CHAPTER- R 9

PIPE CULVERTS
Item No. Descriptions Unit Rate

9.1 PCC 1:3:6 in Foundation (Plain cement concrete cum 1759.00


1:3:6 mix with crushed stone aggregate 40 mm
nominal size mechanically mixed, placed in
foundation and compacted by vibration including
curing for 14 days.)

9.2 Laying Reinforced Cement Concrete Pipe


NP4/prestrssed concrete pipe on first class
bedding in single row . (Laying Reinforced cement
concrete pipe NP4/prestrssed concrete pipe for
culverts on first class bedding of granular material in
single row including fixing collar with cement mortar
1:2 but excluding excavation, protection works,
backfilling, concrete and masonry works in head
walls and parapets . )

A 1000 mm dia metre 3618.00


B 1200 mm dia metre 4496.00

9.3 Laying Reinforced Cement Concrete Pipe NP 4


/prestrssed concrete pipe on first class bedding
in double row . (Laying Reinforced cement concrete
pipe NP4 /prestrssed concrete pipe for culverts on
first class bedding of granular material in double row
including fixing collar with cement mortar 1:2 but
excluding excavation, protection works, backfilling,
concrete and masonry works in head walls and
parapets . )

A 1000 mm dia metre 7284.00


B 1200 mm dia metre 9043.00

Excavation for Structures (Earth work in excavation


of foundation of structures as per drawing and
technical specification, including setting out,
9.4 construction of shoring and bracing, removal of
stumps and other deleteriousmatter, dressing of sides
and bottom and backfilling with approved material.)

I Ordinary soil
A Manual Means
(i) upto 3 m depth Cum. 32.00
B Mechanical Means
(i) Depth upto 3 m Cum. 32.00
II Ordinary rock (not requiring blasting)
A Manual Means
(i) Depth upto 3 m Cum. 46.00
9.5 Plain/Reinforced cement concrete in sub-structure
complete as per drawing and Technical
Specifications
A PCC Grade M15 Cum. 1989.00
Item Descriptions Unit Rate
No.
9.6 Providing and laying boulders apron on river bed Cum. 601.00
for protection against scour with stone boulders
weighing not less than 40 kg each complete as per
drawing and Technical specification.
9.7 Providing and laying Pitching on slopes laid over Cum. 601.00
prepared filter media including boulder apron laid
dry in front of toe of embankment complete as per
drawing and Technical specifications
9.8 Providing and laying Filter material underneath Cum. 760.00
pitching in slopes complete as per drawing and
Technical specification