Professional Documents
Culture Documents
GWP-01
Plan for
Integrity
SAEP 303
Engineering
Reviews of Project
1
Integrity Operating SSWP-01-01
SWP-02-01
Window from PMT Manage
Plan Design Integrity
Change
2 3 4 5
SWP-02-02
SWP-02-03 SWP-02-04 SWP-02-05
Prepare Proactive
Prepare Inspection Prepare Preliminary Prepare Corrosion
Performance
Integrity Strategy Maintenance Plan Management Strategy
Detection Strategy
6
Integrity Approved
Approve Integrity
design
of Design
GWP-03
Manage
Integrity for PMT Design
Procurement & Team
Construction
CorManPro_DESIGN_10 integrated 1
14/12/2009 5 SWP-02-05
GWP-02
Manage Integrity
for Design
1
TWP-02-05-01
Develop Corrosion
Risk
Assessment
5.1
2
TWP-02-05-02
Develop Corrosion
Management Design
Strategy
5.2
3
TWP-02-05-03
Develop Corrosion
Management Tactical
Design
5.3
Approve Integrity of
Design
GWP-03
Manage Integrity
for Procurement
& Construction
CorManPro_DESIGN_10 integrated 2
14/12/2009 TWP-02-05-01 : Develop Corrosion Risk Assessment 5.1 TWP-02-05-01
5.1
SWP-02-05
Prepare
Corrosion
Management
Strategy
2
SAES-L-133 Follow design
SAEP-343 methodology in
SAES-L-133
Theoretical
considerations
Materials
Selection 3
Identify Threats
Industry To Assets
experience Likelihood of failure
Rate of deterioration
Life Criteria
Models
SWP
02-01
5
Plan Integrity
for Design SWP-02-02 SWP-04-02
Evaluate sensitivity to
Prepare IOW Manage IOW
assumptions eg
Strategy In Operate
process variables
6 7 Specify
operational
Rank Risk Record of
Environmental
For each threat/ Assumptions
Conditions
element
Assessment
assumptions
8
CRA
CRA review Report
TWP
02-05-02
Develop Corrosion
Management
Design Strategy
5.2
CorManPro_DESIGN_10 integrated 3
14/12/2009 TWP-02-05-02 : Develop Corrosion Management Design Strategy 5.2a TWP-02-05-02a
5 5.1
TWP
02-05-01
Develop Corrosion
Risk
Assessment
CRA
Establish design
SA standards
corrosion
SAES-L-133
allowance
GWP-01
Plan for
Integrity
TWP
2 Y 02-05-03
Are Risks
Develop Corrosion
Risk assessment Acceptable?
Management
(eg QRA) Tactical Design
N
5.3
3
Define mitigation
activities
to reduce risk
4
Define performance
limit for mitigation
activity
5 Define method of
monitoring and
Measurement of
mitigation
performance
7
Define performance
limits
Acceptance/rejection
criteria
8
Define corrective
action on non
Conformance with
performance limit
5.1b
CorManPro_DESIGN_10 integrated 4
14/12/2009 TWP-02-05-02 : Develop Corrosion Management Design Strategy 5.2b TWP-02-05-02b
5.1a
9
Define
Organisational functions
responsible for mitigation
Monitoroing/measurement
Corrective action
10
Develop Corrosion
Management
Responsibility Matrix
11
Strategic Plan
Document Strategic
Plan
TWP
02-05-03
Develop Corrosion
Management
Tactical Design
5.3
CorManPro_DESIGN_10 integrated 5
14/12/2009 5.3 TWP-02-05-03
TWP-02-05-03 : Develop Corrosion Management Tactical Design
5 5.2
TWP
02-05-02
Develop Corrosion
Management
Design Strategy
CRA
1
SAES-L-132
SAES-L-136 SAES-L-133 MSD
Piping EWP-02-05-03-01
SAES-L-105
Select Materials
SAES-G-005 5.3.1
SAES-G-006
Pumps
SAES-G-007
SAES-H-001 EWP-02-05-03-02
SAES-H-002 Develop Corrosion
Coatings/ CTSC-1000 Control Strategy
Insulation INGG-1000
SAES-H-004
5.3.2
SAES-L-108
SAES-L-109 3
SAES-L-130
Develop Corrosion Record
Vessels/Units/ SABP-A-020
SAES-L-310 Monitoring Philosophy
Systems
SAES-E-004 and Design
SAES-B-017
SAES-F-007
SAES-E-007
SAES-D-001
SAES-F-001 4
SAES-E-006 EWP-02-05-03-03
SAES-D-109 Develop Process
SAES-S-040 Stream Monitoring
SAES-D-100 Strategy
SABP-A-013
VESST001 5.3.3
VESV1002
VESBI002
SAMSS
SAES-X 5
EWP-02-05-03-04
Develop Corrosion
Monitoring Inspection
Standard &Testing Strategy
Drawings
5.3.4
6
AWP
02-02-01-01-04 EWP-02-05-03-05
Plan PPD for Develop Detailed
Functional Corrosion Design
Integrity
5.3.5
A
SWP
02-02 7
AWP Develop Plant Define performance
02-02-01-01-05 Operation Driven limits at item level
Plan PPD for Strategy, Guidelines and identify actions
Functional
Integrity & Specifications required
in Design
8
Carry out Review
Corrosion
of actions to bring
Control Plan
within operating
envelope
SWP Manage
02-05 Projects
Prepare Corrosion
Management
Strategy
CorManPro_DESIGN_10 integrated 6
14/12/2009 5.3.1a EWP-02-05-03-01a
EWP-02-05-03-01 : Select Materials
5.3
TWP
02-05-02
Develop Corrosion
Management
Design Strategy
SAES-L133
SAEP-20
1
CRA
Corrosion N Apply relevant
an issue? Code/standard
API-571
Y
3 AWP
Metallurgical or Y 02-05-03-01-01
mechanical Assess Metallurgical/
degradation? Mechanical
Degradation
N
5.3.1.1
4
AWP
Y
Environment 02-05-03-01-02
Crack-inducing? Assess Environmental
Cracking
Crevice Corrosion
5 AWP
SAES-L-105 MIC Y 02-05-03-01-03
Temperature
Assess High
Galvanic Corrosion >300C?
Temperature
Corrosion
Erosion-Corrosion
SAES-L-132 N
5.3.1.3 Link to MSD
SABP-A-024 CO2 Corrosion
Aqueous Corrosion
ISO 15156
Sour Water Corrosion
6
Select
Amine Corrosion corrosion control
measures giving max
SABP-A-013 Ammonium Chloride&Bisulphide CR=3mpy and/or
Corrosion select adequate CA
Hydrochloric/Hydrofluoric/Napthanic/
SAER-5942 Carbonic/Phosphoric/Sulphuric Acid
Corrosion
7
Determine CA
From design calcs
Codes or standards
(min 1.6mm)
5.3.1b 5.3.1b
CorManPro_DESIGN_10 integrated 7
14/12/2009 5.3.1b EWP-02-05-03-01b
EWP-02-05-03-01 : Select Materials/Control Options
5.3.1
5.3.1a a
8 Evaluate
Y Alternative measures
eg Cra(corrosion
CA>6.35mm?
resistant alloy)/non-
metallic materials,
coatings, CP
N
9 AWP
02-05-03-01-04 Corrosion
Assess applicability Control
Of Carbon Steel & Option report
Define control
options
5.3.1.4
Y Apply
Carbon Steel
SAES-L-133
Adequate?
10
Materials
Select material options Selection
Report
11
Y AWP
Qualification 02-05-03-01-05
Required? Execute Material Link from AWP
Qualification 02-05-03-01-01
N
5.3.1.5
12
AWP
02-05-03-01-06
Assess Economics
of Choices
5.3.1.6
13
14
MSD
Finalise Material (Material Selection
Control Selection Diagram)
EWP-02-05-03-02
Develop Corrosion
Control
Strategy
5.3.2
CorManPro_DESIGN_10 integrated 8
14/12/2009 5.3.1.1aAWP-02-05-03-01-01
AWP-02-05-03-01-01: Assess Metallurgical/Mechanical Degradation
5.3.1
EWP
02-05-03-01
Select Materials
API-571
API-5L
SAES-L-133
SAES-L-105
ISO 15156
NACE MR175
SA standards for
refractory eg
SAES-N-100
SAES-N-140 2
Assess susceptibility
to Spheroidization
Assess susceptibility
to Graphitization
3
Assess susceptibility
to Embrittlement:
Temper, 475C, Sigma
phase
Assess susceptibility
to Brittle Fracture
5
Assess susceptibility
to Creep/Stress
Rupture
6
Assess susceptibility
to Short Term
Overheating – Stress
Rupture
7
Assess susceptibility
to Fatigue: Thermal,
Mechanical,
Vibrational
5.3.1.1
b
CorManPro_DESIGN_10 integrated 9
14/12/2009 5.3.1.1bAWP-02-05-03-01-01
5.3.1.1
a
8
Assess susceptibility
to Dissimilar Weld
Cracking
9
SAES-L-132
Assess susceptibility
SAES-L-133
to Thermal Shock
10
Assess susceptibility
to Erosion/Erosion-
Corrosion
11
Assess susceptibility
to Cavitation
12
Assess susceptibility
to Refractory
Degradation
EWP
02-05-03-01
Select Materials
5.3.1
CorManPro_DESIGN_10 integrated 10
14/12/2009 5.3.1.2AWP-02-05-03-01-01
AWP-02-05-03-01-01 : Assess Environmental Cracking
5.3.1
EWP
02-05-03-01
Select Materials/
Control Options
SAES-L-133
NACE-RP-0296
NACE MR-0175/NACE 1
MR-0103/ISO15156
Base material resistant Assess susceptibility
to SSC
2
01-SAMSS-016
Assess susceptibility
01-SAMSS-035
to HIC
4Assess susceptibility
SABP-A-001 to SCC
SAES-W-010 (Polythonic Acid,
SAES-W-011 Amine, Carbonate,
SABP-A-013 Chloride, Caustic,
Ammonia)
For operating and
downtime conditions
EWP
02-05-03-01
Select Materials/
Control Options
5.3.1
CorManPro_DESIGN_10 integrated 11
14/12/2009 5.3.1.3AWP-02-05-03-01-03
5.3.1
EWP
02-05-03-01
Select Materials
API-571
SAES-L-133
Assess susceptibility
to Oxidation
Assess susceptibility
to Sulfidation
Assess susceptibility
to Decarburization
Assess susceptibility
to Carburization
5
Assess susceptibility
API-RP-941
to Hot Hydrogen
Attack
Assess susceptibility
to Metal Dusting
Assess susceptibility
to Fuel Ash Corrosion
Assess susceptibility
to Nitriding
EWP
02-05-03-01
Select Materials
5.3.1
CorManPro_DESIGN_10 integrated 12
14/12/2009 5.3.1.4 AWP-02-05-03-01-04
AWP-02-05-03-01-04 : Assess Applicability of Carbon Steel & Define Control Options
5.3.1.
EWP
02-05-03-01
Select Materials/
Control Options
Acquire
Operating conditions
Corrosion
Prediction
models 2 Determne
SLC
(Service Life
Corrosion)
Standard
CA
Determine optimum
economic options
Report on Application
and Effectiveness of
Control Options for Manage
Carbon Steel Projects
EWP
02-05-03-01
Select Materials/
Control Options
5.3.1
CorManPro_DESIGN_10 integrated 13
14/12/2009 5.3.1.5 AWP-02-05-03-01-05
AWP-02-05-03-01-05 : Execute Material Qualification
5.3.1
EWP
02-05-03-01
Select Materials/
Control Options
CRA Report
Determine failure
SAES-L-133 modes
API-571
API-581
Other industry
documents
(API,NACE,ISO)
Y
Acceptable by
past experience?
Y
Acceptable by
General test data?
2
Regulated Vendor List Initiate
Specify
Approved Commodity List in SAP Manufacturer Qualification Manage
Material testing
SA Best Practices for Vendor Qualification Programme Projects
methodology
Surveys and Qualification Specify tests
Choose
N Alternative
Tests acceptable?
Selection
method
EWP
02-05-03-01
Select Materials/
Control Options
5.3.1
b
CorManPro_DESIGN_10 integrated 14
14/12/2009 5.3.1.6a AWP-02-05-03-01-06a
5.3.1.6
AWP EWP
02-05-03-01-04 02-05-03-01
Economic Select Materials/
Assessment Control Options
Determine
Cost of Material
2
Determine cost of
corrosion protection
systems
3
Determine cost of
Fabrication/
installation/
commissioning
4
Determine cost of
Inhibitor/chemical
injection
Determine cost of
Corrosion monitoring
Determine cost of
Inspection plan
Determine cost of
Monitoring plan
Determine cost of
maintainability
Determine cost of
workforce
5.3.1.6
b
CorManPro_DESIGN_10 integrated 15
14/12/2009 5.3.1.6b AWP-02-05-03-01-06b
5.3.1.6
a
10
Determine cost of
Maintenance plan
11
Determine potential
Losses of Production
12
Determine costs of
replacement
13
Determine residual
values
14
Determine
Discounted LCC
(Life Cycle Cost)
15
Select material
Control strategy
Based on min cost
EWP
02-05-03-01
Select Materials/
Control Options
5.3.1b
CorManPro_DESIGN_10 integrated 16
14/12/2009 5.3.2 EWP-02-05-03-02
5.3 5.3.1
EWP
02-05-03-01
Select Materials/
Control Options
TWP
02-05-03
Develop Corrosion
Management
Tactical Design
5.3
CorManPro_DESIGN_10 integrated 17
14/12/2009 AWP-02-05-03-02-01 : Establish Chemical Injection/Inhibition Plan 5.3.2.1 EWP-02-05-03-02-01
5.3.2
SAES-L-133
SAES-A-205
EWP
02-05-03-02
Oilfields Chemicals
Develop Corrosion
Evidence
Control Strategy
SABP-A-015
1
Strategic Plan
Select system
types
CRA Report
Select injection 4
SARCOP
procedures points
Evaluate and Select
Chemicals
5 SWP
01-SAIP-04 Inspection 02-03
Establish Inspection Prepare
SAEP-20 Plan
Plan Inspection
Integrity
Strategy
8 6
SWP
Establish Injection Maintenance 02-04
Establish Injection System maintenance Plan Manage
Requirements plan Maintenance
in Design
SWP
7 02-02
Define solution Operations Develop Plant
Dosage Plan Operation Driven
9 Injection rates Strategy, Guidelines
& Specification
Establish Operating/ In Design
Maintenance/Safety
Procedures
SAES-A-205
SAES-A-208 AWP
04-02-03-02-06
10
Generate
Establish Chemical Appropriate Integrity
Quality Control Driven Operation
Procedure Actions to Respond
to Transitional &
Abnormal
GSWP Operations
03
Manage
Change
11
SGWP-07 Establish Injection point
Manage
Manage Documentation details
Projects
Knowledge System
EWP
02-05-03-02
Develop Corrosion
Control Strategy
5.3.2
CorManPro_DESIGN_10 integrated 18
14/12/2009 5.3.2.2 EWP-02-05-03-02-02
AWP-02-05-03-02-02 : Establish Cathodic Protection Plan
5.3.2
EWP
02-05-03-02
Develop Corrosion
SAEP-332 Control Strategy
SAEP-333
1
Select CP
locations
Establish Protection
Criteria
5 Plan Equipment
Inspection :
CP Schedules
Rectifiers, anodes,
solar power systems
connections
6
CP Maintenance
Establish Equiipment
Plan
Maintenance/Test
plan
SAEP-333
7
CP Schedules
Plan CP Potential
Locations
Survey
Establish Safety
procedures
GI-0428-001
9
Establish Roles
Responsibilities
Competencies
NACE
International
CP Level 1
Certification
10
Establish Resource
Manage
Resource Plan Plan
Projects
11
Establish KPIs
EWP
02-05-03-02
Develop Corrosion
Control Strategy
5.3.2
EWP
02-05-03-02
Develop Corrosion
Control Strategy
SAEP-1025
SAEP-1662
Establish Roles
Responsibilities
Inspection
Establish Need
Sample analysis
Define
Schedule
Scale
Select Stages
analysis
Establish
Procedures
6
Review
Approve
Procedures
procedures
8
Establish Safety
Requirements
9
Resource
Establish Resource Plan Manage
Plan Projects
10
Establish KPIs
EWP
02-05-03-02
Develop Corrosion
Control Strategy
5.3.2
CorManPro_DESIGN_10 integrated 20
14/12/2009 5.3.2.4 AWP-02-05-03-02-04
AWP-02-05-03-02-04 : Establish Paints/Coatings/Linings Plan
5.3.2
EWP
02-05-03-02
Develop Corrosion
Control Strategy
1
GSWP
02 Establish
Manage Competency
Competency
2
Corrosion
Identify Inspection
Review
Locations
SAES-H-002
SAES-H-101
SAES-H-001
SAES-H-003
SAES-H-004
SAES-H-100 3
Establish
SAES-H-200 Internal Selection
SAES-H-201 Requirements/
Procedures
4 Establish
External Selection
Requirements/
Procedures
5
SAES-H-002V
Identify approved
SAES-H-101V
APCS coatings
6
SAES-H-102 Establish
HSE Requirements
7 SWP
Coating 02-03
Prepare
Inspection plan Manage
Inspection plan
Inspection
in Design
8
Coating
Prepare Resource Manage
Resource plan
Plan Projects
EWP
02-05-03-02
Develop Corrosion
Control Strategy
5.3.2
CorManPro_DESIGN_10 integrated 21
14/12/2009 5.3.3a EWP-02-05-03-03
EWP-02-05-03-03 : Develop Process Stream Monitoring Strategy
5.3
TWP
02-05-03
Develop Corrosion
Management
SABP-A-013
Tactical Design
SABP-A-016
SABP-A-018
SABP-A-019
SABP-A-020
SABP-A-021
1
Select Physical and
Chemical
Parameters
Establish Sampling
Locations
CRA
Report
3
Process Stream
Establish sampling Monitoring
Frequency and schedule
Methodology
4
Establish Field and
Lab Operating
Procedures
5 6
Method
Prepare
Prepare Lab Statements and
Stream Monitoring
Quality Plan Quality plans
Method statements
7
SM resource
Prepare Resource
plan
Plan
Draft SM
Plan
9
Submit Draft
for Approval
N Y Agreed SM
Manage
Approved? plan
Projects
5.3.3
b
CorManPro_DESIGN_10 integrated 22
14/12/2009 5.3.3b EWP-02-05-03-03
EWP-02-05-03-03 : Develop Process Stream Monitoring Strategy
5.3.3
a
10
Process Stream
Monitoring Plan/ Prepare Monitoring
Resource Plan List
11
Review/Revise
Existing Method
Statements/Quality
Plans
12
Draft method
Statements/Quality
Plans
13 Establish:
-Acceptance Criteria,
-Accuracy
Requirements,
-Turnaround time
14
Submit Drafts
for Approval
15
N Y Method
Issue Approved statements Manage
Approved?
Method/Quality plans Quality plans Projects
TWP
02-05-03
Develop Corrosion
Management
Tactical Design
5.3
CorManPro_DESIGN_10 integrated 23
14/12/2009 5.3.4 EWP-02-05-03-04
EWP-02-05-03-04 : Develop Corrosion Monitoring Inspection and Testing Strategy
5.3
SWP-05-02
Inspect
Assets TWP
02-05-03
Develop Corrosion
Management
Tactical Design
SABP-A-013
SABP-A-016
TWP SABP-A-018
02-03-01 SABP-A-019
Plan SABP-A-020
Inspections SABP-A-021
SAES-L-133
1
Plan OSI
(On stream
Inspections)
2 4 5 6 7 AWP
AWP AWP AWP
Plan EIS 02-05-03-04-04
02-05-03-04-01 02-05-03-04-02 02-05-03-04-03
(Equipment Plan
Plan Plan Probe Plan
Inspections) ILI
Coupons Program Management CUI Program
(Pipelines)
SABP-325 9
SABP-317 SAEP-20 Establish data
SABP-1143 management software
SABP-1144
SABP-1145
SABP-1146
EWP
02-05-03-05
Develop detailed
corrosion design
5.3.5
CorManPro_DESIGN_10 integrated 24
14/12/2009 5.3.4.1 AWP-02-05-03-04-01
AWP-02-05-03-04-01 : Plan Coupons Program
5.3.4
EWP
02-05-03-04
Develop Corrosion
Monitoring
Inspection and
SABP-A-013
Testing Strategy
SABP-A-016
SABP-A-018
SABP-A-019
SABP-A-020
SABP-A-021
SAES-L-133 1
Establish
Roles/Responsibilities
2
Establish
Safety
Procedures
Establish Schedule
4
Establish
Monitoring Points
Establish
Coupon Types
Establish
Times of Retrieval
EWP
02-05-03-04
Develop Corrosion
Monitoring
Inspection and
Testing Strategy
5.3.4
CorManPro_DESIGN_10 integrated 25
14/12/2009 5.3.4.2 AWP-02-05-03-04-02
5.3.4
EWP
02-05-03-04
01-SAMSS-023 Develop Corrosion
Monitoring
Inspection and
Testing Strategy
SABP-A-013
SABP-A-016
SABP-A-018
SABP-A-019
SABP-A-020
SABP-A-021
SAES-L-133 1
Select Locations
CRA
Report
2
Select
LPR Probe Types
Galvanic appropriate for
ER damage mechanisms
UT
ML
3 Establish probe
management system,
AER
data management
CMS
systems and interface
requirements
4
Establish
Probe
Measurement
Schedules
Schedule (for non
continuous monitoring)
5
CRA Establish probe Probe
Report maintenance/ Maintenance Plan
replacement plan
01-SAMSS-023
EWP
02-05-03-04
Develop Corrosion
Monitoring
Inspection and
Testing Strategy
5.3.4
CorManPro_DESIGN_10 integrated 26
14/12/2009 5.3.4.3 AWP-02-05-03-04-03
AWP-02-05-03-04-03 : Plan CUI Program
5.3.4
EWP
02-05-03-04
Develop Corrosion
Monitoring
Inspection and
Testing Strategy
00-SAIP-74
NACE-RP0198
EFC-55
SAES-L-133
2
TWP
SSWP-02-05
02-03-01 Identify all susceptible
Inspect
Plan systems
Assets
Inspections
CRA
Report
3
Identify all
Inspection
Locations
4
Visual Identify
Instrumental Inspection
Stripping Methods
Review Repair
Procedures 7
Prepare Visual
Inspection Plan
6 Prepare
8 Instrumental
SWP
Inspection Plan
Prepare CUI 02-03
(low power
Inspection Inspection plan Manage
radiography/X-ray/
Plan Inspection
Linear accelerator/
in Design
Insulation sensors
EWP
02-05-03-04
Develop Corrosion
Monitoring
Inspection and
Testing Strategy
5.3.4
CorManPro_DESIGN_10 integrated 27
14/12/2009 5.3.4.4 AWP-02-05-03-04-04
AWP-02-05-03-04-04 : Plan In-Line-Inspections (pipelines)
3.4.4
EWP
02-05-03-04
Develop Corrosion
Monitoring
Inspection and
Testing Strategy
SABP-A-019
SAES-L-133
Establish Schedule
/Inspection Date
2
Establish Method
U/T, MFL
3
Regulated Vendor Identify and
List Commission
Contractor/Tool
EWP
02-05-03-04
Develop Corrosion
Monitoring
Inspection and
Testing Strategy
5.3.4
CorManPro_DESIGN_10 integrated 28
14/12/2009 5.3.5 EWP-02-05-03-05
EWP-02-05-03-05 : Develop Detailed Corrosion Design
5.3
EWP
02-05-03-04
Develop Corrosion
Monitoring
Inspection and
Testing Strategy
SABP-A-013
SABP-A-016
SABP-A-108 1
SABP-A-019
SABP-A-020 Equipment design
SABP-A-021 considerations for
SABP-A-015 monitoring
SAES-L-133
Design detailing to
facilitate inspection
3 Select locations
configurations and
orientations that minimise
threats to integrity (eg
deadlegs,crevicfes,low
flow areas)
4 Design to allow
Optimise
more reliable
redundancy
and
CRA Report
effective
Eg backup inspection,
injection
adequate
pumps
access for
I&M equipment
Design for
maintainability
7 AWP
02-05-03-05-01
Establish Design
Basis for
Cathodic Protection
5.3.5.1
8 AWP
02-05-03-05-02
Establish Design
Basis for
Chemical Injection
5.3.5.2
TWP
02-05-03
Develop Corrosion
Management
Tactical Design
5.3
CorManPro_DESIGN_10 integrated 29
14/12/2009 5.3.5.1a AWP-02-05-03-05-01a
AWP-02-05-03-05-01 : Establish Design Barriers for Cathodic Protection
5.3.5
EWP
02-05-03-05
Develop Detailed
Corrosion
Design
SAES-X-300
SAES-X-400
SAES-X-500
SAES-X-600
SAES-X-700
17- SAMSS-004 1
17-SAMSS-005
17-SAMSS-006 Establish design
17-SAMSS-007 philosophy
17-SAMSS-008
17-SAMSS-012
17-SAMSS-017
Standard drawings
2
Establish potential
Criteria/current density
criteria
3
Specify design lifes for
impressed current
and/or galvanic
system
4 Conduct soil
resistivity/conductivity
measurements over a
representative sample
of locations
5
17-SAMSS-04
Optimise sizing of
17-SAMSS-05
rectifier
6
17-SAMSS-06 Number and size
Establish design detail
17-SAMSS-07 requirement of
of anodes
anode beds
7
Establish design detail
17-SAMSS-17
Type and size of
cable, jacket
Design bonding/cable
connections
9
17-SAMSS-18 Establish monitoring
SAEP-333 capability
(test stations/holes)
5.3.5.1
b
CorManPro_DESIGN_10 integrated 30
14/12/2009 5.3.5.1b AWP-02-05-03-05-01b
5.3.5.1
a
10
Design bonding
Electrical continuity
Electrical insulation
11
12
Develop workscope
13 14
15
CSD review/approval
EWP
02-05-03-05
Develop Detailed
Corrosion
Design
5.3.5
CorManPro_DESIGN_10 integrated 31
14/12/2009 5.3.5.2a AWP-02-05-03-05-02
AWP-02-05-03-05-02 : Establish Design Basis for Chemical Injection
5.3.5
EWP
02-05-03-05
Develop Detailed
Corrosion
Design
SABP-A-015
1
SABP-A-205
SAES-L-133
Establish design basis
01-SAIP-04
2
Establish design
Requirements for
chemicals/materials
3
Ensure effective
design of CI pump/
storage tank
Evaluate chemical/
Chemical Alliance
environment
Source chemical
6
Evaluate by test for all
variations in operating
conditions
(for purity,
compatibility etc)
Test
N Approved?
Select chemical
Chemical/material
Cost effective?
5.3.5.2
b
CorManPro_DESIGN_10 integrated 32
14/12/2009 5.3.5.2bAWP-02-05-03-05-02
5.3.5.2
a
8
Evaluate quill for
stress, fatigue, flow
induced vibration
10
Ensure injection point
locations adequate
access for Ops
monitoring
EWP
02-05-03-05
Develop Detailed
Corrosion
Design
5.3.5
CorManPro_DESIGN_10 integrated 33