CHAIN SURVEYING

12. If the smallest division


Objective Iype Guestions longer
on the vernier is
than the smallest division
on ihe
1 The main scale it is known as
process of
determining the relative
positions on the earth's
surface by means :Retrogradevernier
of 13. If the
direct indirect measurements
or slope of ground is up to
of
distance, direction and elevation is degrees, it is generally taken as level
ground 3
Surveyingg P14:
2. Surveying Generally area is less
is the art of
determining than. are
. . . OT
treated as plane : 260 sq.km
objects on the suface of the earth
15. Geodetic survey is preferred when the
Relative position of land exceeds
area
3. The main
object of
surveying is to obtain
.of the area to be surveyed :100sq.miles or 260 sq.km
16. Geodetic surveying is different from
Map or Plan piane
4. Surveying because of
The rafio of map distance to the
Curvature of earth
corresponding ground distancee is 17. The polar axis is
independent of
shorter than the equatorial
the units of measurements
is called
axis by 42.95km
Representative Fraction (R.F.) 18. Relative to the diameter of the earth
5. On the polar
preparation of a map the scale axis is less than ... 7 0.34
Used is Small
6. On the
19The circle defined by the intersection of
preparation of a plan the scale level line is known
Used is ..
as Great circle
:Large 20. Difference befween the sum of the
7. In a . . angles
SCale, it is possible to measure two of
spherical triangle on the earth's surface
dimensions only Plain and angles ofthe coresponding plane
8. On a.. SCale. is possible tomeasure triangle for every 195.5km.sq. :1 sec
three dimensions :Diagonal 21. The of
length 12 kilometres long lying
an arc
9. If the smallest division on the Vernier is in the earth surface is only ..greater thn
shorter than the smallest division on the ihe subtended chord :1 cm/0.01m
main scole it is known as.... :Direct Vernier The
22. length of an arc 18.2 kilo metres long
10. A Vernier is one which cxtends or lying in the earih sUrface is only .. greater
increases in ihe opposite direction as that than the subtended chord : 10 cm/0.1m
of the main scale Retrograde Vernier 23. The lengtn of an arc 54.3 kiomeres long
1. A Vernier is one which exiends or ving in the earth surface is only.grceate
IncreaseS in the same direction as that of tnan the subtended chord

ihe main scale : Diiect Vernier : 30 cm/ 0.3m

Civilianz, Thyvila Road, Near Ayurveda College Jn.+rivandrum. www.civilianz.com 949 74 98 415/ 416 /417

A. revenue chain

Jn.Trivandrum.
www.civilianz.com 949 74 98 415/ 416/417
Near Ayurveda College
Civilianz, Thyvila Road,
sUrveys deals with the
Iying 36. Hydrographical
24. The length of an arc 91 kilometres long
:Large water bodies
than mapping of
in the earth surface is only.. greater
minerals
37. The survey used to explore the
the subtended chord 50 cm /0.5m
is SUch as gold, silver, coal, copper etc. are

25. In plane Surveying the level line


considered as ... and all plumb lines are called :Minesurvey
relics oof
considered as .. :Straight, Parallel 38. The survey which is used to unearth

In geodetic survey allines in ihe surface are antiquity to know the history of human
26.
civilization in the past is
... lines and the triangles are triangles
Archaeological survey
Curved, Spherical
The main principle of surveying is to work 39. SUrveying are made in connection with
27.
the construction of streets water supply
from Whole to part

28. In survey when work is done from part to whole, Schemes, sewers and other works
the smaller eror are Magnified City
29. The preliminary inspection of the area to be 40. Jhe determine the points of strategic

Surveyed is called Reconnaissänce importance of the enemy for both offensive

30. Surveys which are carried ouf to depict and defensive point of view is

mountains. rivers, water bodies, wooded Military survey


areas and other cultural details are known 41. Which SUrveyors are Conducted or

as : Topographical survey determining different strata's in earth's crust


31. In order to determine the natural features :Geologicalsurvey
such as valleys, rivers, lakes etc. the 42. Which sunvey is conducted for locating

Surveying preferred is additional details such as boundaries of

Topographical survey fields :Cadastral survey


32. The survey, where curvature of the earth is 43. For the determination of Mean Sea Level

faken in to account :Geodeticsurvey Survey is Conducted

33 Surveys which are caried out to provide a : Marine/Hydrographic


notiondl grid of control for preparation of 44. The astronomical survey is Used for

accurate maps of large areas are known as determining the absolute locaion of a

point or the absolute location and direction


Geodetic survey
34. For the transfer of land property from one of any line on the..

Owner fo another SUrvey is conducted Surface ofthe earth


:Cadastral survey 45 survey is under taken for the

35 Revenue chain is comnonly Used for detemination of quantities or to afford

measuring ficld in :Cadastral survey sufticient data for the designing of

Civitianz, Thyvila Road, Near Ayurveda College Jn.Trivandrum. www.civilianz.com 949 74 98 415/ 416/ 4172
odd fup

he

engineering worksS 58. The of acCuracy in chain sUrvey


degree
46. The
Engineering survey under in average condition is
method of surveying in which the :1 in 500
length of lines are measured directly in the 59. For measurements over rough or somewhat
field with chain is
hilly ground the permissible error is
:Chainsurveying :lin250
47. In surveying all measurements of distance 60. The lateral distance measured on either
are Horizontal side of the chain line up to the objects are
48. The principle of chain surveying is known as Offsets
Triangulation 61. The distance measured at right angles to
49.. is the simplest figure which can be plotted the chain line from the object are known as
v. .
from known length of sides :Perpendicular/ Right ofsets
Triangle 62. All offsets which are not to right angles to
50. The system of lines or triangles covering the the main survey line are known as
area to be surveyed is called . of survey Oblique / Tie line offsets
Skelton or frame work 63. The process of locating objects with
51. The principle of
chjain surveying is to divide reference to the main chain line
the areá in to networkof Offsetting
Triangle 64. The operation of measuring Iateral distance
52. A triangles is said to be well conditioned if from the chain line to the objecis which are
none of its angle is less than :30° to be plotted is known as
53. All the angles of a well,conditioned or well :Offsetting
shaped triangle are 65. The simplest form of cross staff is
:Greater than 300 and less than 1200 :Open cross staff

54. A triangle whose sides are in a proportion of 66. Angles of 45° with a chain line may be e t

3,45IS Out with :French cross staff

Right angle triangle 67. The cross staff which consist of

55. The degree of acCuracy for measurement octagonal brass tube with slits on all

with invar fape eight side is : French cross staff

:1 in 10,000 68. The distance belween any wo slits

56. The degree of accuracy for ordinary french Cross staff is about :8 cm
meosurement with steel lape 1 in 1,000 69. The instrument used for setting out ight

57. The degree of accuracy for measurements angles on the lines are

made wilh tested chain cross staff/ Optical square/ Ptrism squaie

1 in 1,000

Civilanz, Thyvila Road, Near Ayurveda College J.livandrun www.civitanz.com 949 74 98 415/416/417
chain survey
accuracy
in
The degree
of
58.
engineering works condition iS
under in average

Engineering survey :1 in 500


in which fhe somewhat
46 he method of surveying measurements
over rough or
59. For
measured directly in the is
length oflines are the permissible
error
hilly ground
field with chain is 1in 250
: Chain surveying measured on either
distance
measurements of distance 60. The lateral
47. In surveying all to the objects are
side of the chain line up
:Horizontal
are :Offsets
known as
The principle of chain surveying
is
48. fo
61. The distance measured at right angles
Triangulation
the chain line from the object are known as
49. ..is the simpiest figure which can be plotted
: Perpendicular/ Right offsets
from known length of sides
62. All offsets which are not to right angles to
Triangle
50 The system of lines or triangles COvering the the main survey line are known as
area to be surveyed is called... of survey :Oblique/Tie line offsets
: Skelton or frame work 63. The process of locating objects with
51. The principle chain surveying is to divide
of reference to the main chain lin
the area in to network of
Offsetting
Triangle 64. The operation of
52. A
measuring lateral distance
triangles is said to be well
conditioned if from the chain line to the
none of its is less than
objects which are
angle : 30° to be plotted is
53. All the angles of a well
known
as
conditioned or
wel
shaped triangle are Offsettingg
65 The simplest form of cross staff is
Greater than 300 and less than 120
54 A
triangle whose sides are in a proportion of Open cross staff
66. Angles of 45° with
3,4.5 is .... achain line may be set
OUt with
Right angle triangle French cross staff
55. The 67. The
degree of
acCuracy for measuremeni
croSs staff which Consist of
with invar fope
octagonal brass tube with
slits on all
:1 in 10,000 eight side is th
56. The
degree of 68. The
French cross staff
acCuracy for distance between
meosurenmenf with steel tape ordinary French cross staff is
any two slits
57. The degree of 1 in 1,000 69. The
about
:8 cm
accuracy for
measurements instrument used for
made with tested
chain angles on the lines are setting oUt right
:1 in 1,000 cross staff /
Optical square/ Prism
Civilianz, Thyvila Road, Near square
Ayurveda College Jn.lrivandruin.
www.civilianz.com 949 74 98
415/416/417
LIVIsi,
Standard specification the
The optical square is made based up on 83. As per Indian
70.
chain should have
overall length of a 30m
the principle of : Reflection
8
71 In order to set out right angles with the an accuracy of. mm
84. Base line measurement
is done by
optical square the two mirors in the
:Chain
optical square must make an angle . . with

Chain surveying is most suitable where the


each other :450 85.
to be surveyed is in extend
The angle between the index line and the
. . . .

area
72.
: Small
horizon line is 450
The angle between the horizon mirror and 86. Check line in chain suveying are essentially
73.
the horizon sight of an optical square is required to indicate

1200 :Correcfness of survey workK


100 links chain, the amount. is
74. The angle between the index mirror and the 87. For a
called as the hypotenusal allowance for a
index sight of an optical square is

:1050 sloping ground having of slope 0°.

75. ... is based on the same principle as the 100(sece-1)


optical square and is used in the same 88. The correction per chain length of 100 links
alonga slope of 60 is given by
manner
:Prismsquare
76. A Short offsets does not have its length 1.502 100links
greaterfhan 15metres5 89. The correction per chain length of 100 links
77. The offset rod is used for taking along a slope of 10 is given by

Short :Shortoffsets 1.5 links


90. The correction per chain length of 100 links
78. A metallic tape is made of
:Cloth and metal wires along a slope of '6'radians is given by

An eror that always follows some definite 50 02links


79
mathematical or physical law is known as 91. Correction per chain length of 100 links
along a slope having a rise of 1 unit in 'n'
Systematic error
horizontal units is : 50+n2 links
Accidental erors follow a definite law
80.
When the length of a chain along a slope
: Law of probability 92.
known as..
Standard specification every of e is 't, the correction for slope required
81 As per Indian
should have an acCUIaCy of S :2 e sin2 (9/2)
metre chain
2 When 'h' is the ditterence in heights
N n
93
the between the the extremities of a chain
Indian Standard specification
82. AS per
d ZUm chain should have length " , the corection for slope required
oT
overall lengih
mm t5 S :h2/2
an acCUrOCy 1...

College Jn.Trivandrum
www.civilianz com 949 74 98 415/416/417
NearAyurveda
Road,
Civilianz, Thyvila

ce in
too short the measured
106. If the chain
94.
Comection for temperature is calculated
disfance is...he actual distance
from the equatioon C=a (Tm To)L
that occur in chaining are Larger
95. Cumulative errors
distance
:L 107. If the chain too long the measured
proportional to
is...he actual distance
Corection for pull or tension is calculated
96.
:Shorter
from the equation Cp(P- Po) L/A.E
we work from part to the whole, error get
108. If
A tape of length
'L' and weight 'W' kg/m is
97. : Increased
with a pull of 'P' kg.
sUspended at its ends errors are of
109. AGcidental or compensating
The sag comection is VL
length "L" are proportional
24 n2P2, (L w2) + 24 n2p2
(L3 wa)+ 110. Number links per metre length of a metric
remains after mistakes and
98. Errors which :5
are
chain is
errors have been eliminated
systematic
111. As per Indian
standards, the length of one
:Accidentalerror 20cm
link in metric chain
For 100 links chain, a change of 15°F in
99. Sq.yards
Sq.fe
112. One sq.m
will produce a change in
temperature
Sq.Inch

lengthabout....links :0.01 1.196, 10.7639, 1550

is accompanied by
100. Generally one chain
113. One are is equal to...sq.mn
. arrOWS

as
100 s.m
fape is foo long
101. If a measuring
is egual fo..Are
the error will be 114 One hectare
compared to standard,
100 aree
known as 115. One hectare is equal to . . .Sq.m.
Instrumental / N e g a t i v e eror

are not :10000 sq.m


102. In . . ranging, the end stations acres.
116. One hectare is eqUalf o .
intervisible
Reciprocal
visible
: 2.47acres
103. If both ends of a chain line can be
about :40.47m2
the chain117. One cent is equal to
only any intermediate point on

by mixing 64% of steel and 3 6 of


is 118. The alloy
line, the ranging
can be done :Invar
nickel is
:Reciprocal
ranging themal expansior
119. The co-efficient of
number of ranging rods
104. For indirect ranging :0.9x 10-4/°C
invar steel is
required is :4
120. The area ot any iregular figure of plettcd
chain line cannot be
105. If both ends of
a
with :Planimeter
ihe map is measured
visible from any intermediate points,
at the end of the chain is
121. The brass handle
chaining of that lirne can be donG by
piOVided willh.... JOnt Swivel
Random line method

Irivanirum.
www.civilianz.comm 949 74 98 415/416 /41.
Near Ayurveda College Jn.
Civilianz, Thyvila Road,
USEd fo measure the
which is
137. The chain
in
122. The chain is made
of steel wire of **

miles and furlongs is


distance in
diameter
4mm :Gunter's chain
the forward end whose limit that a
123. The chainman at maximum
allowable
138. The
value
drags the chain forward is called from the true
measurement may vary
Leader : Permissible error
is called
at the rear end of the chain are
124. The chainman 6m length
139. The ranging rod having 4m to
:Follower
is called
called
Ranging poles
length less than peg interval
125. The chord of a
chain a r e made of
140. The straight links of
is known as Sub-chord :Galvanized mild steel
conditions will
126. An eTor that under the same in
to denote a
141. The symbol A is used
. . .

always be of the same


size and sign is
the field book Main station
Systematic error reinforced
for the 142. The tape made of linen cloth
127. The diameter of steel wireUsed
with brass or copper wire is called
fabrication of arrows is 4mm
128. The line used in chain survey to avoid long Metallic tape
chain is.... SOUrce
offsets are called : Tie line 143. Variable tension in the
129. The line which are. Used to take the interior of error Compensating error
is ddopted when
details which are far away from main line 144. Reciprocal ranging
IS encountered A hillock
are calied Tie line
130. The error due to the sag is. proporfional 145. Error due to sag in chain survey

to the square of the weight of the chain or : Positive error

146. Those errors which make ihe measured


tape. Directly
length less than the actual length
131. The eror inchaining which ocCur in either
Negative error
direction and tend multiply at the end is
: Cumulative 147. Sag corection is always Negative
called....eror
132. The fixed points selecied on the main 148. The length of a arow should be

the 395mm to 405 mmn


survey lines when it is necessary to draw
149. The primary object of survey is the
lines to subdivided the area for locating the
interior details are called preparation of a :Plan or Map

The of ihe ground and


Tie stations or subsidiary station 150. representation
on a hoizontal
133. The length of engineer's chain :100ft. object Up on it is projeCted
in a large scale is called
134. The length of revenue chain 33 ft. plane
: Plan
135. The lengtti of gunter's chain 66ft
136. The length of metric chain
20/30mir.

www.civilianz.com 949 74 98 415/416/417


Civilianz, Thyvila foad, Near Ayurveda CollegeJn.Irivandruin.
151. The length of a . . . is the distance 166. The instrument used for making the end of
between the centres of two consecutive each chain length during the process of
middle rings Link chaining Arrows
152. The chain is composed of 100 or 150 pieces 167. The operation of establishing infermediate
of galvanised mild steel wire 4mm in point on a straight line between he end

diameter is called Link points is known as Ranging


153. Two links are connected with 168. Direct ranging is possible only when the end

:Three circular or oval rings points are : Intervisible

154. In revenue chain, length of one link is 169. A small reflecting instrument Used for

: Line ranger
:2sfeet ranging
155. Number of links in Engineers chain :100 170. Error due to incorrect holding of chain

156. Number of linksin Revenue chain 1 : Compensating or personal error

157. Number of links in Gunier's or surveyor's 171. The error which are OCCur in the same

chain 100 direction and tend to add Up

158. Number of links on a 20m. Metric dhain is accumulate is called

100 Cumulative error


159. Number of links on a 30m. Metric chain is 172. The measured length is more than the

150 actual, the error is called :Positive error

160. The scale used to measure and toget out 173. The measured length is less than the actual,

angels is
: Scale of chord theerror is called Negative error
161. The difficulty and strain of counting the 174. In a triangulation frame work the . . i s the
faces maybe overcome by the use of an most important linee : Base line
instrument called Passometer 175. The line joining the apex of a triangle to sum
162. Average length of 80cm
d
pace fixed point on the opposite side is called
163. A simple device attached with the wheel of
:Check line
any vehicle and registers the number of 176. If chain gets out the correct line by a
revolution of the wheel is :Odometer perpendicular distance 'd' metre, the
164. The method of measuring distance with in ' metre length is d221
chain or tape is called :Chaining 177. The size of field book is
165. In metric chain fallies are provided at every :20 cm X 12 cmn
ength and.are provided at evey 178. An obstacle which obstructs both
chaining
metre length and ranging may be
Building
: 5m, brass rings 179. An obstacle which obstructs
chaining buf
not vision : River, Lake Elc.

Civilianz, Thyvila Road, Near Ayurveda College Jn.Trivandrum. www.civiiianz.com 949 74 98 415/416/ 417

Cterrestriar,
180. An obstacle which obstructs vision but not
maximum allowable limit that a
chaining : Hill 193. The
from the true
181. It is more convenient and measurement may vary
gives better
results while measuring horizontal value is... Permisslble error
on a map or in
distance.... by stepping method 194. Objects are represented
called
: Down the hill the field book by signs or symbols is

182. Drop arow is Used in .method of Conventional signs


195. The symbols which are drawn to natural or
SUveying Stepping
183. The distance of the object from the survey artificial details on a map is known as...

line is :Offset Conventional signs


be drawn the
184. In order to locket a point by oblique offsets 196. North point symbol must on

we must measure and not at least ********


plan... A the
t top pointing upward
197. In surveying the relative positions of points
distance Two
are located by measurements from at
185. The boundaries of the area that has to be

least Two points


calculated are assumed to be straight in
in position
Trapezoldal rule 198. To facilitate holding of arows
with the handie of the chain, by the
186. The boundaries of the area that has to be
calculated are assumed to be parabolic in provision of..
A groove is cut on the
Simpson's rule
187. The angle of slope are measured USIing outside surface of the handle
1acre is equal fo : 1 0square chain
Clinometer 199. .

188. The book in which the distance along the 200. 1furlong equals
chain, the offsetmeasurements andd 10Gunters's Chain
sketches of detail points are recorded 201. 1mile equals ..
80 Gunter's chain
Field book
189. The most commonly Used field book for 202. 1 hectare equals.* : 10000 mn2

ordinary Work is Double line 203. One nautical mle is equal to.* * *

190. ......field book is used for a comparatively :1.852km


scale and most detailed dimension 204. For accurate work, should aways bee
arge
work Single line preferable than chain

191. Topographical survey, cadastral survey Steel band

and city Survey included in... 205. The cquatoria! diometer of earth ... . . .

:Land survey 12756.75 km


generally available in 206. The polar diameter of eartn
192. Meiric chains are .

lengths of-
------- 5,10,20 and 30 m 12713.80 km

Civilianz, Thyvila Road, Near Ayurveda College Jn.lrivandrum. www.civilianz.com 949 74 98 415 /416 /4178
OVR MARCH 10/06/2018
MODEL TEST

D oblique photography
increases in
T h e main object of surveying is to obtain . . . o f
9 A . . Vernier is one which extends or

the area to be surveyed the opposite direction as that of the main scale

A. Reference sketch A. Direct vernier

B.Linesketch Retrograde Vernier


Map or Plan C. Plain scale
D. D. Computing scale
Key plan
the scale used is.. 10. North point symbol must be drawn on the plan..
2. On the preparation of a plan
Small
A. A. At bottom
Large B. centre
C. Medium
At the top pointing upward
D. same
area is less than are treated as D. At top right downward
3. Generally . . . .

plane 11. ...ranging,


the end stations are not inter

260 sq.km
visible
90 sq.km
A. Direct
C. 360sq.km
D. 100sq.km Reciprocal
of distance are
surveying all
measurements
4. In
C. Inverted
Horizontal
D. inclined
B. Vertical
C. Leve 12. If we work from part to the whole, error get
D. Curved
from one owner
AIncreased
5. For the transfer of land property
conducted
B. Decreased
to another.... Survey is

A. Mine sunvey C. Remains same

BCity survey D. doubled


Cadastral survey end of the chain is
13. The brass handle at the
D. Topographic survey
to the corresponding provided with.... joint
6. The ratio of map distance
units of
ground distance is independent of the Swivel
measurements is called
B. Jewel
A.Representative factor
B. scale
C. Tight
Representative Fraction (R.F.) D. loose
D. Representative value chain
14. The length of
revenue

10m on the
7. When 1 cm on a map represents
33 ft.
8round, the RF of the scale
B. 66ft
A. 1/10
B. 1/100 C 30m
1/1000 D. 32ft
D. 1/10000
used to measure the distance in
example of 15. The chain which is
8. Google maps is an

Satellite images miles and furlongs IS

8 Aerial photography A. revenue chain


C terrestrial photography

Civilianz, Thyvila Road, Near


Ayurveda College
In.Trivandrum.
www.civilianz.com 949 74 98 415/416/417
1
MODEL TEST oVRMARCH 10/06/2018
B. Engineers chain
B. Moulding brick earth
Gunter's chain
Tempering brick earth
D. Metric chain
D. All the above
16.
Reciprocal ranging is adopted when
22. The minimum
compressive strength of 1st class
***** S

encountered bricks should be


A. 75 kg/cm
A. building
B. 99 kg/cm
A hillock
1 0 0 kg/cm2
C. Sea
23. Pick up the
120 kg/cm
D. tree constituent of good brick earth whose
excess causes the raw
17. bricks shrink and
Sag correction is always warp
during drying.and burning, from the following:
Negative Alumina
B. Positive B. Lime
C. Ironoxide
C. No change
D. Magnesia.
D. additive 24. For making bricks which of the following is good
18. A simple device attached with the wheel of
any B.
AWeathered clay
Unweathered clay
vehicle and registers the number of
revolution of C. Silted clay
the wheel is
. Black cotton soil
25. The main
Odometer fupction of alumina in brick earth iss
B. Passometer Impart plasiticity
B. Increase durability
C. Speed governor C. Prevent shrinkage
D. pedometer D. Increase impermeability
26. Swelling of bricks
19. An obstacle which is known as
obstructs both chaining
ranging may be
and
ABloating
B. Lamination

A. River C. Chuffs
D. Efflorescence
B Tree 27. The wall in different
directions united at places
C. hill known as?
A. jenction
Building B Connections
20. For accurate work, should always be C. corner
preferable than chain . D. joints

28. Inclined surfaces of brick


Steel band masonry should be
checked by means of
B Tape A. spirit level
C. Cloth tape N WOoden templates
C. straight edge
Invar tape
D. gauge rod
21. The pug mill is used for 29. Bond which consists of aiternate
courses of
A.Softeningbrick earth headers and stretchers is known as

Civilianz, Thyvila Road, Near Ayurveda College Jn.Trivandrum. www.civilianz.com 949 74 98 415/ 416/ 417
MODEL TEST OVR MARCH 10/06/2018

English bond 37. For providing windscreen of cars, buses and other
Sipgle flemish bond
Double Flemish bond
automoileyehicles, the g'ass usedis
1 Sheet glass
D. Diagonal bond
30. A solvent BPlate glass
commonly used for oil paint is C. Laminated glass
A.jinseed oil D. Flint glass
turpentine 38. The glass used for display windows of jewellery
C. petrol shops is
D. tar A. Sheet glass
31. Materials used for the protect the surface of Laminated glass
structure are known as C. Wired glass
A. solid materials D. Lead glass
protective materials 39. Bullet proof glass
C. cementing materials A. Has iron wires embedded in its
D. None of these structures
32. Which of the following is not used as a vehicle of oil
BA made ofthick glass sheets
borne paint sandwitched by a layer of high tensile
water plastic
B. boiled linseed oil C. Is covered by steel sheet from inside
C. raw linseed oil D. None of the above
D. poppy oil 40. Glass panes can be cleaned by
33. Which of the following is a drier used in oil borne A. Methylated spirit
B. Rubbing finely powdered chalk
paint
A. linseed oil C. Rybber damp salt
B. ung oil Any of the above
litharge 41. A chapter of Economic survey 2017-18 has been
D. titanium white specifically devoted to -

34. The surfaces painted with can stand extreme A. Agriculture and Rural Development
degrees of cold and heat Clothes and shoes
aluminium paint C. Sun Rising Industries
B. asbestos paint D. Infrastructure
c e l l u l o s e paint 42. he recently published book "She Walk, She Leads"
D. luminous paint is written by
35. Bullet proof glass is made of thick glass sheet Gunjan Jain
sandwiched by a layer of B. Nita Ambani
A. Steel C. Chanda Kochha
B. xainless steel D. Mala Sen
high test plastic 43. Dipa Karmakar was recently in news, she is
D. chromium plate. associated with
36. Density of glass is A. Badminton
A. 25.1 kN/nm' B Tennis

24.3 kN/m C. Chess


22.4 kN/m Gymnastic
D. 0.8 kN/m 44 An United Nations' report entitled, "leave No One
Behind" specifically deals issues related to-

Civilianz, Thyvila Road, Near Ayurveda College In.Trivandrum. www.civilianz.com 949 74 98 415/ 416/ 417
3
MODEL TEST oVR MARCH 10/06/2018
Women & girls
B. Children
C. Refugees
D. Persons with
different abilities
45. Whid team has won
Santosh Trophy 2017 football
tournament
A. Goa
B. Manipur

C Pyjab
West Bengal
46. Central Drug Research Institute is located at
A. Nagpur

Mysore
Lucknow
D. Mumbai
47. The First Round Table Conference
was held on:
ANov 12, 1930
Dec 12, 1937
C. Oct 12, 1930
D. Nov 12, 1937
48. Which article authorizes the Parliament to form a
new state by separation of territory from any
state?
AArticles 3
B. Articles 13
C. Articles 23
D.
Articles 33
49. Nishi Vasudeva is the first lady to head an oil
company. The name of this oil company is:
A. IOC
BPCL
ONGC
DHPCL
50. Which date declared International Day of
was
for
Sport
Development and Peace in 2013
A.
Aphil 5

April 6
C. April 7
D. April 8