You are on page 1of 14

01

06/14
A B C D E F G H

3070
320 480 480 480 480 480 320
40 110 175 20 140 180 130 40 130 180 130 170 180 170 130 180 145 80 120 100 120 80 175 110 40

W-1 TW-1 TW-1


155

155
175

175
-0.30 +1.57

19 90
W-2 W-1 W-1 W-1 W-2
40

40
1
D-2 D-2 D-2 D-2
RG

10
300

9
Office Office

300
Hand
RG

421
2
Area = 19.6m 4 Area = 12.8m2
Kitchen wash FF.Pvc tile FF.Pvc tile
885

885
Area = 12.8m2 Area = 5.9m2 3
610

610
FF.NS.ceramic FF.NS.ceramic D-1 D-1
20 305 20 140 20 785 20 450 20 465 20 465 20 305 20
100

100
W-3 D-1 W-3

20
D-1
D-1 D-1
D-1
170

170
8

170
6

D-1 D-1 D-1


80 40

40
2 ±0.00

20
W-4 W-4

80
Cafiteria
Area = 102.9m2 2 1
FF.Pvc tile Date Description Rev. No. Rev. By

Office Office Project Title


280

WD-1 2
Area = 26.7m2

280
7
500

Area = 27.3m

500
FF.Pvc tile FF.Pvc tile DAB

20 950 20 70 300 70 20 470 20 460 20


Project Location
600

600
JINKA
40 100

100
W-3 W-3
Client

40
3 JINKA UNIVERSITY
100

WD-1
W-1

200
180

180
11 Consultant
W-1 W-5
E-Mail: acutengineering@gmail.com
Tel : 251-11-8602050,

2050 180 75 20 140 180 130 20 90 300 110 440 110 300 90 20 130 180 140 20 65 180 80 Fax: 251-11-6392120
P.O.Box: 23219 Code 1000,
140

140
Addis Ababa,Ethiopia

Designed By License/Signature
320 480 480 480 480 480 320 Misgana A. PAR/1632

3070 Checked-By Approved-By


Semeneh M. PAR/1296 Semeneh M. PAR/1296
01 CAD By
06/14 Misgana A. PAR/1632
GROUND FLOOR
01 1:100
Date

Sheet Title
September, 2020
Design Stage
FINAL

Ground Floor Plan

Scale Rev. No. Sheet No.

1:100 No.
AR
01/14
01
06/14
A B C D E F G H

3070
320 480 480 480 480 480 320
110 175 160 180 300 180 300 180 300 180 225 120 100 120 80 175 110 40
W-1 W-1 W-1 W-1 TW-1 TW-1
155

155
20

20
175

175
W-2 W-2

40
40

20 305 20 460 20 465 20 150 160 150 20 460 20 220


D-2
20 220 20 305 20
D-2 D-2 D-2

510
9
Office Office
510

1 10

300
300

Office Area = 23.5m2


Area = 23.5m 2
Office Office
Area = 12.8m2
FF.Pvc tile FF.Pvc tile 2 Area = 12.8m2
Area = 23.6m
FF.Pvc tile FF.Pvc tile
FF.Pvc tile D-1
2 3
610

610
D-1
11
100

100
W-3 D-1 D-1 W-3
20

20
D-1 D-1 D-1 D-1 D-1
170

170
150

+3.10
12
1485

1485
290
20
80 40

80 40
2
W-4 W-4
D-1 D-1
D-1
D-1 6 D-1 Office

20
Area = 26.7m2
4
FF.Pvc tile
Office
Office Area = 27.4m2
Office
280

280
8
500

500
Area = 16.5m 2 FF.Pvc tile
Area = 26.6m2
580

7
FF.Pvc tile FF.Pvc tile

360
Date Description Rev. No. Rev. By

20 305 20 460 20 460 20 460 20 460 20 460 20 Project Title

5
Office
40 100

40 100
W-3 Area = 16.5m2 W-3 DAB
FF.Pvc tile
3

20
Project Location

W-1 W-4 W-1 W-4 W-1 JINKA


200

200
100 20
180

180
Client

JINKA UNIVERSITY

70 180 75 20 140 180 170 130 180 130 170 180 170 130 180 130 170 180 140 20 65 180 6020
Consultant

320 480 480 480 480 480 320 E-Mail: acutengineering@gmail.com

3070 Tel : 251-11-8602050,


Fax: 251-11-6392120
P.O.Box: 23219 Code 1000,
Addis Ababa,Ethiopia
FIRST FLOOR
01 1:100
01
06/14 Designed By License/Signature
PAR/1632
Misgana A.
Checked-By Approved-By
Semeneh M. PAR/1296 Semeneh M. PAR/1296
CAD By
Misgana A. PAR/1632

Date Design Stage


September, 2020 FINAL
Sheet Title

First Floor Plan

Scale Rev. No. Sheet No.

1:100 No.
AR
02/14
01
06/14
A B C D E F G H

3070
320 480 480 480 480 480 320
40 110 175 160 180 300 180 300 180 300 180 220 120 100 120 80 180 120 30
W-1 W-1 W-1 W-1 TW-1 TW-1
155

155
20
20

140 20
175

175
W-2 W-2
40

40
1 D-2 D-2 D-2 D-2

2
3 Office
Area = 23.6m2
FF.Pvc tile
510

510
300

240

300
1
Office 2
Office 10 Office
Area = 23.5m Area = 23.5m2 9
Office FF.Pvc tile FF.Pvc tile
Area = 12.8m2
Area = 12.8m2 D-1 FF.Pvc tile
D-1
610

610
FF.Pvc tile
11
20 305 20 460 20 465 20 460 20 460 20 465 20 305 20
100

100
W-3 D-1 W-3
20

20
300
D-1
D-1 D-1 D-1 D-1
12
170

170
150
1485

1485
290
20

20
80 40

80 40
2
W-4 W-4
D-1
D-1 D-1
D-1 D-1 Date Description Rev. No. Rev. By

Office

20
6
Office Area = 26.7m2 Project Title

Area = 26.6m2 Office Office FF.Pvc tile


Area = 27.4m2 DAB
280

280
2
500

500
FF.Pvc tile Area = 16.5m
FF.Pvc tile FF.Pvc tile
580

580

4 7 8
20 460 20 460 20 460 20 460 20 460 20

360
Project Location

JINKA
5 Office
Area = 16.5m2 Client
40 100

40 100
W-3 FF.Pvc tile W-3
JINKA UNIVERSITY
3

20
W-1 W-4 W-1 W-4 W-1 Consultant
100 20
200

200
20
180

180
E-Mail: acutengineering@gmail.com
Tel : 251-11-8602050,
Fax: 251-11-6392120
P.O.Box: 23219 Code 1000,
Addis Ababa,Ethiopia
70 180 75 20 140 180 170 130 180 130 170 180 160 140 180 140 170 180 140 20 65 180 6020
Designed By License/Signature
320 480 480 480 480 480 320 Misgana A. PAR/1632

Checked-By Approved-By
3070 Semeneh M. PAR/1296 Semeneh M. PAR/1296
CAD By
Misgana A. PAR/1632
01
2nd & 3rd FLOOR
01 1:100
06/14
Date

Sheet Title
September, 2020
Design Stage
FINAL

2nd & 3rd Floor Plan

Scale Rev. No. Sheet No.

1:100 No.
AR
03/14
01
06/14
A B C D E F G H

3070
320 480 480 480 480 480 320
40 110 175 160 180 300 180 300 180 300 180 220 120 100 120 80 175 120 30
W-1 W-1 W-1 W-1 TW-1 TW-1
155

155
20

140 20
175

175
W-2 W-2
40

40
1

D-2 D-2 D-2 D-2


20 1270 20 150 2 160 150 20 460 20 220 20 220 20 305 20

240
300

300
1 Office 3
Office
Area = 23.6m2 Area = 12.8m2
700

885
FF.Pvc tile D-1 D-1 FF.Pvc tile
610

610
4

100
2
100

100
W-3 W-3

WD-2
5 D-1
Meeting Room

120
D-1 D-1
Area = 85.6m2 +12.40
170

170
FF.Pvc tile
1485

20 100
80 40

80 40
2
20

W-4 W-4 W-4 W-4 W-4 W-4 W-4

2050 180 75 15 145 180 300 180 300 180 300 180 310 180 145 15 65 180 60 20
500

500
Date Description Rev. No. Rev. By

15 2395 15 Project Title


665

665

Concrete Flat roof


600

600

600
DAB
+12.40
Project Location
3
JINKA
Client
200

200
JINKA UNIVERSITY
15

15

280 2425 325 Consultant

320 480 480 480 480 480 320 E-Mail: acutengineering@gmail.com


Tel : 251-11-8602050,
3070 Fax: 251-11-6392120
P.O.Box: 23219 Code 1000,
Addis Ababa,Ethiopia

4th FLOOR
01 1:100 01
06/14
Designed By
Misgana A.
License/Signature
PAR/1632

Checked-By Approved-By
Semeneh M. PAR/1296 Semeneh M. PAR/1296
CAD By
Misgana A. PAR/1632

Date Design Stage

FINISHING SCHEDULE
01
September, 2020 FINAL
Sheet Title

1:200 Fourth Floor Plan

Scale Rev. No. Sheet No.

1:100 No.
AR
04/14
01
06/14
A B C D E F G H

3070
320 480 480 480 480 480 320

slope 12%
Galvanized EGA roof cover
885
610
1485

Date Description Rev. No. Rev. By

Project Title
500

DAB

Project Location
600

JINKA
Client
Concrete Flat roof
3 JINKA UNIVERSITY
+12.40
200

Consultant

E-Mail: acutengineering@gmail.com
Tel : 251-11-8602050,
Fax: 251-11-6392120
320 480 480 480 480 480 320 P.O.Box: 23219 Code 1000,
Addis Ababa,Ethiopia
325 2425 325
Designed By License/Signature
Misgana A. PAR/1632

01 Roof Plan
1:100 01
06/14
Checked-By
Semeneh M. PAR/1296
CAD By
Misgana A.
Approved-By
Semeneh M. PAR/1296

PAR/1632

Date Design Stage


September, 2020 FINAL
Sheet Title

Roof Plan

Scale Rev. No. Sheet No.

1:100 No.
AR
05/14
1 2 3

Galvanized EGA roof cover


RHS rafter 30x30x2.5mm
RHS lattice purlins 25x25x2mm
40x50 zigba Wooden ceiling batten
8mm Chipwood ceiling

+15.50 +15.50
Roof Level Roof Level

CORRIDOR

+12.40 +12.40
Fourth Floor Level Fourth Floor Level

CORRIDOR
CORRIDOR
30mm thick cement screed
280mm thick ribbed slab
+9.30 plastered and painted +9.30
Third Floor Level Third Floor Level

CORRIDOR
30mm thick cement screed
280mm thick ribbed slab
+6.20 plastered and painted +6.20
Second Floor Level Second Floor Level

CORRIDOR
Date Description Rev. No. Rev. By
30mm thick cement screed
280mm thick ribbed slab Project Title
+3.10 plastered and painted +3.10
First Floor Level First Floor Level
DAB

Project Location

CORRIDOR
JINKA
Client

JINKA UNIVERSITY
±0.00 ±0.00
Ground Floor Level Ground Floor Level
2% ground slope 2% ground slope Consultant

E-Mail: acutengineering@gmail.com
Tel : 251-11-8602050,
Fax: 251-11-6392120
P.O.Box: 23219 Code 1000,
50mm thick cement screed Addis Ababa,Ethiopia

01 SECTION
1:100
100mm thick r.c. slab
250mm Hard Core
150mm thick selected material fill
Compacted soil
Designed By
Misgana A.
License/Signature
PAR/1632

Checked-By Approved-By
Semeneh M. PAR/1296 Semeneh M. PAR/1296
CAD By
Misgana A. PAR/1632

Date Design Stage


September, 2020 FINAL
Sheet Title

Section

Scale Rev. No. Sheet No.

1:100 No.
AR
06/14
A B C D E F G H

+17.50

+15.50 +15.50
Roof Level Roof Level
+15.00 +15.00 +15.00 +15.00 +15.00

+14.40

+13.40 +13.40 +13.40


plastered and
painted HCB wall
+12.40 plastered and plastered and +12.40
Fourth Floor Level painted HCB wall painted HCB wall Fourth Floor Level
+11.90 +11.90 +11.90 +11.90 +11.90

+11.30

+10.30 +10.30 +10.30 +10.30


plastered and
painted HCB wall
+9.30 plastered and +9.30
Third Floor Level plastered and painted HCB wall Third Floor Level
+8.80 +8.80 +8.80 painted HCB wall +8.80 +8.80

+8.20

+7.20 +7.20 +7.20 +7.20


plastered and
painted HCB wall
+6.20 plastered and plastered and +6.20
Second Floor Level painted HCB wall painted HCB wall Second Floor Level
+5.70 +5.70 +5.70 +5.70 +5.70

+5.10

+4.10 +4.10 +4.10 +4.10


plastered and
+3.10 painted HCB wall +3.10
First Floor Level First Floor Level
+2.60 +2.60 +2.60 +2.60 +2.60

+2.00
Date Description Rev. No. Rev. By

Project Title
+1.00 +1.00 +1.00 +1.00

plastered and DAB


±0.00 painted HCB wall ±0.00
Ground Floor Level Ground Floor Level
Project Location

JINKA
Client

01 REAR SIDE ELEVATION


1:100
JINKA UNIVERSITY

Consultant

E-Mail: acutengineering@gmail.com
Tel : 251-11-8602050,
Fax: 251-11-6392120
P.O.Box: 23219 Code 1000,
Addis Ababa,Ethiopia

Designed By License/Signature
Misgana A. PAR/1632

Checked-By Approved-By
Semeneh M. PAR/1296 Semeneh M. PAR/1296
CAD By
Misgana A. PAR/1632

Date Design Stage


September, 2020 FINAL
Sheet Title

Elevation

Scale Rev. No. Sheet No.

1:100 No.
AR
07/14
3 2 1

+17.50

+15.50 +15.50
Roof Level Roof Level

+12.80 289
+12.40 +12.40
Fourth Floor Level Fourth Floor Level
+11.90 +11.90

plastered and
painted HCB wall plastered and
painted HCB wall
+9.30 +9.30
Third Floor Level Third Floor Level
+8.80 +8.80

plastered and
painted HCB wall
+6.20 +6.20
Second Floor Level Second Floor Level
+5.70 +5.70

plastered and
painted HCB wall

+3.50
Date Description Rev. No. Rev. By
+3.10 plastered and +3.10
First Floor Level painted HCB wall First Floor Level Project Title
+2.60 +2.60

DAB

Project Location

JINKA
Client
±0.00 ±0.00
Ground Floor Level Ground Floor Level JINKA UNIVERSITY

Consultant

01 RIGHT SIDE ELEVATION


1:100
E-Mail: acutengineering@gmail.com
Tel : 251-11-8602050,
Fax: 251-11-6392120
P.O.Box: 23219 Code 1000,
Addis Ababa,Ethiopia

Designed By License/Signature
Misgana A. PAR/1632

Checked-By Approved-By
Semeneh M. PAR/1296 Semeneh M. PAR/1296
CAD By
Misgana A. PAR/1632

Date Design Stage


September, 2020 FINAL
Sheet Title

Elevation

Scale Rev. No. Sheet No.

1:100 No.
AR
08/14
H G F E D C B A

+17.50

plastered and plastered and


painted HCB wall plastered and
painted HCB wall
painted HCB wall
+15.50 +15.50
Roof Level Roof Level
+15.00 +15.00 +15.00

plastered and plastered and


painted HCB wall plastered and
painted HCB wall
painted HCB wall
+12.80
+12.40 +12.40
Fourth Floor Level Fourth Floor Level
+11.90 +11.90 +11.90

+10.30 +10.30 +10.30

plastered and plastered and plastered and


+9.30 +9.30
painted HCB wall painted HCB wall painted HCB wall
Third Floor Level Third Floor Level
+8.80 +8.80 +8.80

+7.20 +7.20 +7.20

plastered and plastered and


+6.20 plastered and +6.20
painted HCB wall painted HCB wall
Second Floor Level painted HCB wall Second Floor Level
+5.70 +5.70 +5.70

Date Description Rev. No. Rev. By

+4.10 +4.10 +4.10 Project Title

plastered and plastered and DAB


+3.10 painted HCB wall +3.10
painted HCB wall
First Floor Level First Floor Level
+2.60 +2.60 Project Location

JINKA
Client

+1.00 +1.00 JINKA UNIVERSITY

plastered and
±0.00 painted HCB wall ±0.00 Consultant

E-Mail: acutengineering@gmail.com
Ground Floor Level Ground Floor Level
Tel : 251-11-8602050,
Fax: 251-11-6392120
P.O.Box: 23219 Code 1000,
Addis Ababa,Ethiopia

01 FRONT SIDE ELEVATION


1:100 Designed By
Misgana A.
License/Signature
PAR/1632

Checked-By Approved-By
Semeneh M. PAR/1296 Semeneh M. PAR/1296
CAD By
Misgana A. PAR/1632

Date Design Stage


September, 2020 FINAL
Sheet Title

Elevation

Scale Rev. No. Sheet No.

1:100 No.
AR
09/14
FINISHING SCHEDULE

FINISHING SCHEDULE
01 1:200

01 1:200 No Room Name Floor Finishing Schedule Skirting Schedule Wall Finishing Schedule Ceiling Finishing Schedule Area

No Room Name Floor Finishing Schedule Skirting Schedule Wall Finishing Schedule Ceiling Finishing Schedule Area

1 Meeting Room PVC skirting Plastered & Painted Chipwood Ceiling 12.8m2
PVC tile ff

1 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 27.3m2 23.5m2
2 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling

2 PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 26.7m2 Office 23.5m2
Office 3 PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling

3 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 19.6m2 Office 26.6m2
4 PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling

4 Toilet Non-slippery porcelain Porcelain Skirting Plastered & Painted Chipwood Ceiling 16m2
5 Office
PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 16.5m2

5 Office
PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 12.8m2 Office
6 PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 27.4m2

6 Lobby/Corridor PVC skirting Plastered & Painted Chipwood Ceiling 84.2m2 Office
PVC tile ff 7 PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 16.5m2

7 Cafiteria PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 102.9m2 Office
8 PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 26.7m2

8 Corridor PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 7.3m2 Office
9 PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 23.6m2

9 Kitchen Porcelain Skirting Chipwood Ceiling 12.8m2


Non-slippery porcelain Plastered & Painted 10 Toilet Non-slippery porcelain Porcelain Skirting Chipwood Ceiling 23.5m2
ceramic tile up to 180m

10 Hand Wash Non-slippery porcelain Porcelain Skirting Plastered & Painted Chipwood Ceiling 5.9m2 Office
11 PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 12.8m2

11 Entrance Lobby PVC skirting Plastered & Painted Chipwood Ceiling 38.3m2
PVC tile ff 12 Lobby/Corridor PVC tile ff PVC skirting ceramic tile up to 180mm Chipwood Ceiling 59.4m2

FINISHING SCHEDULE
01
FINISHING SCHEDULE
FINISHING SCHEDULE 01 1:200
01 1:200
No Room Name Floor Finishing Schedule Skirting Schedule Wall Finishing Schedule Ceiling Finishing Schedule Area
No Room Name Floor Finishing Schedule Skirting Schedule Wall Finishing Schedule Ceiling Finishing Schedule Area

1 Meeting Room PVC skirting Plastered & Painted Chipwood Ceiling 85.6m2
PVC tile ff Date Description Rev. No. Rev. By
2 2
1 Office PVC skirting Plastered & Painted Chipwood Ceiling 12.8m x2=25.6m
PVC tile ff Project Title
2 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 23.6m2
2 2
Office Chipwood Ceiling 23.5m x2=47m DAB
2 PVC tile ff PVC skirting Plastered & Painted
3 Toilet Non-slippery porcelain Porcelain Skirting ceramic tile up to 180mm Chipwood Ceiling 23.5m2
3 Office PVC skirting Plastered & Painted Chipwood Ceiling 23.5m2x2=47m2
PVC tile ff Project Location

4 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 12.8m2 JINKA
4 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 26.6m2x2=53.2m2 Client
2
5 Lobby/ Corridor PVC skirting Chipwood Ceiling 36.3m
PVC tile ff ceramic tile up to 180m JINKA UNIVERSITY
2 2
5 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 16.5m x2=33m

Consultant
6 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 27.4m2x2=54.8m2 E-Mail: acutengineering@gmail.com
Tel : 251-11-8602050,
Fax: 251-11-6392120
7 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 16.5m2x2=33m2 P.O.Box: 23219 Code 1000,
Addis Ababa,Ethiopia

8 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 26.7m2x2=53.4m2 Designed By License/Signature
Misgana A. PAR/1632

9 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling Checked-By Approved-By
23.6m2x2=47.2m2 Semeneh M. PAR/1296 Semeneh M. PAR/1296
CAD By
10 Toilet Non-slippery porcelain Porcelain Skirting ceramic tile up to 180mm 23.5m2x2=47m2 PAR/1632
Chipwood Ceiling Misgana A.
Date Design Stage
September, 2020 FINAL
2 2
11 Office PVC tile ff PVC skirting Plastered & Painted Chipwood Ceiling 12.8m x2=25.6m Sheet Title

Finishing Schedule
Lobby/Corridor 59.4m2x2=118.8m2
12 PVC tile ff PVC skirting ceramic tile up to 180mm Chipwood Ceiling
Scale Rev. No. Sheet No.

1:200 No.
AR
10/14
03
12/15

103
05
12/15

+15.27
Roof Level

40
CORRIDOR

261
02
12/15
+12.36
Fourth Floor Level

28
Ø10cm Steel Truss Members
CORRIDOR 40 x 40 x 2mm Truss Members

281
Ø100 mm eucalyptus wood

+9.27
Third Floor Level 40 x40 x 2mm Truss Members
50x40mm Zigba wood
5

28
nailed to eucalyptus wood 40 x 50mm Wood Batten(c/c60cm)

5
30mm cement screed floor finish
60 x 60 x 2.5mm Truss Members

5
280 cm. thick ribbed slab
Plastered and painted ceiling CORRIDOR

281
60 x 60 x 2.5mm Truss Members

30
8mm Chipwood Ceiling

+6.18
Second Floor Level 19 R.Concrete Beam
28

10mm Mortar Joint


CORRIDOR 20mm Plastering
Hollow Concrete Block
281

+3.09 40 x 20 x 30 x 1.2mm Angle Iron


First Floor Level
28

Decorated Zigba Corner List


30mm cement screed floor finish
280 cm. thick ribbed slab
Plastered and painted ceiling CORRIDOR

04 Detail
1:20
281

40 x 40 x 2mm Truss Members

01
11/15 Date Description Rev. No. Rev. By
±0.00
Ground Floor Level Project Title
30mm Cement Screed Floor Finish
10

100mm Reinforced Concrete


250mm Hard Core DAB
Selected Material Fill
20mm Plastering Crack Protection Groove Compacted Soil Project Location

20mm Plastering 20mm plastering R.Concrete Beam JINKA

1
10mm Styrofoam Expansion Joint 100mm Styrofoam Expansion Joint

19
05 Wall Section Client
Crack Protection Groove
19 1 Crack Protection Groove
1:100 30mm Cement Screed Floor Finish JINKA UNIVERSITY

10
10
sheet metal roof cape

40
25cm hard core Consultant
HCB Parapet Wall 28 E-Mail: acutengineering@gmail.com

Ega Sheet Roof Cover Tel : 251-11-8602050,


Fax: 251-11-6392120

25 x 25 x 2mm Lattice Purlin 20 P.O.Box: 23219 Code 1000,


1 21

20 280mm Ribbed Slab


Addis Ababa,Ethiopia

Compacted Earth
6

Designed By License/Signature
20mm Plastering
5 20mm Plastering
Hollow Concrete Block
Misgana A.
Checked-By
PAR/1632

Approved-By
Semeneh M. PAR/1296 Semeneh M. PAR/1296
10mm Mortar Joint
Ø10cm steel Truss Members CAD By
Misgana A. PAR/1632

Date Design Stage


September, 2020 FINAL

03 Detail
1:20 02 Detail
1:20
01 Detail
1:20
Sheet Title

Details

Scale Rev. No. Sheet No.

1:100 No.
AR
11/14
Ø100 mm eucalyptus wood
Tied To Truss member
1
50x40mm Zigba wood nailed to
horizontal eucalyptus Log
Approved Type Water Proofing Material
05
12/14
Cement screed
pe
Light Weight Concrete With
18% slo
+15.27 2% Slope Towards Down Pipe
Roof Level Crossed Wire Strainer
150mm Thick Rc Slab
30
+14.97

Plastered & Painted Ceiling


161

20
+13.36

30
2028 100

02
+12.36 12/15

Fourth Floor Level 20 8mm Chipwood Ceiling


+11.88

40 x 50mm Zigba Batten


161

+10.27
20mm Plastering
100

+9.27
Third Floor Level
2028

+8.79
4mm thick glass
Plastered and Painted External HCB Wall
190 x 190 x 390mm
161

01 Hollow Concrete Block


12/15
20mm Plastering

19 19 1
+7.18
15mm Plastering
10mm Mortar Joint Pointed Internally
100

+6.18

1
Second Floor Level Crack protection groove 10mm Styrofoam Expansion Joint
20 28

+5.70

05 Detail

3
10
1:20 R .Concrete Beam 30mm Cement Screed Floor Finish
30 100mm Reinforced Concrete

50
261

40
2% Slope
100mm Thick Stone Pavement 250mm Hard Core
+3.09
100mm Thick Red Ash
First Floor Level Date Description Rev. No. Rev. By
28

+2.61
Project Title
Compacted Earth

10mm Mortar Joint DAB


281

Hollow Concrete Block


04
06
19 Externally Plastered and Internally Pointed Project Location
19 119 1

12/15

04 Detail
Half Ø 40cm cement pipe ditch 12/15

20mm Plastering JINKA


±0.00
Ground Floor Level -0.30
1:20 Client
Crack Protection Groove Crack Protection Groove
10

30mm Cement Screed Floor Finish JINKA UNIVERSITY


4mm Thick Clear Glass
28 3

20mm Plaster & painted finish


LTZ-38 frame
Consultant
280mm Ribbed Slab
E-Mail: acutengineering@gmail.com
30mm thick Tel : 251-11-8602050,
Granite window sill Fax: 251-11-6392120
P.O.Box: 23219 Code 1000,

03 Detail Addis Ababa,Ethiopia


20mm thick Mortar
joint with 2% slope
1:100 20 15mm Plastering
2% Slope Designed By License/Signature
Misgana A. PAR/1632
Hollow concrete block
Water drip Checked-By Approved-By
Semeneh M. PAR/1296 Semeneh M. PAR/1296
20mm Plaster & painted finish CAD By
Misgana A. PAR/1632

Date
4mm thick glass September, 2020
Design Stage
FINAL
Sheet Title

Details

02 Detail
1:20 01 Window Sill Detail
1:20 Scale

As Shown
Rev. No.

No.
Sheet No.
AR
12/14
A
2 1
C D

1
+6.23

+1.62
152

458
5cm cement screed f.f.
150 162 150 28cm ribbed slab
Plastered and painted
ceiling
+4.68

B
3030303030303030

30303030303030

381
431
5x5cm RHS HAND RAIL

+3.13 4X4cm RHS POSTS

02
11/15
Date Description Rev. No. Rev. By
5cm cement screed f.f.
40

2 28cm ribbed slab Project Title


Plastered and painted
ceiling
+1.59 DAB
131

+3.17
Project Location

JINKA
Client

JINKA UNIVERSITY

out side slab line landing ±0.00


metal balustrad Consultant

E-Mail: acutengineering@gmail.com
Tel : 251-11-8602050,
Fax: 251-11-6392120

01 Ground Floor Section


1:50
P.O.Box: 23219 Code 1000,
Addis Ababa,Ethiopia
A

01 Section
1:50
Designed By
Misgana A.
Checked-By
Semeneh M. PAR/1296
License/Signature
PAR/1632

Approved-By
Semeneh M. PAR/1296
CAD By
Misgana A. PAR/1632

Date Design Stage


September, 2020 FINAL
Sheet Title

Section Details

Scale Rev. No. Sheet No.

1:100 No.
AR
13/14
PLAN 3000
PLAN
900 315 900 610
700 800 800 700 3000

3000 900
1210

700
700

500
610

2800

2800
1000
950
2800

2800
SECTION

2600
and

200

2100
2100

2100

200
ELEVATION
SECTION
and

750

700
ELEVATION
Designation W-5

200

200
Location
Designation Ground -1st Floor
WD-1 WD-2 D-1 D-2
Opening Size (3000mmx2800mm)
Location th
Ground -4 Floor th
Ground -4 Floorth
Ground Floor Ground -4 Floor
Quantity (pcs) (1-Pieces)
Opening Size (3000mmx2750mm) (1210mmx2600mm) (900mmx2800mm) (610mmx2100mm)
LH 32 LH 2 Frame LTZ-38
Quantity (pcs) (2-Pieces) (11-Pieces) (55-Pieces) (20-Pieces)
RH 20 RH 2
Glazing 4mmTinted Glass
Frame LTZ-38 LTZ-38 Wooden & Glass for fan light LTZ-38 Window Door Schedule
Glazing 4mmTinted Glass 4mmTinted Glass 4mmTinted Glass 4mmTinted Glass 01 1:50
Window Door Schedule
02 1:50

PLAN 600 600 600 600 600 1000 605 605

1800
Date Description Rev. No. Rev. By

1800 1200 Project Title

DAB

1200
2500

2500
Project Location
1600

1600
1600

1596

2800

2800
JINKA
SECTION

600
Client
and
ELEVATION JINKA UNIVERSITY

Consultant

E-Mail: acutengineering@gmail.com
Designation W-1 W-2 W-3 TW1 Tel : 251-11-8602050,
Fax: 251-11-6392120
P.O.Box: 23219 Code 1000,
Location th st nd th W-4
Ground -4 Floor Ground -1 Floor Ground -2 Floor Ground -4 Floor Addis Ababa,Ethiopia

Opening Size (1800mmx1600mm) (1200mmx1600mm) (1000mmx2500mm) (1210mmx600mm) Ground -4th Floor Designed By License/Signature
Misgana A. PAR/1632
(1800mmx2800mm)
Quantity (pcs) (31-Pieces) (10-Pieces) (18-Pieces) (10-Pieces) Checked-By Approved-By
Semeneh M. PAR/1296 Semeneh M. PAR/1296

LTZ-38 LTZ-38 LTZ-38 (2-Pieces) CAD By


Frame LTZ-38 Misgana A. PAR/1632

Date Design Stage


4mmTinted Glass LTZ-38 September, 2020 FINAL
Glazing 4mmTinted Glass 4mmTinted Glass 4mmTinted Glass
Sheet Title

4mmTinted Glass Window & Door Schedule


Window Door Schedule
01 1:50
Scale Rev. No. Sheet No.

1:50 No.
AR
14/14

You might also like