You are on page 1of 1

No.

Dok : Form-KPC-PL-040
Rev :
Bag Filter Checksheet For Pre-Commissioning Rev Date :
First Date : 28.09.19
Filtration Area 65 m2
Check Items Good No good
Review Installation condition of equipment (Review kondisi instalasi alat) ü
Review Installation of auxiliaries (Review instalasi alat pendukung) ü
- Solenoid valve (Air Pulse) ü
- Autocoupler (PLC) ü
- Regulator & Drain Separator ü
- Vibro ü
- Fu Conveyor ü
- Air Tank ü
- Air Dryer ü
- Compressor ü
- Air Burst ü
Review Equipment Internal Cleanliness; Filter Cloth, Retainer/Cage (Review kebersihan bagian dalam alat) ü
Confirm no foreign materials which can damage equipment (Konfirmasi tidak ada material asing yang dapat merusak alat) ü
No-load operation (Operation tanpa beban) ü
- Adjust the pressure of pulse air (Penyesuaian tekanan udara Pulse/Backwast Sistem) MPaG 0,2 ü
- Check no-leakage from air blow tube (Pengecekan tudak ada kebocoran pada pipa udara) ü
- Check operation of pulse air (Pengecekan Operational udara Pulse/backwast sistem) s/cycle ü
Check the inside cleanliness (after flushing and load/no-load operation) ü
Confirm no foreign materials which can damage equipment (after flushing and load/no-load operation) ü
Remaks
- Semua baut perlu pelumasan di daerah atas penutup retainer
- Elbow Union 10 minta diganti karena sudah tidak merekat maksimal dan gampang lepas
- PLC Rusak

Name Name in Block Signature Date


Inspected by Sidik.A

Witnessed by Bag Filter Agus Sotowijoyo 14-Dec-19

Witnessed by Supri Yanto

Accepted Date of Accepted Process Code Sheet No.


Accepted with Comment
Not Accepted

You might also like