You are on page 1of 3

PROJECT : FITTING OUT "........?

"( isi sendiri)


LOCATION : Jl. .............( isi sendiri)
Daerah Khusus Ibukota Jakarta
Attention : Mr / Mrs ......... ( isi sendiri)

Dear : Mr / Mrs ......... ( isi sendiri)


We would like to submit our quotation with description, as follow:
QUOTATION
Date : November 26, 2016

Supply Install Supply + Install


No Description Unit
Total Price Total Price Total Price

Alt. 1
I PRELIMINARIES WORKS & DISMANTLE WORK 1.00 Lot Rp 5,358,000 Rp 282,000 Rp 5,640,000
II FURNITURE WORK 1.00 Lot Rp 309,594,550 Rp 16,294,450 Rp 325,889,000

Total Works I + II Rp 314,952,550 Rp 16,576,450 Rp 331,529,000


Total Works (Rounded) Rp 314,952,000 Rp 16,576,000 Rp 331,529,000
VAT 10% Rp 31,495,200 Rp 1,657,600 Rp 33,152,900
Grand Total Works Rp 346,447,200 Rp 18,233,600 Rp 364,681,900

Pembayaran dapat ditransfer ke:


Nama Bank : BCA
No. Rekening : 3450128570
Penerima : Wirhendy

Note: Term of payment :


- Contractor will do carry out the all items works as stated only. 50% : down payment
- Contractor will receive site area in proper & good condition. 35% : progress on going
- Owner should have the handover documents from building after the final check of existing site area 10% : upon completion
and
theshows
documents to the contractor. 5% : retention 1 month
- Project will be started after the Down Payment and Building Permit receive by Contractor.
- Time completion shall be in 1 (one) months after Contractor receive the Down Payment and
Building Permit have approved by Building Management.
- Quotation validity only for 2 (two) weeks.
- The payment should be made maximum within 7 (seven) days after invoice.
- Franco Jakarta.

Sincerely, Approved by,

Wirhendy Wijaya (isi sendiri)


PROJECT : FITTING OUT "........?"( isi sendiri)
LOCATION : Jl. .............( isi sendiri)
Daerah Khusus Ibukota Jakarta
Attention : Mr / Mrs ......... ( isi sendiri)

QUOTATION
Date : November 26, 2016

Supply + Install
No Scope of Work Specification Code Qty Unit Total Price
Unit Price (Rp)
(Rp)
I PRELIMINARIES WORKS & DISMANTLE WORK
1 Material and debris 1.00 ls 1,504,000 1,504,000

2 Cleaning work during & after construction 1.00 ls 752,000 752,000

3 Protection work 1.00 ls 1,128,000 1,128,000

4 Electricity during construction - Refer to the building regulation (by Owner) - ls By Owner

5 Water during construction - Refer to the building regulation (by Owner) - ls By Owner

6 Fit out deposit and construction fees - Refer to the building regulation (by Owner) - ls By Owner

7 Safety equipment and overtime works 1.00 ls 2,256,000 2,256,000

Total Work I 5,640,000

Page 2 of 3
Supply + Install
No Scope of Work Specification Code Qty Unit Total Price
Unit Price (Rp)
(Rp)

II FURNITURE WORK
A Built in Furniture
1 Cabinet Laundry, size max. 3970 x 600 x 3400 mm - Plywood fin. HPL ex. Taco 1.00 unit 68,201,000 68,201,000

2 Cabinet Laundry, size max. 4350 x 600 x 3400 mm - Plywood fin. HPL ex. Taco 2.00 unit 74,729,000 149,458,000

3 Cabinet Laundry, size max. 4500 x 600 x 3400 mm - Plywood fin. HPL ex. Taco 1.00 unit 77,306,000 77,306,000

4 Pilar, size max. 400 x 600 x 3400 mm - Plywood fin. HPL ex. Taco 3.00 unit 6,872,000 20,616,000

5 Pilar, size max. 600 x 600 x 3400 mm - Plywood fin. HPL ex. Taco 1.00 unit 10,308,000 10,308,000

Total Work II 325,889,000


Total Works I + II 331,529,000
Total Works (Rounded) 331,529,000
VAT 10% 33,152,900
Grand Total Works 364,681,900

Page 3 of 3