You are on page 1of 13

No.

Case Description Date Source

A. Kommy unit

UT reports for all banks


1 12/21/2020 WASCO Audit
(manifolds)

NDT –MPI for all welding points


2 12/21/2020 WASCO Audit
at manifold area

Reading of pre-charge for all


3 12/21/2020 WASCO Audit
bottles

4 Many leaks found all over the 12/21/2020 WASCO Audit


unit
Secondary retention for all
5 12/21/2020 WASCO Audit
lighting
6 Alarm testing 12/21/2020 WASCO Audit
7 Emergency lighting system 12/21/2020 WASCO Audit
8 Earhting reading 12/21/2020 WASCO Audit
9 Usable fluid calculation 12/21/2020 WASCO Audit

10 Review EX electrical 12/21/2020 WASCO Audit


connections
B. Mud pump

11 Discharge manifold UT report 12/21/2020 WASCO Audit

12 Pump Modules UT report 12/21/2020 WASCO Audit

13 Purity test device not available 12/21/2020 WASCO Audit

NDT-MPI for all welding point in


14 12/21/2020 WASCO Audit
the discharge HP line

Pulsation dampener Precharge


15 12/21/2020 WASCO Audit
gauges need to be replaced

Oil gauge painted and not


16 12/21/2020 WASCO Audit
serviceable
C: Man riding
Man riding emergency stop not
17 12/21/2020 WASCO Audit
working properly
D: Air winch
Air winch position need to be
18 12/21/2020 WASCO Audit
adjusted
E: Draw work

Draw work Hydraulic unit


19 nitrogen bottle wall thickness 12/21/2020 WASCO Audit
report not available

F. Vacuums degasser
No calibration stamp on the
20 gauge so, Gauge calibration 12/21/2020 WASCO Audit
certificate

21 Vacuum motor PMS records 12/21/2020 WASCO Audit

22 Degasser vent not installed yet 12/21/2020 WASCO Audit

23 Bolts need to be well tightened 12/21/2020 WASCO Audit

G. Eassy torque
Wires has many wire cut and in
24 very bad condition and need to 12/21/2020 WASCO Audit
be replaced
NDT – MPI certificate must be
25 12/21/2020 WASCO Audit
provided
H. Top drive

26 NDT MPI for sever sub , IBOP 12/21/2020 WASCO Audit


upper and lower , goese neck

I. BOP

27 Full housekeeping for all BOP 12/21/2020 WASCO Audit


parts in order to be inspected

28 Spools inspection certificates 12/21/2020 WASCO Audit

Test stump inspection


29 12/21/2020 WASCO Audit
certificates

30 Date of elastomers installation 12/21/2020 WASCO Audit

31 Elastomers spare for all rams 12/21/2020 WASCO Audit

32 NDT –MPI for H-Beem stoppers 12/21/2020 WASCO Audit

J. Mud system
Junction boxes EX d need to be
33 12/21/2020 WASCO Audit
retighten
6 Secondary retentions for flood
34 lights need to be replaced due to 12/21/2020 WASCO Audit
corrosion
All mud system valves need to
35 12/21/2020 WASCO Audit
be color coded
Lighting need to be increased on
36 12/21/2020 WASCO Audit
hopper area

37 Flow line not connected till now 12/21/2020 WASCO Audit

Installing jetting connection on


38 12/21/2020 WASCO Audit
flow line
K. Rig floor
H2S and LEL sensor installed in
39 12/21/2020 WASCO Audit
wrong position
O-Matic brake air hose need to
40 12/21/2020 WASCO Audit
be replaced

Stand pipe manifold need color


41 code and numbers for each 12/21/2020 WASCO Audit
valve and sketch must be posted

Draw work brakes need deep


42 12/21/2020 WASCO Audit
housekeeping to check leaking

  SWL not posted on the Air


43 winches and man riding 12/21/2020 WASCO Audit

All tripping tools need to be


44 12/21/2020 WASCO Audit
color coded
RED ZONE not identified on rig
45 12/21/2020 WASCO Audit
floor
L. Choke manifold
Coflixp hose damaged from two
46 points need to be repaired or 12/21/2020 WASCO Audit
replaced
Kill line in bad condition need to
47 12/21/2020 WASCO Audit
be replaced
All valves must be numbered
48 and colored with appropriate 12/21/2020 WASCO Audit
color code

49 Some safety pins were missed 12/21/2020 WASCO Audit

  NDT –MPI reports for welding


50 12/21/2020 WASCO Audit
areas need to be reviewed

Pressure gauge need to be


51 12/21/2020 WASCO Audit
replaced and to be small scale

M. Shut down items list


52 Shut down items list 12/21/2020 WASCO Audit
N. Shale shakers
MI SWACO representative must
53 be in rig site very soon in order 12/21/2020 WASCO Audit
to check shakers
Mud cleaner
Gauge need to be replace due to
54 12/21/2020 WASCO Audit
reading malfunction
NDT-MPI must be applied for all
55 12/21/2020 WASCO Audit
new welding areas
56 NDT-MPI inspection report 12/21/2020 WASCO Audit
P.Training certificates

IWCF for all stuff starting from


57 12/21/2020 WASCO Audit
derrick man to tool pusher

58 Look out tag out for all 12/21/2020 WASCO Audit


maintenance staff
HSE training certificates for all
59 12/21/2020 WASCO Audit
staff
Q. Calibration sheets

60 PRV list with calibration sheet 12/21/2020 WASCO Audit

61 Gauges calibration sheet 12/21/2020 WASCO Audit

Increase the number of gravity


62 eye wash to be 4 units 12/21/2020 WASCO Audit

New caravan in very bad


63 condition and need to be 12/21/2020 WASCO Audit
replaced
478
479
480
481
482
483
484
485
486
487
Corrective/Preventive Action - its No. Responsibility Follow up Result

A. Kommy unit

Will be done tomorrow On progress

Done and waiting for certificate closed

Done closed

Done closed

Will be installed tomorrow On progress

Done closed
Done closed
Done closed
Will be done tomorrow On progress

Done closed

B. Mud pump

Will be done tomorrow On progress

Will be done tomorrow On progress


No recharge in rig site. Recharging by third
closed
party (New Delta Co.).

Done and waiting for certificate closed

Done closed

Done closed

C: Man riding

Done closed

D: Air winch
Done closed

E: Draw work

Will be done tomorrow On progress

F. Vacuums degasser

New Gauge will be installed open

No recharge in rig site. Recharging by closed


.third party (New Delta Co.)
Done closed

Done closed

G. Eassy torque

Waiting to arrived to rig by towmorrow On progress

Done and waiting for certificate closed

H. Top drive

Will be done tomorrow On progress

I. BOP

Done closed

Available at rig site closed

Will be done tomorrow On progress

Available closed

Available closed

Will be done tomorrow On progress

J. Mud system

Done closed

Will be installed by tomorrow On progress

Done closed
Will be add by tomorrow On progress

Done closed

Done closed

K. Rig floor

Removed to other side closed

Done closed

Done closed

Done closed

Done closed

Done closed

Done closed

L. Choke manifold

Will be done tomorrow On progress

Will be done tomorrow On progress

Done closed

Done closed

Done and waiting for certificate closed

Done closed

M. Shut down items list


Available closed
N. Shale shakers

On progress

O. Mud cleaner
Done closed

Done and waiting for certificate closed

Done and waiting for certificate closed


P.Training certificates

available closed

available closed

available closed

Q. Calibration sheets

Will be done tomorrow closed

Will be done tomorrow closed

Required and waiting for supply closed

Will be replaced by towmorrow On progress


Time frame

Wednesday, December 23, 2020

Wednesday, December 23, 2020

Wednesday, December 23, 2020

Wednesday, December 23, 2020

Wednesday, December 23, 2020


Wednesday, December 23, 2020

Saturday, December 26, 2020

Wednesday, December 23, 2020

Wednesday, December 23, 2020

Wednesday, December 23, 2020

Wednesday, December 23, 2020

Wednesday, December 23, 2020


Wednesday, December 23, 2020

Wednesday, December 23, 2020

Wednesday, December 23, 2020

Wednesday, December 23, 2020


Wednesday, December 23, 2020