Alt. 1
I PRELIMINARIES WORKS & DISMANTLE WORK 1.00 Lot Rp 5,358,000 Rp 282,000 Rp 5,640,000
II FURNITURE WORK 1.00 Lot Rp 309,594,550 Rp 16,294,450 Rp 325,889,000
QUOTATION
Date : November 26, 2016
Supply + Install
No Scope of Work Specification Code Qty Unit Total Price
Unit Price (Rp)
(Rp)
I PRELIMINARIES WORKS & DISMANTLE WORK
1 Material and debris 1.00 ls 1,504,000 1,504,000
4 Electricity during construction - Refer to the building regulation (by Owner) - ls By Owner
5 Water during construction - Refer to the building regulation (by Owner) - ls By Owner
6 Fit out deposit and construction fees - Refer to the building regulation (by Owner) - ls By Owner
Page 2 of 3
Supply + Install
No Scope of Work Specification Code Qty Unit Total Price
Unit Price (Rp)
(Rp)
II FURNITURE WORK
A Built in Furniture
1 Cabinet Laundry, size max. 3970 x 600 x 3400 mm - Plywood fin. HPL ex. Taco 1.00 unit 68,201,000 68,201,000
2 Cabinet Laundry, size max. 4350 x 600 x 3400 mm - Plywood fin. HPL ex. Taco 2.00 unit 74,729,000 149,458,000
3 Cabinet Laundry, size max. 4500 x 600 x 3400 mm - Plywood fin. HPL ex. Taco 1.00 unit 77,306,000 77,306,000
4 Pilar, size max. 400 x 600 x 3400 mm - Plywood fin. HPL ex. Taco 3.00 unit 6,872,000 20,616,000
5 Pilar, size max. 600 x 600 x 3400 mm - Plywood fin. HPL ex. Taco 1.00 unit 10,308,000 10,308,000