1. The following is the criteria for triggering the development of rescue Plan for WAH
activity
1/1 point
2. Descent rescue is ….
1/1 point
A rescue where the casuallyt is slightly A rescue where the casualty is raised to
raised so that their Fall Arrest Lanyard the required extraction location
can be removed from its anchor and the
A rescue where the casually is lowered
casualty can be either raised or lowered
to the required extraction location
A rescue where the casualty is
transferred from one location to another
location whilst in Suspension.
1/1 point
4. A rescue where the casualty is raised vertically out of a confined space is known as
_______
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 2 of 23
1/1 point
5. A Stretcher Rescue is a rescue where the casualty needs to be immobilized by the use
of a Stretcher due to injury before or after being rescued.
True
False
1/1 point
6. A full body harness & lanyard is not required to be registered and maintained, because
the equipment is already certified by an international standard.
True
False
0/1 point
7. After equipment has been inspected, a tagged shall be installed, in the event of missing
tag on an equipment the following is correct, EXCEPT.
Replace the tag with a new tag only Replace the tag and inspect the
equipment.
Stop using the equipment before inspect
the equipment. Replace the equipment with a new one
and install the tag.
0/1 point
1/1 point
9. For PETRONAS Carigali Offshore Facilities on a Mother Platform, the WAH primary
rescue team shall come from the contractors that perform the activity.
True
False
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 3 of 23
10. In PETRONAS Carigali PTW system under Hot Work management, what are the
classifications of Area?
Zone 1, Zone 2 and Zone 3 Green field, Brown field and Red field.
Process, Instrument and Electrical Area. Zone 0, Zone 1, Zone 2 and Non-
classified area
1/1 point
Page 2/12
11. In PETRONAS Carigali PTW Procedure, what is the limitation in Zone 1 with respect
to Hot Work activities?
No hot work on live facility shall be Open flame hot work on live facility
allowed, unless the facility is shutdown, shall only proceed with use of
depressurise and render hydrocarbon- Pressurised Habitat
free
Hot work may be allowed with the
For open flame hot work e.g. oxy conduct of gas testing and
cutting, grinding, etc., the facility shall implementation of other required
be shutdown, depressurise and render control and recovery barriers identified
hydrocarbon-free prior proceeding with in risk assessment
hot work
1/1 point
12. What is the limitation in Zone 2 with respect to Hot Work activities?
No hot work on live facility shall be Open flame hot work on live facility
allowed, unless the facility is shutdown, shall only proceed with use of
depressurise and render hydrocarbon- Pressurised Habitat
free
Hot work may be allowed with the
For open flame hot work e.g. oxy conduct of gas testing and
cutting, grinding, etc., the facility shall implementation of other required
be shutdown, depressurise and render control and recovery barriers identified
hydrocarbon-free prior proceeding with in risk assessment
hot work
1/1 point
13. Who is responsible to carry out gas testing as well as filling in the Gas Test Form?
1/1 point
14. Once a PTW is approved, what is the validity period of the Hot Work permit?
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 4 of 23
7 days 1 month
1/1 point
Control room area before the permit Worksite during work activity
being approved.
Control room after work being
Worksite meeting after the PTW suspended.
approve and before the work start
1/1 point
16. After the PTW has been approved by the Approving Authority (AA), what is the
purpose of the joint site (JSV) inspection which is performed by the Approving Authority
Representative (AAR) and Work Leader (WL)?
1/1 point
17. Once a PTW is approved, what is the validity period of the Cold Work permit?
1/1 point
18. Under the PTW Inspection and Assurance, who is responsible to conduct PTW
Quarterly Assurance?
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 5 of 23
19. All routine work DO NOT require PTW, Is the statement TRUE or False?
True
False
1/1 point
20. For hot work inside confined space, in addition to the hot work requirement, the
confined space entry requirement shall be fully complied with.
1/1 point
Page 3/12
21. The following are general requirement in PETRONAS Carigali PTW system,
EXCEPT?
PTW & Certificates recoded in PTW Specific Job Hazard Analysis (JHA)
Logbook. shall be developed for all PTW
application.
All PTW and Certificates revalidated
and tracked to closure. None of the above
1/1 point
22. In the event that non-conformities or new hazards are found after work commenced,
the correct action shall be:
I. Permit shall be suspended and activity stopped.
II. Only resume after rectification/site conditions is safe and subsequent approval from
AA obtained
III. Continue with the activity and record in the operation log
IV. Remove the hazards and make safe the area
IV only I, II, IV
1/1 point
23. Based on PETRONAS Carigali PTW procedure, when Emergency Shutdown (ESD) /
General Platform Alarm (GPA) activated, the following is applicable, EXCEPT?
All work shall stop and PTW suspended For confirmed emergency, all PTW and
and secured and made safe worksite. associated certificates cancelled and re-
applied prior to resume work as
If false alarm or emergency drill, work
worksite condition has changed.
may resume after AA confirmed,
condition remains the same and safe. None of the above
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 6 of 23
1/1 point
25. Vehicle Entry Certificate shall be raised and required for any vehicles entry the
process area for both contractor and company vehicles.
True
False
1/1 point
26. In the Diving Certificate who shall be responsible to declare all precautions required
for diving work have been implemented
1/1 point
27. In what Section in the Hot Work PTW, the requirements of the PPE are being
specified and identified
Section 2 Section 5
Section 4 Section 6
1/1 point
28. How many cold work PTW will be required to be raised for the same work activity
that continuously operating 24 hours by a 2 shift crew?
1 PTW 4 PTW
2 PTW No PTW
1/1 point
29. Who is the authorised entrant for Confined Space Entry activity?
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 7 of 23
1/1 point
30. Please select all the relevant supporting certificates under PETRONAS Carigali PTW
System?
x. Excavation Certificate
All of the above i, ii, iii, vi, vii, viii, ix, x, xi, xii, xiv, xv,
xvii, xviii
iv, v, xiii, xvi
i, ii, iv, v, xii, x, xi, xii, xvi, xviii
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 8 of 23
Page 4/12
31. What is the main responsibility of Entry Supervisor?
I. Identify all authorised entrants, the standby person and alternate standby person;
II. Determine frequency for gas testing with consultation from the CSE AGT
III. Brief the entry team on PTW, JHA and emergency procedures;
IV. Supervise entry, not leave the work site until handed over to another ES;
1/1 point
YES, anyone can stop the activities if it NO, because it will delayed the
not safe to proceed with the activities. completion date
NO, only AA can stop Confined Space NO, because he is not the supervisor of
activities the activities.
1/1 point
1/1 point
True
False
1/1 point
1/1 point
36. What is the validity of the Health Assessment Certificate for the entrant?
3 years 4 years
1 year 2 years
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 9 of 23
1/1 point
1/1 point
38. Who is responsible to certify the fitness to work certificates of the Entrant?
1/1 point
39. Does an entrant need to use BA when the LEL < 1%?
Yes
No
1/1 point
1/1 point
Page 5/12
41. What is the definition of Confined Space Entry?
I. Not intended as regular workplace
II. Has restricted means of entry/exit
III. Large enough, so configured that a worker can bodily enter and perform assigned
work
IV. At atmospheric pressure during occupancy
I and II II and IV
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 10 of 23
1/1 point
43. What authorized entrants have to do prior entering the Confined Space?
1/1 point
44. What does AGT need to do when the level of gas is unsafe during work in progress?
Withdraw the work permit and stop the Continuously monitor the level and site
activities immediately continue with the activities
1/1 point
1/1 point
46. What are the other TWO (2) conditions of Confined Space Entry WITHOUT
BREATHING APPRATUS?
I. Oxygen: 19.5% - 23.5%
II. Toxic Vapor: More than 50% PEL
III. Oxygen: Less than 19.5%
IV. Toxic Vapor: Less than or equal to 50% PEL
1/1 point
47. Once entrants leave Confined Space and need to re-enter, does gas test require
‘private entering’?
Yes No
0/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 11 of 23
48. The following is the gas test required prior to Confined Space Entry EXCEPT
1/1 point
49. The following is the requirements for the CSE rescue procedures, EXCEPT?
Rescue team shall ensure continuous List and inventory of the rescue
supply of air through the air line for equipment is available.
rescue
Standby person shall immediately enter
Entry supervisor shall immediately the confined space and make the rescue
arrange for rescue operations
1/1 point
1/1 point
Page 6/12
51. Who is responsible to conduct risk assessment before SSBOC can be approved:
1/1 point
52. As per communication of Bypass of SCPD, for standalone SSBOC - the original copy
of the SSBOC shall be kept at _______ for tracking purposes?
1/1 point
53. On approval of SSBOC, the level of AA shall be based on the level shall be based on
the duration of the bypass, for bypass for more than I days up to 7 days, the
_____________ shall approve the certificates.
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 12 of 23
1/1 point
54. ___________ shall be responsible for planning and execution of Bypass of SCPD and
carrying out of the precautionary measures?
1/1 point
55. Shift leader/Production Supervisor, to carry out _________ audit on all bypass SCPD.
Daily Monthly
Weekly 6 monthly
0/1 point
56. What is an integral system in the PETRONAS Maintenance Management System that
provide visual, easy to read and to understand the status of the Asset Integrity Sustaining
work actions (PM) and the Integrity Restoring works Actions (CM) and where they
currently are at, with respect to the Latest Allowed Finish Date.
1/1 point
57. How many categories of safety critical element (SCE) are there in PETRONAS
Carigali?
7 10
8 12
1/1 point
58. In what section of the PPM SSBOC that the applicant required to described the reason
for the bypass/override/isolation/defeating of the SCPD and Identified and specified the
effect on system due to the bypass.
Section 1 Section 4
Section 3 Section 5
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 13 of 23
59. A bypass due to faulty SCPD and pose imminent or immediate adverse impact to
HSE and/or production is known as?
1/1 point
60. A bypass due to faulty / prolong and DOES NOT pose imminent or immediate
adverse impact to HSE and/or production
1/1 point
Page 7/12
61. In Section 7 of prolong/faulty SSBOC the ______ shall confirm the implementation
of precaution actions to prevent incorrect bypass/override/isolation/defeating of the
SCPD and /or inadvertent normalization by other personnel in these section. Any
additional precaution actions shall be specified. The _____ shall then sign to agree the
implementation of all precautions prior start work.
RA AAR
SME TA
1/1 point
62. The bypass status shall be reported or communicated in the following, EXCEPT?
1/1 point
63. Based on the PETRONAS Carigali BSCPD procedure, the required assurance and
inspection for BSCPD shall be conducted, EXCEPT?
Daily Bi-Monthly
Weekly Quarterly
1/1 point
64. All equipment that to be bypass during operations shall be managed with safety
system bypass override certificates (SSBOC).
True
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 14 of 23
False
1/1 point
1/1 point
1/1 point
67. Can the Physical Isolation Certificate (PIC) be valid even AFTER the PTW has been
closed?
YES
NO
1/1 point
1/1 point
69. Who approves the certificates of isolation for less than 12 weeks?
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 15 of 23
I & II II & IV
1/1 point
Page 8/12
71. As part of equipment preparation of Physical Isolation, what are the additional steps
to be taken for any COMPLEX SYSTEM?
1/1 point
72. For any Energy Isolation activities, should the photocopy of the relevant certificate
(PIC/EIC) accompany the Permit to Work?
Yes
No
1/1 point
73. Closure of two block valves in series, with an intermediate bleed valve which is
vented to a safe location to atmosphere, flare header or to drain vessel where no back
pressure accumulate, is known as??
1/1 point
74. A secure box capable of holding the keys from lockout devices used to render
isolation points in a system inoperable. Equipped with a visible means of observing the
keys inside and has provision to be secured by additional locks. Is known as?
1/1 point
75. Identify the owner of the discipline for the following Tag Out colors: Red, Blue and
Yellow
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 16 of 23
1/1 point
76. Who is the Approving Authority (AA) if the Physical Isolation is more than 16 weeks
(4 months)?
1/1 point
77. The status of LOTO at each isolation point shall be filled up in which section of the
Positive Isolation Certificate (PIC)?
Section 1 Section 10
Section 5 Section 12
1/1 point
1/1 point
79. Prolong energy isolation certificate shall be valid only after the Management of
Change has been raised and approved.
True
False
1/1 point
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 17 of 23
Page 9/12
81. One of the sources of input for JHA development can be obtained from Direct
Observation. What are the advantages of Direct Observation?
I. Can immediately recognize potential accident performing the work
II. Can promote sharing of experience and knowledge about accident.
III. Can relate the work with actual environment or conditions, hence specific method
can be applied accordingly.
IV. Preliminary prepared JHA can be used from previous work activities.
I I, II & III
I & IV IV only
1/1 point
1/1 point
83. What is PEAR representing in assessing the potential impact of hazard release in
developing a Job Hazard Analysis?
1/1 point
84. What is the advantage of having a JHA before executing the job?
I. Potential hazards related to the job task are identified
II. Required control are identified to manage the risk
III. Cost of activity can be reduced
IV. Required recovery barriers are identified to manage the risks
I, II & IV II & IV
1/1 point
85. As part of JHA update and audit, what is the retention period of the JHA if there is no
incident?
1 year 5 years
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 18 of 23
3 years 7 years
1/1 point
86. Who should attend the JHA certification as part of the PTW system training?
1/1 point
I II & IV
1/1 point
88. The person who leads work crew to carries out the work is called the ‘Work Leader”.
Verify the statement.
True
False
1/1 point
89. In developing JHA, can Hazard Effect Register (HER) be used as a reference?
Yes
No
1/1 point
90. Once JHA has already been developed, who shall approve the JHA that has been
reviewed by Work Leader?
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 19 of 23
Page 10/12
91. Can Receiving Authority (RA) be part of JHA approving signatory?
Yes
No
1/1 point
92. The following scenarios are among the conditions which allow the review and update
of JHA, EXCEPT?
I. Change in working condition
II. After an incident related to work
III. Upon completion of any work activities
IV. Findings arising from incident investigation
I & II IV
1/1 point
93. In preparing JHA, what number should be filled in the section of JHA Number?
1/1 point
1/1 point
95. Who should attend JHA Awareness training as per PTW awareness training?
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 20 of 23
For Hot Work and Confined Space For all activities that require PTW at all
Entry activity only work locations throughout PETRONAS
Carigali global operations.
1/1 point
97. JHA shall be applicable for all activities that require PTW at all work locations
throughout PETRONAS Carigali global operations, including works/activities carried out
by Contractors and Sub-Contractors engaged for work on Company facilities.
True
False
1/1 point
98. Before the JHA and PTW have been approved, the WL shall communicate the JHA to
all the work team members during Pre-Job or Toolbox Meeting and shall be signed by all
work team members
True
False
1/1 point
1/1 point
100. Under Occupational Safety and Health Act 1994, what are the duties of employees?
i. Take reasonable care for the safety and health of himself and of others who may be
affected by his acts or omissions at work.
ii. Wear or use at all times any protective equipment or clothing provided by the
employer for the purpose of preventing risks to his safety and health.
iii. Comply with any instruction or measure on occupational safety and health
instituted by his employer or any other person by or under this Act.
i, ii, iii
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 21 of 23
Page 11/12
101. Once a PTW is approved, what is the validity period of the Hot Work permit?
7 days 1 month
1/1 point
1/1 point
103. What is the intent of the slogan “No work is so urgent that we cannot take time to do
it safely”?
1/1 point
1/1 point
105. What can happen when you do not comply with HSE requirements?
You can cause company bonus for all You can cause incidents resulting in
employees. near misses, minor injury or fatality
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 22 of 23
Zones 0, 1 & 2
1/1 point
1/1 point
Memory failure and attention failure Failed control and failed defense
1/1 point
109. Which one is the best description for “knowledge based mistakes”?
The likelihood that a health hazard will An individual run out of pre-packaged
cause harm or health effect(s) in the solutions and have to think out the
actual circumstance of exposure solutions
1/1 point
Breaking the rule due to pressure from Breaking rule due to lack of awareness
the job. This may include insufficient and understanding. This may be caused
time, lack of manpower, unavailability by unavailability of updated procedure
of right equipment or extreme weather or obsolete training curriculum
conditions
1/1 point
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019
Level 3 Survey Page 23 of 23
https://www.surveymonkey.com/r/quiz/results?sm=BB_2B8RihIf6Aa6MufGgLaxDO1wz8c711cOMGvbBHL_2FZwI3Sr9olc39aTUDM5h... 3/4/2019