Job Name/Location: Tag No.

:
Date: For: File Resubmit
Approval Other
PO No.:
Architect: GC:
Engr: Mech:
Rep:
(Company) (Project Manager)

ARUM504DTE5 (a) ARUM121DTE5


Multi V™ 5 460V ODU (b) ARUM168DTE5
42 Ton Heat Pump and Heat Recovery (c) ARUM216DTE5 Operating Range:
Performance: Cooling (°F DB)** 5 - 122
Cooling Mode: Heating (°F WB) -13 ‐ 61
Synchronous
Nominal Capacity (Btu/h) 504,000 Cooling Based (°F DB) 14 - 81
Power Input1 (kW) 35.32 Heating Based (°F WB) 14 - 61
Heating Mode: Unit Data:
Nominal Capacity (Btu/h) 567,000 Refrigerant Type R410A
Power Input1 (kW) 40.93 Refrigerant Control EEV
Max. Number of Indoor Units³ 64
Rated capacity is certified under AHRI Standard 1230. Ratings are subject to change without notice. Current certified
ratings are available at www.ahridirectory.org. Sound Pressure⁴ dB(A)
67
Electrical: Weight
Frame (a) ARUM121DTE5 (b) ARUM168DTE5 (c) ARUM216DTE5 Frame (a) ARUM121DTE5 (b) ARUM168DTE5 (c) ARUM216DTE5
Power Supply (V/Hz/Ø)1 460/60/3 460/60/3 460/60/3 Net (lbs.) 507 639 666
MOP (A) 25 35 50 Shipping (lbs.) 534 666 694
MCA (A) 18.4 28.5 38.3 Communication Cable (No x AWG)⁵ 2 x 18
Rated Amps (A) 15.7 25.6 34.4 Heat Exchanger Coating Black Coated Fin™
Compressor A (A) 10.7 11.4 15.5 Compressor:
Compressor B (B) - 9.2 13.9
Type HSS DC Scroll
Fan (A) 5.0 5.0 5.0
Quantity 5
Piping:² Oil / Type PVE / FVC68D
Frame (a) ARUM121DTE5 (b) ARUM168DTE5 (c) ARUM216DTE5 Fan:
Refrigerant Charge (lbs.) 23.2 26.5 37.5 Type Propeller
Liquid (in., O.D.) 1/2 Braze 5/8 Braze 5/8 Braze Quantity (a) + (b) + (c) 6
High Pressure Vapor
Motor Drive Brushless Digitally Controlled Direct
(Heat Recov only; in, O.D.) 3/4 Braze 7/8 Braze 7/8 Braze
Low Pressure Vapor Air Flow Rate (a) + (b) + (c) (CFM) 33,900
(in., O.D.) 1-1/8 Braze 1-1/8 Braze 1-1/8 Braze Notes:
1. Power wiring cable size must comply with the applicable local and national codes.
Standard Features: Cables terminate at each frame.
2. For main pipe segment size, refer to the LATS Multi V tree diagram.
• Advanced Smart Load Control • Active Refrigerant Control
3. The combination ratio must be between 50‐130%.
• Intelligent Heating • Variable Heat Path Exchanger 4. Sound pressure levels are tested in an anechoic chamber under ISO Standard 3745
• HiPOR (High Pressure Oil Return) • Subcooling and Vapor Injection for the combination of outdoor units.
• Smart Oil Control Control 5. Communication cable between ODU and IDUs must be 2‐conductor, 18 AWG,
• Night Quiet Operation • Liquid Cooled Inverter Controller twisted, stranded, and shielded. Ensure the communication cable shield is properly
grounded to the Master ODU chassis only. Do not ground the communication cable
• Fault Detection and Diagnosis
at any other point. Wiring must comply with all applicable local and national codes.
6. Acceptable operating voltage: 414V - 528V
Required Accessories: 7. The order of these units on the submittal (i.e., a+b+c) does not represent the
ARCNB21 (Frame Connector Y‐branch) installation order. Highest capacity unit is used as the Master, followed by the next
ARCNB31 (Frame Connector Y‐branch) smaller size as Slave 1, and so on.
Optional Accessories:
Air Guide ‐ ZAGDKA52A (3 required)
Hail Guard Kit ‐ ZHGDKA52A (3 required)
Low Ambient Baffle Kit ‐ ZLABKA52A (3), Control Kit ‐
PRVC2 (1 per system)

**(‐9.9°F achieved only when all IDUs are operating in cooling mode.
Does not impact synchronous operating range.)
For continual product development, LG reserves the right to change specifications without notice. SB_MultiV_5_ODU_ARUM504DTE5_2018_09_06_164923
© LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG Life’s Good” is a registered trademark of LG Corp. /www.lghvac.com Page 1 of 2
Job Name/Location:
Tag No.:
ARUM504DTE5 (a) ARUM121DTE5
Date:
Multi V™ 5 460V ODU (b) ARUM168DTE5
PO No.:
42 Ton Heat Pump and Heat Recovery (c) ARUM216DTE5

Typical Triple Frame Configuration


W
1 (min) 1 (min)

W W W
146-7/16 (min)
Note: Please refer to multi-frame placement information and piping rules in the Multi V 5 Engineering
Manual and the Multi V 5 Installation Manual. Minimum spacing between frames is 1 inch.
D

L9
L13

L11
L12

L10
L14

7/8” Diameter Leak Test Hole


Left Side View Right Side View L9 6 – 1/2”
L10 5 – 9/16”
M5
D Power Cord Routing Hole
M6 L11 8 – 5/8
(Bottom); two (2) - ø2”
Airflow
M7 L12 6 – 7/16
M8 Two (2) 7/8” Diameter Wire
M9 Routing Holes (Bottom) L13 9 – 15/16”
M10 L14 3 – 5/8”
19/32” Dameter Hole M5 11 – 15/16”
M11
M6 11 – 1/16”
M7 10 – 1/2”
M14
M15
M12
M13

M8 8 – 7/16”
W
Airflow
Airflow

M9 8 – 1/8”
M16

Piping M10 6 – 1/16”


Routing
M11 4 – 15/16”
Holes (Bottom);
two - ø2-5/8,” M12 7 – 1/2”
Airflow
ø2-1/8” M13 4 – 13/16”
M14 4 – 5/16”
M15 3 – 5/8”
Top View Bottom Mounting Holes Center of Gravity
M16 3”

For continual product development, LG reserves the right to change specifications without notice. SB_MultiV_5_ODU_ARUM504DTE5_2018_09_06_164923
© LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG Life’s Good” is a registered trademark of LG Corp. /www.lghvac.com Page 2 of 2

You might also like