Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Extent of Inspection
Ad-hoc WPK was provided ( 560506-AG63-IM-ITP-0038-000). As per WPK & SAP Scope description, internal visual
inspection to be conducted on all internal shell & domes and welds surfaces , nozzles bores to the extent visible and all
internals’ components to confirm integrity. External inspection of the vessel is not required because it was conducted recently
in 2022 under MO 100560950 (reference report EA-VIS-22-049).
Vessel Details
Process description
This pressure vessel is a three-phase separator, and its function is to accommodate separation of 3 phase fluid (oil, water and
gas). The feed to the separator is well stream fluids from the platform wellheads. The separator is required to test high pressure
wells (nominal pressure of 60 brag) and low-pressure wells (nominal pressure of 25 brag). The separator will also be utilized for
well clean-up.
PSVs Details
Refer to recent External inspection report (EA-VIS-22-049) for details of Vessel PSV (2E-PSV130103).
Exceptions/Restrictions
No External inspection of the vessel was conducted because it was completed recently in 2022 under MO
100560950 (reference report EA-VIS-22-049). External inspection omission was reflected as such in SAP and WPK
(560506-AG63-IM-ITP-0038-000). This inspection is limited to Internal close visual inspection of the vessel.
No NDT was conducted either as this was optional requirement (to be opportunely conducted in case NDT team are
available onboard) as per the above mentioned WPK.
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Pre-cleaning Findings
Upon opening of both Manways M 1&2, the internal condition of test separator (pre cleaning condition) was noted full of oily
sludge / debris almost covering distributor plate hatch height) Refer to last photos 41 to 44 of this report). The vessel was
thoroughly cleaned using hot water jets and offered for internal inspection
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
8. Nozzles bores:
All nozzles were inspected for blockage to the extent possible. No blockage was noticed apart from Nozzle N3 (oil
Outlet) was found full of oily debris (Refer photo 28). This was reported to MTL for flushing upon deisolation of the
Test separator. No visible pitting was noted to the accessible extent on all nozzle’s bores (example photos 31 & 32).
9. Manways M1 & M2:
Both Manways bores overlay welds were found free from any visible cracks, pitting or mechanical damages.
However, several grinding marks were noted.
Both flanges face of manway nozzles were found in good condition. However, two minor mechanical gouges (5mm
long & 1 mm deep) were noted inward of gasket seating area of M2 Manway (located at 5 & 7 o’clock position).
These gouges have no threat to sealing integrity as they were located beyond the gasket sealing area (refer to
photos 33 to 36)
10. Nozzles Flange face inspection:
Refer to section 9 above for Manways FF inspection.
FF of Nozzle N8 (connected to vessel PSV) has minor gouge at west side (No concerns – located outside of gasket
seating area) (refer to photos 37 to 38).
Remaining nozzles were not offered during the internal inspection as the nozzles were positively isolated. MTL was
notified to offer remaining nozzles for FF inspection upon vessel deisolation. A follow up inspection report would be
generated accordingly.
11. Miscellaneous devises:
Dip Pipe and thermowell element were found in acceptable condition (refer to photos 39 to 40).
Attachments:
Photos 1 to 44 (inclusive).
Markup GA drawing.
P&ID Drawing.
Recommendations:
It is recommended to:
offer nozzles flanges for FF visual inspection (apart from the ones covered in section 9 & 10 above). MTL was
notified to offer remaining nozzles for FF inspection upon vessel deisolation. A follow up inspection report would be
generated accordingly.
Flush out Nozzle N3 (oil Outlet) upon vessel de-isolation as it was found full of oily debris (Refer photo 28). Nozzle
bore cleanliness would be verified during FF inspection.
No further action is recommended regarding the finding reported in section 1 above- grinding marks (Refer photos 1
to 4) and pitting noted on west dome (Refer photos 5 to 8). To be monitored at next internal inspection opportunity.
No further action is recommended regarding gouges reported on FF of Manway M1 (photos 33 to 36) & Nozzle N 8
(photos 37 to 38) as these were located outside of gasket seating area. To be monitored at next internal inspection
opportunity.
Conclusion:
In general, no major threats to integrity were noted.
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
No further action is
recommended regarding gouges Two remarkable linear grinding
reported on FF of Manway M1 marks (length 150 mm & 40 mm,
(photos 33 to 36) & Nozzle N 8 max depth 1 mm) were noticed
(photos 37 to 38) as these were at 7 o’clock position (adjacent to
located outside of gasket seating weir plate to the shell weld).
area. To be monitored at next Refer photos 1 to 4.
internal inspection opportunity.
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
P&ID Drawing
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Photo 5: Showing general view of random pin holes / Photo 6: Showing close view of photo 5 - random
pitting were noticed on the west dome with maximum pin holes / pitting was noticed on the west dome with
depth 0.7 mm (above liquid level position). maximum depth 0.7 mm (above liquid level position).
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Photo 13: Showing general view of Perforated Photo 14: Showing close view of Perforated distributor
distributor plate arrangement segments securely fitted plate arrangement segments securely fitted & in
& in satisfactory condition. One hatch was removed satisfactory condition. No missing or loose bolts / nuts
for inspection access of east dome were noted
Photo 15: Showing example close view of the support Photo 16: Showing distributor plate removed hatch
brackets & its bolts / welds were found secured and being reinstated upon completion of east dome
free from any visible cracks inspection
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Photo 17: Showing general view of Inlet diffuser & its Photo 18: Showing general view of Inlet diffuser & its
cascade tray (3 phase fluid inlet )were found free from cascade the bolting system was found intact
any cracks , mechanical damage, erosion or any
integrity threats. The bolting system was found intact
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Photo 31: Showing example close view of PSV nozzle Photo 32: Showing example close view of nozzles
bore (N8) no concerns were noted. bore N 1 B ( Level Indicator) (No visible pitting was
noted to the accessible extent).
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Photo 37: Showing General view of FF of Nozzle N8 Photo 38: close view of photo 37 FF of Nozzle N8
(for vessel PSV) (for vessel PSV) showing minor gouge at west side (No
concerns - inward of gasket seating area)
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Photo 41: Showing General view of internal condition Photo 42: General view of internal condition of test
of test separator upon opening of Manway M2 ( pre separator upon opening of Manway M1 ( pre cleaning
cleaning condition) – oily sludge noted almost covering condition) – oily sludge noted under sand wash
distributor plate hatch height ) manifolds )
Client / Project: BP-AGT Asset / Site: East Azeri Platform Report Ref.: EA-VIS-2023-001
Item ID / Tag No.: EA-V13010 Work Order: 101347087 Workpack Ref.: 560506-AG63-IM-ITP-0038-000
Offshore Inspection
Narmin Sultanova
by Marei Hamad DN: CN = Narmin