Professional Documents
Culture Documents
a. Class A
b. Class B
c. Class C
d. Class D
e. Class K
2. Building contents that are liable to produce a considerable volume of smoke in
case of fire but will not cause explosions or produce poisonous fumes.
a. Class A
b. Class B
c. Class C
d. Class D
e. Class K
5. Based on the occupancy classifications in the Fire Code, dry and wet markets are
classified as:
a. Business
b. Mercantile
c. Industrial
d. Special Structures
e. Mixed
6. Fires involving flammable liquids and gases.
a. Class A
b. Class B
c. Class C
d. Class D
e. Class K
7. A system of vertical pipes to which firehoses can be attached on each floor.
a. Standpipe system
b. Automatic fire suppression system
c. Sprinkler system
d. Riser
e. Fire detection and alarm system
8. A building is considered high-rise in the Fire Code when it is ___ meters of more
in height.
a. 10
b. 15
c. 30
d. 40
e. 50
9. This person is tasked with the review of the plans and the specifications to
determine the design’s compliance with the Fire Code and other life and safety
standards.
a. Building Official
b. Plan Evaluator
c. Fire Safety Inspector
d. Chief of the FSES
e. Fire Marshall
10. Fire safety inspection not required for:
a. Certificate of Occupancy
b. Business Permit
c. Building Permit
d. It is required for all of the above
e. Both A and B
11. Which is required for the Building Permit?
a. FSIC
b. FSEC
c. FALAR 3
d. FSMR
e. FSCCR
12. Which is required for the issuance of the FSIC for Occupancy?
a. FSIC
b. FSMR
c. FSCR
d. FSCCR
e. FALAR 2
13. If after the building plan review, the plans are disapproved, the Fire Marshall will
not issue the FSEC. What will he/she issue instead?
a. FALAR 1
b. Notice of Disapproval
c. Notice to Comply
d. FSIC
e. FSMR
14. Minimum width of a door opening in a means of egress.
a. 710mm
b. 810mm
c. 900mm
d. 910mm
e. 1220mm
15. Which types of operations are required to undergo business inspection?
a. Industrial operations
b. Commercial or business operations
c. Residential occupancies
d. A, B, and C
e. A and B only
16. The following are typically included in this report: as-built plans, testing
certificates, and certification that the building complies with the requirements of the
Fire Code.
a. FSCR
b. FSIC
c. FSCCR
d. FSMR
e. Both C and D
a. Assembly
b. Storage
c. Institutional
d. Mercantile
e. All of these are occupancy classifications in the Fire Code
a. 5 meters
b. 6 meters
c. 8 meters
d. 10 meters
e. 46 meters
20. How many means of egress at the minimum are required for a floor level that will
be occupied by 1,000 people?
a. 1
b. 2
c. 3
d. 4
e. 5
21. According to the Fire Code, if two exits are required, what is the required
minimum distance between them? Assume that the building has no sprinkler
system.
a. 200mm
b. 230mm
c. 250mm
d. 280mm
e. 300mm
23. Minimum width required for new stairs serving an occupant load of 49.
a. 710mm
b. 915mm
c. 1015mm
d. 1120mm
e. 1420mm
24. Which handrail mounting height is prohibited by the Fire Code for stairways?
a. 760mm
b. 785mm
c. 865mm
d. All of these are prohibited
e. None of these is prohibited
25. Occupant load factor of in-patient healthcare treatment facilities, according to
the Fire Code
a. 9.30 sqm/person
b. 11.10 sqm/person
c. 18.60 sqm/person
d. 22.30 sqm/person
e. 33.10 sqm/person
26. Occupant load factor of residential occupancies, according to the Fire Code
a. 9.30 sqm/person
b. 11.10 sqm/person
c. 18.60 sqm/person
d. 22.30 sqm/person
e. 33.10 sqm/person
27. Minimum illumination required for the means of egress.
a. 8.50 lux
b. 10.70 lux
c. 12.30 lux
d. 14.60 lux
e. All of these are acceptable levels of illumination
28. According to the Fire Code, the minimum width of a ramp that is used as
a component in a means of egress
a. 1,120 mm
b. 1,200 mm
c. 1,220 mm
d. 1,400 mm
e. 1,420 mm
29. What is the required fire resistance rating of an exit enclosure if the exit connects
5 levels?
a. 30 minutes
b. 1.00 hour
c. 1.50 hours
d. 2.00 hours
e. 3.00 hours
30. When was the IRR of the Fire Code revised?
a. 2008
b. 2010
c. 2015
d. 2019
e. 2020