You are on page 1of 5

ANALYTIC PERFORMANCE SCORING RUBRICS FOR MARCOTTING

CRITERIA PERFORMANCE INDICATOR


95 90 85 80
40% Removal of bark Sphagnum moss is The wrapping with Manifestation of
and cambium layer rightly moist and plastic put the moss mishandling of
is performed enough quality. firmly to cover the Marcotting knife
correctly. whole marcot area. which result to
1. Workmanship A. Correct removal A. The wrapping of accident.
ofbark and plastic and moss is
cambium layer. properly done.
B. Incorrect B. Incorrect
removal of bark wrapping of plastic
and cambium layer. and moss and not
firmly covered.
25% Marcotting is Marcotting knife Use of blunt knife in Manifestation of
2. Proper Used of Tools and successfully used is sharp enough the operation. mishandling of
Materials performed with the to produce a clean Marcotting knife
used of standard cut. which result to
tools and materials. accident.
15% The handling of Shows incorrect Manifestation of the Manifestation of
3. Safety Measure Marcotting knife handling of improper placement mishandling of
indicated skills on Marcotting knife and and use of Marcotting knife
safety. handling of scion. Marcotting knife. which result to
accident.
15% Performed with Performed with Performed with Performed with
4. Speed and Accuracy accuracy on or accuracy 5 minutes accuracy 8 minutes accuracy 10 minutes
before time. after the time. after the time. after the time.
5% Performed with Able to Able to Able to
accuracy on or discuss/explain with discuss/explain with discuss/explain with
before time. confidence 3 of the confidence 2 of the confidence 2 of the
5. Communication skills (3- following: following: following:
5minutes only) A. Process A. Process A. Process A. Process
B. Function of B. Function of tools B. Function of tools B. Function of tools
tools materials and materials and materials and materials and
equipment equipment equipment equipment
C. Cost of C. Cost of C. Cost of C. Cost of
production production production production
D. Business D. Business D. Business D. Business
opportunity opportunity opportunity opportunity

PREPARED BY:
JOMEL P. CARLOS
ANALYTIC PERFORMANCE SCORING RUBRICS FOR GRAFTING

CRITERIA PERFORMANCE INDICATOR


95 90 85 80
1. Both scion and 1. Was able to 1. Incorrect chosen 1. Used immature
stock are of the same choose mature matured scion (light green in
size and maturity. scion. ( dark green scion/infected with color)
2. Scion and stock color with alive molds and aphids. 2. Made two or
are neatly cut to buds) 2. One slice of scion more slices of scion.
shape correctly clip 2. Perfectly done in making the wedge 3. Tying is done
for stock and wedge and precision cut on cut. below the incision
for scion. the scion in making 3. The removal of area covering the
1. Workmanship 40% 3. Scion is inserted the wedge for scion. scion from the stock whole part of the
to the stock and 3. Not detached or show that it is scion
securely tied by the removed from the insecurely tied by 4. Poorly done,
budding tape. stock while the grafting tape. unwrapped contact
4. Grafting tape is contestants lifts or 4. Not neatly done point.
applied correctly pull up the scions. and there is space in 5. Followed
starting from the 4. Correctly done wrapping the scion standard procedure
point of contact and neatly done 5. Followed correctly applied
upward. wrap the contact standard procedure ( refer to nos. 1 to 2)
5. Standard point. correctly applied
procedures in 5. Followed (refer to nos. 1 to 3)
grafting are properlystandard procedure
applied. correctly applied.
(refer to nos. 1 to 4)
Grafting was Grafting knife used Use of blunt knife in Did not use standard
2. Proper Used of Tools and 25% performed/done with is sharp enough to the operation. tools and materials
Materials the use of standard produce a clean cut.
tools and materials.
The handling of Shows incorrect Manifestation of Manifestation of
3. Safety Measure 15% grafting knife and handling of grafting improper placement mishandling of
handling of scion is knife and handling and use of budding grafting knife which
correctly done. of scion. knife. result to accident.
Performed with Performed with Performed with Performed with
4. Speed and Accuracy 15% accuracy on or accuracy 5 minutes accuracy 8 minutes accuracy 10 minutes
before time. after the time. after the time. after the time.
Able to Able to Able to Able to
discuss/explain with discuss/explain with discuss/explain with discuss/explain with
confidence 3 of the confidence 3 of the confidence 2 of the confidence 2 of the
5. Communication skills (3- following: following: following: following:
5minutes only) A. Process A. Process A. Process A. Process
5% B. Function of tools B. Function of tools B. Function of tools B. Function of tools
materials and materials and materials and materials and
equipment equipment equipment equipment
C. Cost of C. Cost of C. Cost of C. Cost of
production production production production
D. Business D. Business D. Business D. Business
opportunity opportunity opportunity opportunity

PREPARED BY:
JOMEL P. CARLOS
ANALYTIC PERFORMANCE SCORING RUBRICS FOR BUDDING

CRITERIA PERFORMANCE INDICATOR


95 90 85 80
Removal of the bud Inverted T incision Insertion of the buds Bbudding tape is
eye from the scion is in the stock is assures full contact correctly starting
correctly done. (not correctly performed. of both scion and below the point of
so thin, not so thick stock. contact going
and not so bulging) A. insertion of the upward.
bud is done exactly. A. Perfectly done
1. Workmanship 40% B. Insertion of the and neatly tied from
bud eye is not the point of contact
exactly done. going upward.
C. Both scion and B. Th tying of tape
stock is not in full is loose and not
contact. neatly done.
D. Insertion of the C. poorly and not
bud eye is poorly correctly done.
done.
Budding was Budding knife used Use blunt knife in Did not use standard
2. Proper Used of Tools and successfully is sharp enough to the operation. tools and materials.
Materials 25% performed with the produce a clean cut.
use of standard tools
and materials.
The handling of Shows incorrect Manifestation of Manifestation of
3. Safety Measure 15% budding knife handling of budding improper placement improper placement
indicated skills on knife. and use of budding and use of budding
safety. knife. knife.
Performed with Performed with Performed with Performed with
4. Speed and Accuracy 15% accuracy on or accuracy 5 minutes accuracy 8 minutes accuracy 10 minutes
before time. after the time. after the time. after the time.
5% Able to Able to Able to Able to
discuss/explain with discuss/explain with discuss/explain with discuss/explain with
confidence 3 of the confidence 3 of the confidence 2 of the confidence 2 of the
following: following: following: following:
A. Process A. Process A. Process A. Process
5. Communication skills (3- B. Function of tools B. Function of tools B. Function of tools B. Function of tools
5minutes only) materials and materials and materials and materials and
equipment equipment equipment equipment
C. Cost of C. Cost of C. Cost of C. Cost of
production production production production
D. Business D. Business D. Business D. Business
opportunity opportunity opportunity opportunity

PREPARED BY:
JOMEL P. CARLOS

You might also like