CADANGAN MEMBINA SEBUAH KILANG MENGANDUNGI (i) PEJABAT 3 TINGKAT BERSERTA SHOWROOM (ii) 1 UNIT PONDOK PENGAWAL

(iii) 1 UNIT KEBUK SAMPAH (iv) 1 UNIT RUMAH PAM (v) 1 BLOK WAREHOUSE BERSERTA KANTIN DI LOT 42807, MUKIM LABU,
DAERAH SEREMBAN, SENDAYAN TECHVALLEY, BANDAR SERI SENDAYAN, NEGERI SEMBILAN DARUL KHUSUS.
UNTUK TETUAN CHINA TANGXING EQUIPMENT(M) SDN BHD

BILL NO. D - EXTERNAL & INFRASTRUCTURE WORKS


ITEM NO. DESCRIPTION 描述 UNIT QUANTITY AMOUNT
RM SEN

D/7 FENCING AND GATE 围栏和大门

SLIDING ENTRANCE MAIN GATE & SIDE GATE 滑动入口主门和侧门

A Supply and install 12,000mm x 2100mm Sliding gate 供应并安装12,000mm x 2100mm滑动门,


complete with 100mm x 50mm x 3mm thk RHS 并配有100mm x 50mm x 3mm thk的矩形
as main frame and associated 25mm x 50mm thk 钢结构作为主框架,并附带25mm x 50mm
as SHS with 50mm x 50mm x 3mm thick supported 厚的四方形钢结构和50mm x 50mm x 3mm 的
frame, with underlay stainless steel pile embeded 支撑框架,并在水泥地面上嵌入了不锈
to concrete floor; painted etc. 钢底层桩; 油漆等 no 1

B Ditto; 2000mm x 2000mm high swing gate 同上,2000mm x 2000mm高的平开门 no 1

BRICK WALL FENCING 围栏围墙

Well burnt clay brick bedded and jointed in 2000毫米高的砖围墙由抹灰与砂浆(1:3)


2000mm high to be laid with R.C beam on top, 铺设在钢筋混凝土基础上包括混凝土墙顶 ;
200mm x 300mm x 2000mm high R.C column 包括所有必要的油漆、 钢筋、开挖和模板
with R.C capping fixed on top including,
R.C ground beam, excavation, plastering

C Front fencing 150mm thick for signage & logo 前围栏厚度为150mm,用于标牌和徽标 m 9

BRICKWALL C/W ANTI-CLIMB MESH FENCING 配有防盗围栏的围栏砖墙

150mm thick Well burnt clay brick bedded and jointed 2000毫米高的150mm厚陶土砖围墙
in 2000mm high to be laid with R.C beam on top, 包括抹灰与砂浆(1:3)铺设在钢筋混凝土基础上
200mm x 300mm x 2000mm high R.C column 包括混凝土墙顶 ;所有必要的油漆、
with R.C capping fixed on top including, R.C ground 钢筋、开挖和模板,UPVC沟槽,1550mm高
beam, excavation, plastering c/w upvc groove line, PLYTEC580 热浸镀锌防盗防爬围栏 和铁丝网
painting complete with 1550mm high "PLYTEC 580" 围栏,包括框架等等工作
High Tensile Steel Wire Mesh anti climb fence in
hot dipped galvanised finishes and barded wire
including angle with post and all necessary works

D Fencing 围栏 m 401 Omitted 取消

总共携带到外部工作摘要:
TOTAL CARRIED TO SUMMARY OF EXTERNAL WORKS: -
FENCING AND GATE 栅栏和门

D/7/1