNPAID
CONCOURSE) in Enterance 1 at concourse level.as per highlighted location.part2
Inspection Request for the surface preparation prior to application of putty & paint at
M3-CJV-IRF-EAR00-UGS-
613 grid line (32-33 ) ROOM NO : M.12 (VR2) at concourse level. (PART3 As per AA A Architectural GEGC Inspection Reports
001197
highlighted location)
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
614 screed placement on the concourse floor in room no: P.02 (UNPAID CONCOURSE) in AA A Architectural GEGC Inspection Reports
001198
Entrance
Inspection1Request
at concourse level  surface
for screed Part 2 (As per highlighted
preparation, location).
leveling, setting out & installation of
embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
M3-CJV-IRF-EAR00-UGS-
615 & block out) prior to concrete screed placement in room no. P.02 (UNPAID AA A Architectural GEGC Inspection Reports
001199
CONCOURSE) in Entrance 1 at concourse level  (Part 3) (As Per Highlighted
Location.)
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to application of  putty & paint for
616 AA A Architectural GEGC Inspection Reports
001200 ROOM NO: P.08 (COR) at grid line (28-30) at Concourse level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
617 screed placement on the concourse floor in room no Grid (J-S) P.02 (UNPAID AA A Architectural GEGC Inspection Reports
001201
CONCOURSE) in Entrance 1 at concourse level Part 3 (As Per Highlighted Location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to up to Soffit on grid 16
618 AA A Architectural GEGC Inspection Reports
001202 Room no: P.13 (Platform) at Platform level.
Inspection Request For the surface preparation prior to installation of Rockwool 
M3-CJV-IRF-EAR00-UGS- materials  and fire stop sealant at Grid line (32-33 )ROOM NO : M.12(VR2) at
619 AA A Architectural GEGC Inspection Reports
001203 Movement Joints  & Between Block Wall &  Roof  Slab  at concourse level Part 2 (As
Per Highlighted Location)
Inspection Request for the surface preparation  prior to  application of putty & paint at
M3-CJV-IRF-EAR00-UGS-
620 grid line (B-C) ROOM NO : R.01 (Retail) at concourse  level. (As Per Highlighted AA A Architectural GEGC Inspection Reports
001204
Location).
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
621 AA A Architectural GEGC Inspection Reports
001210 & block out) prior to concrete screed placement in grid (J-S) room no. P.02 (UNPAID
CONCOURSE) in Entrance 1 at concourse level. part4 .(As Per Highlighted Location).
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
622 screed placement on the concourse floor in room no Grid (J-S) P.02 (UNPAID AA A Architectural GEGC Inspection Reports
001211
CONCOURSE) in Entrance 1 at concourse level part4 .(As Per Highlighted Location).
Inspection Request for the surface preparation  prior to  application of putty & paint at
M3-CJV-IRF-EAR00-UGS-
623 grid line (29-30) ROOM NO : P.10 (COR) at concourse  level. (As Per Highlighted AA A Architectural GEGC Inspection Reports
001212
Location).
Inspection Request for the  installation of Block Wall  from concourse level to up to
M3-CJV-IRF-EAR00-UGS-
624 soffit  of Secondary Slab  at grid (32-33) Room Name: P.27 (COR) at concourse level. AA A Architectural GEGC Inspection Reports
001213
(As per highlighted location).
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
625 AA A Architectural GEGC Inspection Reports
001215 & block out)   prior to concrete screed placement in room no. P.O2(UNPAID
CONCOURSE)in Entrance 3 at concourse level. (As Per Highlighted Location) .
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
626 grid (25-30 )ROOM NO: P.16 (COR at Movement Joints  &  Between Block Wall AA A Architectural GEGC Inspection Reports
001216
& Roof  Slab at platform level. (As Per Highlighted Location) .

Page 48 of 103
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
627 grid (10-11 ) ROOM NO : T.08 (PSDR) at Movement Joints  &  Between Block Wall &  AA A Architectural GEGC Inspection Reports
001217
Roof  Slab  at platform level. (As Per Highlighted Location) .
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
628 grid (09-10) ROOM NO: P.20 (COR) at Movement Joints  &  Between Block Wall &  AA A Architectural GEGC Inspection Reports
001218
Roof  Slab  at platform level. (As Per Highlighted Location) .
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
629 screed placement on the concourse floor in Room no: P.02 (UNPAID CONCOURSE) AA A Architectural GEGC Inspection Reports
001219
in Entrance 3. (As Per Highlighted Location) .
Inspection Request for the surface preparation  prior to  application of putty & paint at
M3-CJV-IRF-EAR00-UGS-
630 grid line (32-33) ROOM NO: M.12 (VR2) at concourse level (PART4). ( As per AA A Architectural GEGC Inspection Reports
001220
Highlighted location)
Inspection Request for the surface preparation  prior to  application of  Anti-Dust
M3-CJV-IRF-EAR00-UGS-
631 sealant for ceiling at grid line (32-33 ) ROOM NO: M.12 (VR2) at concourse level AA A Architectural GEGC Inspection Reports
001221
(PART2). ( As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  putty & paint at grid line (32-33) ROOM NO:
632 AA A Architectural GEGC Inspection Reports
001222 M.12 (VR2) at concourse level (PART3 ) (As Per Highlighted Location).
Inspection Request for the application of  Anti-Dust sealant (2 COAT)   for ceiling at
M3-CJV-IRF-EAR00-UGS-
633 grid line (32-33) ROOM NO: M.12 (VR2) at concourse level (PART2)  (As Per AA A Architectural GEGC Inspection Reports
001223
Highlighted Location).
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
634 grid (26-30 ) ROOM NO : P.19 (TRACK SIDE WALK WAY) at Movement Joints  &  AA A Architectural GEGC Inspection Reports
001224
Between Block Wall &  Roof  Slab  at platform level. (As Per Highlighted Location).
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
635 grid (11-13 ) ROOM NO: P.13 (PLATFORM) at Movement Joints  &  Between Block AA A Architectural GEGC Inspection Reports
001225
Wall &  Roof  Slab  at platform level. (As Per Highlighted Location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  putty & paint at grid line (32-33) ROOM NO:
636 AA A Architectural GEGC Inspection Reports
001227 M.12 (VR2) at concourse level (PART4) (As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from platform level to up to 3Mt height gridline (9-11 )
637 AA A Architectural GEGC Inspection Reports
001228 Room no: P.20 (COR) at platform level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  putty & paint at grid line (32-33 ) ROOM NO:
638 AA A Architectural GEGC Inspection Reports
001229 M.12 (VR2) at concourse level (PART5). (As per highlighted location)
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
639 grid (32-33 ) ROOM NO: M.12 (VR2) at concourse level (PART2) ( As per highlighted AA A Architectural GEGC Inspection Reports
001230
location).
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items ( Galvanized / poly carbonate angles, filler board grouting of floor
640 AA A Architectural GEGC Inspection Reports
001231 drain & block out)   prior to concrete screed placement in room no. M.05 (ACR5) at
concourse level. (As per highlighted location).
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
641 screed placement on the concourse floor in room no: M.05 (ACR5) at concourse level. AA A Architectural GEGC Inspection Reports
001232
(As per highlighted location).
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
642 AA A Architectural GEGC Inspection Reports
001233 & block out) prior to concrete screed placement in room no. M.23 (ACR10) at
concourse level. (As per highlighted location) .
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
643 screed placement on the concourse floor in room no: M.23 (ACR10) at concourse level AA A Architectural GEGC Inspection Reports
001234
(As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  prior to  application of  Anti-Dust
644 AA A Architectural GEGC Inspection Reports
001235 sealant for Floor at grid line (3-5 ) ROOM NO : T.06 (SER) at concourse level.

Page 49 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  Anti-Dust sealant (2 COAT)   for Floor at grid
645 AA A Architectural GEGC Inspection Reports
001236 line (3-5 ) ROOM NO : T.06 (SER) at concourse level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded it ems (galvanized / poly carbonate angles, filler board grouting of floor
646 AA A Architectural GEGC Inspection Reports
001237 drain & block out) prior to concrete screed placement in room no. M.01 (ACR1) at
concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
647 AA A Architectural GEGC Inspection Reports
001238 screed placement on the concourse floor in room no: M.01 (ACRl) at concourse level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
648 AA A Architectural GEGC Inspection Reports
001239 & block out) prior to concrete screed placement in room no. M.02 (ACR2) at concourse
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
649 AA A Architectural GEGC Inspection Reports
001240 screed placement on the concourse floor in room no: M.02 (ACR2) at concourse level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized I poly carbonate angles, filler board grouting of floor drain
650 AA A Architectural GEGC Inspection Reports
001241 & block out) prior to concrete screed placement in room no. M.13 (CWT) at concourse
level.
M3-CJV-IRF-EAR00-UGS- ln~pection Request for final inspection prior to concrete screed casting & concrete
651 AA A Architectural GEGC Inspection Reports
001242 screed placement on the concourse floor in room no: M.13 (CWT) at concourse level
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized I poly carbonate angles, filler board grouting of floor drain
652 AA A Architectural GEGC Inspection Reports
001243 & block out) prior to concrete screed placement in room no. S.01 (STAIR1) at
concourse level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
653 screed placement on the concourse floor in room no: S.01 (STAIR 1) at concourse AA A Architectural GEGC Inspection Reports
001244
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  putty & paint at grid (22-25 ) ROOM NO :
654 AA A Architectural GEGC Inspection Reports
001245 F.01 (TO) at concourse level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
M3-CJV-IRF-EAR00-UGS-
655 & block out) prior to concrete screed placement in room no. P.02 (UNPAID AA A Architectural GEGC Inspection Reports
001246
CONCOURSE), P.01 (PAID CONCOURSE) &  Part of COR P.08 at concourse level.
(As per highlighted
Inspection Request location)
for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
656 screed placement on the concourse floor in room no. P.02 (UNPAID CONCOURSE), AA A Architectural GEGC Inspection Reports
001247
P.01 (PAID CONCOURSE) &  Part of COR P.08 at co
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
657 AA A Architectural GEGC Inspection Reports
001248 & block out) prior to concrete screed placement in room no. F.01 (TICKET OFFICE) at
concourse level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
658 screed placement on the concourse floor in room no: F.01 (TICKET OFFICE) at AA A Architectural GEGC Inspection Reports
001249
concourse level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
659 AA A Architectural GEGC Inspection Reports
001250 & block out) prior to concrete screed placement in room no. B.09 (AFC) at concourse
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
660 AA A Architectural GEGC Inspection Reports
001251 screed placement on the concourse floor in room no: B.09 (AFC) at concourse level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
661 AA A Architectural GEGC Inspection Reports
001252 & block out) prior to concrete screed placement in room no. T.09 (SMR) at concourse
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
662 AA A Architectural GEGC Inspection Reports
001253 screed placement on the concourse floor in room no: T.09 (SMR) at concourse level.

Page 50 of 103
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
663 AA A Architectural GEGC Inspection Reports
001254 & block out) prior to concrete screed placement in room no. M.06 (ACR6) at concourse
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
664 AA A Architectural GEGC Inspection Reports
001255 screed placement on the concourse floor in room no: M.06 (ACR6) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  prior to application of putty & paint on
665 AA A Architectural GEGC Inspection Reports
001256 concrete wall at grid line (22-25) ROOM NO: F.01 (TO) (Part2) at concourse level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
666 AA A Architectural GEGC Inspection Reports
001257 & block out) prior to concrete screed placement in room no. M.07 (ACR7) at concourse
level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
667 AA A Architectural GEGC Inspection Reports
001258 & block out) prior to concrete screed placement in room no. M.03 (ACR3) at concourse
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
668 AA A Architectural GEGC Inspection Reports
001259 screed placement on the concourse floor in room no: M.07 (ACR7) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
669 AA A Architectural GEGC Inspection Reports
001260 screed placement on the concourse floor in room no: M.03 (ACR3) at concourse level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
embedded Items (galvanized I poly carbonate angles, filler board grouting of floor drain
M3-CJV-IRF-EAR00-UGS-
670 & block out) prior to concrete screed placement in room no. M.04 (ACR4) in entrance 1 AA A Architectural GEGC Inspection Reports
001267
at
concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the final approval of paint on the walls at grid line (03-05)
671 AA A Architectural GEGC Inspection Reports
001268 ROOM NO : T.06 (SER) at concourse level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
672 screed placement on the concourse floor in room no: M.04 (ACR4) in entrance 1 at AA A Architectural GEGC Inspection Reports
001269
concourse level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS- screed placement on the concourse floor in room no: P.02 (UNPAID CONCOURSE),
673 AA A Architectural GEGC Inspection Reports
001270 R.01 (RETAIL 1), P.25 (COR) & E.14 (IDF2) in entrance 1 at concourse level. (As per
highlighted location)for screed surface preparation, leveling, setting out & installation of
Inspection Request
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
674 AA A Architectural GEGC Inspection Reports
001271 & block out) prior to concrete screed placement in room no. P.13 (PLATFORM) at
platform level. (As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection request for the application of putty & paint on concrete wall at grid (22-25 )
675 AA A Architectural GEGC Inspection Reports
001272 ROOM NO : F.01 (TO) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  putty & paint at grid line (32-33) ROOM NO:
676 AA A Architectural GEGC Inspection Reports
001273 M.12 (VR2) at concourse level (PART5). (As per highlighted location)
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain GEGC Subcontractor not
677 AA B Architectural GEGC
001274 & block out) prior to concrete screed placement in room no. M.17 (ACR9) at platform approved by RAMPED
level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
678 screed placement on the concourse floor in Room no: P.13 (PLATFORM) at Platform AA A Architectural GEGC Inspection Reports
001275
Level. (AS per highlighted location).
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
679 AA A Architectural GEGC Inspection Reports
001276 & block out) prior to concrete screed placement in room no. M.17 (ACR8) at platform
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
680 AA A Architectural GEGC Inspection Reports
001277 screed placement on the concourse floor in room no: M.17 (ACR8) at platform level.

Page 51 of 103
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
681 AA A Architectural GEGC Inspection Reports
001278 & block out)   prior to concrete screed placement in room no. P.16 (COR) & Stair 3 at
platform level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
682 screed placement on the concourse floor room no. P.16 (COR) & Stair 3 at platform AA A Architectural GEGC Inspection Reports
001279
level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
683 AA A Architectural GEGC Inspection Reports
001280 & block out)   prior to concrete screed placement in room no. P.17 (LOBBY) at platform
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
684 AA A Architectural GEGC Inspection Reports
001281 screed placement on the concourse floor in room no: P.17 (LOBBY) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of putty & paint on the walls at grid (29-30 )
685 AA A Architectural GEGC Inspection Reports
001282 ROOM NO : P.09 (COR) & P.11 (COR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
686 AA A Architectural GEGC Inspection Reports
001283 screed placement on the concourse floor in room no: M.17 (ACR9) at platform level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
687 AA A Architectural GEGC Inspection Reports
001284 & block out) prior to concrete screed placement in room no. M.25 (ACR 11) at platform
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
688 AA A Architectural GEGC Inspection Reports
001285 screed placement on the concourse floor in room no: M.25 (ACR 11) at platform level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
689 AA A Architectural GEGC Inspection Reports
001287 & block out) prior to concrete screed placement in room no. P.15 (COR) Part-1 at
platform level. Part-1
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
690 screed placement on the concourse floor in room no. P.15 (COR)  Part-1 at platform AA A Architectural GEGC Inspection Reports
001288
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application  of paint work at grid line (10-12) ROOM NO
691 AA A Architectural GEGC Inspection Reports
001290 E.16 (ER5) & M.20 (TWC) at platform  level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of putty & paint on the walls at grid (22-25)
692 AA A Architectural GEGC Inspection Reports
001291 ROOM NO : P.08 (COR) & P.10 (COR) part2 at concourse level.
Inspection request for plinth including surface preparation, formwork & rebar's
M3-CJV-IRF-EAR00-UGS-
693 anchorage prior to casting concrete pouring in Room no: M.08 (FPR) at concourse  AA A Architectural GEGC Inspection Reports
001292
level.
Inspection request for surface preparation of walls & Roof  prior to application of
M3-CJV-IRF-EAR00-UGS-
694 vandex super for water proofing purpose at grid (29-30) ROOM NO : M.09 (FWT1) & AA A Architectural GEGC Inspection Reports
001293
M.10 (FWT2) at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  prior to application of Anti-Dust sealant
695 AA A Architectural GEGC Inspection Reports
001294 for ceiling at grid line (10-12 ) ROOM NO: M.20 (TWC) & E.16 (ER5) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth for Room no: M.08 (FPR) at concourse 
696 AA A Architectural GEGC Inspection Reports
001296 level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of Anti-Dust sealant
697 AA A Architectural GEGC Inspection Reports
001297 at inside the POPUP at grid line (7-10) ROOM NO: T.07 (TPS) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant at inside the POPUP at grid
698 AA A Architectural GEGC Inspection Reports
001298 line (7-10) ROOM NO : T.07 (TPS) at concourse level.

Page 52 of 103
Inspection Request For the surface preparation prior to installation of
M3-CJV-IRF-EAR00-UGS- Rockwool materials  and fire stop sealant at Grid line (28-31) ROOM NO: P.08 (COR),
699 AA A Architectural GEGC Inspection Reports
001299 P.09 (COR), P.10 (COR) & P.11 (COR) at Movement Joints  & Between Block Wall &
Roof Slab at concourse level (PART2). (As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation/Rebar anchorage/kicker at gridline (09-11)
700 AA A Architectural GEGC Inspection Reports
001300 beside stair 2 at concourse level. (As per highlighted location)
Inspection Request for surface preparation for concrete plinth prior to application of
M3-CJV-IRF-EAR00-UGS-
701 epoxy primer at grid line (08-10) ROOM NO: M.13 (CWT) at concourse level. ( As per AA A Architectural GEGC Inspection Reports
001301
highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of  Anti-Dust sealant
702 AA A Architectural GEGC Inspection Reports
001302 at inside the POPUP at grid line (10-11) ROOM NO : T.02 (LPS2) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant at inside the POPUP at grid
703 AA A Architectural GEGC Inspection Reports
001303 line (10-11 ) ROOM NO: T.02 (LPS2) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the final approval of paint on the walls at grid line (7-10) ROOM
704 AA A Architectural GEGC Inspection Reports
001304 NO : T.07 (TPS) at concourse level.
Inspection request for plinth including surface preparation, formwork & rebar's
M3-CJV-IRF-EAR00-UGS-
705 anchorage prior to casting concrete pouring IN Room no: M.18 (PR) at concourse  AA A Architectural GEGC Inspection Reports
001305
level.
Inspection Request for surface preparation prior to application of tremp proof for wet
M3-CJV-IRF-EAR00-UGS-
706 area at grid line (03-12) ROOM NO: M.01 (ACR1), M.02 (ACR2), M.06 (ACR6) & M.13 AA A Architectural GEGC Inspection Reports
001306
(CWT) at concourse level (As per highlighted location).
Inspection Request for surface preparation for concrete plinth prior to application of
M3-CJV-IRF-EAR00-UGS-
707 epoxy primer at grid line (09-13) ROOM NO : M.06 (ACR6) at concourse level ( As per AA A Architectural GEGC Inspection Reports
001307
highlighted location) .
M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth for Room no:M.18 (PR) at platform
708 AA A Architectural GEGC Inspection Reports
001308 level.
Inspection Request for the application of Tremp proof for wet area at grid line (03-12)
M3-CJV-IRF-EAR00-UGS-
709 ROOM NO : M.01 (ACR1), M.02 (ACR2), M.06 (ACR6) & M.13 (CWT) at concourse AA A Architectural GEGC Inspection Reports
001309
level. (As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of  Anti-Dust sealant
710 AA A Architectural GEGC Inspection Reports
001310 at inside the POPUP at grid line (06-08) ROOM NO : T.01 (LPS1) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
711 AA A Architectural GEGC Inspection Reports
001321 screed placement for Room no: M.20 (TWC) at Platform level.
Inspection Request for the surface preparation  prior to application of putty & paint on
M3-CJV-IRF-EAR00-UGS-
712 concrete wall at grid line (32-33) ROOM NO: M.12 (VR2) P.27 (COR) at concourse AA A Architectural GEGC Inspection Reports
001328
level (As per highlighted location (PAERT6).
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant at inside the POPUP at grid
713 AA A Architectural GEGC Inspection Reports
001329 line (06-08) ROOM NO: T.01 (LPS1) at concourse level.
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
714 at grid line (13-23) ROOM NO: P.01 (PAID CONCOURSE) south & north side at AA A Architectural GEGC Inspection Reports
001330
concourse level. As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection request for the application of vandex  super for water tank walls & ceiling at
715 AA A Architectural GEGC Inspection Reports
001331 grid (29-30) ROOM NO: M.10 (FWT2) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to up to 3Mt height at grid (09-
716 AA A Architectural GEGC Inspection Reports
001332 11) beside stair 2 at concourse level (As per highlighted location).

Page 53 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the final approval of paint on the walls at grid line (11-10)
717 AA A Architectural GEGC Inspection Reports
001334 ROOM NO: T.02 (LPS2) at concourse level.
Inspection Request For the surface preparation prior to Rockwool & application of fire
M3-CJV-IRF-EAR00-UGS- stop sealant at grid (09-10 ) ROOM NO: Beside S.02. (STAIR 2) at Movement Joints &
718 AA A Architectural GEGC Inspection Reports
001335 Between Block Wall &  Roof  Slab  at concourse level (See the attached Highlighted
Area).
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS- grid (28-31) ROOM NO: P.08 (COR) & P.09 (COR) P.10 (COR) & P.11 (COR) at
719 AA A Architectural GEGC Inspection Reports
001336 Movement Joints & Between Block Wall &  Roof Slab at concourse level (See the
attached Highlighted Area).
Inspection Request for the surface preparation  prior to  application of Anti-Dust
M3-CJV-IRF-EAR00-UGS-
720 sealant at inside the POPUP at grid line (4-6 ) ROOM NO: T.04 (PP) at concourse AA A Architectural GEGC Inspection Reports
001337
level up to ground level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of  Anti-Dust sealant at inside the POPUP at
721 AA A Architectural GEGC Inspection Reports
001338 grid line (4-6 ) ROOM NO: T.04 (PP) at concourse level up to ground level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Final approval of Paint on the walls at grid line (06-08)
722 AA A Architectural GEGC Inspection Reports
001339 ROOM NO: T.01 (LPS1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  prior to  application of  Anti-Dust
723 AA A Architectural GEGC Inspection Reports
001340 sealant on the ceiling at grid line (10-11 ) ROOM NO: T.08 (PSDR) at Platform level
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS- screed placement on the concourse floor in room no: M.18 (PR), P.15 (COR), M.14
724 AA A Architectural GEGC Inspection Reports
001341 (ACR8 PART2) & TRACK SIDE WALK WAY at platform level. As per highlighted
location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant on the ceiling at grid line
725 AA A Architectural GEGC Inspection Reports
001342 (10-12 ) ROOM NO: T.08 (PSDR), E.16 (ER5 ) & M.20 (TWC) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Tremp proof for wet area on the floor at
726 AA A Architectural GEGC Inspection Reports
001343 ROOM NO : B.01 (CLR1) & B.11 (TRR) at concourse level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
embedded items (galvanized / poly carbonate angles, filler board grouting of floor
M3-CJV-IRF-EAR00-UGS-
727 drain, water channel & block out) prior to concrete screed placement in room no. M.18 AA A Architectural GEGC Inspection Reports
001344
(PR), P.15 (COR), M.14 (ACR8 PART2) & TRACK SIDE WALK WAY at platform level
(As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation/Rebar anchorage/kicker at gridline (27-28)
728 AA A Architectural GEGC Inspection Reports
001345 beside stair 3 at concourse level (As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation prior to application of tremp proof for wet
729 AA A Architectural GEGC Inspection Reports
001346 area on the floor for Room No: B.02 (CLR2 )at concourse level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of tremp proof for wet area on the floor for
730 AA A Architectural GEGC Inspection Reports
001347 ROOM NO: CLR2 at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of epoxy Paint 1st &  final coating on the plinth
731 AA A Architectural GEGC Inspection Reports
001348 concrete at ROOM NO: M.13 (CWT) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the final approval of paint on the walls at grid line (04-06)
732 AA A Architectural GEGC Inspection Reports
001349 ROOM NO: T.04 (PP) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the WATER LEAK TEST FOR Room # TRR AND CLR1 for the 
733 AA A Architectural GEGC Inspection Reports
001350 Trem proof water proofing at Concourse Level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Leak test of wet area for Floor for Room no : B.02 (CLR2) at
734 AA A Architectural GEGC Inspection Reports
001366 concourse level.

Page 54 of 103
Inspection Request for surface preparation prior to application of tremp proof for wet
M3-CJV-IRF-EAR00-UGS-
735 area on the Floor drain at grid line (03-12) ROOM NO: B.10 (SSR) & M.03 (ACR3) at AA A Architectural GEGC Inspection Reports
001367
concourse level (As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for the final approval of paint on the walls at grid line (04-06)
736 AA A Architectural GEGC Inspection Reports
001368 ROOM NO: T.08 (PSDR) at concourse level.
Inspection request for surface preparation of floor prior to application of vandex super
M3-CJV-IRF-EAR00-UGS-
737 for water proofing purpose at grid ( 29-30 ) ROOM NO: M.09 (FWT1) & M.10 (FWT2) AA A Architectural GEGC Inspection Reports
001369
at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection request for the application of vandex  super for water tank walls & ceiling at
738 AA A Architectural GEGC Inspection Reports
001370 grid (29-30 ) ROOM NO: M.09 (FWT1) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for paint work on  concrete wall  At grid (28~29) Room no: M.03
739 AA A Architectural GEGC Inspection Reports
001371 (ACR3) at concourse level (Part2) .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from platform level to up to 3Mt height at Gridline
740 AA A Architectural GEGC Inspection Reports
001372 (26-28) beside stair 3 Mechanical shaft closer at PLATFORM LEVEL .

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of  putty & paint at grid line (32-33) ROOM NO :
741 AA A Architectural GEGC Inspection Reports
001373 M.12 (VR2) & P.27 (COR) at concourse level PART6 ( As per highlighted location).
Inspection Request For the surface preparation prior to rockwool & application of fire
M3-CJV-IRF-EAR00-UGS-
742 stop sealant at grid line (32-33) ROOM NO: M.12 (VR2) at concourse level PART 6 (As AA A Architectural GEGC Inspection Reports
001374
per highlighted location).
Inspection Request For the surface preparation prior to rockwool & application of fire
M3-CJV-IRF-EAR00-UGS-
743 stop sealant at grid line (26-28) beside stair 3 mechanical shaft closer at PLATFORM AA A Architectural GEGC Inspection Reports
001375
LEVEL
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, Rebars, filler board grouting of
744 AA A Architectural GEGC Inspection Reports
001376 floor drain & block out) prior to concrete screed placement in room no. E.07 (CER),
P.03 (C0R), B.01 (CLR1) & P.01 (PAID CONCOURSE ) at concourse level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
745 screed placement on the concourse floor in room no: E.07 (CER), P.03 (C0R), B.01 AA A Architectural GEGC Inspection Reports
001377
(CLR1) & P.01 (PAID CONCOURSE ) at concourse level .
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
746 at grid line (23-24 Axis) (S-N) ROOM NO: P.02 (UNPAID CONCOURSE) Entrance 1 at AA A Architectural GEGC Inspection Reports
001387
concourse level (As per highlighted location) Except FHC & FEC Locations
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Tremp proof for wet area around the floor
747 AA A Architectural GEGC Inspection Reports
001388 drain at ROOM NO: M.03 (ACR3), at concourse level (As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of epoxy Paint 1st & final coating on the plinth
748 AA A Architectural GEGC Inspection Reports
001389 concrete at ROOM NO: M.06 (ACR6) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Tremp proof for wet area around the floor
749 AA A Architectural GEGC Inspection Reports
001390 drain at ROOM NO: B.10 (SSR), at concourse level (As per highlighted location).
Inspection Request for surface preparation prior to application of tremp proof for wet
M3-CJV-IRF-EAR00-UGS-
750 area on around the floor drain at  Room No : M.17 (ACR9), M.14 (ACR8) & M.25 AA A Architectural GEGC Inspection Reports
001391
(ACR11) at platform level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
751 AA A Architectural GEGC Inspection Reports
001392 & block out)   prior to concrete screed placement in room no. P.06 (LOBBY), B.10
(SSR), B.11Request
Inspection (TRR) &forB.02
final(CLR2) at concourse
inspection level. screed casting & concrete
prior to concrete
M3-CJV-IRF-EAR00-UGS- screed placement on the concourse floor in Room no: P.06 (LOBBY), P.03 (C0R)
752 AA A Architectural GEGC Inspection Reports
001394 (PART2), B.10 (SSR), B.11 (TRR), P.01 (PAID CONCOURSE), B.02 (CLR2 ) at
concourse level (As per highlighted location).

Page 55 of 103
Inspection Request for surface preparation/ lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
753 at grid line (13-15) Axis (S-T) ROOM NO : P.01 (PAID CONCOURSE) at concourse AA A Architectural GEGC Inspection Reports
001397
level ( As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection request for the application of vandex  super for Water Tank Floor at grid
754 AA A Architectural GEGC Inspection Reports
001398 (29-30 ) ROOM NO: M.09 (FWT1) & M.10 (FWT2) at concourse level.
Inspection Request for Surface Preparation for Concrete Plinth prior to application of
M3-CJV-IRF-EAR00-UGS-
755 Epoxy Primer at ROOM NO: M.05 (ACR5), M.03 (ACR3) & M.07 (ACR7) at concourse AA A Architectural GEGC Inspection Reports
001399
level.
Inspection Request for the Application of Primer & Putty on Concrete Plinth prior to
M3-CJV-IRF-EAR00-UGS-
756 application of epoxy paint at ROOM NO : M.05 (ACR5), M.03 (ACR3) M.07 (ACR7) at AA A Architectural GEGC Inspection Reports
001400
concourse level.
Inspection Request for the Application of Epoxy Paint 1st &  final coating on the
M3-CJV-IRF-EAR00-UGS-
757 Concrete plinth concrete at ROOM NO : M.05 (ACR5), M.03 (ACR3) & M.07 (ACR7) at AA A Architectural GEGC Inspection Reports
001401
concourse level.
Inspection Request for the Application of Tremp Proof for Wet Area on the floor around
M3-CJV-IRF-EAR00-UGS-
758 the floor drain at  Room No : M.17 (ACR9), M.14 (ACR8) & M.25 (ACR11) at platform AA A Architectural GEGC Inspection Reports
001402
level.
Inspection Request for Surface Preparation for Concrete Plinth prior to application of
M3-CJV-IRF-EAR00-UGS-
759 Epoxy Primer at ROOM NO: M.04 (ACR4), M.08 (ACR8) & M.09 (ACR9) at concourse AA A Architectural GEGC Inspection Reports
001403
level.
Inspection Request for the Application of Primer & Putty on Concrete Plinth prior to
M3-CJV-IRF-EAR00-UGS-
760 application of epoxy paint at  ROOM NO: M.04 (ACR4), M.08 (ACR8) & M.09 (ACR9) AA A Architectural GEGC Inspection Reports
001404
at concourse level.
Inspection Request for the Application of Epoxy Paint 1st & final coating on the
M3-CJV-IRF-EAR00-UGS-
761 Concrete  plinth concrete at  ROOM NO : M.04 (ACR4), M.08 (ACR8) & M.09 (ACR9) AA A Architectural GEGC Inspection Reports
001405
at concourse level.
Inspection Request for floor surface preparation prior to concrete screed placement in
M3-CJV-IRF-EAR00-UGS-
762 Room no: M.08 (FPR) & P.02 (UNPAID) Area at concourse level. (As per Highlighted AA A Architectural GEGC Inspection Reports
001406
Location) .
M3-CJV-IRF-EAR00-UGS- Inspection Request for floor surface preparation prior to concrete screed placement in
763 AA A Architectural GEGC Inspection Reports
001407 Room no: P.13 (PLATFORM) at platform level (As per highlighted location).
Inspection Request For the surface preparation prior to installation of
M3-CJV-IRF-EAR00-UGS-
764 Rockwool materials and fire stop sealant Room no B.12 (CLR3) at Movement Joints & AA A Architectural GEGC Inspection Reports
001408
Between Block Wall & Roof Slab platform level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
765 materials and fire stop sealant Room no B.02 (CLR2)  at Movement Joints & Between AA A Architectural GEGC Inspection Reports
001409
Block Wall & Roof Slab at Concourse level .
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
766 screed placement on the concourse floor in Room no: M.08 (FPR) & P.02 (UNPAID) AA A Architectural GEGC Inspection Reports
001416
Area at Concourse level. (As per highlighted location).
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
767 screed placement on the concourse floor in Room no: P.13 (PLATFORM) at Platform AA A Architectural GEGC Inspection Reports
001417
level. (As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of putty & paint on
768 AA A Architectural GEGC Inspection Reports
001418 concrete wall at grid line (26-28) ROOM NO: P.16 (COR) (Part2 ) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of paint at grid line (26-28) ROOM NO: B.10
769 AA A Architectural GEGC Inspection Reports
001419 (SSR) at concourse level ( As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
770 AA A Architectural GEGC Inspection Reports
001420 no: E.10 (LVMDB2) at concourse level.

Page 56 of 103
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
771 AA A Architectural GEGC Inspection Reports
001421 no: E.09 (LVMDB1) at concourse level.
Inspection Request for surface preparation / lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
772 at grid line (13-15) axis (W-V) ROOM NO: P.01 (PAID CONCOURSE) at concourse AA A Architectural GEGC Inspection Reports
001422
level (As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for "Mock-Up" of Movement Joint, Construction Joint & Expansion
773 AD A Architectural GEGC Inspection Reports
001423 Joint Cover @UN-PAID CONCOURSE 4C2 STATION

M3-CJV-IRF-EAR00-UGS-
774 Inspection Request for Block wall from concourse level to up to 3Mt height at grid (27~28) Room
AA no:P.7(COR)
A at concourse
Architectural
level . GEGC Inspection Reports
001424
Inspection Request for Block wall (2nd Stage) from 3Mt height to up to Soffit at grid
M3-CJV-IRF-EAR00-UGS-
775 (27-28) ROOM NO behind S.03 (STAIR 3) at platform level (Part2) (As per highlighted AA A Architectural GEGC Inspection Reports
001425
location) .
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to up to 3Mt height at  grid (09-
776 AA A Architectural GEGC Inspection Reports
001426 11) beside stair 2 at concourse level (PART2) (As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation for Concrete Plinth prior to application of
777 AA A Architectural GEGC Inspection Reports
001427 Epoxy Primer at ROOM NO: M.02 (ACR2) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer & Putty on Concrete Plinth prior to
778 AA A Architectural GEGC Inspection Reports
001428 application of epoxy paint at ROOM NO: M.02 (ACR2) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st & final coating on the
779 AA A Architectural GEGC Inspection Reports
001429 Concrete  plinth concrete at ROOM NO: M.02 (ACR2) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation of walls & Roof  prior to application of
780 AA A Architectural GEGC Inspection Reports
001430 vandex super for water proofing purpose at ROOM NO: M.16 (DWT2) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation for Concrete Plinth prior to application of
781 AA A Architectural GEGC Inspection Reports
001431 Epoxy Primer at ROOM NO: M.08 (FPR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer & Putty on Concrete Plinth prior to
782 AA A Architectural GEGC Inspection Reports
001432 application of epoxy paint at  ROOM NO: M.08 (FPR) at concourse level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
783 AA A Architectural GEGC Inspection Reports
001439 & block out) prior to concrete screed placement in room no.P.02 (UNPAID
CONCOURSE) at concourse level. (As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation prior to application of tremp proof for wet
784 AA A Architectural GEGC Inspection Reports
001440 area on the floor for Room No. B.12 (CLR3) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Tremp proof for wet area on the floor at
785 AA A Architectural GEGC Inspection Reports
001441 ROOM NO: B.12 (CLR3) at patform level.
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
786 AA A Architectural GEGC Inspection Reports
001442 & block out) prior to concrete screed placement in room no.B.12 (CLR3) at platform
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for final inspection prior to concrete screed casting & concrete
787 AA A Architectural GEGC Inspection Reports
001443 screed placement on the concourse floor in room no: B.12 (CLR3) at platform level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
788 screed placement on the concourse floor in room no: P.02 (UNPAID CONCOURSE) at AA A Architectural GEGC Inspection Reports
001444
Concourse level .

Page 57 of 103
Inspection Request for the surface preparation  prior to  application of putty & paint on
M3-CJV-IRF-EAR00-UGS-
789 concrete wall at grid line (29-30 ) ROOM NO: P.19 (TRACK SIDE WALK WAY) at AA A Architectural GEGC Inspection Reports
001445
Platform level (South Side) .
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of epoxy Paint 1st &  final coating on the plinth
790 AA A Architectural GEGC Inspection Reports
001446 concrete at ROOM NO: M.08 (FPR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of putty & paint on the walls at grid (26-28)
791 AA A Architectural GEGC Inspection Reports
001447 ROOM NO: P.16 (COR)  (Part2 ) at Platform level.
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
792 at grid line (25-26) Axis (Q-X) ROOM NO: P.02 (UNPAID CONCOURSE) in entrance 1 AA A Architectural GEGC Inspection Reports
001448
& 3 at concourse level. As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for room floor prior to application of epoxy
793 AA A Architectural GEGC Inspection Reports
001449 primer at ROOM NO: E.09 (LVMDB1) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for room floor prior to application of epoxy
794 AA A Architectural GEGC Inspection Reports
001450 primer at ROOM NO: E.10 (LVMDB2) at concourse level
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
795 except the FHC & FEC locations at grid line (25-26) axis (Q-k) ROOM NO: P.02 AA A Architectural GEGC Inspection Reports
001451
(UNPAID CONCOURSE) in entrance 1 at concourse level. (As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for room floor prior to application of epoxy
796 AA A Architectural GEGC Inspection Reports
001452 primer at ROOM NO: T.08 (PSDR) at platform level .
Inspection Request for the Application of Primer for room floor prior to application of
M3-CJV-IRF-EAR00-UGS-
797 epoxy putty & paint at ROOM NO: E.10 (LVMDB2) & E.09 (LVMDB1) at concourse AA A Architectural GEGC Inspection Reports
001453
level
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation prior to application of Tremp proof for wet
798 AA A Architectural GEGC Inspection Reports
001454 area on around the floor drain at Room No: M.04 (ACR4) at Concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for room floor prior to application of
799 AA A Architectural GEGC Inspection Reports
001465 epoxy putty & paint at ROOM NO: T.08 (PSDR) at platform level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Tremp proof for wet area around the floor
800 AA A Architectural GEGC Inspection Reports
001466 drain at ROOM NO: M.04 ACR4) at concourse level (As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of putty & paint on the walls at grid(29-30) ROOM
801 AA A Architectural GEGC Inspection Reports
001467 NO: P.19 (TRACK SIDE WALK WAY) at Platform level (Part2 ).  

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
802 AA A Architectural GEGC Inspection Reports
001468 no: E.01 (CBS) & E.12 (UPS1) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation of floor  prior to application of vandex super
803 AA A Architectural GEGC Inspection Reports
001469 for water proofing purpose at ROOM NO: M.16 (DWT2) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of vandex  super for water tank walls & ceiling at
804 AA A Architectural GEGC Inspection Reports
001470 ROOM NO: M.16 (DWT2) at Platform level. .
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
805 at grid line (25-26) axis (N-J) ROOM NO: P.02 (UNPAID CONCOURSE) in entrance 1 AA A Architectural GEGC Inspection Reports
001471
at concourse level. (As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation/Rebar anchorage/kicker at gridline (G-H)
806 AA A Architectural GEGC Inspection Reports
001472 Room no: P.32 (LOBBY) Entrance 1 at concourse level.

Page 58 of 103
Inspection Request For the surface preparation prior to installation of
M3-CJV-IRF-EAR00-UGS- Rockwool materials and fire stop sealant grid (A-C) Room no P.02 (UNPAID
807 AA A Architectural GEGC Inspection Reports
001473 CONCOURSE) at Movement Joints & Between Block Wall & Roof Slab at  Entrance 1
Concourse level.
Inspection request for surface preparation of walls & Roof prior to application of
M3-CJV-IRF-EAR00-UGS- GEGC Subcontractor not
808 Vandex super for water proofing purpose at ROOM NO: M.15 (DWT1) at platform AA B Architectural GEGC
001474 approved by RAMPED
level.
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
809 grid (30-31) ROOM NO: M.08 (FPR) at Movement Joints &  Between Block Wall AA A Architectural GEGC Inspection Reports
001475
& Roof  Slab  at concourse level (See the attached Highlighted Area).
M3-CJV-IRF-EAR00-UGS- Inspection request for the application of vandex  super for Water Tank Floor at Room
810 AA A Architectural GEGC Inspection Reports
001476 NO: M.16 (DWT2) at Platform level. .
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
811 grid (26-28 ) ROOM NO: B.10 (SSR) at Movement Joints  &  Between Block Wall &  AA A Architectural GEGC Inspection Reports
001477
Roof  Slab at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection request for verification of lintels modification at multiple locations at
812 AA A Architectural GEGC Inspection Reports
001478 concourse/platform level. ( Ref: DJV RFI). M3-CJV-RFI-Q00934
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS- Except FHC & FEC locations at grid line (23-24) Axis (N-I) ROOM NO: P.02 (UNPAID
813 AA A Architectural GEGC Inspection Reports
001479 CONCOURSE) in Entrance 1 at concourse level ( LIFT SIDE.). (As per Highlighted
Location).
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
814 grid (31-32) ROOM NO: P.08 (COR), P.10 (COR) & P.11 (COR) at Movement Joints & AA A Architectural GEGC Inspection Reports
001480
Between Block Wail & Roof Slab at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st & final coating on the Floor at
815 AA A Architectural GEGC Inspection Reports
001481 ROOM NO: T.08 (PSDR) at platform level.
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
816 at grid line (25-26) axis (J-F) ROOM NO: P.02 (UNPAID CONCOURSE) in entrance 1 AA A Architectural GEGC Inspection Reports
001482
at concourse level ( RIGHT SIDE.) (As Per Highlighted Location).
Inspection Request For the surface preparation prior to installation o f Rockwool
M3-CJV-IRF-EAR00-UGS-
817 materials and fire stop sealant grid (27-28) behind S.03 (STAIR 3) at Movement Joints AA A Architectural GEGC Inspection Reports
001483
& Between Block Wall & Roof Slab at plat form level to up to concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to up to 3Mt height at grid (G-
818 AA A Architectural GEGC Inspection Reports
001484 H) Room no: P.32 (LOBBY) Entrance 1 at concourse level
Inspection Request for the surface preparation prior to application of putty & paint on
M3-CJV-IRF-EAR00-UGS-
819 concrete wall at grid line (A-B) ROOM NO: M.04 (ACR4) Entrance 1 at Concourse AA A Architectural GEGC Inspection Reports
001485
Level. (As Per Highlighted Location).
Inspection Request for the Application of Epoxy Paint 1st on complete floor & 2nd
M3-CJV-IRF-EAR00-UGS-
820 coating only on the Floor equipment’s Location at Room NO: E.09 (LVMDB1) at AA A Architectural GEGC Inspection Reports
001491
concourse level
Inspection Request for the Application of Epoxy Paint 1st on complete floor &  2nd
M3-CJV-IRF-EAR00-UGS-
821 coating only on the Floor equipment’s location at Room NO: E.10 (LVMDB2) at AA A Architectural GEGC Inspection Reports
001492
concourse level
Inspection Request For the installation of Rockwool & application of fire stop sea lant
M3-CJV-IRF-EAR00-UGS-
822 at grid(32-33) ROOM NO: M.12 (VR2) at Between Block Wall & Roof Slab at AA A Architectural GEGC Inspection Reports
001493
concourse level (See the attached Highlighted Area). part 3
Inspection Request for Block wall (2nd Stage) from 3Mt height to up to Soffit at grid
M3-CJV-IRF-EAR00-UGS-
823 (27-28) ROOM NO: behind S.03 (STAIR 3) at concourse level (As per highlighted AA A Architectural GEGC Inspection Reports
001494
location)
Inspection Request for Survey of laid masonry wall at Room no: P.32 (LOBBY) & MEP
M3-CJV-IRF-EAR00-UGS-
824 SHAFT CLOSER LOCATIONS at CONCOURSE level. See the attached Highlighted AA A Architectural GEGC Inspection Reports
001495
Area)

Page 59 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st & final coating for skirting on
825 AA A Architectural GEGC Inspection Reports
001496 the room wall. at ROOM NO: T.OB (PSDR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of vandex super for water tank walls & ceiling at
826 AA A Architectural GEGC Inspection Reports
001497 ROOM NO: M.15 (DWT1) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation of floor  prior to application of vandex super
827 AA A Architectural GEGC Inspection Reports
001498 for water proofing purpose at ROOM NO: M.15 (DWT1) at platform level.
Inspection Request For the surface preparation prior to installation of Rockwool 
M3-CJV-IRF-EAR00-UGS-
828 materials and fire stop sealant  grid (13-14) Room no P.01 (PAID CONCOURSE) at AA A Architectural GEGC Inspection Reports
001502
Movement Joints & Between Block Wall & Roof  Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation of walls & Roof prior to application of
829 AA A Architectural GEGC Inspection Reports
001503 Vandex super for water proofing purpose at ROOM NO: E.18 (IWT2) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor & Skirting on Walls prior to
830 AA A Architectural GEGC Inspection Reports
001504 application of epoxy primer at ROOM NO: E.12 (UPS1) at concourse level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st & final coating for skirting on
831 AA A Architectural GEGC Inspection Reports
001505 the Walls for ROOM NO: E.09 (LVMDB1) & E.10 (LVMDB2) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor & Skirting on Walls prior to
832 AA A Architectural GEGC Inspection Reports
001506 application of epoxy primer at ROOM NO: E.01 (CBS) at concourse level .
Inspection Request for the Application of Primer for floor & Skirting on Walls prior to
M3-CJV-IRF-EAR00-UGS-
833 application of epoxy primer at ROOM NO: E.12 (UPS1) & E.01 (CBS) at concourse AA A Architectural GEGC Inspection Reports
001507
level .
Inspection request for installation of Rockwool & Application of fire Stop Sealant at grid
M3-CJV-IRF-EAR00-UGS-
834 (A-C) at Room # P.02 (Unpaid Area) at Movement Joint & Between Wall & Roof Slab AA A Architectural GEGC Inspection Reports
001508
at Entrance 1 Concourse Level.
M3-CJV-IRF-EAR00-UGS- Inspection request for the application of vandex super for Water Tank Floor at Room
835 AA A Architectural GEGC Inspection Reports
001515 NO: M.15 (DWT1) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
836 AA A Architectural GEGC Inspection Reports
001516 no: E.08 (IDF1), E.02 (ER1) & E.13 (VER2) at concourse level.
Inspection request for Pull Out Test by Third Party for anchor bolt of Metal Stud Room#
M3-CJV-IRF-EAR00-UGS-
837 P.01 (PAID CONCOURSE) & Room# P.02 (UNPAID CONCOURSE) at Concourse AA A Architectural GEGC Inspection Reports
001517
Level.(Ref Certificate Number: RMR18009201/2)
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
838 AA A Architectural GEGC Inspection Reports
001518 no: E.03 (ER2), E.11 (VER1) & E.15 (IDF3) at concourse level.
Inspection Request for the Application of Epoxy Paint 1 st Coat  on complete floor &
M3-CJV-IRF-EAR00-UGS-
839 Skirting on Walls & 2nd Epoxy coating only on the Floor Equipment location at Room AA A Architectural GEGC Inspection Reports
001519
NO: E.01 (CBS) at concourse level .
Inspection Request for the Application of Epoxy Paint 1 st Coat  on complete floor &
M3-CJV-IRF-EAR00-UGS-
840 Skirting on Walls & 2nd Epoxy coating only on the Floor Equipment location at Room AA A Architectural GEGC Inspection Reports
001520
NO: E.12 (UPS1)
Inspection requestatfor
concourse level . for completed floor screed crack repair work with
final inspection
no more visible cracks on concrete screed surface at Room NO :E.03 (ER 2), E.11
M3-CJV-IRF-EAR00-UGS-
841 (VER1), E.01 (CBS), E.12 (UPS1), E.09 (LVMDB1) & E.10 (LVMDB2)  E.08 (IDF1), AA A Architectural GEGC Inspection Reports
001522
E.02 (ER1) & E.13 (VER2) & E.15 (IDF3) at concourse level & T.08 (PSDR) at platform
level.
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
842 AA A Architectural GEGC Inspection Reports
001524 no: E.16 (ER5), B.09 (AFC) & T.09 (SMR) at concourse level & Platform Level.

Page 60 of 103
M3-CJV-IRF-EAR00-UGS- Inspection request for the Application of Vandex super for water tank walls & ceiling at
843 AA A Architectural GEGC Inspection Reports
001525 ROOM NO: E.18 (IWT2) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation of floor prior to application of Vandex super
844 AA A Architectural GEGC Inspection Reports
001526 for water proofing purpose at ROOM NO: E.18 (IWT2) at Platform level.
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS- grid (27-29) ROOM No: B.11 (TRR) & Grid line (13-14) Room no P.01 (PAID
845 AA A Architectural GEGC Inspection Reports
001527 CONCOURSE) at Movement Joints & Between Block Wall &  Roof  Slab at Concourse
level.
M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation of walls & Roof prior to application of vandex
846 AA A Architectural GEGC Inspection Reports
001528 super for water proofing purpose at ROOM NO: E.17 (IWT1) at Platform level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant At grid line (13-19) Room no P.13 (PLATFORM) at
847 AA A Architectural GEGC Inspection Reports
001529 Movement Joints & Between Block Wall & Roof Slab platform level. (As per highlighted
location) .
M3-CJV-IRF-EAR00-UGS- Inspection request for the application of vandex super for water tank walls & ceiling at
848 AA A Architectural GEGC Inspection Reports
001530 ROOM NO: E.17 (IWT1) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation of floor prior to application of vandex super
849 AA A Architectural GEGC Inspection Reports
001531 for water proofing purpose at ROOM NO: E.17 (IWT1) at Platform level. 

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of vandex super for Water Tank Floor at Room
850 AA A Architectural GEGC Inspection Reports
001532 NO: E.18 (IWT2) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of putty & paint on the walls at grid (A-B) ROOM
851 AA A Architectural GEGC Inspection Reports
001533 NO : M.04 (ACR4) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
852 AA A Architectural GEGC Inspection Reports
001534 no: R.01 (RETAIL 1) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
853 AA A Architectural GEGC Inspection Reports
001535 no: E.04 (ER3) Entrance 1at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the Application of vandex super for Water Tank Floor at Room
854 AA A Architectural GEGC Inspection Reports
001536 NO: E.17 (IWT1) at Platform level.
Inspection request for the surface preparation prior to application of vandex super for
M3-CJV-IRF-EAR00-UGS-
855 Water Tank Floor sump pit at Room NO: E.17 (IWT1), E.18 (IWT2), M.15 (DWT1) & AA A Architectural GEGC Inspection Reports
001537
M.16 (DWT2) at Platform level.
Inspection request for the Application of vandex  super for Water Tank Floor sump pit
M3-CJV-IRF-EAR00-UGS-
856 at Room NO: E.17 (IWT1), E.18 (IWT2), M.15 (DWT1) & M.16 (DWT2) at Platform AA A Architectural GEGC Inspection Reports
001538
level.
Inspection request for Pull Out Test by Third Party for anchor bolt of Metal Stud Room
M3-CJV-IRF-EAR00-UGS-
857 # P.01 (PAID CONCOURSE) & Room # P.02 (UNPAID CONCOURSE) at Concourse AA A Architectural GEGC Inspection Reports
001517
Level. (Ref Certificate Number: RMR18009201/2).
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
858 at Grid line (A-H) ROOM NO: P.02 (UNPAID CONCOURSE) Entrance 1 at concourse AA A Architectural GEGC Inspection Reports
001523
level. (As per highlighted location).
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS- except the FEC & FHC locations at Grid line (12-14) ROOM NO: P.01 (PAID
859 AA A Architectural GEGC Inspection Reports
001541 CONCOURSE) & Grid line (24-25) P.02 (UNPAID CONCOURSE) at concourse level .
(As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
860 AA A Architectural GEGC Inspection Reports
001542 no: E.06 (GSM) at concourse level.

Page 61 of 103
Inspection request for the Surface preparation Prior to Application Putty and Paint on
M3-CJV-IRF-EAR00-UGS-
861 the Concrete & CMU walls at grid (A-B) ROOM NO: M.04 (ACR4) Entrance 1 at AA A Architectural GEGC Inspection Reports
001543
Concourse Level.
M3-CJV-IRF-EAR00-UGS- Inspection request for the Surface preparation Prior to Application Putty and Paint on
862 AA A Architectural GEGC Inspection Reports
001544 the Concrete & CMU walls at grid (23-28) ROOM NO: M.17 (ACR8) at Platform Level.

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work (2ND Stage) from 3m height up to soffit at grid (09-
863 AA A Architectural GEGC
001545 11) beside stair 2 at platform level up to concourse level. (As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work  (2ND Stage) from 3m height up to soffit at grid (G-
864 AA A Architectural GEGC
001546 H) Room No. P.32 ( LOBBY) Entrance 1 at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work (2ND Stage) from 3m height up to soffit at grid (A-
865 AA A Architectural GEGC
001547 B) Room no: E.14 (IDF2), P.25 (COR) Entrance 1 at Concourse level.
Inspection Request For the installation of Rockwool & application of fire stop sealant at
M3-CJV-IRF-EAR00-UGS-
866 grid (27-28 ) ROOM NO behind S.03 (STAIR 3) MEP shaft closer at Movement Joints AA A Architectural GEGC
001548
& Between Block Wall & Roof  Slab at platform level to up to concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Installation of handrails & balustrade for TSY rooms at MIR CODE-A/SDR NOT
867 AA B Architectural GEGC
001549 ROOM NO: T.04 (PP), T.02 (LPS2), T.04 (LPS1), T.07 (TPS) at concourse level. APPROVED

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of  Anti-Dust sealant
868 AA A Architectural GEGC
001550 for ceiling at grid line (A-B) ROOM NO: M.04 (ACR4) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for floor surface preparation prior to concrete screed placement in
869 AA A Architectural GEGC
001551 Room no. M.11 (VR1), & M.12 (VR2) at concourse level
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
870 screed placement on the concourse floor in room no: M.11 (VR1), & M.12 (VR2) at AA A Architectural GEGC
001552
concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work [3rd Stage] from 5m height up to soffit at grid (G-
871 AA A Architectural GEGC
001564 H) Room No.P.32 ( LOBBY )Entrance 1 at Concourse level.
Inspection Request for surface preparation/lay out & Metal stud installation inspection
M3-CJV-IRF-EAR00-UGS- Except the FEC & FHC locations at grid line (22-23) axis (H-D) ROOM NO: P.02
872 AA B Architectural GEGC SDR NOT APPROVED
001566 (UNPAID CONCOURSE) in entrance 1 at concourse level ( LIFT SIDE.) (As Per
Highlighted Location).
Inspection Request for Plinth Including Surface Preparations, Formworks & Rebar’s
M3-CJV-IRF-EAR00-UGS-
873 Anchorage  Prior to casting concrete pouring at  Room no: M.11 (VR1) & M.12 (VR2 ) AA A Architectural GEGC
001567
at concourse level
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Anti-Dust sealant (2 COAT) for ceiling at grid
874 AA A Architectural GEGC
001568 line (A-B) ROOM NO: M.04 (ACR4) at concourse level.
Inspection Request For installation of Rockwool materials and fire stop sealant At grid
M3-CJV-IRF-EAR00-UGS-
875 line (13-19) Room no P.13 (PLATFORM) at Movement Joints & Between Block Wall &  AA A Architectural GEGC
001569
Roof Slab platform level. (As per highlighted location) .
M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth upstand at  Room no: M.11 (VR1) &
876 AA A Architectural GEGC
001575 M.12 (VR2)at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
877 AA A Architectural GEGC
001576 coating at ROOM NO :B.09 (AFC) & T.09 (SMR) at concourse level .

M3-CJV-IRF-EAR00-UGS- Inspection request for the Surface preparation Prior to Application Putty and Paint on
878 AA A Architectural GEGC
001577 the walls at grid (20-27 ) ROOM NO: P.15 (COR) & P.16 (COR) at Platform Level.

Page 62 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
879 AA A Architectural GEGC
001578 at ROOM NO: E.11 (VER1), E.15 (IDF3) & E.03 (ER2) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to application of Anti-Dust sealant for
880 AA A Architectural GEGC
001579 floor at Room no: E.06 (GSM) at concourse level.

M3-CJV-IRF-EAR00-UGS- Visual inspection Request for Mock-up sample for screed joint sealant & color approval
881 AA A Architectural GEGC
001580 (gray & aluminum stone) at Room NO: T.05 (PSDR) at Platform level

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation, Rebar anchorage, Kicker form Grid (B-L)
882 AA A Architectural GEGC
001581 Room No: E.19 (ER6) & E.14 (IDF2) at Concourse Level.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
883 materials and fire stop sealant at Grid line (A-C ) ROOM NO: R.01 (RETAIL 1) AA A Architectural GEGC
001582
at Movement Joints & Between Block Wall & Roof  Slab at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
884 AA A Architectural GEGC
001583 at ROOM NO: E.02 (ER1), E.13 (VER2) & E.08 (IDF1) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Anti-Dust sealant (2 COAT) for Floor at
885 AA A Architectural GEGC
001584 ROOM NO: E.06 (GSM) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation and application of putty prior to paint at grid
886 AA A Architectural GEGC
001585 line(A-C) Room No: E.04 (ER3) & P.07 (COR)  at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
887 AA A Architectural GEGC
001586 primer at ROOM NO :E.11 (VER1), E.15 (IDF3) & E.03 (ER2) at concourse level.
Inspection Request for the surface preparation prior to application of putty & paint on
M3-CJV-IRF-EAR00-UGS-
888 concrete wall at grid line (09-11) ROOM NO: P.21 (COR) Part2 at concourse level (As AA A Architectural GEGC
001587
per highlighted location
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of  Anti-Dust
889 AA A Architectural GEGC
001588 sealant for ceiling at grid line (A-C) Room No: E.04 (ER3) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & paint work on Concrete & CMU wall up to 5.5 meter
890 AA A Architectural GEGC
001598 height from FFL at grid line (A-B) ROOM NO: M.04 (ACR4) at concourse level (Part2 ).
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
891 materials  and fire stop sealant at Grid line (A-C ) ROOM NO: M.04 (ACR4) & P.25 AA A Architectural GEGC
001599
(COR) at Movement Joints  & Between Block Wall & Roof Slab at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling at grid
892 AA A Architectural GEGC
001600 line Room No: E.04 (ER3) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
893 AA A Architectural GEGC
001601 coating at ROOM NO: E.02 (ER1), E.13 (VER2) & E.08 (IDF1) at concourse level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & paint work on Concrete & CMU wall at grid line (20-27)
894 AA A Architectural GEGC
001602 ROOM NO: P.16 (COR) & P.15 (COR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
895 AA A Architectural GEGC
001603 at ROOM NO: B.09 (AFC) & T.09 (SMR) at concourse level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from concourse level to up to 3Mt height at grid (L-K)
896 AA A Architectural GEGC
001604 Room no:E.19 (ER6) Entrance 1 at concourse level.

Page 63 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of putty & paint on
897 AA A Architectural GEGC
001605 CMU wall at grid line (20-23) ROOM NO: P.15 (COR) (Part3) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
898 AA A Architectural GEGC
001606 no: M.10 (ACR10) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & paint work on Concrete & CMU wall at grid line (20-23)
899 AA A Architectural GEGC
001607 ROOM NO: M.17 (ACR8) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation/Rebar anchorage/kicker at grid line (21-23) Design Drawing Not
900 AA C Architectural GEGC MEP EQUIPMENT PLINTH
001608 ROOM NO: S.05 (STAIR 5) at Ground level. Approved by Ramped
APPROVAL SUBJECT
FOR FINAL
M3-CJV-IRF-EAR00-UGS- Inspection Request For Surface Preparation prior of Application of nito proof at Room
901 AA A Architectural GEGC INSTALLATION FAST
001613 No.S.05 (STAIR5) & sky light at ground level Entrance-01 4C2 station..
FULLY RESPONSIBLE
FOR THE EQUIPMENT
M3-CJV-IRF-EAR00-UGS- Inspection Request For application of nito proof at Room No.S.05 (STAIR5) & sky light DSD &LOCATION
PLINTH SD NOT
902 AA A Architectural GEGC
001614 at ground level Entrance-01 4C2 station. APPROVED

M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & paint work on Concrete & CMU wall at grid line (A-C)
903 AA A Architectural GEGC
001615 ROOM NO: P.25 (COR)  & E.04 (ER3) at concourse level
Inspection Request for Putty & Paint work on Concrete & CMU wall at grid line (A-C )
M3-CJV-IRF-EAR00-UGS-
904 ROOM NO: R.01 RETAIL Entrance -01 & Gird Line (9-11) P.21 (COR)  at concourse AA A Architectural GEGC
001617
level
M3-CJV-IRF-EAR00-UGS-
905 Inspection Request for the surface preparation prior to application of putty & paint on the wall AA
at grid line (28-29)
A ROOM Architectural
NO: P.19 (TRACK SIDE WALK WAY) at Platform level (South S
GEGC
001619

M3-CJV-IRF-EAR00-UGS- Inspection Request for Putty & Paint Work on Concrete & CMU Wall at grid line (09-25)
906 AA A Architectural GEGC MEP EQUIPMENT PLINTH
001630 ROOM NO: P.20 (COR) & P.15 (COR) at Platform level (Part3) .
APPROVAL SUBJECT
Inspection request for Plinth Modification including Surface preparation, Formwork & FOR FINAL
M3-CJV-IRF-EAR00-UGS-
907 Rebar's anchorage prior to casting concrete pouring in Room no: M.03 (ACR3), M.04 AA B Architectural GEGC INSTALLATION FAST
001631
(ACR4), M.13 (CWT), M.05 (ACR5) & M.02 (ACR2) at Concourse  level. FULLY RESPONSIBLE
FOR THE EQUIPMENT
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation for Floor prior to Application of Epoxy PLINTH LOCATION
908 AA A Architectural GEGC
001632 primer at ROOM NO: M.10 (ACR10) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
909 AA A Architectural GEGC
001633 no: M.05 (ACR5) & M.03 (ACR3) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & paint work on wall at grid line (27-28 ) ROOM NO: P.07
910 AA A Architectural GEGC
001634 (COR) at concourse level.part2

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
911 AA A Architectural GEGC
001635 coating at ROOM NO: M.10 (ACR10) at concourse level.   

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to application of putty at grid (30~31)
912 AA A Architectural GEGC
001636 Room no: M.08 (FPR) at concourse. part2

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
913 AA A Architectural GEGC
001637 NO: E.15 (IDF3), E.02 (ER1), E.13 (VER2) & E.08 (IDF1) at concourse level.

M3-CJV-IRF-EAR00-UGS-
914 Inspection Request for Putty & Paint Work on Concrete & CMU Wall at grid line (20-26) ROOM
AANO: P.19 (TRACK
A SIDE Architectural
WALK WAY) at Platform level (north Side) (As per highlighted lo
GEGC
001638

Page 64 of 103
Inspection Request For the surface preparation prior to installation of
M3-CJV-IRF-EAR00-UGS-
915 Rockwool materials and fire stop sealant grid (20-23) Room no M.17 (ACR8) & P.15 AA A Architectural GEGC
001639
(COR) at Movement Joints & Between Block Wall &  Roof Slab at Platform level.
Inspection Request for the surface preparation prior to application of putty & paint on
M3-CJV-IRF-EAR00-UGS-
916 concrete wall at grid line (20-26) ROOM NO: P.19 (TRACK SIDE WALK WAY) at AA B Architectural GEGC
001640
Platform level (South Side) (As per highlighted location).
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
917 materials and fire stop sealant grid (A-C) Room No: E.04 (ER3) at Movement Joints & AA A Architectural GEGC
001641
Between Block Wall & Roof Slab at Concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to up to last layer at
918 AA A Architectural GEGC
001653 Room no: E.19 (ER6) at concourse level (As per highlighted location.).

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from 1 st layer to up to Soffit at Room no: S.05 (stair DSD & SD NOT
919 AA B Architectural GEGC
001654 5) at ground level (As per highlighted location.). APPROVED

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
920 AA A Architectural GEGC
001655 no: M.06 (ACR6), M.01 (ACR1) & M.02 (ACR2) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
921 AA A Architectural GEGC
001657 at ROOM NO: M.03 (ACR3) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation & Crack Repairing for Screed Floor at
922 AA A Architectural GEGC
001658 Room # M.04 (ACR4) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy coating 1st Coat on the floor at ROOM
923 AA A Architectural GEGC
001659 NO: B.09 (AFC) & T.09 (SMR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for final installation of Stainless Steel & GI cat ladder @ CLDR NO:
924 AA A Architectural GEGC
001660 12, 13, 14, 15, 16,17,18,19, 31, 30, 32, 33, 34, 35 &36 at Platform & concourse level.
Inspection Request For installation of Rockwool  materials  and fire stop sealant At grid
M3-CJV-IRF-EAR00-UGS- line (A-C) Room No: E.04 (ER3), P.25 (COR) & R.01 (RETAIL1) at Movement
925 AA A Architectural GEGC
001681 Joints & Between Block Wall & Roof Slab @ Entrance 1 concourse level. (As per
highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
926 AA A Architectural GEGC
001682 no: M.26 (ACR11) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
927 AA A Architectural GEGC
001683 coating at ROOM NO: M.03 (ACR 3) at concourse level.   

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
928 AA A Architectural GEGC
001684 at ROOM NO: E.04 (ER3) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
929 AA A Architectural GEGC
001685 no: M.17 (ACR9) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
930 AA A Architectural GEGC
001686 coating at ROOM NO: E.04 (ER 3) at concourse level.   

M3-CJV-IRF-EAR00-UGS- Inspection Request for Putty & Paint Work on the column Grid (14-16) LIFT 01 & LIFT
931 AA A Architectural GEGC
001689 02 from platform level to concourse level.
Inspection Request For the surface preparation prior to installation of
M3-CJV-IRF-EAR00-UGS- Rockwool materials and fire stop sealant at Grid line (09-10 ) ROOM NO: P.20 (COR)
932 AA A Architectural GEGC
001690 at Movement Joints & Between Block Wall &  Roof  Slab at platform level. (see the
attached highlighted area) (Part2).

Page 65 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
933 AA A Architectural GEGC
001691 NO: M.10 (ACR10) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
934 AA A Architectural GEGC
001692 no: M.19 (FWR) & M.20 (TWC) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
935 AA A Architectural GEGC
001693 sealant for ceiling at grid line (20-26) Room No: P.15 (COR) at Platform level.
Inspection Request for Putty & Paint Work on CMU Wall at grid line (28-29) ROOM
M3-CJV-IRF-EAR00-UGS-
936 NO: P.19 (TRACK SIDE WALK WAY) at Platform level  (North Side) (As per AA A Architectural GEGC
001694
highlighted location) (Part 2 ).
Inspection Request for surface preparation prior to application of Tremp proof for wet
M3-CJV-IRF-EAR00-UGS-
937 area on around the floor drain at Room No: M.05 (ACR5) at Concourse level (As per AA A Architectural GEGC
001696
highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Tremp proof for wet area around the floor
938 AA A Architectural GEGC
001697 drain at ROOM NO: M.05 (ACR5) at concourse level (As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation PRIOR TO application of Anti-Dust
939 AA A Architectural GEGC
001698 sealant for floor at grid line (12~13) Room no E.07 (CER) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Anti-Dust sealant (2 COAT) for Floor at
940 AA A Architectural GEGC
001699 ROOM NO: E.07 (CER) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
941 AA A Architectural GEGC
001700 no: P.23 (COR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation for Floor prior to Application of Epoxy
942 AA A Architectural GEGC
001701 primer at  ROOM NO: E.16 (ER5 ) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
943 AA A Architectural GEGC
001703 coating at ROOM NO: E.16 (ER5 ) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
944 AA A Architectural GEGC
001704 NO: M.03 (ACR3) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy coating 1st Coat on the floor at Room
945 AA A Architectural GEGC
001705 NO: E.04 (ER3) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
946 AA A Architectural GEGC
001706 at ROOM NO: M.OS (ACRS) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation prior to application of putty & paint on
947 AA A Architectural GEGC
001707 the wall at ROOM NO: : M.18 (PR) at platform level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
948 AA A Architectural GEGC
001708 coating at ROOM NO: M.05 (ACR5) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
949 AA A Architectural GEGC
001709 at ROOM NO: M.01 (ACRl) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of e poxy
950 AA A Architectural GEGC
001710 coating at ROOM NO: M.01 (ACR1) at concourse level.

Page 66 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for t he modification of Plinth for Room no: M.02
951 AA A Architectural GEGC Closed
001711 (ACR2), M.03 (ACR3), M.04 (ACR4), M.OS (ACRS) & M.12 (CWT) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for plinth including surface preparation, formwork & rebar's
952 AA A Architectural GEGC Closed
001712 anchorage prior to casting at ROOM NO: PPR5 & PPR8 at ground level.

M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth for ROOM NO: PPR5 & PPR8 at
953 AA A Architectural GEGC Closed
001713 ground level.
Inspection request for plinth including surface preparation, formwork & rebar's
M3-CJV-IRF-EAR00-UGS-
954 anchorage prior to casting at ROOM NO: Generator yard 2 at ground level (As per AA A Architectural GEGC Closed
001714
highlighted location).
M3-CJV-IRF-EAR00-UGS- Request To cast Concrete for Plinth for ROOM NO: Generator yard 2 at ground level
955 AA A Architectural GEGC Closed
001715 as per attached highlighted drawing

M3-CJV-IRF-EAR00-UGS- Inspection Request for t he surface preparation PRIOR TO application of Anti-Dust sea
956 AA A Architectural GEGC Closed
001716 lant for ceiling a t Room No: M.18 (PR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Anti-Dust sealant (2 COAT) for ceiling at
957 AA A Architectural GEGC Closed
001717 Room No: M.18 (PR) & P.15 (COR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Water leakage test for water tank at Room No: M.09
958 AA A Architectural GEGC Closed
001719 (FWT1) at concourse level.         

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
959 AA A Architectural GEGC Closed
001721 no : P.0 2 (UNPAID CONCOURSE) at Ent rance 3 concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request For Mock-up” of the stone cladding & accessories at Room no: S.05 mock-up comments to
960 AB B Architectural GEGC
001722 (STAIR5) & S.3 (SKYLIGHT3) at Ground level. improve the quality

M3-CJV-IRF-EAR00-UGS- Inspection request for installation of Gypsum board on the metal stud prior to wall tile
961 AA A Architectural GEGC Closed
001723 @ grid (13-23) Room No: P.01 (PAID CONCOURSE) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Water leakage test for water tank at Room No: M.10
962 AA A Architectural GEGC Closed
001724 (FWT2) at concourse level. 

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for concrete plinth prior to application of
963 AA A Architectural GEGC Closed
001725 epoxy primer at ROOM NO: M.18 (PR) at p latform level.
Inspection request for plinth including surface preparation, formwork & rebar's
M3-CJV-IRF-EAR00-UGS- shop drawing /after mep
964 anchorage prior to casting at ROOM NO: Generator yard 1 at ground level. (As per AA B Architectural GEGC
001726 installation
highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinths for ROOM NO: Generator yard 1 at
965 AA A Architectural GEGC Closed
001753 ground level at 4C2 station (As per Highlighted Area).

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy coating 1st Coat on the floor at Room
966 AA A Architectural GEGC Closed
001754 NO: E.16 (ER5) at platform level
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized / poly carbonate angles, filler board grouting of floor drain
967 AA A Architectural GEGC Closed
001756 & block out) prior to concrete screed placement in room no.:  E.19 (ER6), P.03 (C0R),
P.32 (LOBBY), under escalator & R.02 (RETAIL 2) at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request For Surface Preparation & application of nito proof at Room No.
968 AA A Architectural GEGC Closed
001757 M.37 at ground level Entrance-01 4C2 station.as per highlighted location.

Page 67 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Water leakage test for water tank at Room No: M.15
969 AA A Architectural GEGC Closed
001758 (DWT1) & M.16 (DWT2) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for application of putty &paint work on  concrete wall  At grid
970 AA A Architectural GEGC Closed
001759 (28~29) Room no: M.08 (FPR) at concourse level.part2

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of epoxy primer on the plinth concrete. At
971 AA A Architectural GEGC Closed
001760 ROOM NO: M.18 (PR) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
972 AA A Architectural GEGC Closed
001761 NO: M.05 (ACR5) at Concourse level.
Inspection Request for Surface Preparation for Concrete Plinth prior to application of
M3-CJV-IRF-EAR00-UGS- Shop Drawing not 
973 Epoxy Primer at ROOM NO: Generator Yard 1 at Ground level. as per highlighted AA B Architectural GEGC
001764 approved by RAMPED.
location.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of Epoxy Primer prior to epoxy filler at ROOM
974 AA A Architectural GEGC Closed
001765 NO: Generator Yard 1 at Ground level. as per highlighted location.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st & final coating on the
975 AA A Architectural GEGC Closed
001766 Concrete plinth concrete at ROOM NO: M.18 (PR) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Water leakage test for water tanks at Room No: M.15
976 AA A Architectural GEGC Closed
001767 (DWT1) &E.18 (IWT2) at Platform level
Inspection request for Drilling & chemical Anchoring ,surface preparation, rebar's
M3-CJV-IRF-EAR00-UGS-
977 Installation  &  formwork  prior to casting for Plinths & Bund wall at  ROOM NO: AA A Architectural GEGC Closed
001780
Generator yard 2 at ground level (Part-2). (As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinths & Bund wall for ROOM NO: Generator
978 AA A Architectural GEGC Closed
001781 yard 2 at ground level(Part-2). (As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation for Floor prior to Application of Epoxy
979 AA A Architectural GEGC Closed
001782 primer at ROOM NO: M.06 (ACR6) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
980 AA A Architectural GEGC Closed
001783 no: P.05 (COR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation  PRIOR TO application of  Anti-Dust
981 AA A Architectural GEGC Closed
001784 sealant for ceiling  at Room no R.02(RETAIL1)  at concourse level .
Inspection Request for surface preparation for concrete plinth prior to application of
M3-CJV-IRF-EAR00-UGS- epoxy primer at ROOM NO: M.13
982 AA A Architectural GEGC Closed
001785 (CWT),M.01(ACR1),M.02(ACR2),M.03(ACR3),M.04(ACR4) & M.05(ACR5)at
concourse level. ( As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
983 AA A Architectural GEGC Closed
001786 NO: M.01(ACR1) at Concourse level.
nspection Request for surface preparation for concrete plinth prior to application of
M3-CJV-IRF-EAR00-UGS-
984 epoxy primer at ROOM NO: Generator yard 1 at ground level.( As per highlighted AA A Architectural GEGC Closed
001787
location)
Inspection Request for the Application of epoxy Primer on Concrete Plinth prior to
M3-CJV-IRF-EAR00-UGS-
985 application of epoxy paint at ROOM NO: M.13 (CWT), M.02 (ACR2), M.03 (ACR3), AA A Architectural GEGC Closed
001789
M.04 (ACR4) & M.05 (ACR5) at concourse level ( As per highlighted location).
Inspection Request for the Application of Epoxy Primer on Concrete Plinth prior to
M3-CJV-IRF-EAR00-UGS-
986 application of epoxy paint at ROOM NO: Generator yard 1 at ground level( As per AA A Architectural GEGC Closed
001790
highlighted location).

Page 68 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
987 AA A Architectural GEGC Closed
001791 coating at ROOM NO:  M.06 (ACR6) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of  Anti-Dust sealant (2 COAT)   for ceiling  at
988 AA A Architectural GEGC Closed
001792 Room no R.02(RETAIL1)  at concourse level.
IInspection Request for the application of epoxy 1st & final coating on the plinth
M3-CJV-IRF-EAR00-UGS-
989 concrete at ROOM NO: GENERATOR YARD 1) at Ground level. ( As per highlighted AB A Architectural GEGC Closed
001793
location)
Inspection Request for the application of epoxy 1st & final coating on the plinth
M3-CJV-IRF-EAR00-UGS-
990 concrete at ROOM NO: M.13 (CWT), M.03 (ACR3), M.02 (ACR2), M.04 (ACR4) & AA A Architectural GEGC Closed
001801
M.05 (ACR5) at concourse level ( As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for final installation of GI cat ladder @ CLDR NO: 39, 41, 43 & 44
991 AA A Architectural GEGC Closed
001802 at Platform to concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation & survey report prior to raised floor system
992 AA A Architectural GEGC Closed
001803 at Room no E.07 (CER) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for screed joint surface preparation & Application of sealant at
993 AA A Architectural GEGC Closed
001804 Room no E.07 (CER) at concourse level .

M3-CJV-IRF-EAR00-UGS-
994 Inspection Request for surface preparation prior to application of Tremp proof for wet area forAA
DRAINAGE CHANNEL
A at  Architectural
Room no M.08  (FPR)
GEGC
& M.18(PR)  at concourse
Closed
& Platform lev
001805

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation for Floor prior to Application of Epoxy
995 AA A Architectural GEGC Closed
001806 primer at ROOM NO: M.02 (ACR2) at concourse level.
Inspection request for drilling & chemical anchoring, surface preparation, rebar's
M3-CJV-IRF-EAR00-UGS-
996 installation & formwork prior to casting at ROOM NO: Generator yard 1 at ground level. AA A Architectural GEGC Closed
001813
Part2 (As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Tremp proof for wet area for DRAINAGE
997 AA A Architectural GEGC Closed
001814 CHANNEL at Room no M.08 (FPR) & M.18 (PR) at Concourse & Platform level .

M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Bund Wall & Plinths for Room no: Generator
998 AA A Architectural GEGC Closed
001815 yard 1 at ground level(Part2) (As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection request for the Application of vandex super for sump-pits at ROOM NO:
999 AA A Architectural GEGC Closed
001836 S.05 (STAIR5),M.07 (ACR7) & M.04 (ACR4) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation of Sump pits prior to application of vandex
1000 AA A Architectural GEGC Closed
001837 super for water proofing purpose at ROOM NO: M.07 (ACR7) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
1001 AA A Architectural GEGC Closed
001848 no: P.03 (COR), P.04 (COR), P.21 (COR) & P.24 (COR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request For the installation of stone cladding & accessories at Room no:
1002 AA A Architectural GEGC Closed
001849 S.05 (STAIR5) & S.3 (SKYLIGHT3) at Ground level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of epoxy Paint 1st & final coating on the plinth
1003 AA A Architectural GEGC Closed
001850 concrete at ROOM NO: M.11 (VR1) & M.12 (VR2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of Gypsum board on the metal stud prior to wall tile
1004 AA A Architectural GEGC Closed
001851 @ grid (13-14- S-W) Room No: P.01 (PAID CONCOURSE) at concourse level.

Page 69 of 103
Design Drawing not
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS- Approved by
1005 at grid line (X-Y) ROOM NO : P.02(UNPAID CONCOURSE) Entrance 3 at concourse AA B Architectural GEGC
001852 Ramped/Shop drawing
level   (As per highlighted locatio
endrosed by DJV.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
1006 AA A Architectural GEGC Closed
001853 NO: M.02 (ACR2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request fo r the application of epoxy Paint 1st & final coating on the plinth
1007 AA A Architectural GEGC Closed
001855 concrete at ROOM NO: M.11(VRl) & M .l2 (VR2) at Concourse level.
Design Drawing not
M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of Gypsum board on the metal stud prior to wall tile Approved by
1008 AA B Architectural GEGC
001856 @ grid (13-14- S-W) Room No: P.01 (PAID CONCOURSE) at concourse level.PART-2 Ramped/Shop drawing
endrosed by DJV.
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1009 AA A Architectural GEGC Closed
001857 no: P.25 (COR) at concourse level.
Inspection Request for the Surface Preparation prior to Application of epoxy Primer on
M3-CJV-IRF-EAR00-UGS-
1010 Concrete Plinths at ROOM NO: Generator Yard 1 & 2 at Ground Level. PART3 (As per AB A Architectural GEGC Closed
001858
Highlighted Location).
M3-CJV-IRF-EAR00-UGS- Final Inspection request for raised floor system accessories & installation of tile at
1011 AA A Architectural GEGC Closed
001609 Room no E.07 (CER) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for raised floor system accessories & installation of tile at Room no
1012 AA A Architectural GEGC Closed
001610 E.07 (CER) at concourse level
Inspection Request for Putty & Paint Work on Concrete & CMU Wall at grid line (20-
M3-CJV-IRF-EAR00-UGS-
1013 26 )ROOM NO : P.19 (track side walk way) at Platform level. (North side as per AA A Architectural GEGC Closed
001638
attached highlighted location)
Inspection request for Surface preparation of Sump pits prior to Application of Vandex
M3-CJV-IRF-EAR00-UGS-
1014 super for water proofing purpose at ROOM NO: S.05 (STAIR5) & M.04 (ACR4) at AA A Architectural GEGC Closed
001816
concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of Gypsum board on the metal stud prior to wall tile
1015 AA A Architectural GEGC Closed
001832 @ grid (13-23) Room No: P.01 (PAID CONCOURSE) at concourse level (South side).

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation for concrete plinth prior to application of
1016 AA A Architectural GEGC Closed
001833 epoxy primer at ROOM NO: ROOM NO: M.11 (VR1) & M.12 (VR2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to Application of epoxy
1017 AA A Architectural GEGC Closed
001834 coating at ROOM NO: M.11 (VR1) & M.12 (VR2) at Concourse level.
Inspection Request for the application of epoxy 1st & final coating on the plinth
M3-CJV-IRF-EAR00-UGS-
1018 concrete at ROOM NO: GENERATOR YARD 2) at Ground level. ( As per highlighted A Architectural GEGC Closed
001788
location)
M3-CJV-IRF-EAR00-UGS- Inspection request for paint work on concrete column at grid(06~07) Room No.p-
1019 AA A Architectural GEGC Closed
000994 18(TRACK SIDE WALK WAY)   at platform level. ( As per highlighted location)

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation & application of putty prior to paint at
1020 AA A Architectural GEGC Closed
001129 grid(20~26) Room No.P-15(COR)   at platform level. ( As per highlighted location)

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface Preparation & Crack repairing for Screed Floor in Room
1021 AA A Architectural GEGC Closed
001835 no:  E.05 (ER4) at Concourse level. Design Drawing not
Approved by
Inspection Request for Examine Condition of Structural Surface, tolerance &
M3-CJV-IRF-EAR00-UGS- Ramped/Shop drawing
1022 Roughness of Handrails & Balustrade for TSY rooms at ROOM NO: T.02 (LPS2), T.01 AA B Architectural GEGC
001838 endrosed by DJV/Final
(LPS1),T.04 (PP) &  T.07 (TPS) at concourse level.
Approval Subject to Paint
Touch Up
Page 70 of 103
Final Inspection Request for ( Examine Condition of Structural Surface, tolerance & Approved by
M3-CJV-IRF-EAR00-UGS- Roughness , Installation Inspection & Painting/Touch Up Inspection  ) of Handrails & Ramped/Shop drawing
1023 AA B Architectural GEGC
001839 Balustrade for TSY rooms at ROOM NO: T.02 (LPS2), T.01 (LPS1),T.04 (PP) &  T.07 endrosed by DJV/Final
(TPS) at concourse level. Approval Subject to Paint
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer Touch Up
1024 AA A Architectural GEGC Closed
001861 at ROOM NO :R.01 (Reatail-01) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
1025 AA A Architectural GEGC Closed
001862 NO: M.06 (ACR6) at Concourse level.
Inspection Request for the Application of epoxy Primer prior to epoxy coating on
M3-CJV-IRF-EAR00-UGS-
1026 Concrete Plinths at ROOM NO: Generator Yard 1 & 2 at Ground Level. PART2 (As per AA A Architectural GEGC Closed
001883
Highlighted Location).
M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of Gypsum board on the metal stud prior to wall tile
1027 AA A Architectural GEGC Closed
001884  @  Room No: P.02 (PAID CONCOURSE)Entrance3 at concourse level
Inspection Request for surface preparation & application of Tremp proof for wet area
M3-CJV-IRF-EAR00-UGS-
1028 on the Floor drain at ROOM NO : M.07(ACR7) at concourse level(As per highlighted AA A Architectural GEGC Closed
001885
location).
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1029 AA A Architectural GEGC Closed
001886 no: P.08(COR) & P.10(COR) at concourse level.
Inspection request for Plinth Modification including Surface preparation, Formwork & NOT SHOWING THE
M3-CJV-IRF-EAR00-UGS-
1030 Rebar's anchorage prior to casting concrete pouring in Room no:.17(ACR9) & M.08 AA B Architectural GEGC LOCATION OF PLINTH IN
001887
(ACR8) at Platform  level. SD
M3-CJV-IRF-EAR00-UGS- Inspection Request for floor surface preparation prior to concrete screed placement in
1031 AA A Architectural GEGC Closed
001888 Room no.S.O4 (STAIR4) at concourse level.
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
1032 screed placement on the concourse floor in room no: E.19 (ER6), S.O4 (STAIR4) & AA A Architectural GEGC Closed
001889
R.02 (RETAIL 2) at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth Modification Room no:.17(ACR9) &
1033 AA A Architectural GEGC Closed
001904 M.08 (ACR8) at Platform  level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the final installation of grating for drainage channel at Room no
1034 AA A Architectural GEGC Closed
001905 M.08 (FPR) & M.18 (PR) at Concourse & Platform level.
Inspection Request for the installation of porcelain tile With Adhesive without Grout
M3-CJV-IRF-EAR00-UGS- filling in Between Gaps on the wall at North side grid line (13-23 S-W ) Room NO: P.01
1035 AA A Architectural GEGC Closed
001906 (PAID CONCOURSE) at Concourse level.(EXCEPT THE FHC,FEC &
ADVERTISEMENT BOARD
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
1036 AA A Architectural GEGC Closed
001907 at ROOM NO: M.25 (COR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
1037 AA A Architectural GEGC Closed
001908 at ROOM NO: M.25 (COR) at concourse level.
Inspection request for Surface preparation of Sump pits at  Platform Slab (Waste
M3-CJV-IRF-EAR00-UGS-
1038 Water Sumpit)  & Room# M.19 (FWR)   prior to Application of Vandex super for water AA A Architectural GEGC Closed
001909
proofing  purpose at  Platform level.
M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinths for Room no: Generator yard 1 at
1039 AA A Architectural GEGC Closed
001910 ground level. (Part3) (As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
1040 AA A Architectural GEGC Closed
001911 at ROOM NO: M.04 (ACR4) & M.25 (ACR11) at Platform & concourse level.

Page 71 of 103
Inspection Request for the Application of Primer for floor prior to application of epoxy
M3-CJV-IRF-EAR00-UGS-
1041 coating at ROOM NO:  M.04 (ACR4),P.25(COR) ,R.02(RETAIL2) & M.25(ACR11)at AA A Architectural GEGC Closed
001912
Platform & concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
1042 AA A Architectural GEGC Closed
001913 coating at ROOM NO: M.17 (ACR9) &M.18 (PR) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
1043 AA A Architectural GEGC Closed
001914 at ROOM NO: M.17 (ACR9) &M.18 (PR) at Platform level.
Inspection Request for the installation of porcelain tile on the wall except the grout
M3-CJV-IRF-EAR00-UGS- filling between the gap of tile joints at South side grid line {13-23) Room NO: P.01
1044 AA A Architectural GEGC Closed
001915 (PAID CONCOURSE) at Concourse
leveL (EXCEPT THE FHC,FEC & ADVERTISEMENT BOARD LOCAION)
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1045 AA A Architectural GEGC Closed
001916 no: M.08 (FPR) at concourse level
Inspection request  for the Application of Vandex super for water proofing  purpose for
M3-CJV-IRF-EAR00-UGS-
1046 Sump pits at  Platform Slab (Waste Water Sumpit)  & Room# M.19 (FWR)   at  AA A Architectural GEGC Closed
001917
Platform level
Inspection Request for the installation of porcelain tile on the wall  except the grout
M3-CJV-IRF-EAR00-UGS- filling between the gap of tile joints at South side grid line (25-27 –X-W)Room NO: P.02
1047 AA A Architectural GEGC Closed
001921 (PAID CONCOURSE) at Entrance 3 Concourse level.(EXCEPT THE FHC&FEC 
LOCAION)
Inspection request for instal lation of Gypsum boa rd on the metal stud prior to wall tile
M3-CJV-IRF-EAR00-UGS- @grid (23-24 -S-M) Room No: P.02 (PAID CONCOURSE) at Entrance 1 concourse
1048 AA A Architectural GEGC Closed
001918 level. (EXCEPT THE FHC & FEC
LOCAl ON)
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1049 AA A Architectural GEGC Closed
001919 no: M.13 (CWT )at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1050 AA A Architectural GEGC Closed
001920 no: P.22(COR),P.11(COR)& P.09(COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1051 AA A Architectural GEGC Closed
001924 no: P.07(COR) at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1052 AA A Architectural GEGC Closed
001951 no: P.15 (COR) &  P.16 (COR) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation of Sump pits prior to Application of Vandex
1053 AA A Architectural GEGC Closed
001952 super for water proofing purpose at Room no. M.14(ACR8) at platform Level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy coating 1st Coat on the floor at ROOM
1054 AA A Architectural GEGC Closed
001953 NO: M.25 (ACR11) & M.18 (PR) at Platform level.
Inspection request for installation of Gypsum board on the metal stud prior to wall tile
M3-CJV-IRF-EAR00-UGS-
1055 @ grid (23-24  -M-J) Room No: P.02 (PAID CONCOURSE) at Entrance 1 concourse AA A Architectural GEGC Closed
001954
level (PART2)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy coating 1st Coat on the floor at ROOM
1056 AA A Architectural GEGC Closed
001955 NO: M.04 (ACR4) & R.01 (RETAIL 1) at Entrance 1 concourse level.
Inspection Request for the application of epoxy Hardtop coat 1st & final coating on the
M3-CJV-IRF-EAR00-UGS-
1057 plinth concrete at ROOM NO: GENERATOR YARD 1 & 2) at Ground level. ( As per AA A Architectural GEGC Closed
001854
highlighted location)
Inspection request for installation of Gypsum board on the metal stud prior to wall tile
M3-CJV-IRF-EAR00-UGS-
1058 @ grid (23-24  -J-F) Room No: P.02 (PAID CONCOURSE) at Entrance 1 concourse AA A Architectural GEGC Closed
001956
level (PART3).

Page 72 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy coating 1st Coat on the floor at ROOM
1059 AA A Architectural GEGC Closed
001957 NO: M.17 (ACR9) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the Application of vandex super for sump-pits at ROOM NO: .
1060 AA A Architectural GEGC Closed
001958 M.14(ACR8) at platform Level .
Inspection request for installation of Gypsum board on the metal stud prior to wall tile
M3-CJV-IRF-EAR00-UGS-
1061 @ grid (13-14  U-W) Room No: P.01 (PAID CONCOURSE) at concourse AA A Architectural GEGC Closed
001960
level(PART2).
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation for Concrete Plinth prior to application of
1062 AA A Architectural GEGC Closed
001961 Epoxy Primer at ROOM NO:  M.14(ACR8) at platform Level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation for Concrete Plinth prior to application of
1063 AA A Architectural GEGC Closed
001962 Epoxy Primer at ROOM NO:  M.20 (TWC) at platform Level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
1064 AA A Architectural GEGC Closed
001963 no: P.20 (COR),P.14(COR) & P.30(COR) at Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
1065 AA A Architectural GEGC Closed
001976 at ROOM NO:  M.19 (FWR) at platform level.
Inspection request for installation of Gypsum board on the metal stud prior to wall tile
M3-CJV-IRF-EAR00-UGS-
1066 @ grid (23-24  -F-C) & (25-26-S-P)Room No: P.02 (PAID CONCOURSE) at Entrance AA A Architectural GEGC Closed
001977
1 concourse level (PART4)(As per highlighted location).
Inspection request for Drilling & chemical Anchoring, surface preparation, rebar's
M3-CJV-IRF-EAR00-UGS-
1067 Installation & formwork prior to casting for Plinths at ROOM NO: PPR1, PPR2, PPR3, AA A Architectural GEGC Closed
001978
PPR4 & PPR7 at ground level (As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
1068 AA A Architectural GEGC Closed
001979 coating at ROOM NO:  M.19 (FWR) &  M.20(TWC) at platform Level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy coating 1st Coat on the floor at ROOM
1069 AA A Architectural GEGC Closed
001980 NO:  M.20(TWC) at platform Level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of epoxy coat 1st & final coating on the plinth
1070 AA A Architectural GEGC Closed
001981 concrete at ROOM NO:  M.14(ACR8) at platform level( As per highlighted location) .

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
1071 AA A Architectural GEGC Closed
001982 at ROOM NO:M.08 (FPR) at concourse level.
Inspection request for installation of Gypsum board on the metal stud prior to wall tile
M3-CJV-IRF-EAR00-UGS-
1072 @ grid (25-26  -P-F)Room No: P.02 (PAID CONCOURSE) at Entrance 1 concourse AA A Architectural GEGC Closed
001990
level (PART5).(As per highlighted location ) .
Inspection Request for surface preparation/lay out & Metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
1073 at grid line(25-26)axis (F-B) ROOM NO : P.02(UNPAID CONCOURSE)in entrance 1 at AA A Architectural GEGC Closed
001991
concourse level( RIGHT  SIDE.) (As Per Highlighted Location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for final installation of GI cat ladder @ CLDR NO: 37 & 27 at
1074 AA A Architectural GEGC Closed
001992 Platform & concourse level.
Inspection Request for screed surface preparation, leveling, setting out prior to
M3-CJV-IRF-EAR00-UGS-
1075 concrete screed placement in Room no.:  S.01 (STAIR 1) Landing location at AA A Architectural GEGC Closed
001993
concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for final installation of GI cat ladder (CLDR NO: 40) inside LPS1-
1076 AA A Architectural GEGC Closed
001994 Riser from Platform level to Concourse Level.

Page 73 of 103
Inspection request for Surface preparation of Sump pits at Platform Slab ( WASTE
M3-CJV-IRF-EAR00-UGS-
1077 WATER SUMP PIT) prior to Application of Vandex super for water proofing purpose AA A Architectural GEGC Closed
001995
at P.13 Platform level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
1078 AA A Architectural GEGC Closed
001996 NO:  M.19 (FWR)   at  Platform level

M3-CJV-IRF-EAR00-UGS- Inspection request  for the Application of Vandex super for water proofing  purpose for
1079 AA A Architectural GEGC Closed
001997 Sump pits at Platform Slab ( WASTE WATER SUMP PIT) at P.13 Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
1080 AA A Architectural GEGC Closed
001998 at ROOM NO: M.13 (CWT) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (3rd Stage) from 6Mt height to up to last layer at
1081 AA A Architectural GEGC Closed
001999 Room no: E.19 (ER6) at concourse level(As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation for Floor prior to Application of Epoxy
1082 AA A Architectural GEGC Closed
002000 primer at  ROOM NO:  P.29(COR ) at concourse level.

M3-CJV-IRF-EAR00-UGS- I Inspection Request for the Application of Primer for floor prior to application of epoxy
1083 AA A Architectural GEGC Closed
002001 coating at ROOM NO:  P.29(COR ) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
1084 AA A Architectural GEGC Closed
002002 NO:  M.08 (FPR) at concourse level.
Inspection Request for the installation of porcelain tile With Adhesive without Grout
M3-CJV-IRF-EAR00-UGS- filling in Between Gaps on the wall at grid line (25-26 S-P )& (S-J -23-24) Room NO: Shop Drawing not 
1085 AA B Architectural GEGC
002003 P.02 (UNPAID CONCOURSE) Entrance 1 at Concourse level.(EXCEPT THE approved by RAMPED.
FHC,FEC & ADVERTIS
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
1086 screed placement on the stair landing location in room no:  S.03 (STAIR3) , S.02 AA A Architectural GEGC Closed
002004
(STAIR2) ,S.05 (STAIR5) & P.32 (LOBBY)at concourse level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
1087 AA A Architectural GEGC Closed
002005 NO:  M.13 (CWT) at concourse level
Inspection Request for the installation of porcelain tile With Adhesive without Grout
M3-CJV-IRF-EAR00-UGS- filling in Between Gaps on the wall at grid line (25-26 P-E ) Room NO: P.02 (UNPAID Shop Drawing not 
1088 AA B Architectural GEGC
002006 CONCOURSE) Entrance1 at Concourse level.(EXCEPT THE FHC,FEC & approved by RAMPED.
ADVERTISEMENT BOARD LOCATION)
Inspection request for Block wall from concourse level up to 3Mt height  at Room
M3-CJV-IRF-EAR00-UGS-
1089 No:R.02(RETAIL2),B.07(MWC2) at concourse level.AS PER HEIGHLIGHTED AA A Architectural GEGC Closed
002007
LOCATION.
Inspection request for Installation of Gypsum board on the metal stud prior to wall tile
M3-CJV-IRF-EAR00-UGS-
1090 @ Grid line (B-F) Room No: P.02 (PAID CONCOURSE) Entrance1 at concourse level. AA A Architectural GEGC Closed
002008
(AS PER HEIGHLIGHTED LOCATION.)
M3-CJV-IRF-EAR00-UGS-
1091 Inspection Request for the surface preparation prior to application of putty on concrete structure
AA at grid line (14-16)
A ROOM
Architectural
NO: LIFT 01 & LIFTGEGC
02 at platform level. Closed
002030
Inspection Request for the insta llation of porcelain tile With Adh esive without Grout
filling in
M3-CJV-IRF-EAR00-UGS- Shop Drawing not 
1092 Between Gaps on the wall at grid line (23-24 J -D) & (25-25 E-B) Room NO: P.02 AA B Architectural GEGC
002032 approved by RAMPED.
(UNPAID CONCOURSE ) Entrance1 a t Concourse levei.(EXCEPT THE FHC,FEC &
ADVERTISEMENT
Inspection Request BOARD LOCATION)
for the porcelain tile Grout filling on the wall at grid line (13-15-V-W
M3-CJV-IRF-EAR00-UGS- Shop Drawing not 
1093 ) Room NO: P.O1 ( PAID CONCOURSE) at Concourse level. (EXCEPT THE FHC, AA B Architectural GEGC
002033 approved by RAMPED.
FEC & ADVERTISEMENT BOARD LOCATION
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint on the lift pits at grid line
1094 AA A Architectural GEGC Closed
002044 (14-16) ROOM NO: LIFT 01 & LIFT 02 at platform level.

Page 74 of 103
Inspection Request for the Application of Epoxy coating 1st Coat on the floor at ROOM
M3-CJV-IRF-EAR00-UGS-
1095 NO: AA A Architectural GEGC Closed
002045
P.29 (COR)Request
Inspection at concourse level
for final inspection prior to concrete screed casting & concrete
screed placement on the stair landing location in room no: 8.01 (STAIR 1 ),8.02
M3-CJV-IRF-EAR00-UGS-
1096 (STAIR2),S.03(STAIR3),S.05 (STAIR5)& P.32(LOBBY) ,8.01 (STAIR5)floor at AA A Architectural GEGC Closed
002046
concourse to ground
Inspection
level. Request To cast Concrete for Plinth@ ROOM NO: PPR1 , PPR4, and
M3-CJV-IRF-EAR00-UGS- PPR7@
1097 AA A Architectural GEGC Closed
002047 ground level & Ramp beside the MWC2 @Entrance1 Concourse level (As per
highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection request for the Ramp surface preparation beside the toilets@Entrance1
1098 AA A Architectural GEGC Closed
002031 Concourse level .
Inspection Request for surface preparation/lay out & Metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
1099 at grid line(23-24)axis (B-D) ROOM NO : P.02(UNPAID CONCOURSE)in entrance 1 at AA A Architectural GEGC Closed
002049
concourse level( LIFT SIDE.) (As Per Highlighted Location).
Inspection Request for the porcelain tile Grout filling on the wall at grid line (24-27-W-X
M3-CJV-IRF-EAR00-UGS- Shop Drawing not 
1100 ) Room NO: P.02 (UNPAID CONCOURSE)Entrance3 at Concourse level.(EXCEPT AB B Architectural GEGC
002050 approved by RAMPED.
THE FHC & FEC )
Inspection Request for the porcelain tile Grout filling on the wall at grid line (23-26-S-B)
M3-CJV-IRF-EAR00-UGS- Shop Drawing not 
1101 Room NO: P.02 (UNPAID CONCOURSE)Entrance1 at Concourse level.(EXCEPT THE AB B Architectural GEGC
002051 approved by RAMPED.
FHC & FEC )
Inspection request for Installation of Gypsum board on the metal stud prior to wall tile
M3-CJV-IRF-EAR00-UGS-
1102 @ Grid line (23-24 B-D) Room No: P.02 (PAID CONCOURSE) Entrance1 at concourse AA A Architectural GEGC Closed
002052
level. (AS PER HEIGHLIGHTED LOCATION.)
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
1103 at grid line(11-13) ROOM NO : P.13(PLATFORM)at Platform level. As per highlighted AA A Architectural GEGC Closed
002053
location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for final installation of GI cat ladder (CLDR NO: 45) inside LPS2-
1104 AA A Architectural GEGC Closed
002054 Riser & (CLDR NO: 42) inside TPS-Riser from Platform level to Concourse Level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall (2nd Stage) from 3Mt height to up to last layer at
1105 AA A Architectural GEGC Closed
002055 Room no: B.07 (MWC2)& (RETAIL2) at concourse level(As per highlighted location.).
Inspection Request for surface preparation/lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
1106 at grid line (X-Y) ROOM NO : P.02(UNPAID CONCOURSE) Entrance 3 at concourse AA A Architectural GEGC Closed
002056
level   (As per highlighted location).PART2
Visual Inspection Request for Mock-up sample of the screed joint sealant at ROOM
M3-CJV-IRF-EAR00-UGS-
1107 NO : E.08 (IDF1) at concourse levei.(MATERIAL ONE COMPONENT AB A Architectural GEGC Closed
002061
POLYURETHANE SEALANT SODAMCO WEBER)
Inspection Request for the application of epoxy Hardtop coat 1st & final coating on the
M3-CJV-IRF-EAR00-UGS-
1108 plinth concrete at ROOM NO: GENERATOR YARD 1 at Ground level.part2( As per AA A Architectural GEGC Closed
002062
highlighted location)
Inspection request for installation of Gypsum board on the metal stud prior to wall tile
M3-CJV-IRF-EAR00-UGS- @ grid (X-Y) ROOM NO : P.02(UNPAID CONCOURSE) Entrance 3 at concourse level
1109 . A Architectural GEGC Closed
002063 PART2 &   grid line(11-13) ROOM NO : P.13(PLATFORM)at Platform level. As per
highlighted location) (As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for opening, placing of door frame & installation of Roller shutter
1110 AA A Architectural GEGC Closed
002077 door @ Room No: R.01 (Retail1) & R.02 (Retail2)@concourse level.
Inspection Request for the installation of porcelain tile on the wall  except the grout
M3-CJV-IRF-EAR00-UGS- Shop Drawing not 
1111 filling between the gap of tile joints at grid line (23-26 –A-D)Room NO: P.02 (UNPAID AB B Architectural GEGC
002081 approved by RAMPED.
Gap between the tiles
CONCOURSE) at Entrance 1 Concourse level.(EXCEPT THE FHC&FEC  LOCAION)
should not be irregular
Inspection Request for the installation of porcelain tile on the wall  except the grout
M3-CJV-IRF-EAR00-UGS- - Cross of the tiles should
1112 filling between the gap of tile joints at grid line (13-14 –U-W)Room NO: P.01 (PAID AA B Architectural GEGC
002082 be cross view/Shop
CONCOURSE) at Concourse level.(EXCEPT THE FHC&FEC  LOCAION)
Drawing not  approved by
RAMPED.
Page 75 of 103
Inspection Request for final installation of GI cat ladder
M3-CJV-IRF-EAR00-UGS-
1113 @ CLDR NO:46,47,48,49,50,51,52 & Stainless Steel cat ladder @ CLDR NO:20,22 & AA A Architectural GEGC Closed
002088
28 @ground level.
M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation for tile surface & lay-out at Room no
1114 AA A Architectural GEGC Closed
002089 ,B.11(TRR)at concourse level
Inspection Request for screed joint surface preparation & Application of sealant  at
M3-CJV-IRF-EAR00-UGS-
1115 Room no B.01(CLR1),B.02(CLR2), B.11(TRR)at concourse level & .B.12(CLR3)@ AA A Architectural GEGC Closed
002091
Platform level
M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation for tile surface & lay-out at Room no
1116 AA A Architectural GEGC Closed
002092 B.01(CLR1),B.02(CLR2), at concourse level & .B.12(CLR3)@ Platform level
Inspection Request for the installation of porcelain tile on the wall except the grout
M3-CJV-IRF-EAR00-UGS- Shop Drawing not 
1117 filling between the gap of tile joints at  Room NO: P.02 (UNPAID CONCOURSE) at AB B Architectural GEGC
002096 approved by RAMPED.
Entrance 3 Concourse level. (as per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation/Rebar anchorage/kicker at  Room no:
1118 AA A Architectural GEGC Closed
002097 Entrance 2 at concourse level.(as per highlighted location)
Need to Follow
M3-CJV-IRF-EAR00-UGS- Inspection Request for Mock-up of external wall finish at Room No: Generator yard 2 at
1119 AA B Architectural GEGC Manufacturer
002101 ground level.(As per highlighted location).
Recommendation.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Mock-up of Roller shutter Door at Room No: R.02(RETAIL2) at
1120 AA A Architectural GEGC Closed
002102 Concourse level.
Door Leaf Wavy /Provide
M3-CJV-IRF-EAR00-UGS- Inspection Request for Mock-up of Hollow Metal Door with Hardware & frame at Room PlateBetween Kicker&
1121 AA C Architectural GEGC
002103 No: PP & Door No: T.04-B at Concourse level. )RAL 7004) Leaf/Provide Plate under
Door to Auto Door Seal
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
1122 AA A Architectural GEGC Closed
002110 no:  M.11 (VR1) at Concourse level.
Inspection Request for Surface preparation & skim coat prior to application of putty
M3-CJV-IRF-EAR00-UGS-
1123 at Room no B.01(CLR1),B.02(CLR2), B.11(TRR)at concourse level & B.12(CLR3) at AA A Architectural GEGC Closed
002111
Platform level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application Of putty & two coat paint at Room no
1124 AA A Architectural GEGC Closed
002121 B.01(CLR1),B.02(CLR2), B.11(TRR)at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint work  on Concrete & CMU Wall
1125 AA A Architectural GEGC Closed
002122 at ROOM NO: M.18(PR)  at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the porcelain tile Grout filling on the wall at Room NO: P.01 Shop Drawing not 
1126 AA B Architectural GEGC
002125 (PAID AREA) at Concourse level. (EXCEPT THE FHC & FEC). approved by RAMPED.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
1127 AA A Architectural GEGC Closed
002126 at Room No :E.14 (IDF2)  at Entrance-01 Concourse level @ 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Putty & Paint work on Concrete & CMU wall Room
1128 AA A Architectural GEGC Closed
002134 No:B.12(CLR3)@ Platform level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
1129 AA A Architectural GEGC Closed
002135 coating at Room No: E.14(IDF2) at Concourse Level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Block wall from concourse level to up to 3Mt height  at Room no:
1130 AA A Architectural GEGC Closed
002136 (ENTRANCE2) at concourse level 4C2 Station.

Page 76 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for screed joint surface preparation & Application of sealant  at
1131 AA A Architectural GEGC Closed
002137 Room no M.01(ACR1) ,M.13(CWT)& M.05(ACR5) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work [2ND Stage] from 3m height up to soffit at  Room
1132 AA A Architectural GEGC Closed
002138 No. ENTRANCE 2 at Concourse level.
Inspection Request for the installation of porcelain tile on the floor & skirting With
M3-CJV-IRF-EAR00-UGS-
1133 Adhesive with Grout filling in Between Gaps at Room no B.11(TRR) & B.02(CLR2), at AC A Architectural GEGC Closed
002139
concourse level.
Inspection Request For installation of Insulation materials (Rockwool) & fire stop
M3-CJV-IRF-EAR00-UGS-
1134 sealant  Room no M.04 (ACR4),  at Movement Joints  &  Between Block Wall &  Roof  AA A Architectural GEGC Closed
002140
Slab at Concourse LEVEL
Inspection Request for the installation of porcelain tile on the floor & skirting With
M3-CJV-IRF-EAR00-UGS-
1135 Adhesive with Grout filling in Between Gaps at Room no B.01(CLR1), at concourse AC A Architectural GEGC Closed
002141
level.
Inspection Request for surface preparation/ lay out & metal stud installation inspection
M3-CJV-IRF-EAR00-UGS-
1136 at grid line(23-24) Axis (J-G) ROOM NO : P.02(UNPAID CONCOURSE) at concourse AA A Architectural GEGC Closed
002142
level( As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation & application of skim coat prior to AI-
1137 AA A Architectural GEGC Closed
002162 Jazeera putty work on Concrete Wall at ROOM NO: Generator Yard 1 at Ground level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation & application of sl<im coat prior to
1138 AA A Architectural GEGC Closed
002163 primer & putty work at ROOM NO: S.Ol{STAIRS) at Concourse to Ground level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the installation of porcelain tile on the floor & skirting With
1139 AC A Architectural GEGC Closed
002164 Adhesive with Grout filling in Between Gaps at Room no: B.12(CLR3) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for final installation of galvanized CLDR No:38 (L=7552mm) (Inside
1140 AA A Architectural GEGC Closed
002165 PP-Room Riser) from concourse to ground level at 4C2 Station •
Inspection Request for final installation of Stainless Steel cat ladder for platform sump-
M3-CJV-IRF-EAR00-UGS- pits @ CLDR NO: 2 (L=l350mm), 3 (L=1350rnm), 4 (L=2S80mm), 1(L=2445mm) 5
1141 AA A Architectural GEGC Closed
002166 (l=l350mm) ,6 (L=1350mm), 7 (l=2610mm), 9 (L=1350mm), 10 (L=1350mm), 11
(L=1430mm) & 29 (L=1350mm) at Platform level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
1142 AA A Architectural GEGC Closed
002167 at Room No: M.ll (VRl) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer prior to epoxy filler at Room No:
1143 AA A Architectural GEGC Closed
002168 M.ll (VRl) at Concourse Level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
1144 AA A Architectural GEGC Closed
002169 no: M.l2 (VR2) at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation & application of skim coat prior to
1145 AA A Architectural GEGC Closed
002171 primer & putty work at ROOM NO: E.19(ER6) at concourse level.
Inspection Request for the surface preparation & application of skim coat prior to AL-
M3-CJV-IRF-EAR00-UGS-
1146 JAZEERA MATRIX EX (FILLER) at ROOM NO: M.29 (PPR1) & M.13 (PPR3) at AA A Architectural GEGC Closed
002172
Ground level.
Inspection Request for the surface preparation & application of skim coat prior to
M3-CJV-IRF-EAR00-UGS-
1147 primer & putty work at ROOM NO: S.OS(STAIRS) at concourse level.part2 as per AA A Architectural GEGC Closed
002173
highlighted location
M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation & application of skim coat prior to
1148 AA A Architectural GEGC Closed
002184 primer & putty work at ROOM NO: S.04(STAIR4) at concourse to ground level.

Page 77 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for screed joint surface preparation & Application of sealant at
1149 AA A Architectural GEGC Closed
002185 Room no E.13 (VER2) & M.02 (ACR2) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the surface preparation & application of skim coat prior to
1150 AA A Architectural GEGC Closed
002187 primer & putty work at ROOM NO: P.32 (LOBBY} at concourse level.
Inspection request for Drilling & chemical Anchoring, surface preparation, rebar's
M3-CJV-IRF-EAR00-UGS-
1151 Installation & formwork prior to casting for Plinths at ROOM NO: PPR6 at ground level AA A Architectural GEGC Closed
002195
(As per highlighted location).
Inspection Request for Surface preparation & skim coat prior to application of al-
M3-CJV-IRF-EAR00-UGS-
1152 jazeera filler at Room No: M.24(TVS1},M.25(TVS2),M.36(ECR1) & M.37(ECR2) at AA A Architectural GEGC Closed
002196
ground levei.(As per highlighted location).
Inspection Request for screed surface preparation, leveling, setting out & concrete
M3-CJV-IRF-EAR00-UGS-
1153 screed placement in sump-pits (WASTE WATER SUMP PIT)@Room no. P.18 AA A Architectural GEGC Closed
002197
(TRACKSIDE WALKWAY),P.13 (PLATFORM)&M.14 (ACR8) in at platform level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of putty & paint work on Concrete & CMU Wall
1154 AA A Architectural GEGC Closed
002198 at ROOM NO: S.05 (STAIR5) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application Of putty & two coats paint at Room no 8.11
1155 AA A Architectural GEGC Closed
002199 (TRR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request To cast Concrete for Plinth @ ROOM NO: PPR2, PPR3, and
1156 AA A Architectural GEGC Closed
002206 PPR6@ ground level (As per highlighted location).
Inspection Request for the surface preparation & application of skim coat prior to
M3-CJV-IRF-EAR00-UGS-
1157 primer & putty work at ROOM NO: L.03(LIFT3) at concourse ceiling to up to ground AA A Architectural GEGC Closed
022220
level.
Inspection Request for the surface preparation & application of skim coat prior to
M3-CJV-IRF-EAR00-UGS-
1158 primer & putty work at ROOM NO: S.01 STAIR1 at concourse ceiling to up to ground AA A Architectural GEGC Closed
022221
level.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation & skim coat prior to application of AI-
1159 AA A Architectural GEGC Closed
022222 Jazeera filler at Room No: PPR2 at ground levei.(As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy coating 1st Coat on the floor at ROOM
1160 AA A Architectural GEGC Closed
002223 NO: M.ll(VRl) & E.l4 (IDF2) at Entrance-01 Concourse level@ 4C2 Station
Inspection Request for Surface preparation & skim coat prior to application of Al-
M3-CJV-IRF-EAR00-UGS-
1161 Jazeera filler at Room No: Generator Yard-2 at ground level.(As per highlighted AA A Architectural GEGC Closed
002228
location).
Inspection Request for Examine Condition of Structural Surface, tolerance &
M3-CJV-IRF-EAR00-UGS-
1162 Installation of floor mounted handrails & balustrade for Stair at ROOM NO: S.01 AB A Architectural GEGC Closed
002229
(STAIR1) at Platform to ground level.(Except the paint)
Inspection Request for Examine Condition of Structural Surface, tolerance &
M3-CJV-IRF-EAR00-UGS-
1163 Installation of floor mounted handrails & balustrade for Stair at ROOM NO: S.02 AB A Architectural GEGC Closed
002230
(STAIR2) at Platform to ground level.(Except the paint)
Inspection Request for Examine Condition of Structural Surface, tolerance &
M3-CJV-IRF-EAR00-UGS-
1164 Installation of floor mounted handrails & balustrade for Stair at ROOM NO: S.03 AB A Architectural GEGC Closed
002231
(STAIR3) at Platform to ground level.(Except the paint)
Inspection Request for Examine Condition of Structural Surface, tolerance &
M3-CJV-IRF-EAR00-UGS-
1165 Installation of floor mounted handrails & balustrade for Stair at ROOM NO: S.04 AB A Architectural GEGC Closed
002232
(STAIR4) at Platform to ground level.(Except the paint)
Inspection Request for Examine Condition of Structural Surface, tolerance &
M3-CJV-IRF-EAR00-UGS-
1166 Installation of floor mounted handrails & balustrade for Stair at ROOM NO: S.05 AB A Architectural GEGC Closed
002233
(STAIR5) at Platform to ground level.(Except the paint)

Page 78 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for final Installation of GI Cat Ladder (CLDR-21)  at Ground Level
1167 AA A Architectural GEGC Closed
002259 & Stainless steel (CLDR NO: 8 ) Platform  for 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1168 AA A Architectural GEGC Closed
002260 no P.18( TRACKSIDE WALKWAY)  at Platform level.
Inspection Request for Surface preparation & skim coat prior to application of Al-
M3-CJV-IRF-EAR00-UGS-
1169 Jazeera filler at Room No: PPR7 at ground level for 4C2 Station. AA A Architectural GEGC Closed
002261
.(As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation & skim coat prior to application of Al-
1170 AA A Architectural GEGC Closed
002262 Jazeera filler at Room No: PPR4 at ground level.(As per highlighted location).

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation & skim coat prior to application of Al-
1171 AA A Architectural GEGC Closed
002263 Jazeera filler at Room No: PPR5 at ground level.(As per highlighted location).
Inspection Request for the Application of Putty  & 2 Coat paint Application work at Final Approval Subject for
M3-CJV-IRF-EAR00-UGS-
1172 Room No : P.01 (STAIR1) from Concourse Level up to Ground Level  at 4C2 Station AA B Architectural GEGC MEP Installation.MEP PIPE
002264
(As per Highlighted location). AREA NEED TO RECTIFY
Inspection Request for Surface preparation & skim coat prior to application of Al-
M3-CJV-IRF-EAR00-UGS-
1173 Jazeera filler at  Room No : M.26(TVS3),M.38(ECR3) & M.39(ECR4) at ground level AA A Architectural GEGC Closed
002268
4C2 Station.(As per highlighted location).
Inspection Request for screed surface preparation & installation of poly carbonate
M3-CJV-IRF-EAR00-UGS-
1174 angles prior to concrete screed casting in room no. P.13(PLATFORM) at platform level AA A Architectural GEGC Closed
002279
4C2 Station. North side
M3-CJV-IRF-EAR00-UGS- Inspection Request for installation of Anti-static membrane pr.ior to concrete screed
1175 AA A Architectural GEGC Closed
002280 casting in room no. P.13(PLATFORM) at platform levei4C2 Statioo
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
1176 screed placement on the concourse floor in room no: P.13 {PLATFORM) at platform AA A Architectural GEGC Closed
002281
leve14C2 Station. As per highlighted location
M3-CJV-IRF-EAR00-ugs- Inspection Request for surface preparation for floor prior to application of epoxy primer
1177 AA A Architectural GEGC Closed
002282 at Room No: P.18 (TRACKSIDE WALKWAY) at platform level.

M3-CJV-IRF-EAR00-ugs- Inspection Request for the application of epoxy primer for floor prior to epoxy filler at
1178 AA A Architectural GEGC Closed
002283 Room No: P.18 (TRACKSIDE WALKWAY) at platform level.
Inspection Request for screed surface preparation & installation of poly carbonate
M3-CJV-IRF-EAR00-UGS-
1179 angles prior to concrete screed casting in room no. P.13 (PLATFORM) at platform AA A Architectural GEGC Closed
002284
levei4C2 Station. South side
M3-CJV-IRF-EAR00-UGS- Inspection Request for installation of Anti-static membrane prior to concrete screed
1180 AA A Architectural GEGC Closed
002285 casting in room no. P.13 (PLATFORM) at platform levei 4C2 Station. South side
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
1181 screed placement on the concourse floor in room no: P.13 (PLATFORM) at platform AA A Architectural GEGC Closed
002287
levei4C2 Station. As per highlighted location. south side
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack Repairing for Screed Floor in Room
1182 AA A Architectural GEGC Closed
002288 no: P.19 (TRACKSIDE WALKWAY) at platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy coating 1st Coat on the floor at Room
1183 AA A Architectural GEGC Closed
002289 No: P.18 (TRACKSIDE WALKWAY) at platform level. (As per highlighted location)
Inspection Request for screed surface preparation, leveling, setting out & installation of
M3-CJV-IRF-EAR00-UGS- embedded items (galvanized angles, filler board) prior to concrete screed placement at
1184 AA A Architectural GEGC Closed
002290 around lift-01& 02 ,Around travellators at concourse level & beside the lift-05 at ground
level.

Page 79 of 103
Inspection Request for final inspection prior to concrete screed casting & concrete
M3-CJV-IRF-EAR00-UGS-
1185 screed placement on the floor at around lift-01& 02 ,around travellators at concourse AA A Architectural GEGC Closed
002291
level & beside the lift-05 at ground level.
Inspection Request for the application of surface preparation, epoxy primer, filler &
M3-CJV-IRF-EAR00-UGS-
1186 epoxy Hardtop coat lsr & 2No coating on the plinth concrete at ROOM AA A Architectural GEGC Closed
002299
NO:PPR1,2,3,4,5 ,6,7 & beside stairS at Ground level. (As per highlighted location)
Inspection Request for surface preparation for Floor prior to application of epoxy primer
M3-CJV-IRF-EAR00-UGS-
1187 at ROOM NO: P.19(TRACKSIDE WALKWAY) at Platform level( As per highlighted AA A Architectural GEGC Closed
002300
location)
Inspection Request for the Application of Primer for floor prior to application of epoxy
M3-CJV-IRF-EAR00-UGS-
1188 coating at ROOM NO: P.l9(TRACKSIDE WALKWAY) at Platform level( As per AA A Architectural GEGC Closed
002301
highlighted location
Inspection Request for screed surface preparation, leveling, setting out & Rebar's ,filler
M3-CJV-IRF-EAR00-UGS-
1189 board installation & concrete screed casting in Room no.PPR 1 ,2 & 3 at Ground level AA A Architectural GEGC Closed
002302
4C2 Station
M3-CJV-IRF-EAR00-UGS- lnspection Request for surface preparation for floor prior to application of epoxy primer
1190 AA A Architectural GEGC Closed
002306 at Room No: P.OS & 04 (COR) at Concourse level.
lnspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS-
1191 materials and fire stop sealant at Room no: FCC,Around stair 2 and MECH-07,09 & 24 AA A Architectural GEGC Closed
002307
at Ground level

1192 M3-CJV-IRF-EAR00-UGS-2313 Inspection Request for the surface preparation prior to Application of Epoxy AA A Architectural GEGC Closed

M3-CJV-IRF-EAR00-UGS- lnspection Request for the application of primer prior to Application of Epoxy coating
1193 AA A Architectural GEGC Closed
002314 1st Coat on the floor at Room No: M.12 (VR2) at CONCOURSE LEVEL

M3-CJV-IRF-EAR00-UGS- Inspection Request for screed surface preparation, leveling, setting out &Rebar's ,filler
1194 AA A Architectural GEGC Closed
002315 board installation & concrete screed casting in Room no.PPR4& 5 at Ground level 4C2

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Primer for floor prior to application of epoxy
1195 AA A Architectural GEGC Closed
002316 filler at ROOM NO :P.04(COR) & P.OS(COR) at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy coating 1st Coat on the floor at Room
1196 AA A Architectural GEGC Closed
002317 No: M.12 (VR2) at concourse level.( As per highlighted location)

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation for floor prior to application of epoxy primer
1197 AA A Architectural GEGC Closed
002318 at Room No: P.03(COR), P.21 (COR),P.24(COR) at Concourse level.
Inspection request for Surface preparation & Crack repairing for Screed FloW in Room
M3-CJV-IRF-EAR00-UGS-
1198 NO: P.Ol (PAID CONCOURSE) North side at Concourse level. (as per highlighted AA A Architectural GEGC Closed
002319
location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy coating 1st Coat on the floor at Room
1199 AA A Architectural GEGC Closed
002321 No: P.19 (TRACKSIDE WALKWAY) at platformlevel .. ( As per highlighted location)
Inspection Request for screed sw-face preparation, leveling, setting out filler board
M3-CJV-IRF-EAR00-UGS-
1200 installation & concrete screed casting in Room no. LIFT -06 at Platform level 4C2 AA A Architectural GEGC Closed
002322
Station
Inspection Request for surface preparation for floor prior to application pf epoxy primer
M3-CJV-IRF-EAR00-UGS-
1201 at ROOM NO:P.07(COR,P.22(COR),P.09(COR),P.ll(COR) & P.23(COR) at concourse AA A Architectural GEGC Closed
002324
level.
Inspection Request for the Application of Primer for floor prior to application of epoxy
M3-CJV-IRF-EAR00-UGS-
1202 coating at Room NO: P.07(COR,P.22(COR),P.09(COR),P.11(COR) & P.23(COR) at AA A Architectural GEGC Closed
002325
concourse level.

Page 80 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
1203 AA A Architectural GEGC Closed
002326 NO: ~ p.26(COR,P.OS(COR),P.04(COR),P.21(COR) & P.24(COR) at concourse level.
Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
M3-CJV-IRF-EAR00-UGS-
1204 NO: P.Ol {PAID CONCOURSE) south side at Concourse level. {as per highlighted AA A Architectural GEGC Closed
002327
location)
Inspection Request for the installation of porcelain tile on the floor With Adhesive &
M3-CJV-IRF-EAR00-UGS- Shop Drawing not 
1205 Grout filling in Between Gaps at Grid (13-23-U-S) Room no P.01(PAID AB B Architectural GEGC
002344 approved by RAMPED.
CONCOURSE) at concourse level.(As per highlighted location) .
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Surface Preparation for floor prior to application of epoxy
1206 AA A Architectural GEGC Closed
002351 Primer at Room NO: M.07(ACR7)  at Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st  Coat on floor prior at Room
1207 AA A Architectural GEGC Closed
002352 NO: P.07(COR),P.09(COR),P.11(COR),P.22(COR) & P.23(COR) at Concourse level.
Inspection Request for Screed Surface preparation ,leveling ,setting out prior to
M3-CJV-IRF-EAR00-UGS-
1208 concrete Screed casting on Stair Roof for drain Leveling Room#S.01(STAIR AA A Architectural GEGC Closed
002353
1),S.03(STAIR 3) & S.04(STAIR 4) AT Ground Level.
Inspection request for Surface preparation & Crack repairing for Screed Floor in Grid
M3-CJV-IRF-EAR00-UGS-
1209 (S-P) Room NO: P.02 (UNPAID CONCOURSE) East Side Entrance-01 at Concourse AA A Architectural GEGC Closed
002354
level. (As per highlighted location) .
Inspection Request for the Installation of porcelain tile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS- Shop Drawing not 
1210 between the gap of tile joints at Grid line (13-19 & W-U) Room NO: P.01 (PAID AB B Architectural GEGC
002355 approved by RAMPED.
CONCOURSE) at Concourse level. (as per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation Prior to Application of Epoxy primer on the
1211 AA A Architectural GEGC Closed
002357 Floor at ROOM NO: P.08(COR),P.10(COR),P.23(COR) at 4C2-Station concourse level
Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
M3-CJV-IRF-EAR00-UGS-
1212 NO: P.02 (UNPAID CONCOURSE) at Concourse level at 4C2-Station . (As per AA A Architectural GEGC Closed
002358
highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on floor at Room NO:
1213 AA A Architectural GEGC Closed
002359 M.07( ACR-7) at Concourse level at 4C2-Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation & Application of Epoxy primer on the Floor
1214 AA A Architectural GEGC Closed
002378 at Room no: M.21(FCC) at Ground level -4C2 Station .
Inspection Request for the installation of porcelain tile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS- Shop Drawing not 
1215 between the gap of tile joints at Grid line(25-26-P-J) Room NO: P.02 (UNPAID AB B Architectural GEGC
002379 approved by RAMPED.
CONCOURSE) Entrance1 at 4c2-Station Concourse level (As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for Concrete screed casting above the staircase roof at Room no.
1216 AA A Architectural GEGC Closed
002380 STAIR 1,3 & 4 at Ground level -4C2 Station .
Inspection request for installation of Rockwool & Application of fire Stop Sealant at
M3-CJV-IRF-EAR00-UGS-
1217 Room# FCC, Around stair 2 and MECH-07,09 & 24 at Movement Joint & Between Wall AA A Architectural GEGC Closed
002381
& Roof Slab at Ground level at 4C2 Station.
DESIGN & SHOP
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Installation of secondary steel for ceiling at ROOM NO:
1218 AA C Architectural GEGC DRAWING NOT
002385 P.13(PLATFORM) at Platform level 4C2 Station .
APPROVED
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation Prior to Application of Epoxy primer on
1219 AA A Architectural GEGC Closed
002386 the Floor at Room no: E.19(ER6) at concourse level 4C2 Station .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the Floor at Room no:
1220 AA A Architectural GEGC Closed
002387 E.19(ER6) at concourse level 4C2 Station .

Page 81 of 103
Inspection Request for the installation of porcelain tile on the floor with the grout filling
Fast must protect the
M3-CJV-IRF-EAR00-UGS- between the gap of tile joints at Grid line(25-26-S-P)Room NO: P.02 (UNPAID
1221 AB B Architectural GEGC tile/Shop Drawing not 
002388 CONCOURSE) Entrance1 at Concourse level 4C2 Station . (as per highlighted
approved by RAMPED.
location)
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1222 AA A Architectural GEGC Closed
002397 no: P.02(UNPAID CONCOURSE) Entrance 1at concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at ROOM
1223 AA A Architectural GEGC Closed
002398 NO: P.08(COR),P.10(COR),P.23(COR) at 4C2-Station concourse level

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation for Floor Prior to Application of Epoxy
1224 AA A Architectural GEGC Closed
002399 Primer at Room# P.15(COR) & P.16(COR) at Platform Level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at ROOM
1225 AA A Architectural GEGC Closed
002400 NO: Room no: E.19(ER6) at 4C2-Station concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at ROOM
1226 AA A Architectural GEGC Closed
002401 NO: Room no: M.21 (FCC) at 4C2-Station Ground level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the Floor at ROOM NO:
1227 AA A Architectural GEGC Closed
002402 P.15(COR) & P.16(COR) at 4C2-Station platform level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation prior to Application of Epoxy primer on the
1228 AA A Architectural GEGC Closed
002406 Floor at ROOM NO: P.20(COR), P.14(COR)&P.30(COR) at 4C2-Station platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the Floor at ROOM NO:
1229 AA A Architectural GEGC Closed
002407 P.20(COR), P.14(COR)&P.30(COR) at 4C2-Station platform level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at ROOM
1230 AA A Architectural GEGC Closed
002408 NO: Room no: P.15 & P.16(COOR) at 4C2-Station platform level .
Inspection Request for the installation of porcelain tile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS- Shop Drawing not 
1231 between the gap of tile joints at Room NO: P.01 (PAID CONCOURSE) (in between AB B Architectural GEGC
002375 approved by RAMPED.
Axis 16-17, 19-21) at Concourse level. (as per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the Floor at ROOM NO:
1232 AA A Architectural GEGC Closed
002376 P.08(COR),P.10(COR),P.23(COR) at 4C2-Station concourse level
Inspection Request for the Installation of porcelain tile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1233 between the gap of tile joints at Room NO: P.02 (UNPAID CONCOURSE) Grid line ( S- AA A Architectural GEGC Closed
002420
P WEST SIDE) & (K-G) Entrance1 at 4C2-Station Concourse level. (As per highl
M3-CJV-IRF-EAR00-UGS- Inspection Request for screed surface preparation, leveling, setting out & concrete
1234 AA A Architectural GEGC Closed
002421 screed casting above staircase 2 & M.21 (FCC) Roof at Ground level at 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for screed surface preparation, leveling , setting out & concrete
1235 AA A Architectural GEGC Closed
002422 screed casting for PPR6 & PPR8 Floor at Ground level at 4C2 Station Entrance-01.
Inspection Request For installation of Insulation materials (Rockwool) & fire stop
M3-CJV-IRF-EAR00-UGS-
1236 sealant in movement joint & between the block wall and ceiling joint at Room no: AA A Architectural GEGC Closed
002423
E.19(ER6)at concourse level at 4C2 Station Entrance1.
Inspection Request for the installation of porcelain tile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS- between the gap of tile joints at Grid line (G-D) Room NO: P.02 (UNPAID
1237 AA A Architectural GEGC Closed
002424 CONCOURSE) at 4C2 Station Entrance1 at Concourse level. (As Per Highlighted
Location)
Inspection Request for screed surface preparation, leveling, setting out prior to
M3-CJV-IRF-EAR00-UGS-
1238 concrete screed casting above stair 5 roof at Room no.S.05(STAIR 5) at Ground level AA A Architectural GEGC Closed
002425
4C2 Station Entrance-01 .

Page 82 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface preparation prior to putty & paint at Room no: M.21
1239 AA A Architectural GEGC Closed
002426 (FCC) at 4C2-Station Ground level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for concrete screed casting above staircase 5 Roof at Ground
1240 AA A Architectural GEGC Closed
002427 level at 4C2 Station Entrance-01..
Inspection Request for screed surface preparation, leveling, setting out , filler board
M3-CJV-IRF-EAR00-UGS-
1241 installation & concrete screed casting in Room no. ECR,1,2,3 & 4 at Ground level (As AA A Architectural GEGC Closed
002428
per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation prior to Application of Epoxy primer on the
1242 AA A Architectural GEGC Closed
002429 Floor at Room no: P.21(COR) Part-2 at 4C2 Station Concourse level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the Floor at Room no:
1243 AA A Architectural GEGC Closed
002431 P.21(COR) Part-2 at 4C2 Station Concourse level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation prior to Application of Epoxy primer on the
1244 AA A Architectural GEGC Closed
002432 Floor at Room no: PPR 1,2,3 at Ground level -4C2 Station .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the Floor at Room no: PPR
1245 AA A Architectural GEGC Closed
002433 1,2,3 at Ground level -4C2 Station .

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
1246 AA A Architectural GEGC Closed
002434 no: P.14,(COR),P.20(COR) & P.30(COR) at platform level 4C2 Station .
Inspection Request for the installation of porcelain tile on the floor with the grout filling Fast must protect the
M3-CJV-IRF-EAR00-UGS-
1247 between the gap of tile joints at Room NO: P.02 (UNPAID CONCOURSE) (P-H) Left AB B Architectural GEGC tile/Shop Drawing not 
002437
Side at 4C2 Station Entrance1 Concourse level. approved by RAMPED.
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1248 AA A Architectural GEGC Closed
002438 no: P.13(PLATFORM) at 4C2 Station Platform level.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to EPDM laying on stair roof at Room
1249 AA A Architectural GEGC Closed
002464 no: S.01(STAIR1) ,S.03(STAIR3) & S.04(STAIR4) at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation Prior to Application of Epoxy primer on
1250 AA A Architectural GEGC Closed
002465 the Floor at Room no: PPR 04 & 05 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the Floor at Room no: PPR 04
1251 AA A Architectural GEGC Closed
002466 & 05 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation Prior to Application of Epoxy primer on
1252 AA A Architectural GEGC Closed
002467 the Floor at Room no: ECR1 & 2 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the Floor at Room no: ECR01
1253 AA A Architectural GEGC Closed
002468 & ECR02 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation Prior to Application of Epoxy primer on
1254 AA A Architectural GEGC Closed
002469 the Floor at Room no: ECR3 & 4 at 4C2 Station Ground level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & paint work on concrete and block wall at Room no: E.19
1255 AA A Architectural GEGC Closed
002470 (ER6)at concourse level 4C2 Station

M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & paint work on concrete and block wall at Room no: E.14
1256 AA A Architectural GEGC Closed
002471 (IDF2)at concourse level4C2 Station

Page 83 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the Floor at Room no: ECR3 &
1257 AA A Architectural GEGC Closed
002472 4 at 4C2 Station Ground level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Mock-up of Handrail & Balustrade (RAL 7016) at Room
1258 AA A Architectural GEGC Closed
002473 No:S.27(STAIRCASE) at Ground level 4C2 Station.
DESIGN & SHOP
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Installation of Sub structure(CD-60 & HOOK-ON profile for
1259 AB B Architectural GEGC DRAWING NOT
002483 ceiling at ROOM NO: P.13(PLATFORM) at Platform level- 4C2 Station .
APPROVED
Inspection Request for the Installation of secondary steel & Sub structure(CD-60 &
M3-CJV-IRF-EAR00-UGS-
1260 HOOK-ON profile for ceiling at ROOM NO: P.01(PAID CONCOURSE) at Concourse AA A Architectural GEGC Closed
002484
level -4C2 Station .
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at ROOM
1261 AA A Architectural GEGC Closed
002485 NO: Room no: COR(P.21) Part-2 at Concourse level -4C2 Station .

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at ROOM
1262 AA A Architectural GEGC Closed
002486 NO: Room no: PPR 1,2 & 3 at Ground level-4C2 Station .

M3-CJV-IRF-EAR00-UGS- Final Inspection Request for paint touch-up work on concrete and block wall at Room
1263 AA A Architectural GEGC Closed
002487 no: M.19 (FWR) & M.20(TWC) at platform Level-4C2 Station .

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at ROOM
1264 AA A Architectural GEGC Closed
002488 NO: Room no: ECR1 & 2at Ground level-4C2 Station .

M3-CJV-IRF-EAR00-UGS-
1265 Inspection Request for  Application of Epoxy primer  on the Floor at  Room no: PPR6 & PPR8AA
at  4C2 Station
A Ground level.
Architectural GEGC Closed
002490
Fast must protect the
M3-CJV-IRF-EAR00-UGS-
1266 Inspection Request for the installation of porcelain tile on the floor with the grout filling between
ABthe gap of tileBjoints at Room
Architectural
NO: P.02 (UNPAID
GEGC
CONCOURSE)
tile/Shop
(Grid K-B)
Drawing
at Entrance
not  1
002491
approved by RAMPED.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation prior to Application of Epoxy primer on the
1267 AA A Architectural GEGC Closed
002493 Floor at Room no: PPR 7 at Ground level -4C2 Station .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the Floor at Room no: PPR 6,7
1268 AA A Architectural GEGC Closed
002494 & 8 at Ground level -4C2 Station .

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation prior to Application of Epoxy Primer on
1269 AA A Architectural GEGC Closed
002497 the Floor at Room no: PPR 6,7 & 8 at 4C2 Station Ground level.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy Hard Top Coat on the Floor at Room no:
1270 AA A Architectural GEGC Closed
002498 PPR 6,7 & 8 at 4C2 Station Ground level.
Inspection Request for the installation of porcelain tile on the floor with the grout filling Fast must protect the
M3-CJV-IRF-EAR00-UGS-
1271 between the gap of tile joints at Room NO: P.02 (UNPAID CONCOURSE ) Entrance1 AB B Architectural GEGC tile/Shop Drawing not 
002499
at concourse  level 4C2 Station . (as per highlighted location) approved by RAMPED.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy Hard Top Coat on the Floor at Room no:
1272 AA A Architectural GEGC Closed
002500 PPR 4 & 5 at 4C2 Station Ground level.
Inspection Request for Surface Preparation Prior to Application of Epoxy primer on the
M3-CJV-IRF-EAR00-UGS-
1273 stair steps & landing location at ROOM NO: S.01(STAIR1) at 4C2-Station concourse to AA A Architectural GEGC Closed
002501
ground level
Inspection Request for the installation of porcelain tile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1274 between the gap of tile joints at Room NO: P.13 (PLATFORM ) at platform level 4C2 AB A Architectural GEGC Closed
002502
Station . (as per highlighted location)

Page 84 of 103
M3-CJV-IRF-EAR00-UGS- Inspection request for EPDM laying on stair roof at Room no: S.01(STAIR1) at
1275 AA A Architectural GEGC Closed
002503 Ground level 4C2 Station.
Inspection Request for the installation of porcelain tile on the floor with the grout filling Fast must protect the
M3-CJV-IRF-EAR00-UGS-
1276 between the gap of tile joints at Room NO: P.02 (UNPAID CONCOURSE ) Entrance3 AB B Architectural GEGC tile/Shop Drawing not 
002504
at concourse level 4C2 Station . (as per highlighted location) approved by RAMPED.
M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & 2 coat paint work on concrete wall & bellow staircase at
1277 AA A Architectural GEGC Closed
002505 Room no: S.03 (STAIR3)at platform to ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the stair steps & landing location
1278 AA A Architectural GEGC Closed
002516 at ROOM NO: S.01(STAIR1) at 4C2-Station concourse to ground level

M3-CJV-IRF-EAR00-UGS- Inspection request for EPDM laying on stair roof at Room no: S.03(STAIR3) &
1279 AA A Architectural GEGC Closed
002517 S.04(STAIR4) at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Leak test after EPDM laying on stair roof at Room no:
1280 AA A Architectural GEGC Closed
002518 S.01(STAIR1),S.03(STAIR3) &S.04(STAIR4) at Ground level 4C2 Station.
Inspection Request for the Installation of secondary steel & Sub structure (CD-60) &
M3-CJV-IRF-EAR00-UGS-
1281 HOOK-ON profile for ceiling at ROOM NO: P.02(PAID CONCOURSE) Entrance-01 & AA A Architectural GEGC Closed
002519
03 at Concourse level -4C2 Station .
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy hardtop Coat on the floor at ROOM
1282 AA A Architectural GEGC Closed
002526 NO: Room no: PPR7,ECR3 & 4 at Ground level

M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & 2 coat paint work on concrete wall & bellow staircase at
1283 AA A Architectural GEGC Closed
002527 Room no: S.02 (STAIR2)at platform to ground level 4C2 Station.
Inspection Request For installation of Rockwool  materials  and fire stop sealant At grid
M3-CJV-IRF-EAR00-UGS-
1284 line (15-17) Room No: P.13(PLATFORM) at Movement Joints & Between Block Wall AA A Architectural GEGC Closed
002528
& Roof Slab @ platform level. (As per highlighted location).
Inspection Request for the surface preparation  prior to Application of Epoxy primer  on
M3-CJV-IRF-EAR00-UGS-
1285 the floor ,steps & landing location at Room NO: S.05(STAIR5) at Concourse  to ground AA A Architectural GEGC Closed
002534
level at 4C2 Station
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy primer on the floor ,steps & landing
1286 AA A Architectural GEGC Closed
002535 location at Room NO: S.04(STAIR4) at Concourse to ground level at 4C2
Inspection Request for the surface preparation prior to Application of Epoxy Primer on
M3-CJV-IRF-EAR00-UGS-
1287 the floor ,steps & landing location at Room NO: S.05(STAIR4) from Concourse to AA A Architectural GEGC Closed
002537
ground level at 4C2 station.
Inspection Request for the Installation of balustrade stringer & HDG brackets at
M3-CJV-IRF-EAR00-UGS- staircase S.06 & S.07 from Concourse to Platform, Around staircase S.06 ,
1288 AA A Architectural GEGC Closed
002538 S.07(@Concourse Level) and Escalators 1,2,3 & 4(@Concourse Level) at 4C2 Station
.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the floor ,steps & landing
1289 AA A Architectural GEGC Closed
002545 location at Room NO: S.05(STAIR5) at Concourse to ground level.at 4C2 station.
Inspection Request for the Application of Epoxy Paint 1st Coat on the floor ,steps &
M3-CJV-IRF-EAR00-UGS-
1290 landing location at Room NO: S.01(STAIR1) at Concourse to ground level at 4C2 AA A Architectural GEGC Closed
002546
station.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at Room
1291 AA A Architectural GEGC Closed
002547 NO: P.25(COR) at Concourse level at 4C2 station.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to application of tremp proof on the
1292 AA A Architectural GEGC Closed
002548 floor at Room no: ECR1,2,3&4 at Ground level 4C2 Station.

Page 85 of 103
Inspection Request for the Installation of secondary steel & Sub structure (CD-60) &
M3-CJV-IRF-EAR00-UGS-
1293 HOOK-ON profile for ceiling at ROOM NO: P.02(UNPAID CONCOURSE) (Grid B-K) AA A Architectural GEGC Closed
002550
Entrance 1at Concourse level -4C2 Station. (As per highlighted location)
Inspection Request for the Installation of secondary steel & Sub structure (CD-60) &
M3-CJV-IRF-EAR00-UGS-
1294 HOOK-ON profile for ceiling at ROOM NO: P.02(PAID CONCOURSE) (Axis 24-26) in AA A Architectural GEGC Closed
002551
front of ticketing office at Concourse level -4C2 Station . (As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of 2 Coat paint on the wall at Room no: M.21
1295 AA A Architectural GEGC Closed
002552 (FCC) at 4C2-Station Ground level @ 4C2 Station. .
Inspection Request for the installation of porcelain tile on the floor with the grout filling Fast must protect the
M3-CJV-IRF-EAR00-UGS-
1296 between the gap of tile joints at Room NO: P.02 (UNPAID CONCOURSE ) at AA B Architectural GEGC tile/Shop Drawing not 
002553
concourse level 4C2 Station . (As per highlighted location) approved by RAMPED.
M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to application of tremp proof on the
1297 AA A Architectural GEGC Closed
002554 floor at Room no: PPR1 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to application of tremp proof on the
1298 AA A Architectural GEGC Closed
002555 floor at Room no: PPR2 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to application of tremp proof on the
1299 AA A Architectural GEGC Closed
002556 floor at Room no: PPR3at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to application of tremp proof on the
1300 AA A Architectural GEGC Closed
002557 floor at Room no: PPR4 &PPR5 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to application of tremp proof on the
1301 AA A Architectural GEGC Closed
002558 floor at Room no: PPR7 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to application of tremp proof on the
1302 AA A Architectural GEGC Closed
002559 floor at Room no: PPR6 & PPR8 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of tremp proof on the floor at Room no:
1303 AA A Architectural GEGC Closed
002560 ECR1,2,3&4 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of tremp proof on the floor at Room no:
1304 AA A Architectural GEGC Closed
002561 PPR1,2&3 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of tremp proof on the floor at Room no: PPR4&5
1305 AA A Architectural GEGC Closed
002562 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of tremp proof on the floor at Room no: PPR6&8
1306 AA A Architectural GEGC Closed
002563 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for the application of tremp proof on the floor at Room no: PPR7 at
1307 AA A Architectural GEGC Closed
002564 Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Water leak test after application of tremp proof on the floor at
1308 AA A Architectural GEGC Closed
002565 Room no: ECR1,2,3&4 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Water leak test after application of tremp proof on the floor at
1309 AA A Architectural GEGC Closed
002566 Room no: PPR1,2 &3 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Water leak test after application of tremp proof on the floor at
1310 AA A Architectural GEGC Closed
002567 Room no: PPR4 &5 at Ground level 4C2 Station.

Page 86 of 103
M3-CJV-IRF-EAR00-UGS- Inspection request for Water leak test after application of tremp proof on the floor at
1311 AA A Architectural GEGC Closed
002568 Room no: PPR6 &8 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Water leak test after application of tremp proof on the floor at
1312 AA A Architectural GEGC Closed
002569 Room no: PPR7at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1313 AA A Architectural GEGC Closed
002570 no: P.01 (PAID CONCOURSE) at concourse level. (as per highlighted location)

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Crack repairing for Screed Floor in Room
1314 AA A Architectural GEGC Closed
002571 no: P.01 (PAID CONCOURSE) at concourse level. (as per highlighted location)

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor ,steps &
1315 AA A Architectural GEGC Closed
002572 landing location at Room NO: S.04(STAIR4) at Concourse to ground level.

M3-CJV-IRF-EAR00-UGS- Inspection request for the installation of secondary steel & sub structure for baffle
1316 AA A Architectural GEGC Closed
002573 ceiling at Room No. P.01 (PAID CONCOURSE) at Concourse level - 4C2 station

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy 1st coat on the floor ,steps & landing
1317 AA A Architectural GEGC Closed
002580 location at Room NO: S.05(STAIR5) at Concourse to ground level at 4C2
Inspection Request for the installation of porcelain tile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1318 between the gap of tile joints at Room NO: P.02 (UNPAID CONCOURSE )under sky AA A Architectural GEGC Closed
002581
light-03 at concourse level 4C2 Station . (As per highlighted location)
Inspection Request for Surface Preparation Prior to Application of Epoxy primer on the
M3-CJV-IRF-EAR00-UGS-
1319 stair steps & landing location at ROOM NO: S.02(STAIR2) at 4C2-Station platform to AA A Architectural GEGC Closed
002592
ground level
M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall From Kicker up to Ceiling Height at Room# Beside
1320 AA A Architectural GEGC Closed
002593 Lift 03,Stair 2 ,FCC & MECH-07,09,24,11 at Ground Level at 4C2 Station.
Inspection Request for the installation of porcelain tile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1321 between the gap of tile joints at Room NO: P.01 (PAID CONCOURSE ) South Side at AA A Architectural GEGC Closed
002594
concourse level 4C2 Station . (as per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Installation of secondary steel & Sub structure for ceiling
1322 AA A Architectural GEGC Closed
002595 at ROOM NO: P.02(PAID CONCOURSE) Entrance 3 at Concourse level -4C2 Station
Inspection request for surface preparation prior to Application of Tremp proof on the
M3-CJV-IRF-EAR00-UGS-
1323 roof at Room no:LIFT-03,05 & 06, and MECH-07,09,11,24,40 at Ground level 4C2 AA A Architectural GEGC Closed
002596
Station.
M3-CJV-IRF-EAR00-UGS- Inspection request for Application of Tremp proof on the roof at Room no:LIFT-03,05 &
1324 AA A Architectural GEGC Closed
002597 06, and MECH-07,09,11,24,40 at Ground level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Water leak test after application of Tremp proof on the roof at
1325 AA A Architectural GEGC Closed
002598 Room no:LIFT-03,05 & 06, and MECH-07,09,11,24,40 at Ground level 4C2 Station.
Inspection Request for screed surface preparation, leveling, setting out & concrete
M3-CJV-IRF-EAR00-UGS-
1326 screed casting on the roof at Room no:LIFT-03,05 & 06, and MECH-07,09,11,24,40 at AA A Architectural GEGC Closed
002599
Ground level 4C2 Station.
Inspection Request for Surface Preparation Prior to Application of Epoxy primer on the
M3-CJV-IRF-EAR00-UGS-
1327 stair steps & landing location at ROOM NO: S.03(STAIR3) at 4C2-Station platform to AA A Architectural GEGC Closed
002600
ground level .
M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the stair steps & landing
1328 AA A Architectural GEGC Closed
002601 location at ROOM NO: S.02(STAIR2) at 4C2-Station platform to ground level.

Page 87 of 103
Inspection Request for Application of Epoxy primer on the stair steps & landing
M3-CJV-IRF-EAR00-UGS-
1329 location at ROOM NO: S.03(STAIR3) at 4C2-Station platform to ground level 4C2 AA A Architectural GEGC Closed
002604
Station.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of putty &2 coat paint at ROOM NO : M.12
1330 AA A Architectural GEGC Closed
002605 (VR2) at concourse level 4C2 Station. ( As per highlighted location).
Inspection Request for the Installation of BOH Reflected ceiling framing prior to
M3-CJV-IRF-EAR00-UGS-
1331 calcium silicate board at Room No:CLR2,CLR3,TRR,LSR,SAR &SSR Concourse & AA A Architectural GEGC Closed
002606
platform level -4C2 Station.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Surface Preparation & Application of Anti-Dust sealant (2
1332 AA A Architectural GEGC Closed
002607 COAT) for ceiling at Room no M.12(VR2) at concourse level 4C2 Station.
Inspection Request for the installation of porcelain tile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1333 between the gap of tile joints at Room NO: P.02 (UNPAID CONCOURSE )Entrance3 at AA A Architectural GEGC Closed
002616
concourse level 4C2 Station . (as per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & paint work on concrete and block wall at Room no:
1334 AA A Architectural GEGC Closed
002617 M.11(VR1)at concourse level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy 1st coat on the floor ,steps & landing
1335 AA A Architectural GEGC Closed
002618 location at Room NO: S.02(STAIR2) at platform to ground level at 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation prior to Application of Epoxy primer on the
1336 AA A Architectural GEGC Closed
002619 floor at ROOM NO : M.12 (VR2) at concourse level . ( As per highlighted location).
Inspection Request for the installation of porcelain tile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1337 between the gap of tile joints at Room NO: P.01 (PAID CONCOURSE )North side at AA A Architectural GEGC Closed
002622
concourse level 4C2 Station . (as per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & 2 Coat paint work on concrete and block wall at Room
1338 AA A Architectural GEGC Closed
002623 no: M.11(VR1) at concourse level 4C2 Station
Inspection Request for surface preparation prior to Application of Epoxy primer on the
M3-CJV-IRF-EAR00-UGS-
1339 floor at ROOM NO : M.12 (VR2) at concourse level 4C2 Station . ( As per highlighted AA A Architectural GEGC Closed
002624
location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of Epoxy primer on the floor at ROOM NO : M.12
1340 AA A Architectural GEGC Closed
002625 (VR2) at concourse level 4C2 Station. ( As per highlighted location).
Inspection Request for the installation of porcelain tile on the wall with the grout filling
M3-CJV-IRF-EAR00-UGS-
1341 between the gap of tile joints at Room NO: P.13 (PLATFORM )at Platform level 4C2 AA A Architectural GEGC Closed
002632
Station . (as per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy 1st coat on the floor at Room NO:
1342 AA A Architectural GEGC Closed
002633 M.12(VR2) at concourse level at 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy 1st coat on the floor at Room NO:
1343 AA A Architectural GEGC Closed
002634 M.11(VR1) at concourse level at 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation & application of epoxy primer at Room No:
1344 AA A Architectural GEGC Closed
002635 S.19(STAIR) beside stair2 at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation prior to Application of Epoxy primer at
1345 AA A Architectural GEGC Closed
002636 Room No: M.14 (ACR8) at platform level at 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Application of epoxy primer at Room No: M.14 (ACR8) at
1346 AA A Architectural GEGC Closed
002637 platform level at 4C2 Station

Page 88 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation & application of epoxy primer at Room No:
1347 AA A Architectural GEGC Closed
002647 Lift 01 & 02 at Platform level at 4C2-Station
Inspection Request for the installation of tactile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1348 between the gap of tile joints at Room NO: P.13(PLATFORM ) at platform level 4C2 AA A Architectural GEGC Closed
002648
Station . (as per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy 1st coat on the floor (Pit Area) at
1349 AA A Architectural GEGC Closed
002649 Room No: LIFT-01 & 02 at 4C2 Station Platform level .

M3-CJV-IRF-EAR00-UGS- Inspection Request for application of 1st coat epoxy at Room No: S.19(STAIR)beside
1350 AA A Architectural GEGC Closed
002650 stair2 at 4C2 Station Concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy 1st coat on the floor at Room
1351 AA A Architectural GEGC Closed
002651 No:M.14(ACR8) at 4C2 Station Platform level .
Inspection Request for the installation of Tactile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1352 between the gap of tile joints at Room NO: P.01(PAID CONCOURSE ) at concourse AA A Architectural GEGC Closed
002652
level 4C2 Station . (As per highlighted location)
Inspection Request for the installation of tactile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1353 between the gap of tile joints at Room NO: P.02(UNPAID CONCOURSE ) Entrance 1 AA A Architectural GEGC Closed
002653
at concourse level 4C2 Station . (As per highlighted location)
Inspection Request for the installation of tactile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1354 between the gap of tile joints at Room NO: P.02(UNPAID CONCOURSE ) Entrance 3 AA A Architectural GEGC Closed
002654
at concourse level 4C2 Station . (As per highlighted location)
M3-CJV-IRF-EAR00-UGS- Inspection Request for Final inspection prior to concrete screed casting & Concrete
1355 AA A Architectural GEGC Closed
002655 Screed Placement on the floor (in pit) of Lift-01& 02 at Platform level@ 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Installation of Rockwool & fire stop Sealant around
1356 AA A Architectural GEGC Closed
002660 Demountable Access Panel AP-12 at Platform Level @ 4C2 Station.
Inspection Request For the surface preparation prior to installation of Rockwool
M3-CJV-IRF-EAR00-UGS- materials and fire stop sealant at Room# MECH-11 SHAFT,(M.56)MECH-40,
1357 AA A Architectural GEGC Closed
002661 (L.03)LIFT-03 Beside PPR ROOM at Movement Joints & Between Wall & Roof Slab at
Ground level.
Inspection Request for the installation of tactile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1358 between the gap of tile joints at Room NO: P.01(PAID CONCOURSE ) part2 at AA A Architectural GEGC Closed
002662
concourse level 4C2 Station . (As per highlighted location).
M3-CJV-IRF-EAR00-UGS- Inspection Request for Installation of Rockwool & fire stop Sealant around
1359 AA A Architectural GEGC Closed
002664 Demountable Access Panel AP-13 at Platform Level @ 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation,Installation of Rockwool & fire stop Sealant
1360 AA A Architectural GEGC Closed
002668 around Demountable Access Panel AP-06 at Concourse Level @ 4C2 Station.
Inspection Request for the installation of tactile on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1361 between the gap of tile joints at Room NO: P.01(PAID CONCOURSE ) at concourse AA A Architectural GEGC Closed
002669
level 4C2 Station . (as per highlighted location).part3
Inspection request for installation of Rockwool materials and fire stop sealant at Room
M3-CJV-IRF-EAR00-UGS-
1362 noIDF2,CLR3,VR1,LOBBYP-17.,Lobby,P.12 & MOI Room between the movement AA A Architectural GEGC Closed
002670
joints between Wall & Roof Slab @t CONCOURSE & PLATFORM level at 4C2 Station.
Inspection Request for the Surface Preparation & Application of Anti-Dust sealant (2
M3-CJV-IRF-EAR00-UGS-
1363 COAT) for ceiling at Room no M.11 (VR1) & M.12(VR2)[part-2] at concourse level AA A Architectural GEGC Closed
002672
4C2 Station.
M3-CJV-IRF-EAR00-UGS- Inspection Request for surface preparation prior to application of tremp proof on the
1364 AA A Architectural GEGC Closed
002673 floor for Room no: B.03 (FWC1) & B.04 (MWC1) at concourse level

Page 89 of 103
Inspection Request for the installation of porcelain tile on the floor along with Skirting
M3-CJV-IRF-EAR00-UGS-
1365 tile ,with the grout filling between the gap of tile joints at Room NO: Ticket office at AA A Architectural GEGC Closed
002675
Concourse level -4C2 Station
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation & Application of Tremp Proof on the floor
1366 AA A Architectural GEGC Closed
002676 for Room No. Generator Yard 1 & 2 at Ground level at 4C2 Station
Inspection Request for the Application of Epoxy 1st coat on the floor ,steps & landing
M3-CJV-IRF-EAR00-UGS-
1367 location at ROOM NO: S.03(STAIR3) at 4C2-Station platform to ground level 4C2 AA A Architectural GEGC Closed
002685
Station.
Inspection Request for Installation of Rock-wool & fire stop Sealant for the Access
M3-CJV-IRF-EAR00-UGS-
1368 hatch Slab AH#03 Room No:T.01(LPS1) & AH#05 Room No:T.02(LPS2) at concourse AA A Architectural GEGC Closed
002686
Level @ 4C2 Station.
M3-CJV-IRF-EAR00-UGS- Inspection Request for Surface Preparation & Application of skim coat Prior to Putty &
1369 AA A Architectural GEGC Closed
002687 Paint atRoom No. P.06 (LOBBY) at concourse level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & 2nd coat paint work on the wall at Room No. P.06
1370 AA A Architectural GEGC Closed
002706 (LOBBY) at concourse level 4C2 Station.
Inspection Request for the Surface Preparation & Application of Anti-Dust sealant (2
M3-CJV-IRF-EAR00-UGS-
1371 COAT) for ceiling at Room No. P.06 (LOBBY) Room No. LIFT-06 at concourse AA A Architectural GEGC Closed
002707
level 4C2 Station.
M3-CJV-IRF-EAR00-UGS- Inspection Request for screed surface preparation, leveling, setting out & concrete
1372 AA A Architectural GEGC Closed
002717 screed casting in Room no. Generator Yard 1 (Part1)at Ground level at 4C2 Station.
Inspection Request for screed surface preparation, leveling, setting out & concrete
M3-CJV-IRF-EAR00-UGS-
1373 screed casting in Room no. Generator Yard 2 (Part1) at Ground level at 4C2 Station. at AA A Architectural GEGC Closed
002718
4C2 Station.
Inspection Request for screed surface preparation, leveling, setting out & concrete
M3-CJV-IRF-EAR00-UGS-
1374 screed casting in Room no. Generator Yard 2(Part2) at Ground level at 4C2 Station. at AA A Architectural GEGC Closed
002719
4C2 Station.at 4C2 Station.
M3-CJV-IRF-EAR00-UGS- Inspection Request for screed surface preparation, leveling, setting out & concrete
1375 AA A Architectural GEGC Closed
002720 screed casting in Room no. Generator Yard 1 (Part2)at Ground level at 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection Request for screed surface preparation, leveling, setting out & concrete
1376 AA A Architectural GEGC Closed
002721 screed casting in Room no. Generator Yard 1 (Part3)at Ground level at 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to EPDM laying on stair roof at Room
1377 AA A Architectural GEGC Closed
002722 no: Generator Yard 2 at Ground level at 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation prior to EPDM laying on stair roof at Room
1378 AA A Architectural GEGC Closed
002723 no: Generator Yard 1 at Ground level at 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of EPDM Membrane on the roof at Room no:
1379 AA A Architectural GEGC Closed
002724 Generator Yard 2 at Ground level 4C2 at Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Water leak test for EPDM membrane on the roof at Room no:
1380 AA A Architectural GEGC Closed
002725 Generator Yard 2 at Ground level at 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Application of epoxy 1st coat on the Floor at Room n0-
1381 AA A Architectural GEGC Closed
002727 M.12(VR2) at Concourse Level

M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of Rock-Wool Fire Stop Sealant for the Access Hatch
1382 AA A Architectural GEGC Closed
002728 Slab AH-04 Room n0-T.07(TPS) at Concourse Level Top and Bottom of slab

Page 90 of 103
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface Preparation ,Application of putty 2 nd coat Paint on the
1383 AA B Architectural GEGC CORNER NOT ALLIGNE
002738 wall at Room no-Lift -05 Concourse Level

M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of steel Framing for Gypsum Cladding at Under
1384 AA A Architectural GEGC Closed
002739 Escalator-6,Stair -8,Room no-M.07(ACR.7) Concourse level
Inspection request for Installation of Porcelain tile on the floor Along with along Skirting
M3-CJV-IRF-EAR00-UGS-
1385 Tile With the grout filling Between the Gap of tile Joints at Room No-P.32(LOBBY) AA A Architectural GEGC Closed
002740
Concourse level
Inspection request for Installation of Polyethylene Sheet ,Master Board 32-35 KG/CBM
M3-CJV-IRF-EAR00-UGS-
1386 Loose Laid,50mm tk ,Protection Layer of Non-Woven Geotextile After EPDM AA A Architectural GEGC Closed
002741
Membrane on the Roof at Room No-S.01,Stair-1,S.03,S.04 Ground LEVEL
M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of EPDM Membrane on the Roof at ROOM N0-
1387 AA A Architectural GEGC Closed
002742 Generator Yard 1 at Ground Leve

M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation Prior to EPDM Laying on stair Roof at
1388 AA A Architectural GEGC Closed
002743 ROOM no-S.05(Stair-5)Ground Level
DESIGN & SHOP
M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of steel Framing for Gypsum Board Cladding at
1389 AA C Architectural GEGC DRAWING NOT
002744 Under Escalator-9,10,Stair 10 at Room no-M.04(ACR4) Concourse Level
APPROVED
M3-CJV-IRF-EAR00-UGS- Inspection request for Water Leak test for EPDM Membrane on the Roof at Room
1390 AA A Architectural GEGC Closed
002746 Generator Yard 1 at Ground Level

M3-CJV-IRF-EAR00-UGS- Inspection request for Application of Epoxy 1st coat on the Floor Lift -03,Stair-5
1391 AA A Architectural GEGC Closed
002747 Concourse Level
Inspection request for Polyethylene Sheet Master Board 32-35 KG/CBM Loose Laid ,
M3-CJV-IRF-EAR00-UGS-
1392 50mm thick ,Protection Layer Non-Woven Geotextile Sheet after EPDM Membrane on AA A Architectural GEGC Closed
002748
the Roof at Room Generator yard 2 at Ground Level
Inspection request for Installation of stone Cladding (With Copping)Accessories at
M3-CJV-IRF-EAR00-UGS- Aignment damages must
1393 Room no-Lift-05,M-37 and Extension Modification of S.05(Stair-5).S.3(Skylights-3) at AA C Architectural GEGC
002750 be rectify
Ground Level.
M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of Concrete paver Tile on the Roof at Aignment damages must
1394 AA C Architectural GEGC
002751 Room.S.01,Stair -1,S.03,Stair-3,S.04,Stair-4 at Ground Level be rectify

M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of EPDM Aluminum Flashing and Silicone Sealant on
1395 AA A Architectural GEGC Closed
002752 the Roof at Room no-Generator Yard -2 at Ground Level
Inspection request for Polyethylene Sheet Master Board 32-35 KG,CBM Loose and ,
M3-CJV-IRF-EAR00-UGS-
1396 50mm tk Protection Layer of Non-Woven Geotextile Sheet after EPDM Membrane on AA A Architectural GEGC Closed
002757
roof at Roof Generator yard 1 at Ground Level
M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of Porcelain tile on the wall the grout Filling Between
1397 AA A Architectural GEGC Closed
002758 the gap of tile Joints at room .P.12(Lobby) at Concourse Level

M3-CJV-IRF-EAR00-UGS- Inspection request for Rebar Anchorage/Kicker Formwork ,Block wall from 1st layer
1398 AA A Architectural GEGC Closed
002759 Height up to Soffit at room no-FWC2,MWC2 at Concourse Level

M3-CJV-IRF-EAR00-UGS- Inspection request for Application Of Epoxy Coating  1st Coat on the Floor at Room#
1399 AA A Architectural GEGC Closed
002760 ER4 at Concourse Level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of EPDM Aluminum Flashing and Silicone Sealant on
1400 AA A Architectural GEGC Closed
002766 the Roof at Room# Generator  Yard-01 at Ground Level .t 4C2 Station

Page 91 of 103
Inspection request for Surface Preparation Prior Laying of EPDM Membrane on the
M3-CJV-IRF-EAR00-UGS-
1401 Roof at ROOM N0:S.02(Stair S.02),MECH- 24,7,11, & Lift 03,05,06 at Ground Level  AA A Architectural GEGC Closed
002767
4C2 Station.
Inspection Request for the installation of porcelain tile at Wall along  with the grout
M3-CJV-IRF-EAR00-UGS-
1402 filling between the gap of tile joints at Room P.17(Lobby) ,P.13(Platform) at Platform AA A Architectural GEGC Closed
002768
Level  at 4C2 Station.
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Surface Preparation Prior to Installation of Rubber Tiles &
1403 AA A Architectural GEGC Closed
002769 Carpet Tiles at Room# SMR,SSR,LSR & SAR at Concourse Level at 4C2 Station.
Inspection Request for the Surface Preparation &  Application of  Anti-Dust sealant (2
M3-CJV-IRF-EAR00-UGS-
1404 COAT)   for ceiling  at ROOM NO: Retail-02 at concourse level. at 4C2 Station AA A Architectural GEGC Closed
002770
Entrance-01.
M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of EPDM Membrane on the Roof at Room No:
1405 AA A Architectural GEGC Closed
002771 S.05(STAIR5) at Ground Level at 4C2 Station

M3-CJV-IRF-EAR00-UGS- Inspection Request for putty & 2 coats paint work on the wall at ROOM NO: Retail-02
1406 AA A Architectural GEGC Closed
002772 at concourse level at 4C2 Station Entrance-01.

M3-CJV-IRF-EAR00-UGS- Inspection request for Water Leak test for EPDM Membrane on the Roof at Room No:
1407 AA A Architectural GEGC Closed
002773 S.05(STAIR5) at GROUND LEVEL at 4C2 Station Entrance-01.

M3-CJV-IRF-EAR00-UGS- Inspection Request for the Surface Preparation, Application of Epoxy Primer at ROOM
1408 AA A Architectural GEGC Closed
002774 NO: Retail-02 at concourse level. at 4C2 Station Entrance-01.

M3-CJV-IRF-EAR00-UGS- Inspection request for Installation of EPDM Membrane on the Roof at ROOM
1409 AA A Architectural GEGC Closed
002775 N0:MECH-7,9,24,40,39,11 & LIFT03,06  at Ground Level at 4C2 Station
Inspection request for Installation of Gypsum Board Bottom & Top(Double Layer) on
M3-CJV-IRF-EAR00-UGS-
1410 the Steel Framing for Gypsum Cladding at Under Escalaor at Room# ACR7 & ACR4 AA A Architectural GEGC Closed
002776
Concourse & ACR8 Platform Level at 4C2 Station .
M3-CJV-IRF-EAR00-UGS- Inspection request for Installation Of Gravel On Protection Layer Non-Woven
1411 AA A Architectural GEGC Closed
002777 Geotextile on the Roof no: Generator Yard-02 at Ground Level at 4C2 Station

M3-CJV-IRF-EAR00-UGS- Inspection request for Water Leak test for EPDM Membrane on the Roof at Room
1412 AA A Architectural GEGC Closed
002778 No:MECH-7,9,24,40,39,11 & LIFT03,06 at Ground Level @ 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Application of epoxy 1st coat on the Floor at Room no-LIFT-05
1413 AA A Architectural GEGC Closed
002779 at Concourse Level@ 4C2 Station

M3-CJV-IRF-EAR00-UGS- Inspection request for floor carpet tiles and wooden wall skirting installation and final
1414 AA B Architectural GEGC Lack of documents
002780 acceptance at SMR(T02),Concourse level .@ 4C2 Station.

M3-CJV-IRF-EAR00-UGS-
1415 Inspection request for Installation of Gravel on the Protection Layer of Non-Woven Geotextile AA
on the Roof atARoom no-Generator
Architectural
Yard -1 at Ground
GEGC Level at Ground Closed
 Level 4C2 Station
002784
Inspection request for Installation of Polyethylene Sheet ,Master Board 32-35 KG/CBM
M3-CJV-IRF-EAR00-UGS- Loose Laid,50mm thick ,Protection Layer of Non-Woven Geotextile After EPDM
1416 AA A Architectural GEGC Closed
002785 Membrane on the Roof at Room No:MECH-7,9,24,40,39,11 & LIFT03,06 ,stair5 at
Ground Level at Gr
Inspection Request For installation of Insulation materials & fire stop sealant at Room #
M3-CJV-IRF-EAR00-UGS-
1417 R.01 (RETAIL2) at Movement Joints & Between Block Wall & Roof Slab at Concourse AA A Architectural GEGC Closed
002794
level
Inspection request for Installation of Aluminum Flashing for EPDM, Silicone Sealant
M3-CJV-IRF-EAR00-UGS-
1418 on the Roof at ROOM N0:MECH-7,9,24,40,39,11 & LIFT03,06,STAIR 1,2,3,4,5 at AA A Architectural GEGC Closed
002795
Ground Level at 4C2 Station

Page 92 of 103
M3-CJV-IRF-EAR00-UGS- Inspection Request for the Application of Epoxy Paint 1st Coat on the floor at ROOM
1419 AA A Architectural GEGC Closed
002796 NO: Room no: R.02(RETAIL2) at 4C2-Station concourse level.
Inspection request for Installation Of Gravel On Protection Layer Non-Woven
M3-CJV-IRF-EAR00-UGS-
1420 Geotextile on the Roof ROOM N0:MECH-7,9,24,40,39,11 & LIFT03,06 at Ground AA A Architectural GEGC Closed
002797
Level at 4C2 Station.
M3-CJV-IRF-EAR00-UGS- Inspection request for Surface preparation & Application of Primer on the Floor at
1421 AA A Architectural GEGC Closed
002801 Room No.GSM at Concourse Level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Emulsion 2 coats painting on Gypsum Board cladding at under
1422 AA A Architectural GEGC Closed
002802 Escalator 9 & 10 at Room# M.04(ACR-04) at Concourse Level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for the Application of Tremp proof on the floor at Room no: FWC1 &
1423 AA A Architectural GEGC Closed
002811 MWC1 at Concourse level 4C2 Station

M3-CJV-IRF-EAR00-UGS-
1424 Inspection request for the water leak test after the application of Tremp proof on the floor at Room
AA no:FWC1 A
&  MWC1 atArchitectural
Concourse level 4C2GEGC
STATION Closed
002826

M3-CJV-IRF-EAR00-UGS-
1425 Inspection request  for Installation & anchoring of Access Panel (AD-07,E4 @Platform level &AA
AD-03,06,04,05,E3
A @Concourse
Architectural
level)  at 4C2 GEGC
Station Closed
002827

M3-CJV-IRF-EAR00-UGS-
1426 Inspection request for Installation & anchoring of Roof Access Hatch #AH-25,36,43& 44 @Ground
AA level at 4C2
A Station. Architectural GEGC Closed
002828

M3-CJV-IRF-EAR00-UGS- Inspection request for Emulsion 2 coats painting on Gypsum Board cladding at under
1427 AA A Architectural GEGC Closed
002842 Escalator at Room# M.07(ACR-07) at Concourse Level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Emulsion 2 coats painting on Gypsum Board cladding at under
1428 AA A Architectural GEGC Closed
002843 Escalator at Room# M.14(ACR-08) at Platform Level 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Application of epoxy 1st & 2nd coat on the Floor at Room #-VR1
1429 AA A Architectural GEGC Closed
002849 (inside Air Plenum) at 4C2 Station Concourse level.

M3-CJV-IRF-EAR00-UGS- Inspection request for Application of epoxy 1st & 2nd coat on the Floor at Room #
1430 AA A Architectural GEGC Closed
002850 GSM at 4C2 Station Concourse level.
Inspection Request for screed surface preparation, leveling, setting out & concrete
M3-CJV-IRF-EAR00-UGS-
1431 screed casting in Room no. Entrance1 floor , Stair 8 &10 steps @Ground level & AA A Architectural GEGC Closed
002855
FWC1 , MWC1, at concourse level at 4C2-Station
M3-CJV-IRF-EAR00-UGS-
1432 Inspection Request for screed surface preparation, leveling, setting out & concrete screed casting
AA in Room no. 
A Entrance3@Ground
Architecturallevel at 4C2-Station
GEGC Closed
002856

M3-CJV-IRF-EAR00-UGS-
1433 Inspection request  for surface preparation & Installation of demountable Access Panel AP-06AA
@Concourse A
level & AP-12
Architectural
& 13@Platform level
GEGC
4C2 Station Closed
002857

M3-CJV-IRF-EAR00-UGS-
1434 Inspection request  for application of epoxy 2 coat paint(Jotun Hardtop XP RAL 9010) on demountable
AA Access
A Panel AP-06
Architectural
@Concourse levelGEGC
& AP-12 & 13@Platform
Closed
level 4C2 Statio
002858

M3-CJV-IRF-EAR00-UGS-
1435 Inspection request for surface preparation & application of Nitoproof 10 on floor @ Room no .AA
Entrance-01 &A03@Ground
Architectural
level 4C2 StatioN GEGC Closed
002859

M3-CJV-IRF-EAR00-UGS- Inspection request for the installation of rebar’s ,U bolt & formwork & casting of pre-
1436 AA A Architectural GEGC Closed
002860 cast Access hatch slab @ ACCESS HATCH NO:AH-02@ground level

Page 93 of 103
M3-CJV-IRF-EAR00-UGS- Inspection request for the installation of rebar’s ,U bolt & formwork & casting of pre-
1437 AA A Architectural GEGC Closed
002861 cast Access hatch slab @ ACCESS HATCH NO:AH-05 & 06 @ground level

M3-CJV-IRF-EAR00-UGS- Inspection Request for Block wall from 1st layer to upto Mep duct at Room# SSR
1438 AA A Architectural GEGC Closed
002862 MALE at Concourse 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for Application Emulsion 2 coats painting at Room# SSR MALE at
1439 AA A Architectural GEGC Closed
002863 Concourse 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Inspection request for the installation of rebar’s ,U bolt & formwork & casting of pre-
1440 AA A Architectural GEGC Closed
002864 cast Access hatch slab @ ACCESS HATCH NO:AH-07@ground level

M3-CJV-IRF-EAR00-UGS- Inspection request for the installation of rebar’s ,U bolt & formwork & casting of pre-
1441 AA A Architectural GEGC Closed
002865 cast Access hatch slab @ ACCESS HATCH NO:AH-03 &04@ground level

M3-CJV-IRF-EAR00-UGS-
1442 Inspection Request for surface preparation, Installation & anchoring of floor Access Hatch #AH-13,14,
AA 18 & 19
A at @platform
Architectural
level & Access Hatch
GEGC #AH-23 @Concourse
Closed
level 4C2-Statio
002866

M3-CJV-IRF-EAR00-UGS- Inspection request for the installation of rebar’s ,U bolt & formwork & casting of pre-
1443 AA A Architectural GEGC Closed
002867 cast Access hatch slab @ ACCESS HATCH NO:AH-01@ground level

M3-CJV-IRF-EAR00-UGS- Inspection request for surface preparation & application of 2coat Anti-Dust for pre-cast
1444 AA A Architectural GEGC Closed
002868 Access hatch slab @ ACCESS HATCH NO:AH-01,02,03,04,05,06,07@ground level

M3-CJV-IRF-EAR00-UGS- Inspection Request For Block work (2ND Stage) from 3m height up to soffit at Room
1445 AA A Architectural GEGC Closed
002869 no: B.03 (FWC1), B.04 (MWC1), at concourse level

M3-CJV-IRF-EAR00-UGS- Inspection Request for the application of plastering with SP11 on block wall @Room
1446 AA A Architectural GEGC Closed
002870 No: FWC1 at Concourse level 4C2 station. SHOP DRAWING NOT
APPROVED/ IF ANY
inspection request for final inspection of installed metal ceiling panels @ Room No:
M3-CJV-IRF-EAR00-UGS- MISSED ALIGMENT
1447 P.01(PAID CONCOURSE) &P.02(UNPAID CONCOURSE)South Side Concourse AA B Architectural GEGC
002875 HAPPENT DUE TO MEP
level.
IT WILL BE
Inspection request for MOCK-UP of Stainless Steel Edge Trim/ Corner Bead Please attach the approved
CONTRACTOR RISK
M3-CJV-IRF-EAR00-UGS-
1448 installation of wall tile at Room No:P.12(LOBBY) Entrance-01 at concourse level at AA B Architectural GEGC drawings showing the
002876 SHOP DRAWING
4C2 station(As per Highlighted Drawing). stainless steel cornerNOT
bead.
APPROVED/ IF ANY
Inspection request for Final Inspection of Installed Metal Ceiling panels at Grid (13-26)
M3-CJV-IRF-EAR00-UGS- MISSED ALIGMENT
1449 Room No:P.01(PAID CONCOURSE) & P.02(UNPAID CONCOURSE) North side AA B Architectural GEGC
002877 HAPPENT DUE TONOT
SHOP DRAWING MEP
Concourse level at 4C2 station(As per Highlighted Drawing).
IT WILL BE
APPROVED/ IF ANY
Inspection request for Final Inspection of Installed Metal Ceiling panels at Room CONTRACTOR RISK
M3-CJV-IRF-EAR00-UGS- MISSED ALIGMENT
1450 No:.02(UNPAID CONCOURSE) at ENTRANC-03 Concourse Level at 4C2 station(As AA B Architectural GEGC
002878 HAPPENT DUE TONOT
SHOP DRAWING MEP
per Highlighted Drawing).
IT WILL BE
APPROVED/ IF ANY
M3-CJV-IRF-EAR00-UGS- Inspection request for Final Inspection of Installed Metal Ceiling panels at Room CONTRACTOR
MISSED ALIGMENT RISK
1451 AA B Architectural GEGC
002893 No:.P.13(PLATFORM) Platform Level at 4C2 station(As per Highlighted Drawing). HAPPENT DUE TO MEP
IT WILL BE
Inspection request for Installation of Polyethylene Sheet ,Master Board 32-35 KG/CBM CONTRACTOR RISK
M3-CJV-IRF-EAR00-UGS-
1452 Loose Laid,50mm thick ,Protection Layer of Non-Woven Geotextile,aluminium flashing, AA A Architectural GEGC Closed
002894
sealant After EPDM Membrane on the Roof at Room No: LIFT-05 at Ground Level
Inspection Request for the final Installation of glass balustrades & handrails at
Alignment/sealant
M3-CJV-IRF-EAR00-UGS- staircase S.06 & S.07 from Concourse to Platform, Around staircase S.06 ,
1453 AA B Architectural GEGC remaining/ some glass
002895 S.07(@Concourse Level) and Escalators 1,2,3 & 4(@Concourse Level) at 4C2 Station
missing
.
Inspection request for Application of epoxy 1st & 2nd coat on the Floor at Room no-
M3-CJV-IRF-EAR00-UGS-
1454 VR2 (inside Air Plenum) at Concourse Level at 4C2 Station(As per highlighted AA A Architectural GEGC Closed
002897
attached drawing).

Page 94 of 103
Inspection request for final inspection of installed metal baffle ceiling panels @ Room
M3-CJV-IRF-EAR00-UGS- SHOP DRAWING NOT
1455 No: P.01 (PAID CONCOURSE) from Axis 13 to 19 at Concourse level at 4C2 AA B Architectural GEGC
002898 APPROVED
Station(As per highlighted attached drawing).
Inspection request for Surface Preparation & EPDM Membrane Laying on the Roof at
M3-CJV-IRF-EAR00-UGS-
1456 Room No: LIFT05 at Ground Level @ 4C2 Station Entrance-01 Area(As per AA A Architectural GEGC Closed
002899
highlighted attached drawing)..
Inspection request for Water Leak test for EPDM Membrane on the Roof at Room No:
M3-CJV-IRF-EAR00-UGS-
1457 LIFT05 at Ground Level @ 4C2 Station Entrance-01 Area(As per highlighted attached AA A Architectural GEGC Closed
002900
drawing)..
M3-CJV-IRF-EAR00-UGS- Inspection request for installation of rubber floor tile along with skirting at ROOM NO:
1458 AA A Architectural GEGC Closed
002901 SSR & LSR at Concourse level at 4C2 Station(As per highlighted attached drawing).

M3-CJV-IRF-EAR00-UGS- Inspection request for installation of rubber floor tile along with skirting at ROOM NO:
1459 AA A Architectural GEGC Closed
002902 SAR at Concourse level at 4C2 Station(As per highlighted attached drawing).
Inspection Request for final installed hollow metal Access Panels including complete
M3-CJV-IRF-EAR00-UGS- HEAD & JAMB SEAL
1460 hardware @Room & Door Name: AP-01, 02,03,04,05 at VR1 & AP-07, 08,09,10,11 at AA B Architectural GEGC
002896 REMAINING
VR2
Inspection Request for the installation of porcelain tiles on the floor with the grout filling
M3-CJV-IRF-EAR00-UGS-
1461 between the gap of tile joints at Room NO: P.17(lobby ) at platform & AA A Architectural GEGC Closed
002912 SHOP DRAWING NOT
P.12(LOBBY)Concourse level 4C2 Station . (as per highlighted location)
APPROVED/ IF ANY
inspection request for final inspection of installed metal baffle ceiling panels @Room
M3-CJV-IRF-EAR00-UGS- MISSED ALIGMENT
1462 No: P.02 (UNPAID CONCOURSE) Including stair-08 Entrance-03 Concourse level.as AA B Architectural GEGC
002911 HAPPENT DUE TO MEP
per highlighted attached drawing.
IT WILL BE
M3-CJV-IRF-EAR00-UGS- Inspection Request for screed surface preparation, leveling, setting out & concrete CONTRACTOR RISK
1463 AA A Architectural GEGC Closed
002908 screed casting in Room no.Lift-05 roof @Ground level

M3-CJV-IRF-EAR00-UGS- inspection request for Application of hardtop xp 2 coats on door panels & frame
1464 AA A Architectural GEGC Closed
002909 @Room No: AP-1,2,3,4 &5 VR1 at Concourse level at 4C2 station.

M3-CJV-IRF-EAR00-UGS- inspection request for Application of hardtop xp 2 coats on door panels & frame
1465 AA A Architectural GEGC Closed
002910 @Room No: AP-7,8,9,10 &11 VR2 at Concourse level at 4C2 station.

M3-CJV-IRF-EAR00-UGS- inspection request for Application of hardtop xp 2 coats on door panels & frame
1466 AA A Architectural GEGC Closed
002913 @Room No: M12(VR2),M27(COR), at 4C2 station.

M3-CJV-IRF-EAR00-UGS- Final Inspection Request for surface preparation, Installation & anchoring of floor
1467 AB A Architectural GEGC
002922 Access Hatch #AH-09,10,11 & 21 at @platform level 4C2-Station
Inspection Request for Final Installation of wall & floor mounted handrails , balustrade SEALANT NOT DONE
M3-CJV-IRF-EAR00-UGS-
1468 & final painting (2 coats) at ROOM NO: S.01 (STAIR1) ,S.02 (STAIR2) & S.03 AA B Architectural GEGC BELOW THE STRINGER
002932 Inspection
(STAIR3) atRequest for opening installation of door frame & filling the grout, panels
4C2 Station PLATE
installation & door painting (without hardware) @Room & Door Name:S.01-
M3-CJV-IRF-EAR00-UGS- B(STAIR1),T06-A(SER),T.04-A,B,C & D(PP),T01-A,B & C (LPS1),M05-A,B,C &
1469 AA A Architectural GEGC Closed
002933 D(ACR5),M06-A,B,C
Inspection Request for & opening
D(ACR6),T02-A,T07-A,B&CB&C(LPS2),P.10-B(COR),P.11-
installation of door frame & filling the grout, panels
B(COR) at Concourse
installation level(without
& door painting ,S01-A(STAIR1),S02-A(STAIR2),M21-A(FCC)S.03-
hardware) @Room & Door Name:M01-
M3-CJV-IRF-EAR00-UGS- A(STAIR3),S.04-A(STAIR4) @ground level.
A(ACR1),M11-A(VR1),P.26-A(COR),E08-A(IDF1),E09-A&B(LVMDB1),E02(ER1),M13-
1470 AA A Architectural GEGC Closed
002935 A&B(CWT),P.04,05&24(COR),P.06(LOBBY)CLR1-CER,S02&03(STAIR2,3),
Inspection Request for opening installation
SMR,AFC,SSR,B05-A&B(LSR),CBS of door frame
at Concourse & filling the (COR),S03
level &,P20-A&B grout & panels
installation (with out hardware & painting) @Room & Door
(STAIR3),FWR,TWC,CLR3,PSDR,M25-A&B(ACR11),P.16-A&B(COR)@platform level
M3-CJV-IRF-EAR00-UGS-
1471 Name:P.03,07,08,25(COR).P12&32(LOBBY),S05(STAIR5),B13(SSRM),P.02(UNPAID AA A Architectural GEGC Closed
002936 Inspection Request for opening installation of door frame & filling the grout , panels
CONCOURSE)@concourse level & P.14,15(COR),M14-
installation & painting (with out
A(ACR8),P.17(LOBBY)@Platform level hardware)@Room &Door Name:VER2,
M3-CJV-IRF-EAR00-UGS- ACR2,E12A&B(UPS1), IDF2,ER3,M04A&B(ACR4), ER4,ACR7,M08A&B(FPR)
1472 AA A Architectural GEGC Closed
002937 ,E03A&B(ER2) ,GSM, IDF3,STAIR4,VER1,CLR2,P22-A,P08-B,P09-A,P11-A,P21-
A,P10-A,(COR),CBS,M03-A&B(ACR3),M23A&B(ACR10),E10-A&B(LVMDB2),
FWC1,MWC1@concourse level &M17-A&B(ACR9)@Platform level
Page 95 of 103
Inspection Request for opening installation of door frame & filling the grout , panels
M3-CJV-IRF-EAR00-UGS- installation & painting (with out hardware) @Room & Door Name: P.27-A(COR),M12-
1473 AA A Architectural GEGC Closed
002934 A(VR2)@concourse level &P30-A(COR),ER5,M18-A&B(PP),M14-B(ACR8)@Platform
level & STAIR-05 Ground level
Inspection Request for the installation of porcelain tiles on the Stair # 06,07(Concourse
M3-CJV-IRF-EAR00-UGS-
1474 to Platform level ),08 & 10 (Ground to Concourse Level ) at 4C2 Station.[As per AA B Architectural GEGC SealaNT NOT DONE
002943
highlighted location)for opening installation of HM-Door frame, panels installation &
Inspection request
Hardware installation @Room & Door name: P.29-A(COR), B08-A(SAR), E10-
M3-CJV-IRF-EAR00-UGS-
1475 C(LVMDB2), R01-B & R02-B,(RETAIL), E19-A(ER6), B06-A(FWC2), B07-A(MWC2),@ AA A Architectural GEGC Closed
002984
Concourse level- (Except Sealant, Head & Jamb Seal & painting )at 4C2 Station. [As
per Highlighted
Inspection Drawing]
request for final installation & Anchoring of Access Hatches @ AH-12,15,16
M3-CJV-IRF-EAR00-UGS-
1476 Platform level & AH-22 Concourse level at 4C2 Station.. [As per Highlighted Drawing] . AA A Architectural GEGC Closed
002985
Inspection request for final installation & Anchoring of Access Panels in water tank @
1477 M3-CJV-IRF-EAR00-UGS- AP-16,17,18,19 Platform level & AP-14,15 Concourse level at 4C2 Station.. [As per AA A Architectural GEGC Closed
002986 Highlighted Drawing]
M3-CJV-IRF-EAR00-UGS- Inspection Request for Final Installation of Stair nosing @ Room# Stair -01,02,03,04 &
1478 AA A Architectural GEGC Closed
002954 05 at 4C2 Station.

M3-CJV-IRF-EAR00-UGS- Final Inspection Request for Installation of Glass cladding at TVM area (As per
1479 AA D Architectural GEGC waiting for recevd IR
003006 highlighted attached drawing), Concourse Level @ 4C2 station

M3-CJV-IRF-EAR00-UGS- Inspection Request for final acceptance and operational of Installed Roller shutter door Hold by FAST due to
1480 AA D Architectural GEGC
003005 @ Room No: R.01 (Retail1) & R.02 (Retail2),Concourse level @ 4C2 station Certificate
Final Inspection request of Installed Toilet Accessories (Wash basin / counter top and
1481 Hold by FAST due to comments Mirrior) in MWC-1 & FWC-1 room, GL V-W/12-14 ,Concourse Level (Please see AA D Architectural GEGC
attached highlighted Drawing) @ 4C2 Station
Final Inspection request of Installed Toilet Accessories (Wash basin / counter top and
1481 Hold by FAST due to comments Mirrior) in MWC-2 & FWC-2 room,Concourse Level (Please see attached highlighted AA D Architectural GEGC
Drawing) @ 4C2 Station
Inspection Request for final installation of cat ladder @ CLDR NO: 25 at concourse
1482 Hold by FAST due to comments AA D Architectural GEGC
level, 4C2 Underground Station

Inspection Request for Final Installation of FOH Handrails including wall mounted
1483 Hold by FAST due to comments AA D Architectural GEGC
handrails at STAIR (S08 & S10) at 4C2 Station

Page 96 of 103
M3 Riyadh Metro Project Construction Joint Venture 4G1 4C2

Deliverable Package C CmLot ID: N/A CODE A 37 31

7. List of Shop drawings Component: 84 CODE B 5 7

Station 4C2 & 4G1 CODE C 2 0

Terminated 1 1

RAMPED Review
# Document No Document Title # Sht Status
Discipline Organisation Description Location Remarks WF-Number

1 M3-IID-TRP-ESTMA-UGS-000007 4C2 CONCOURSE LEVEL BLOCK WALL SHOP DRAWING 66 CODE B Architectural GCS Shop drawings 4C2

2 M3-IID-TRP-ESTMA-UGS-000008 4C2 BLOCK WALL TYPE SHOP DRAWING 5 CODE A Architectural GCS Shop drawings 4C2 WF-222256

3 M3-IID-TRP-ESTMA-UGS-000010 4C2 PLATFORM LEVEL BLOCK WALL SHOP DRAWING 19 CODE A Architectural GCS Shop drawings 4C2 WF-222262

4 M3-GCS-TRP-ESTMA-UGS-000002 4C2 GROUND LEVEL BLOCK WALL SHOP DRAWING 23 CODE B Architectural GCS Shop drawings 4C2

5 M3-IID-TRP-ESTMA-UGS-000009 4C2 FIRE RATING BLOCK WALL SHOP DRAWING 26 CODE A Architectural GCS Shop drawings 4C2 WF-260517

6 M3-GCS-TRP-ESTMA-UGS-000004 4C2 MOI ROOM BLOCK WALL SHOP DRAWING 6 CODE A Architectural GCS Shop drawings 4C2 WF-230680

7 M3-GCS-TRP-EARSF-UGS-000003 4C2 PLATFORM,CONCOURSE, GROUND LEVEL SCREED PLANS & DETAILS. 29 CODE A Architectural GCS Shop drawings 4C2 WF-281527

8 M3-GCS-TRP-ESTRE-UGS-000001 4C2 PLATFORM,CONCOURSE LEVEL CONCRETE PLINTH PLANS & REINFORCEMENT DETAIL. 16 CODE A Architectural GCS Shop drawings 4C2 WF-283063

9 M3-GCS-TRP-ESTRE-UGS-000005 4C2 GROUND LEVEL CONCRETE PLINTH PLANS & REINFORCEMENT DETAIL. 12 CODE A Architectural GCS Shop drawings 4C2 WF-276891

10 M3-GCS-TRP-ESTRE-UGS-000008 4C2 PLINTH PLAN & DETAIL IN TWC & FWR SHOP DRAWINGS 4 CODE A Architectural GCS Shop drawings 4C2 WF-256303

11 M3-GCS-TRP-EARIF-UGS-000007 4C2 Screed Reinforcement Shop Drawings 4 CODE A Architectural GCS Shop drawings 4C2

12 M3-GCS-TRP-EARST-UGS-000004 4C2 BOH STEEL HANDRAIL PLANS, SECTIONS & DETAILS. 40 CODE A Architectural GCS Shop drawings 4C2 WF-263068

13 M3-GCS-TRP-EARST-UGS-000005 4C2 FOH STEEL HANDRAIL PLANS, SECTIONS & DETAILS. 23 CODE A Architectural GCS Shop drawings 4C2 WF-274559

14 M3-GCS-TRP-ESTST-UGS-000010 4C2 CONCOURSE & PLATFORM LEVEL STEEL CAT LADDER PLANS, SECTIONS & DETAILS. 17 CODE A Architectural GCS Shop drawings 4C2

15 M3-GCS-TRP-EARSF-UGS-000008 4C2 CONCOURSE & PLATFORM LEVEL DEMOUNTABLE WALL PLANS, SECTIONS & DETAILS 9 CODE A Architectural GCS Shop drawings 4C2 WF-256286

16 M3-GCS-TRP-ESTST-UGS-000011 4C2 TRENCH STEEL GRATING PLANS, SECTIONS & DETAILS 7 CODE A Architectural GCS Shop drawings 4C2 WF-255263

17 M3-GCS-TRP-EARIF-UGS-000025 4C2 TVM Shop drawing 4 CODE A Architectural GCS Shop drawings 4C2 WF-278678

18 M3-GCS-TRP-ESTWP-UGS-000003 4C2 CONCOURSE & PLATFORM LEVEL WATER PROOFING SHOP DRAWING 21 CODE A Architectural GCS Shop drawings 4C2 WF-262246

19 M3-GCS-TRP-ESTWP-UGS-000005 4C2 GROUND & ROOF LEVEL WATER PROOFING MEMBRANE (EPDM) 22 CODE A Architectural GCS Shop drawings 4C2

20 M3-GCS-TRP-EARID-UGS-000001 4C2 STEEL DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE 27 CODE A Architectural GCS Shop drawings 4C2 WF-266592

21 M3-GCS-TRP-EARID-UGS-000003 4C2 ROLLER SHUTTER DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE 10 CODE A Architectural GCS Shop drawings 4C2 WF-283057

22 M3-GCS-TRP-EARSF-UGS-000010 4C2 PLATFORM,CONCOURSE LEVEL FLOOR ACCESS HATCH PLANS, SECTIONS & DETAILS. 30 CODE A Architectural GCS Shop drawings 4C2

23 M3-GCS-TRP-EARSF-UGS-000013 4C2 GROUND LEVEL ROOF FLOOR ACCESS HATCH PLANS, SECTIONS & DETAILS. 11 CODE A Architectural GCS Shop drawings 4C2 WF-255020

24 M3-GCS-TRP-EARSF-UGS-000005 4C2 PLATFORM & CONCOURSE LEVEL ACCESS PANELS PLANS, SECTIONS & DETAILS. 20 CODE A Architectural GCS Shop drawings 4C2 WF-255296

25 M3-GCS-TRP-EARSF-UGS-000012 4C2 PRE-CAST DELIVERY ACCESS HATCH 15 CODE A Architectural GCS Shop drawings 4C2 WF-256171

26 M3-GCS-TRP-EARSF-UGS-000014 4C2 ACCESS PANEL DOOR 16 CODE A Architectural GCS Shop drawings 4C2 WF-270208

27 M3-GCS-TRP-EARID-UGS-000007 4C2 FOH STEEL DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE 18 CODE A Architectural GCS Shop drawings 4C2 WF-270202

Page 97 of 103
28 M3-GCS-TRP-EARIC-UGS-000003 4C2 BOH CONCOURSE & PLATFORM LEVELS REFLECTED CEILING PLANS & DETAILS 8 CODE A Architectural GCS Shop drawings 4C2 WF-276015

29 M3-GCS-TRP-EARIC-UGS-000002 4C2 FOH CONCOURSE & PLATFORM LEVELS REFLECTED CEILING PLANS & DETAILS 45 CODE A Architectural GCS Shop drawings 4C2 WF-276890

30 M3-GCS-TRP-EARIC-UGS-000005 4C2 GYPSUM BOARD CLADDING UNDER ESCALATOR AREA 8 CODE B Architectural GCS Shop drawings 4C2

4C2 FOH CONCOURSE & PLATFORM LEVELS PORCELAIN TILE LAYOUT, ELEVATIONS &
31 M3-GCS-TRP-EARIF-UGS-000006 125 CODE B Architectural GCS Shop drawings 4C2 WF-271489
DETAILS

32 M3-GCS-TRP-EARIF-UGS-000010 4C2 FOH STAIR PORCELAIN TILE LAYOUT 14 CODE B Architectural GCS Shop drawings 4C2

33 M3-GCS-TRP-EARIF-UGS-000013 4C2 BOH CONCOURSE & PLATFORM LEVEL PORCELAIN TILE PLAN,SECTIONS & DETAILS 8 CODE B Architectural GCS Shop drawings 4C2

34 M3-GCS-TRP-EARIF-UGS-000016 4C2 CONCOURSE & PLATFORM LEVEL TACTILE 25 CODE A Architectural GCS Shop drawings 4C2 WF-279818

35 M3-GCS-TRP-EARIF-UGS-000014 4C2 FOH CONCOURSE LEVEL TOILETS PLANS, SECTIONS & DETAILS 14 CODE B Architectural GCS Shop drawings 4C2

36 M3-GCS-TRP-EAREW-UGS-000001  4C2 EXTERIOR WALL CLADDING 4 CODE A Architectural GCS Shop drawings 4C2 WF-275696

37 M3-GCS-TRP-EARIF-UGS-000020 4C2 FLOOR EPOXY COATIING SHOP DRAWING 19 CODE A Architectural GCS Shop drawings 4C2 WF-256186

38 M3-GCS-TRP-EARIF-UGS-000026 4C2 LOBBY SHOP DRAWING 12 Terminated Architectural GCS Shop drawings 4C2

39 M3-GCS-TRP-EARIF-UGS-000027 4C2 ENTRANCE MAT SHOP DRAWINGS 6 CODE A Architectural GCS Shop drawings 4C2 WF-281015

RAMPED Review
# Document No Document Title # Sht Status
Discipline Organisation Description Location Remarks WF-Number

40 M3-IID-TRP-ESTMA-UGS-000001 4G1 CONCOURSE LEVEL BLOCK WALL SHOP DRAWING 47 CODE A Architectural GCS Shop drawings 4G1 WF-180805

41 M3-IID-TRP-ESTMA-UGS-000002 4G1 PLATFORM LEVEL BLOCK WALL SHOP DRAWING 39 CODE A Architectural GCS Shop drawings 4G1 WF-082815

42 M3-GCS-TRP-ESTMA-UGS-000001 4G1 GROUND LEVEL BLOCK WALL SHOP DRAWING 23 CODE A Architectural GCS Shop drawings 4G1 WF-187179

43 M3-IID-TRP-ESTMA-UGS-000006 4G1 Block Wall Type Shop Drawings 4 CODE A Architectural GCS Shop drawings 4G1 WF-191469

44 M3-IID-TRP-ESTMA-UGS-000004 4G1 Block Wall Fire Rating Shop Drawings 18 CODE A Architectural GCS Shop drawings 4G1 WF-178047

45 M3-GCS-TRP-ESTMA-UGS-000003 4G1 MOI BLOCK WALL SHOP DRAWING 5 CODE A Architectural GCS Shop drawings 4G1 WF-272963

46 M3-IID-TRP-EARSF-UGS-000001 4G1 PLATFORM,CONCOURSE, GROUND LEVEL SCREED PLANS & DETAILS. 17 CODE A Architectural GCS Shop drawings 4G1 WF-178042

47 M3-GCS-TRP-ESTRE-UGS-000002 4G1 PLATFORM,CONCOURSE LEVEL CONCRETE PLINTH PLANS & REINFORCEMENT DETAIL. 8 CODE C Architectural GCS Shop drawings 4G1

48 M3-GCS-TRP-ESTRE-UGS-000007 4G1 PLINTH PLAN & DETAIL IN TWC SHOP DRAWINGS 4 CODE A Architectural GCS Shop drawings 4G1 WF-217315

49 M3-GCS-TRP-ESTRE-UGS-000009 4G1 VR ROOMS PLINTH PLANS & DETAILS 5 CODE A Architectural GCS Shop drawings 4G1 WF-217310

50 M3-IID-TRP-EARIF-UGS-000001 4G1 PLASTER DETAILS 3 CODE A Architectural GCS Shop drawings 4G1 WF-178029

51 M3-GCS-TRP-ESTRE-UGS-000010 4G1 SLAB FOR PLANTER IN OPEN LINK 3 CODE A Architectural GCS Shop drawings 4G1 WF-276889

52 M3-GCS-TRP-ESTRE-UGS-000011 4G1 SLAB, UPSTAND CONCRETE AT OPEN LINK & EXTERNAL STAIR SHOP DRAWING 6 Terminated Architectural GCS Shop drawings 4G1

53 M3-GCS-TRP-EARST-UGS-000002 4G1 BOH STEEL HANDRAIL PLANS, SECTIONS & DETAILS. 25 CODE B Architectural GCS Shop drawings 4G1

54 M3-GCS-TRP-EARST-UGS-000003 4G1 FOH HANDRAIL PLANS, SECTIONS & DETAILS. 16 CODE A Architectural GCS Shop drawings 4G1 WF-265616

55 M3-GCS-TRP-ESTST-UGS-000009 4G1 CONCOURSE & PLATFORM LEVEL STEEL CAT LADDER PLANS, SECTIONS & DETAILS. 16 CODE A Architectural GCS Shop drawings 4G1

56 M3-GCS-TRP-ESTST-UGS-000001 4G1 BOH PLATFORM LEVEL TRENCH STEEL GRATING PLANS, SECTIONS & DETAILS 5 CODE A Architectural GCS Shop drawings 4G1 WF-183644

57 M3-GCS-TRP-EARSF-UGS-000007 4G1 CONCOURSE & PLATFORM LEVEL DEMOUNTABLE WALL PLANS, SECTIONS & DETAILS 9 CODE A Architectural GCS Shop drawings 4G1

58 M3-GCS-TRP-EARST-UGS-000006 4G1 INTERNAL GUARD RAIL PLAN SECTION & DETAILS 9 CODE A Architectural GCS Shop drawings 4G1

59 M3-GCS-TRP-EARST-UGS-000007 4G1 INTERNAL HANDRAIL IN MRE 7 CODE A Architectural GCS Shop drawings 4G1

Page 98 of 103
60 M3-GCS-TRP-EARIF-UGS-000024 4G1 TVM Shop drawing 4 CODE B Architectural GCS Shop drawings 4G1

61 M3-GCS-TRP-ESTWP-UGS-000002 4G1 CONCOURSE & PLATFORM LEVEL WATER PROOFING SHOP DRAWING 11 CODE A Architectural GCS Shop drawings 4G1 WF-182649

62 M3-GCS-TRP-ESTWP-UGS-000004 4G1 ROOF LEVEL WATERPROOFING SYSTEM (EPDM) PLANS & DETAILS 12 CODE A Architectural GCS Shop drawings 4G1 WF-280280

63 M3-GCS-TRP-EARID-UGS-000002 4G1 STEEL DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE 24 CODE A Architectural GCS Shop drawings 4G1 WF-259700

64 M3-GCS-TRP-EARSF-UGS-000009 4G1 PLATFORM,CONCOURSE LEVEL FLOOR ACCESS HATCH PLANS, SECTIONS & DETAILS. 19 CODE A Architectural GCS Shop drawings 4G1

65 M3-GCS-TRP-EARSF-UGS-000006 4G1 PLATFORM & CONCOURSE LEVEL ACCESS PANELS PLANS, SECTIONS & DETAILS. 11 CODE A Architectural GCS Shop drawings 4G1

66 M3-GCS-TRP-EARID-UGS-000004 4G1 ROLLER SHUTTER DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE 6 CODE A Architectural GCS Shop drawings 4G1

67 M3-GCS-TRP-EARSF-UGS-000011 4G1 PRE-CAST DELIVERY ACCESS HATCH 7 CODE A Architectural GCS Shop drawings 4G1 WF-242451

68 M3-GCS-TRP-EARID-UGS-000006 4G1 FOH STEEL DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE 16 CODE A Architectural GCS Shop drawings 4G1 WF-281211

69 M3-GCS-TRP-EARIC-UGS-000004 4G1 BOH CONCOURSE & PLATFORM LEVELS REFLECTED CEILING PLANS & DETAILS 8 CODE A Architectural GCS Shop drawings 4G1 WF-199056

70 M3-GCS-TRP-EARIC-UGS-000001 4G1 FOH CONCOURSE & PLATFORM LEVELS REFLECTED CEILING PLANS & DETAILS 30 CODE B Architectural GCS Shop drawings 4G1

71 M3-GCS-TRP-EARIC-UGS-000006 4G1 SAR, CLR3, MOI, SSR (FEMALE & MALE) RCP SHOP DRAWING 6 CODE A Architectural GCS Shop drawings 4G1 WF-279612

72 M3-GCS-TRP-EARIF-UGS-000019 4G1 ENTRANCE BULK-HEAD SHOP DRAWING 6 CODE A Architectural GCS Shop drawings 4G1 WF-276030

73 M3-GCS-TRP-EAREW-UGS-000002 4G1 ABOVE LIFT GLASS GYPSUM BOARD CLADDING 8 CODE A Architectural GCS Shop drawings 4G1 WF-280300

74 M3-GCS-TRP-EAREW-UGS-000003 4G1 GYPSUM BOARD WALL IN SSR ROOM 5 CODE A Architectural GCS Shop drawings 4G1 WF-279902

4G1 FOH CONCOURSE & PLATFORM LEVELS PORCELAIN TILE LAYOUT, ELEVATIONS &
75 M3-GCS-TRP-EARIF-UGS-000005 104 CODE B Architectural GCS Shop drawings 4G1 WF-270971
DETAILS
4G1 BOH CONCOURSE & PLATFORM LEVELS PORCELAIN TILE LAYOUT, ELEVATIONS &
76 M3-GCS-TRP-EARIF-UGS-000009 8 CODE A Architectural GCS Shop drawings 4G1 WF-232970
DETAILS

77 M3-GCS-TRP-EARIF-UGS-000011 4G1 FOH STAIR PORCELAIN TILE LAYOUT 9 CODE A Architectural GCS Shop drawings 4G1 WF-232507

78 M3-GCS-TRP-EARIF-UGS-000015 4G1 CONCOURSE & PLATFORM LEVEL TACTILE 13 CODE A Architectural GCS Shop drawings 4G1 WF-265651

79 M3-GCS-TRP-EARIF-UGS-000012 4G1 FOH CONCOURSE LEVEL TOILETS PLANS, SECTIONS & DETAILS 11 CODE B Architectural GCS Shop drawings 4G1

80 M3-GCS-TRP-EARIF-UGS-000021 4G1 FLOOR EPOXY COATIING SHOP DRAWING 13 CODE A Architectural GCS Shop drawings 4G1 WF-279622

81 M3-GCS-TRP-EARIF-UGS-000029 4G1 EXTERNAL STAIR EPOXY COATING & PORCELAIN TILE SHOP DRAWING 14 CODE C Architectural GCS Shop drawings 4G1

82 M3-GCS-TRP-EARIR-UGS-000001 RAISED FLOOR SYSTEM (4C2, 4G1) 6 CODE A Architectural GCS Shop drawings 4G1 WF-215270

83 M3-GCS-TRP-EARIF-UGS-000008 RUBBER FLOOR TILES (4C2,4G1) 10 CODE A Architectural GCS Shop drawings 4G1 WF-275698

84 M3-GCS-TRP-EARIF-UGS-000017 4G1, 4C2 Concealed access hatch 10 CODE A Architectural GCS Shop drawings 4G1 WF-241969

Page 99 of 103
M3 Riyadh Metro Project Construction Joint Venture 4G1 4C2

Deliverable Package C CmLot ID: N/A UR-FQ 6 4

8. List of As-Builts Component: 84 UR-F 8 6

UR-RLD 6 5

Remaining 24 22

Terminated 1 2

RAMPED Review
# Document No Document Title Revision Discipline Organisation Description Component DP GBS / PBS
Status

1 M3-IID-TRP-ESTMA-UGS-000007 4C2 CONCOURSE LEVEL BLOCK WALL SHOP DRAWING UR-RLD Architectural GCS As -Built

2 M3-IID-TRP-ESTMA-UGS-000008 4C2 BLOCK WALL TYPE SHOP DRAWING UR-FQ Architectural GCS As -Built

3 M3-IID-TRP-ESTMA-UGS-000010 4C2 PLATFORM LEVEL BLOCK WALL SHOP DRAWING UR-RLD Architectural GCS As -Built

4 M3-GCS-TRP-ESTMA-UGS-000002 4C2 GROUND LEVEL BLOCK WALL SHOP DRAWING UR-RLD Architectural GCS As -Built

5 M3-IID-TRP-ESTMA-UGS-000009 4C2 FIRE RATING BLOCK WALL SHOP DRAWING UR-F Architectural GCS As -Built

6 M3-GCS-TRP-ESTMA-UGS-000004 4C2 MOI ROOM BLOCK WALL SHOP DRAWING UR-RLD Architectural GCS As -Built

7 M3-GCS-TRP-EARSF-UGS-000003 4C2 PLATFORM,CONCOURSE, GROUND LEVEL SCREED PLANS & DETAILS. Remaining Architectural GCS As -Built

8 M3-GCS-TRP-ESTRE-UGS-000001 4C2 PLATFORM,CONCOURSE LEVEL CONCRETE PLINTH PLANS & REINFORCEMENT DETAIL. Remaining Architectural GCS As -Built

9 M3-GCS-TRP-ESTRE-UGS-000005 4C2 GROUND LEVEL CONCRETE PLINTH PLANS & REINFORCEMENT DETAIL. Remaining Architectural GCS As -Built

10 M3-GCS-TRP-ESTRE-UGS-000008 4C2 PLINTH PLAN & DETAIL IN TWC & FWR SHOP DRAWINGS UR-FQ Architectural GCS As -Built

11 M3-GCS-TRP-EARIF-UGS-000007 4C2 Screed Reinforcement Shop Drawings Remaining Architectural GCS As -Built

12 M3-GCS-TRP-EARST-UGS-000004 4C2 BOH STEEL HANDRAIL PLANS, SECTIONS & DETAILS. Remaining Architectural GCS As -Built

13 M3-GCS-TRP-EARST-UGS-000005 4C2 FOH STEEL HANDRAIL PLANS, SECTIONS & DETAILS. Remaining Architectural GCS As -Built

14 M3-GCS-TRP-ESTST-UGS-000010 4C2 CONCOURSE & PLATFORM LEVEL STEEL CAT LADDER PLANS, SECTIONS & DETAILS. Remaining Architectural GCS As -Built

15 M3-GCS-TRP-EARSF-UGS-000008 4C2 CONCOURSE & PLATFORM LEVEL DEMOUNTABLE WALL PLANS, SECTIONS & DETAILS UR-F Architectural GCS As -Built

16 M3-GCS-TRP-ESTST-UGS-000011 4C2 TRENCH STEEL GRATING PLANS, SECTIONS & DETAILS UR-FQ Architectural GCS As -Built

17 M3-GCS-TRP-EARIF-UGS-000025 4C2 TVM Shop drawing Remaining Architectural GCS As -Built

18 M3-GCS-TRP-ESTWP-UGS-000003 4C2 CONCOURSE & PLATFORM LEVEL WATER PROOFING SHOP DRAWING UR-RLD Architectural GCS As -Built

19 M3-GCS-TRP-ESTWP-UGS-000005 4C2 GROUND & ROOF LEVEL WATER PROOFING MEMBRANE (EPDM) Remaining Architectural GCS As -Built

20 M3-GCS-TRP-EARID-UGS-000001 4C2 STEEL DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE Remaining Architectural GCS As -Built

21 M3-GCS-TRP-EARID-UGS-000003 4C2 ROLLER SHUTTER DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE Remaining Architectural GCS As -Built

22 M3-GCS-TRP-EARSF-UGS-000010 4C2 PLATFORM,CONCOURSE LEVEL FLOOR ACCESS HATCH PLANS, SECTIONS & DETAILS. Remaining Architectural GCS As -Built

23 M3-GCS-TRP-EARSF-UGS-000013 4C2 GROUND LEVEL ROOF FLOOR ACCESS HATCH PLANS, SECTIONS & DETAILS. UR-F Architectural GCS As -Built

Page 100 of 103


24 M3-GCS-TRP-EARSF-UGS-000005 4C2 PLATFORM & CONCOURSE LEVEL ACCESS PANELS PLANS, SECTIONS & DETAILS. UR-F Architectural GCS As -Built

25 M3-GCS-TRP-EARSF-UGS-000012 4C2 PRE-CAST DELIVERY ACCESS HATCH UR-FQ Architectural GCS As -Built

26 M3-GCS-TRP-EARSF-UGS-000014 4C2 ACCESS PANEL DOOR Remaining Architectural GCS As -Built

27 M3-GCS-TRP-EARID-UGS-000007 4C2 FOH STEEL DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE Remaining Architectural GCS As -Built

28 M3-GCS-TRP-EARIC-UGS-000003 4C2 BOH CONCOURSE & PLATFORM LEVELS REFLECTED CEILING PLANS & DETAILS Remaining Architectural GCS As -Built

29 M3-GCS-TRP-EARIC-UGS-000002 4C2 FOH CONCOURSE & PLATFORM LEVELS REFLECTED CEILING PLANS & DETAILS Remaining Architectural GCS As -Built

30 M3-GCS-TRP-EARIC-UGS-000005 4C2 GYPSUM BOARD CLADDING UNDER ESCALATOR AREA Remaining Architectural GCS As -Built

31 M3-GCS-TRP-EARIF-UGS-000006 4C2 FOH CONCOURSE & PLATFORM LEVELS PORCELAIN TILE LAYOUT, ELEVATIONS & DETAILS Remaining Architectural GCS As -Built

32 M3-GCS-TRP-EARIF-UGS-000010 4C2 FOH STAIR PORCELAIN TILE LAYOUT Remaining Architectural GCS As -Built

33 M3-GCS-TRP-EARIF-UGS-000013 4C2 BOH CONCOURSE & PLATFORM LEVEL PORCELAIN TILE PLAN,SECTIONS & DETAILS Remaining Architectural GCS As -Built

34 M3-GCS-TRP-EARIF-UGS-000016 4C2 CONCOURSE & PLATFORM LEVEL TACTILE UR-F Architectural GCS As -Built

35 M3-GCS-TRP-EARIF-UGS-000014 4C2 FOH CONCOURSE LEVEL TOILETS PLANS, SECTIONS & DETAILS Remaining Architectural GCS As -Built

36 M3-GCS-TRP-EAREW-UGS-000001  4C2 EXTERIOR WALL CLADDING Remaining Architectural GCS As -Built

37 M3-GCS-TRP-EARIF-UGS-000020 4C2 FLOOR EPOXY COATIING SHOP DRAWING UR-F Architectural GCS As -Built

38 M3-GCS-TRP-EARIF-UGS-000026 4C2 LOBBY SHOP DRAWING Terminated Architectural GCS As -Built

39 M3-GCS-TRP-EARIF-UGS-000027 4C2 ENTRANCE MAT SHOP DRAWINGS Terminated Architectural GCS As -Built

RAMPED Review
# Document No Document Title Revision Discipline Organisation Description Component DP GBS / PBS
Status

40 M3-IID-TRP-ESTMA-UGS-000001 4G1 CONCOURSE LEVEL BLOCK WALL SHOP DRAWING UR-RLD Architectural GCS As -Built

41 M3-IID-TRP-ESTMA-UGS-000002 4G1 PLATFORM LEVEL BLOCK WALL SHOP DRAWING UR-RLD Architectural GCS As -Built

42 M3-GCS-TRP-ESTMA-UGS-000001 4G1 GROUND LEVEL BLOCK WALL SHOP DRAWING UR-RLD Architectural GCS As -Built

43 M3-IID-TRP-ESTMA-UGS-000006 4G1 Block Wall Type Shop Drawings Remaining Architectural GCS As -Built

44 M3-IID-TRP-ESTMA-UGS-000004 4G1 Block Wall Fire Rating Shop Drawings UR-FQ Architectural GCS As -Built

45 M3-GCS-TRP-ESTMA-UGS-000003 4G1 MOI BLOCK WALL SHOP DRAWING UR-RLD Architectural GCS As -Built

46 M3-IID-TRP-EARSF-UGS-000001 4G1 PLATFORM,CONCOURSE, GROUND LEVEL SCREED PLANS & DETAILS. UR-FQ Architectural GCS As -Built

47 M3-GCS-TRP-ESTRE-UGS-000002 4G1 PLATFORM,CONCOURSE LEVEL CONCRETE PLINTH PLANS & REINFORCEMENT DETAIL. Remaining Architectural GCS As -Built

48 M3-GCS-TRP-ESTRE-UGS-000007 4G1 PLINTH PLAN & DETAIL IN TWC SHOP DRAWINGS UR-FQ Architectural GCS As -Built

49 M3-GCS-TRP-ESTRE-UGS-000009 4G1 VR ROOMS PLINTH PLANS & DETAILS UR-FQ Architectural GCS As -Built

50 M3-IID-TRP-EARIF-UGS-000001 4G1 PLASTER DETAILS UR-F Architectural GCS As -Built

51 M3-GCS-TRP-ESTRE-UGS-000010 4G1 SLAB FOR PLANTER IN OPEN LINK Remaining Architectural GCS As -Built

Page 101 of 103


52 M3-GCS-TRP-ESTRE-UGS-000011 4G1 SLAB, UPSTAND CONCRETE AT OPEN LINK & EXTERNAL STAIR SHOP DRAWING Terminated Architectural GCS As -Built

53 M3-GCS-TRP-EARST-UGS-000002 4G1 BOH STEEL HANDRAIL PLANS, SECTIONS & DETAILS. Remaining Architectural GCS As -Built

54 M3-GCS-TRP-EARST-UGS-000003 4G1 FOH HANDRAIL PLANS, SECTIONS & DETAILS. UR-F Architectural GCS As -Built

55 M3-GCS-TRP-ESTST-UGS-000009 4G1 CONCOURSE & PLATFORM LEVEL STEEL CAT LADDER PLANS, SECTIONS & DETAILS. Remaining Architectural GCS As -Built

56 M3-GCS-TRP-ESTST-UGS-000001 4G1 BOH PLATFORM LEVEL TRENCH STEEL GRATING PLANS, SECTIONS & DETAILS UR-FQ Architectural GCS As -Built

57 M3-GCS-TRP-EARSF-UGS-000007 4G1 CONCOURSE & PLATFORM LEVEL DEMOUNTABLE WALL PLANS, SECTIONS & DETAILS Remaining Architectural GCS As -Built

58 M3-GCS-TRP-EARST-UGS-000006 4G1 INTERNAL GUARD RAIL PLAN SECTION & DETAILS Remaining Architectural GCS As -Built

59 M3-GCS-TRP-EARST-UGS-000007 4G1 INTERNAL HANDRAIL IN MRE Remaining Architectural GCS As -Built

60 M3-GCS-TRP-EARIF-UGS-000024 4G1 TVM Shop drawing Remaining Architectural GCS As -Built

61 M3-GCS-TRP-ESTWP-UGS-000002 4G1 CONCOURSE & PLATFORM LEVEL WATER PROOFING SHOP DRAWING UR-RLD Architectural GCS As -Built

62 M3-GCS-TRP-ESTWP-UGS-000004 4G1 ROOF LEVEL WATERPROOFING SYSTEM (EPDM) PLANS & DETAILS Remaining Architectural GCS As -Built

63 M3-GCS-TRP-EARID-UGS-000002 4G1 STEEL DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE Remaining Architectural GCS As -Built

64 M3-GCS-TRP-EARSF-UGS-000009 4G1 PLATFORM,CONCOURSE LEVEL FLOOR ACCESS HATCH PLANS, SECTIONS & DETAILS. Remaining Architectural GCS As -Built

65 M3-GCS-TRP-EARSF-UGS-000006 4G1 PLATFORM & CONCOURSE LEVEL ACCESS PANELS PLANS, SECTIONS & DETAILS. Remaining Architectural GCS As -Built

66 M3-GCS-TRP-EARID-UGS-000004 4G1 ROLLER SHUTTER DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE Remaining Architectural GCS As -Built

67 M3-GCS-TRP-EARSF-UGS-000011 4G1 PRE-CAST DELIVERY ACCESS HATCH UR-F Architectural GCS As -Built

68 M3-GCS-TRP-EARID-UGS-000006 4G1 FOH STEEL DOORS PLANS, SECTIONS,DETAILS & DOOR SCHEDULE Remaining Architectural GCS As -Built

69 M3-GCS-TRP-EARIC-UGS-000004 4G1 BOH CONCOURSE & PLATFORM LEVELS REFLECTED CEILING PLANS & DETAILS Remaining Architectural GCS As -Built

70 M3-GCS-TRP-EARIC-UGS-000001 4G1 FOH CONCOURSE & PLATFORM LEVELS REFLECTED CEILING PLANS & DETAILS Remaining Architectural GCS As -Built

71 M3-GCS-TRP-EARIC-UGS-000006 4G1 SAR, CLR3, MOI, SSR (FEMALE & MALE) RCP SHOP DRAWING Remaining Architectural GCS As -Built

72 M3-GCS-TRP-EARIF-UGS-000019 4G1 ENTRANCE BULK-HEAD SHOP DRAWING UR-F Architectural GCS As -Built

73 M3-GCS-TRP-EAREW-UGS-000002 4G1 ABOVE LIFT GLASS GYPSUM BOARD CLADDING UR-F Architectural GCS As -Built

74 M3-GCS-TRP-EAREW-UGS-000003 4G1 GYPSUM BOARD WALL IN SSR ROOM UR-F Architectural GCS As -Built

75 M3-GCS-TRP-EARIF-UGS-000005 4G1 FOH CONCOURSE & PLATFORM LEVELS PORCELAIN TILE LAYOUT, ELEVATIONS & DETAILS Remaining Architectural GCS As -Built

76 M3-GCS-TRP-EARIF-UGS-000009 4G1 BOH CONCOURSE & PLATFORM LEVELS PORCELAIN TILE LAYOUT, ELEVATIONS & DETAILS UR-RLD Architectural GCS As -Built

77 M3-GCS-TRP-EARIF-UGS-000011 4G1 FOH STAIR PORCELAIN TILE LAYOUT Remaining Architectural GCS As -Built

78 M3-GCS-TRP-EARIF-UGS-000015 4G1 CONCOURSE & PLATFORM LEVEL TACTILE UR-F Architectural GCS As -Built

79 M3-GCS-TRP-EARIF-UGS-000012 4G1 FOH CONCOURSE LEVEL TOILETS PLANS, SECTIONS & DETAILS Remaining Architectural GCS As -Built

80 M3-GCS-TRP-EARIF-UGS-000021 4G1 FLOOR EPOXY COATIING SHOP DRAWING Remaining Architectural GCS As -Built

Page 102 of 103


81 M3-GCS-TRP-EARIF-UGS-000029 4G1 EXTERNAL STAIR EPOXY COATING & PORCELAIN TILE SHOP DRAWING Remaining Architectural GCS As -Built

82 M3-GCS-TRP-EARIR-UGS-000001 RAISED FLOOR SYSTEM (4C2, 4G1) UR-FQ Architectural GCS As -Built

83 M3-GCS-TRP-EARIF-UGS-000008 RUBBER FLOOR TILES (4C2,4G1) UR-F Architectural GCS As -Built

84 M3-GCS-TRP-EARIF-UGS-000017 4G1, 4C2 Concealed access hatch Remaining Architectural GCS As -Built

Page 103 of 103

You might also like