CLIENT: Pryce Gas Incorporated
PROJECT : PGI LUGAIT 2000MT PV-2018-007 & PV-2018-008
INSPECTION DATE : June 30, 2021
Inspection Results

4units Dome with initial report of false indication of discontinuity at all the outer nozzles.

internal of pipe

Remarks: As per verification the signal detected is from the internal of


pipe and not due to any discontinuity inside the weld.
Recommendation and As Agreed: All UT reports will be revised as accepted, joints that has
been repaired will be R1 passed, and joints not yet repaired will be passed.

Inspected by : Inspected by : Noted by:

Joseph Molod Benzhar Boy P. Tubiera Cristina Bibera


MCC UT Technician Suntech QA/QC Manager