NAME CHAINAGE LOCATION X Y Z DEPTH START FINISH OBSERVATION

ABH29 9+300 433208.935 2929173.142 125.066 7.5 01-05-2021 01-05-2021 Bore Hole depth terminated 7.5 m, permeability @ 3.0 m
ABH1 9+450 START OF C&C / GAUR HOUSE 433344.315 2929099.424 124.919 11 29-04-2021 29-04-2021 Bore Hole depth terminated 11 m, permeability @ 4.0 m
C&C / RAMP
ABH2 9+550 C&C / TOILET AREA 433425.524 2929081.62 126.699 17 03-05-2021 04-05-2021 Bore Hole depth terminated 17 m, permeability @ 8.0 m
ABH3 9+650 SHAFT START / BARA NIGAM PARK GATE 433502.267 2929039.086 126.624 18 26-04-2021 27-04-2021 Bore Hole depth terminated 18 m, permeability @ 8.0 m
ABH4 9+805 INSIDE BARA PARK END 433643.258 2928979.323 126.574 22 30-04-2021 01-05-2021 Bore Hole depth terminated 22 m, permeability @ 10.5 m
TBM Tunnel & Crosspassage
ABH30 9+910 433749.875 2928871.498 127.504 23 01-05-2021 03-05-2021 Bore Hole depth terminated 23 m, permeability @ 12 m
PABH5 10+100 CHUNNI GANJ / PROPOPSED ENTRY 3 433823.182 2928780.487 127.524 27 29-04-2021 30-04-2021 Bore Hole depth terminated 27 m, permeability @ 5.0 m
ABH6 10+151 CHUNNI GANJ / MID OF STATION NEAR ATM 433871.864 2928692.039 127.143 47 29-04-2021 02-05-2021 Bore Hole depth terminated 47 m, permeability @ 8.0 m
STATION
ABH7 10+200 CHUNNI GANJ/ INSIDE ANCILLIARY BUILDING AREA 433958.689 2928700.361 126.697 27 26-04-2021 28-04-2021 Bore Hole depth terminated 27 m, permeability @ 10.0 m
ABH8 10+263 CHUNNI GANJ/ INSIDE ANCILLIARY BUILDING AREA 434006.235 2928671.964 126.414 27 23-04-2021 25-04-2021 Bore Hole depth terminated 27 m, permeability @ 13.5 m
PABH9 10+331 INSIDE LAL IMLI PREMISES (AK TRIPATHI HOUSE) 434075.324 2928643.801 126.332 21 26-04-2021 27-04-2021 Bore Hole depth terminated 21 m, permeability @ 7 m
ABH 31 10+510 434225.952 2928578.337 125.518 23 30-04-2021 01-05-2021 Bore Hole depth terminated 23 m, permeability @ 12 m
ABH10 10+650 OPPOSITE KESCO OFFICE 434342.816 2928520.125 126.151 24 04-05-2021 05-05-2021 Bore Hole depth terminated 24 m, permeability @ 13.5 m
TUNNEL
ABH11 10+733 CROSS PASSAGE LOCATION (PPN COLLEGE) 434508.386 2928446.844 126.062 25 16-05-2021 16-05-2021 Bore Hole depth terminated 25 m, permeability @ 17 m
ABH12 10+886 TITAN EYE PLUS OPPOSITE 434558.943 2928419.995 126.080 23 14-05-2021 15-05-2021 Bore Hole depth terminated 23 m, permeability @ 12 m
ABH32 11+060 434737.134 2928400.153 126.304 27 02-05-2021 03-05-2021 Bore Hole depth terminated 27 m, permeability @ 3.5 m
PABH13 11+092 NAVEEN MARKET / CRYSTAL PARKING LAWN 434710.280 2928339.514 126.785 27 23-04-2021 25-04-2021 Bore Hole depth terminated 27 m, permeability @ 6m
ABH14 11+150 STATION NAVEEN MARKET / NOVELTY CORNER FRONT 434832.896 2928358.164 126.140 47 07-05-2021 10-05-2021 Bore Hole depth terminated 47 m, permeability @ 11m
ABH15 11+192 NAVEEN MARKET/ NEAR PARADE GROUND MARKET ENTRY 434877.600 2928322.695 126.269 27 06-05-2021 07-05-2021 Bore Hole depth terminated 27 m, permeability @ 14m
ABH16 11+352 NEAR LAND MARK HOTEL 435020.197 2928319.729 125.993 22 14-05-2021 15-05-2021 Bore Hole depth terminated 22m, permeability @ 11m
ABH17 11+500 TUNNEL NEAR THAGGU LADU SHOP 435204.734 2928260.056 125.505 23.5 15-05-2021 15-05-2021 Bore Hole depth terminated 23.5 m, permeability @ 13m
ABH33 11+615 435310.477 2928252.535 125.663 24 16-05-2021 17-05-2021 Bore Hole depth terminated 24m, permeability @ 17m
ABH18 11+760 BADA CHAURAHA / ELDECO LAND INSIDE 435425.387 2928185.076 123.952 47 26-04-2021 29-04-2021 Bore Hole depth terminated 47 m, permeability @ 3.0 m
ABH34 11+810 435466.533 2928206.804 124.566 27 12-05-2021 13-05-2021 Bore Hole depth terminated 27 m, permeability @ 8 m
STATION
ABH19 11+860 BADA CHAURAHA / CHRIST CHURCH COLLLEGE PARKING 435486.347 2928162.197 124.513 27 23-04-2021 25-04-2021 Bore Hole depth terminated 27 m, permeability @ 10.5 m
PABH20 11+971 BADA CHAURAHA / CHRIST CHURCH COLLEGE OPEN PLOT 435611.743 2928150.398 124.842 27 07-05-2021 08-05-2021 Bore Hole depth terminated 27 m, permeability @ 10.5 m
ABH21 12+120 IN FRONT OF GOLD GYM 435760.221 2928055.737 123.814 22 16-05-2021 17-05-2021 Bore Hole depth terminated 22 m, permeability @ 10 m
ABH22 12+300 CROSS PASSAGE / BSNL PREMISES 435903.126 2927934.874 125.516 24 07-05-2021 08-05-2021 Bore Hole depth terminated 24 m, permeability @ 13m
ABH35 12+410 435981.011 2927844.037 125.359 24 19-05-2021 21-05-2021 Bore Hole depth terminated 24 m, permeability @ 15m
TUNNEL
ABH23 12+545 BUILDING AREA 436072.279 2927828.32 126.116 23.5 19-05-2021 20-05-2021 Bore Hole depth terminated 23.5m, permeability @ 18m
PABH24 12+703 BACK SIDE CALCUTTA INSURANCE 436163.302 2927609.215 127.237 23.5 13-05-2021 13-05-2021 Bore Hole depth terminated 23.5 m, permeability @ 13m
ABH36 12+860 436148.043 2927474.817 127.178 22 12-05-2021 13-05-2021 Bore Hole depth terminated 22 m, permeability @ 16 m
ABH25 12+964 NAYA GANJ / NAVROZ BUILDING FRONT 436163.561 2927362.848 127.418 27 10-05-2021 11-05-2021 Bore Hole depth terminated 27 m, permeability @ 3.5m
ABH26 13+014 NAYA GANJ / CHILD DR. CLINIC 436148.563 2927308.765 127.310 27 10-05-2021 11-05-2021 Bore Hole depth terminated 27 m, permeability @ 8m
STATION
PABH27 13+090 NAYA GANJ / NEAR BP PETROL PUMP 436166.634 2927237.524 127.782 47 09-05-2021 12-05-2021 Bore Hole depth terminated 47 m, permeability @ 12m
ABH28 13+152 NAYA GANJ / PROPOSED ENTRY 2 LOCATION 436138.791 2927172.584 127.653 27 08-05-2021 09-05-2021 Bore Hole depth terminated 27 m, permeability @ 15m