Professional Documents
Culture Documents
HOW TO MAKE DOOR; 100 MM PAALAYO SA POSTE THEN, OFFSET 50, THEN LINE PATAAS TO MAKE
TRIANGLE, 900-1000 DISTANCE, THEN CIRCLE AND TRIM.
ELEVATION:
DOORS – H = 2100 W= 600,900,1000
WINDOWS – H = 1200 W=1000 (WINDOWS ELEVATION FROM THE GROUND IS 900)
WALLS – H=2700 (PLUS GRPOUND ELEVATION OF 400 = 3100 WALL HEIGHT)
COLUMNS – H= 3100 (2700 + 400 = 3100 COLUMN HEIGHT)
PAANO GUMAWA:
Front elevation : YUNG FLOOR PLAN TAS DUN MAGLILINE NG VERTICAL AND HORZONTAL LINE (TO
REPRESENT NATURAL GRADE LINE) PARA MAHUGIS
YUNG BAHAY NA BOX. THEN COPY THE LINE SA MGA KANTO NG BAHAY Tas FILLET THEN PARA RIN SA
HUGIS NG PINTO
Finish FLOORING – HIDDEN LINE
FROM FINISH FLOOR LINE – OFFSET 2700 (standard height residential) TOP OF BEAM
TOP OF BEAM YUNG BANDA SA PINAKATAAS NG ELEVATION PAGAANUHAN NG BUBONG BAGO
MAGGAWA NG PINTUAN OR BINTANA
LINE LINE LANG PABABA MULA SA WINDOWS AND DOORS DISATNCE THEN YUNG DIMENSION N A900 SA
WINDOWS.
After that kunin ulit elevation tas dun ilaline kine yung gawang roof.
TYBEAM –
GALING SA FOUNDATION PLAN WHICH IS YUNG MAY MAGKANILAANG POSTE
ICOCOPY PASTE MO YUN KASAMA NG POSTE THEN AYUN YUNG MAGGIGING BASED MO.
MAGLINE PABABA THEN GGAGAWA NG PARANG ZIGZGA TAS IMIMIRROR SA TAAS PATI SA KABILA
OFFSET 50 KABILAAN PARA SA GREEN COLOR, THEN OFFSET 16 SA GREEN PAGLALAGYAN NG KULAY
PINK OR BAKAL 10 MM, DRAW BILOG TO CLOSED THE BAKAL THEN TRIM. AFTER THAT OFFSET MO NA
LANG NG TIG TATLONG 50 100 AND 200 HANGGNAG GITNA THEN MIRROR IT HANGGNAG DULO. LAGAY
RIN NG 200 X 300 TRIANGLE SA DULO NG TYBEAM THEN HATCH. PLUS YUNG TWO DETAILS NG POSTE SA
GILID THEN LAYOUT.
COLUMN FOOTING
LATERAL TIES
COLOUM FOOTING PLAN
- GALING SA FOUNDATION PLAN NA MAY POSTE 200 X 300
COPY YUNG 1200 BOX KASAMA NUNG POSTE
WALL LAYER NA YUNG BOX
OFFSET 50 PAPASOK, USE 16 MM BAKAL LINE THEN CIRCLE SA MIDPOINT NUNG 16 THEN MOVE
PAPASOK FROM OFFSET NA 50, THEN MIRRORTHE CIRCLE SIDE SIDE – P3 THEN HATCH
THEN OFFSET 2 SPACE FROM BAKAL. OFFSET NG 2 SA BAKAL NA BIL0G THEN OFFSET 10 THICKNESS PARA
MA TRIM YUNG LINE
Projection line mula sa poste, THEN HORIZONTAL LINE, THICKNESS 200, COPY AND IBABA YING BAKAL SA
TAAS, MAGLAGAY NG 6 NA BAKAL BILOG.
STANDARD COLUMN CONCRETE COVER - 50 MM ( YUNG BOX TOH SA COLUMN NA MAY BILOG)
STANDARD FOOTING COVER – 75 MM (YUNG BOX TOH SA COLUMN NA MAY BILOG)
FINISH GRADE LINE – DAPAT 350 KUNG 350 YUNG NASA ELEVATION, ALWAYS 200
NATURAL GRADE LINE
OFFSET 50 KABILAAN , THEN OFFSET 16 FOR BAKAL PATUNGAN
THEN MAGLAGAY NUNG NILALALAGYAN NG TYBEAM TEXT SA GITNA WHICH IS WITDH NA 200 TAS 400
HEIGHT
BAKAL 10MM
50, 100 THEN 150 YUNG OFFSET NG BAKAL SA ISAT ISA
WALL FOOTING – DALAWA KASI WALL FOOTING KO
GALING SIYA SA FOUNDATION PLAN
200 THICKNESS BY 400, THEN 200 BY 300
DIFFERENCE; THICKNESS, METAL USE
WF1 – RED
WF2 – YELLOW
OFFSET 125 – SO BALI YUNG GINAMIT NA 400 EQUIBVALENT
400 – LAPAD FROM EXTERIOR WALLFOOTING
DETAILED TRUSS
KUKUNIN YUNG SA TRUSS, TAS AYUN YUNG AAYUSIN
NEED EEXTEND YUNG YERO NG TWO INCHES KASI PPAASOK YUNG TUBIG