SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.

00 30-Jun-18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Stainless Steel and Copper Tubing - Material Receiving SAIC-J-6004 24-Jul-18 INST
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Document Review and Certification


Schedule Q
A1 Review Quality Documentation for Material Receiving.
Att. IV Sec. 3.3

Identification - Instrumentation materials shall be identified by using tags,


Schedule Q
stamps, color coding, stencils or labels. The location and the method of
A2 Att. lV
identification shall not affect the function or quality of the item being
Sec. 4.2
identified.

Schedule G
A3 New and Unused - Instrumentation materials shall be new and unused.
Sec. 2.1
As Designed - Instrumentation materials shall be in accordance with the
Schedule G
A4 Saudi Aramco-approved project-specific design drawings, diagrams,
Sec. 2
schedules, lists, databases and associated documents.

Free of Damage - Instrumentation materials shall be free of damage. All


Schedule Q
incoming materials shall be visually inspected for damage and
A5 Att. IV
conformance to all applicable inspection releases with Material Test
Sec. 3.3
Report (MTR).

QC Before Installation - Instrumentation materials shall conform to all Schedule Q


A6 applicable requirements, standards and specifications prior to release to Att. IV
be used as part of the work. Sec. 3.3

Traceability - Instrumentation materials shall be traceable from the Schedule Q


A7 manufacturer and supplier through delivery, storage, fabrication, erection, Att. IV
installation, repair, modification and use. Sec. 4.3

Verify that the contractor or it's Saudi Aramco approved third party
Schedule Q
inspector performed the quality activities at the supplier and sub-supplier
A8 Att. III
locations as required by the inspection level assigned for the materials
3.2
and equipment identified in SAEP-1150 Inspection Requirements.

B General Requirements
Individuals responsible for special handling, storage and preservation
Schedule Q
B1 shall be fully qualified to do so, and supplied with predetermined WORK
Att. IV Sec. 6.0
and inspection instructions.

The CONTRACTOR shall provide documentation that the required


Schedule Q
B2 Storage, Handling and Preservation (SHP) activities have been
Att. IV Sec. 6.0
performed.

Purchase Order and Instrument specification sheet criteria shall be


confirmed and compared with instrument stainless steel tags / labels and Schedule Q
B3
nameplates, and shipment checked for damage, prior to acceptance of the Att. lV sec.4.2
shipment