TAX INVOICE

Raj Electricals Contruction , Amgaon


Near Masjid,Vidya Nagar,T.B Toli Gondia
BILL NO.REC/2021-22/ DATE:
TO,
THE EXECUTIVE ENGEENER GSTIN NO:-
O&M DIVISION DEORI PAN NO:-
GSTIN NO:-

Preventive/Break Down Maintenance of LT/HT /DTC overhead lines and underground cables inDeori S/dn.
Under O&M Deori Division Gondia Circle.

W.O.No. EEG/TECH/2948/DATE :-01 /AUG/2019


W.O.No. EEG/TECH/2909/DATE :-01 /AUG/2019
Work At:- Deori-I D/C
S.N. Particular's of Work's Rate Amount

Labour Charges for Preventive Maintenance of LT overhead lines /


1
underground cables(EEG/TECH/2948/DATE/:-01/AUG/2019
As per Sheet 1 32865.00

2 Material Supplied By Contractor For LT As per Sheet 11102.00

Labour Charges for Preventive Maintenance of HT overhead lines /


3
underground cables(EEG/TECH/2909/DATE:-01/AUG/2019
As per Sheet 2 11925.00

4 Material Supplied By Contractor For HT As per Sheet 13654.00

Total Rs. 69546.00


4.5 % Above 3129.57

Sub Total 72675.57


SGST 9% 6540.80
CGST 9% 6540.80

Grand total Rs:- 85757.17

" We hereby certify that my/ our registration certificate under the Maharashtra Value Added Tax
Act., 2002 Is in force on the on which the sale of Goods specified in this "tax invoice" is made by
me/us and that the trasactions of sale coered by this " tax invoice"has been effected by me/us
and it shall be accounted for in the turnover of sales while fillin of return and the due tax, if anky
payable on the sale has been paid or shall be paid"

Raj Electricas Construction


Pro.
CERTIFICATE

1 WORK DONE SATISFACTORY AND AS PPER ORDER


2 NO MATERIAL BALANCE WITH THE CONTRACTOR
3 BILL CERTIFY FOR RS:- 72675.57
4 WORK STARTING DATE:-10.04.2020 COMPLETION DATE:-07.06.2020

Assistant Engineer Dy. Ex. ENGINEER


MSEDCL O&M O&M S/DN MSEDCL
Deori-I D/C Deori
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD.
WORK COMPLETION REPORT

Preventive/Break Down Maintenance of LT/HT /DTC overhead lines and


underground cables inDeori S/dn. Under O&M Deori Division Gondia Circle.
DIVISION :- Deori D/c:- Deori-I D/C S/DN Deori
`

CONTRACTOR :- Raj Electrical Construction

NAME OF SCHEME:- Enplanement of Preventive/Break Down Maintenance

W.O.No. EEG/TECH/2948/DATE :-01 /AUG/2019


W.O.No. EEG/TECH/2909/DATE :-01 /AUG/2019

ESTIMATED/ORDER VALUE:-

ACTUAL EXPENDITURE INCURRED:- 72675.57

DATE OF WORK:-

DATE OF COMPLETION:-

REMARK if any

Assistant Engineer
MSEDCL O&M
Deori-I DC

Dy. Ex. ENGINEER EXECUTIVE ENGINEER


O&M S/DN MSEDCL O&M DN. MSEDCL
Deori Deori
Raj Electrical & Construction
WORK COMPLETED ON 31.07.2021
W.O.No. EEG/TECH/2948 DATE :-01 /AUG/2019
CONTRACTOR - SYED BROTHERS ENTERPRISES
Work At:- Tedha D/C

ACTIVITY:-PREVENTIVE LT LINE

Labour charge Per


Unit Rate in Rs.

Makardhokda

Pradhantola
Ushikhedha
Khudshipar

Saledharni

Sahakepar
Gonditola

Kohditola
Chichgad
Per Unit

Amount
Mahaka

Putaddi
Senda
Salai

Dalli
Sr.No Name of Activity

Total
A) SCHEDULE - A
1) Activity as per Enclosed Sheet Overhead Lines Km 1150 1 1 2 0 0 0 0 0 0 0 4 4600
Activity as per Enclosed Sheet 0 0
B) Underground Cables 0 0
C) Overhead Lines 0 0
1) Repair & replacement of damaged fabrications No 100 2 2 4 400
2) Providing guarding where guarding is not provided Span 200 1 1 200

3) Providing of Muffing to any type of poles in 1:2:4 with supply of all No 450 0
material including cement, Size-60cm Dia. Round type and 60cm
height with tapering at top. 0
4) No 100 200
Providing loop type Guarding of both end of span /Guard wire / loop 2 2
5) Labour charges for providing LT spacers(at 3 places) per span 60 2 2 4 240
6) Providing and fixing of stay set set 1650 1 1 1650
7) Providing and fixing of LT earthing to LT support set 200 2 1 1 1 5 1000
Replacement of damage shackel Insulator No 25 2 2 3 7 175
Replacement of Faulty Jumper No 50 5 5 250
D) SCHEDULE - C 0 0
E) Overhead Lines 0 0
F) 0
Providing of Mid-Pole and Replacement of damaged / rusted pole 0

G) 0
Replacement of damaged / rusted RSJ LT pole including removal of
existing line & pole, digging of pit, erection of new pole (concreting
charges will be paid extra) & fitting of all accessories, fabrication etc
to the pole & reconnecting of lines on the pole 0
1) 1. RSJ 125 x 70 mm up to 8 Mtr. No 900 0 0
2) 2. RSJ 175 x 85 mm up to 9 Mtr No 1000 0 0

Concreting & muffing of RSJ LT poles including supply of cement,


3) 3/4'' x 3/4'' machine broken metal & screen sand (Concreting ratio per pole 900 0
1:4:8) to form 0.3 cmt of concrete. Cement required for 0.3 cmt=110
kg.
0
Replacement of damaged PSC pole including removal of existing line
H) & pole, excavation of pit, erection of new pole (concreting charges will 0
be paid extra) & fitting of all accessories, fabrication etc to the pole &
restringing of lines on the pole 0
1) 1. PSC Pole 8 Mtr. No 900 1 1 900

Concreting & muffing of PSC LT poles including supply of cement,


2) 3/4'' x 3/4'' machine broken metal & screen sand (Concreting ratio per Pole 900 0
1:4:8) to form 0.3 cmt of concrete. Cement required for 0.3 cmt =110
kg. 0
Concret odf tree branches of PSC LT pole 1:4:8 EA 1000 0 0
Triming of tree branches fall on line LS 100 5 2 7 700
A) Straightening of Tilted pole 0 0
1) 1. PSC Pole 8 mtr including backfilling, ramming, tightening etc per pole 250 3 6 9 2250
2) per pole 200 0
2. RSJ Pole of any size including backfilling, ramming, tightening etc 0
3) Replacement of conductor 1ph 3wire per span 150 2 2 5 7 3 19 2850
4) Replacement/Stringing of conductor 3ph 4 wire per span 250 12 3 12 5 12 8 7 6 65 16250
5) Replacement of conductor 3ph 5 wire per span 350 0 0 0
Replacement of psc pole incl removal exst line No 1200 1 1 1200
B) Replacement of Meter /Meter taken outside 0 0
1) Replacement of Single Phase Meter with providing of Meter terminal No 50 0
cover & sealing 0
2) Replacement of Three Phase Meter with providing of Meter terminal No 75 0
cover & sealing 0
Repl of HRC Fuse Base, BusBar/Z Patti No 75 0 0

per
3) Replacement of CT operated Meter with box including CT embedded connecti 1500 0
meter with sealing of MTC & Meter Box including of removing of old on
meter & box, crediting to the store and submission of intial reading of
New Meter & final reading of old meter to system. 0
Shifting of Single Phase Meter from inside the premises to outside
4) including work of meter replacement, earthing and replacement of No 150 0
old WPTC by new one from Pole to Meter 0
5) Shifting of Three Phase Meter from inside the premises to outside No 200 0
including work of meter replacement, earthing 0
Shifting of Three Phase Meter from inside the premises to outside
6) including work of meter replacement, earthing and replacement of No 300 0
old WPTC by new one from Pole to Meter 0

Shifting of CT operated Meter from inside the premises to outside per


7) including work of meter replacement with box including CT connecti 2000 0
embedded meter with sealing of MTC & Meter Box including of on
removing of old meter & box, crediting to the store and submission of
initial reading of New Meter & final reading of old meter to system 0
32865.00

Assistant Engineer Dy. Ex. ENGINEER


MSEDCL O&M O&M S/DN MSEDCL
Deori-I DC Deori
Raj Electrical & Construction
WORK COMPLETED ON 31.07.2021
W.O.No. EEG/TECH/2948 DATE :-01 /AUG/2019
CONTRACTOR - SYED BROTHERS ENTERPRISES
Work At:- Tedha D/C

ACTIVITY:-PREVENTIVE LT MATERIAL SHEET

RT/U Rs.

Mahaka
Sr.No.

Unit

Salai
Description of Material Amount

1 M.S.FIat50x6mm Kg. 49.00 3.00 3.00 147


4 L.T Spacers No 110.00 5.00 5.00 550
5 L.T.Shackle lnsulator No. 10 0.00 0
6 L.T. Stay sets No. 472 1 1.00 472
7 LT Shakel Hardware Paire 37 2.00 2.00 74
8 Earthing Set L.T Set 166 0.00 0
LT XLPL Cable ARM 3.5C x70 Sqmm M 204 0.00 0
M.S Angle (75x40 MM) Kg. 70 5.00 5.00 350
H.T Earthing Set Set 342 0.00 0
Hardware ( Nutbolt, washer,Split Pin, Cir
clip ,cutter pin ) No 355 0.00 0
M.S.Angle 50x50x6mm Kg. 52 0.00 0
9 Binding Wire Kg. 70 0.00 0
10 G I Stay Wire 7/3.15mm(10SWG) Kg. 57 9 9.00 513
3 Stay lnsulators No. 10 1 1.00 10
12 G.I Wire 5 mm Kg. 57 0.00 0
13 G.I Wire 10 SWG Kg. 57 10.00 10.00 570
14 Earthing With GI Plate No 1698 0.00 0
15 Concreting Ration 1 :3:6 M3 3027 0.00 0
16 PSC Pole 8 Mtr No 1650 3 2 5.00 8250
17 G.I Nut Bolt Kg. 83 2 2.00 166
18 Salt Kg. 7 0.00 0
Bimetallic lugs 185Sqmm No 23 0.00 0
19 Coal Kg. 15 0.00 0
20 Sundries Ls 810 0.00 0
Material Amount 11102

Assistant Engineer Dy. Ex. ENGINEER


MSEDCL O&M O&M S/DN MSEDCL
Deori-I DC Deori
SYED BROTHERS ENTERPRISES
WORK COMPLETED ON 31.07.2021
W.O.No. EEG/TECH/2948 DATE :-01 /AUG/2019
CONTRACTOR - SYED BROTHERS ENTERPRISES
Work At:- Tedha DC

ACTIVITY:-PREVENTIVE LT WORK SHEET


LT WORK SHEET
SR.NO VILLAGE SITE WORK TILTED POLE TILTED POLE RSJ STRINGING
LT SPAN LT

1 Senda 10 Tilted Pole PSC ,0 Tilted Pole RSJ, 27 Span Wiring


Stringing 3 0 12
2 Soni 0 Tilted Pole PSC ,0 Tilted Pole RSJ, 0 Span Wiring
Stringing 0 0 0

3 Masgaon 17 Tilted Pole PSC , 0 Tilted Pole RSJ, 28 Span Wiring


Stringing 17 0 28

4 Mohadi 15 Tilted Pole PSC , 0 Tilted Pole RSJ, 32 Span Wiring


Stringing 15 0 32

5 Tedha 12 Tilted Pole PSC , 0 Tilted Pole RSJ, 0 Span Wiring


Stringing 12 0 0
Total 47 72

Assistant Engineer Dy. Ex. ENGINEER


MSEDCL O&M O&M S/DN MSEDCL
Deori-I DC Deori
SYED BROTHERS ENTERPRISES
WORK COMPLETED ON 31/07/2021
W.O.No. EEG/TECH/2909/DATE :-01 /AUG/2019
CONTRACTOR - SYED BROTHERS ENTERPRISES
Work At:- Tedha D/C
ACTIVITY:-PREVENTIVE HT LINE SHEET

Saledharni
Sahakepar

Mohghata
Labour charge Per
Sr.No Name of Activity Per Unit Total Amount
Unit Rate in Rs.

A) SCHEDULE - A 0 0
1) Activity as per Enclosed Sheet Overhead Lines Km 925 0 1 0 1 925
B) SCHEDULE - B 0 0
C) Overhead Lines 0 0

1) Labour charges towards Providing carpet guarding with 8 Span


SWG GI wire with lacing at Road cross / Line cross where
guarding are not provided at Road / Nala crossing 300 0 0
2) Replacement of V / Y cross arms/ fiber glass straight cross No
arm. 100 0 0
3) Replacement of damaged / deteriorated Channels No 125 4 4 500
4) Replacement of damaged / deteriorated Top Clip No 50 0 0

Fixing Jumpers with Wedge connectors / Loop connector No 25


(Material will be provided by MSEDCL, if not said cost will
5) be reimbursed as per MSEDCL Cost Data) 0 0
Fixing of HT stay sets including concreting with 1:4:8 ratio
6) to form 0.3 cmt (Cement required for 0.3cmt=110kg) & Set 1300
binding of stay wire 7/8 SWG. 0 0
7) Tightening of loose HT stay sets, re-fixing and binding, Set
labour only 100 0 0
A) SCHEDULE - C 0 0
B) Overhead Lines 0 0
C) Providing of Mid-Pole and Replacement of damaged /
rusted pole 0 0

Replacement of damaged / rusted RSJ pole including


D) removal of existing line & pole, digging of pit, erection
of new pole (concreting charges will be paid extra) &
fitting of all accessories, fabrication etc to the pole &
reconnecting of lines on the pole 0 0
at Cut Point / Tension Point 0 0
1) 1. RSJ pole 152x 152 mm up to 13 Mtr. No 1500 0 0
2) 2. RSJ pole 152x152 mm up to 11 mtr. No 1500 0 0
3) 3. RSJ pole 100x116 mm up to 11 Mtr. No 1200 0 0
4) 4. RSJ pole 100x116 mm up to 10 mtr. No 1200 0 0
5) 5. RSJ pole 175x85 mm up to 10 mtr. No 1200 0 0

Concreting & muffing of RSJ poles including supply of


6) cement, 3/4'' x 3/4'' machine broken metal & screen sand Per Pole 1500
(Concreting ratio 1:4:8) to form 0.5 cmt of concrete.Cement
required for 0.5 cmt = 182 kg. 0 0

Replacement of damaged / rusted RSJ pole including


E) removal of existing line & pole, digging of pit, erection
of new pole (concreting charges will be paid extra) &
fitting of all accessories, fabrication etc to the pole &
reconnecting of lines on the pole at Suspension / Pin
type In Line 0 0
1) 1. RSJ 152x 152 mm up to 13 Mtr. No 1200 0 0
2) 2. RSJ pole 152x152 mm up to 11 mtr. No 1200 0 0
3) 3. RSJ pole 100x116 mm up to 11 Mtr. No 1000 0 0
4) 4. RSJ pole 100x116 mm up to 9 mtr. No 1000 0 0
5) 5. RSJ pole 175x85 mm up to 10 mtr. No 1000 0 0

Replacement of damaged PSC pole including removal of


1) existing line & pole, excavation of pit, erection of new pole No
(concreting charges will be paid extra) & fitting of all
accessories, fabrication etc to the pole & restringing of lines
on the pole at Cut Point 1200 0 0
A) / Tension Point (PSC pole shall be made available at
Section office) 0 0

Replacement of damaged PSC pole including removal of


1) existing line & pole, excavation of pit, erection of new pole No
(concreting charges will be paid extra) & fitting of all
accessories, fabrication etc to the pole & restringing of lines
on the pole at Suspension / Pin type In Line (PSC pole 1000 0 0
B) shall be made available at Section office) 0 0

Concreting & muffing of PSC poles including supply of


1) cement, 3/4'' x 3/4'' machine broken metal & screen sand Per Pole 1200
(Concreting ratio 1:4:8) to form 0.4 cmt of concrete.Cement
required for 0.4 cmt = 146 kg. 0 0
C) Straightening of Tilted pole 0 0
1) 1. PSC Pole 9 mtr including backfilling, ramming, tightening Per Pole
etc 300 4 4 1200
2) 2. RSJ Pole of any size including backfilling, ramming, Per Pole
tiughtening etc 250 0 0

Replacement of damaged / rusted RSJ / PSC DP


structure including removal of existing line & DP
structure, digging of pit, erection of new DP structure
D) (concreting charges will be paid extra) & fitting of all
accessories, fabrication etc 0 0
to the DP structure & reconnecting of lines on the DP
structure 0 0
1) 1. RSJ pole 100x116 mm up to 11 mtr. No 2500 0 0
2) 2. RSJ pole 152 x 152 mm up to 11 mtr. No 3000 0 0
3) 3. PSC pole 9 Mtr long No 2400 0 0

4) Providing of Muffing to any type of poles in 1:2:4 with No


supply of all material including cement, Size-60cm Dia.
Round type and 60cm height with tapering at top. 150 0 0
5) No
Fixing of 33/22 /11 KV pin insulator with pins labour only 50 2 2 100
6) Fixing of DO / Horn gap set including accessories labour Set
only. 500 0 0
A) Paving out and Restringing of 3 HT conductors with
binding labour only. 0 0
1) 1. For 0.1 to 0.2 ACSR/AAAC conductor. Span 800 3 6 9 7200
2) 3. For below 0.06 ACSR/AAAC or equivalent. Span 500 4 4 2000
B) Removing of existing poles and dismantling the
concreting without 0 0
C) cutting the poles and transporting the same to MSEDCL
stores 0 0
1) No
1. 150x150 mm 90/105 Ib/yd Rail 13 mtr long HT pole. 900 0 0
2) 2. 152x152 mm up to 13 Mtr No 900 0 0
3) 3. 100x116 mm up to 11 Mtr No 600 0 0
4) 4. 175x85 mm up to 10 Mtr No 600 0 0
D) Removing of existing line conductor with and crediting
at MSEDCL Sub-Division store. 0 0
1) a) HT (3 conductors) Span 225 0 0
2) Fixing of cross bracing set to 10’ center DP 90/105 lbs per Set
yard / 50x150 mm RSJ. 375 0 0
3) Fixing of cross bracing set to 8’ center DP 90/105 lbs per Set
yard/150x150 mm RSJ. 300 0 0
4) Fixing of cross bracing set to 5’ center DP 90/105 lbs per Set
yard/150x150 mm RSJ. 170 0 0

a)Earth of HT poles by providing 25x3 mm GI flat about 7’


5) long, GI pipe(B/C class) 1” diax6’ long, 10 kg coal, 25 kg salt. No
(all materials at contractor’s cost including making of holes
in poles) 525 0 0

6) Installation of AB switches with alignment and jumper Set


connections so as to give trouble free operation including
erection of pole pieces for fixing of handle including
earthing etc and removing of existing damaged AB switch 1200 0 0

E)
Restringing of loose span conductor (tightening)
without disturbing guarding & removing old binding
jumpers & tightening of clamps, cross arms, stays etc. 0 0
1) a) HT below 0.06 ACSR Span 300 0 0
2) Replacement of damaged Disc Insulator Per String 275 0 0
11925.00

Assistant Engineer Dy. Ex. ENGINEER


MSEDCL O&M O&M S/DN MSEDCL
Deori-I DC Deori
SYED BROTHERS ENTERPRISES
WORK COMPLETED ON 31/07/2021
W.O.No. EEG/TECH/2909/DATE :-01 /AUG/2019
CONTRACTOR - SYED BROTHERS ENTERPRISES
Work At:- Tedha D/C

ACTIVITY:-PREVENTIVE HT WORK SHEET

Makardhokda

Sahakepar

Mohghata
Sr.No.Description of Material Unit RT/U Rs. Total QtyTotal
0 0 0
1 33 KV Pin Insulator With G.I Pi No 541 0 0
3 Concrating Ratio 1:3:6 M3 3027 0 0
4 H.T.Stay Set Set 598 0 0
5 H.T Earthing Set Set 342 0 0
A.B Switch No 1 1 0
6 Danger board in yard No 50 0 0
7 11 KLV V-cross arm with clamp No 639 0 0
8 11 KV Top Fitting NO 91 0 0
9 Stay Wire 7/8 kg 57 0 0
10 Nut Bolt kg 83 0 0
11 PSC Pole 9mtr /200Kg No 2260 1 1 2260
12 G.I flat 50x10mm kg 67 0 0
13 Barbed Wire A Type kg 64 0 0
14 33 KV Top Fitting No 382 0 0
15 RSJ 152x152,10 M Long No 11394 1 1 11394
G.I flat 50x10mm kg 49 0 0
Total Amount 13654

Assistant Engineer Dy. Ex. ENGINEER


MSEDCL O&M O&M S/DN MSEDCL
Deori-I DC Deori