Name of the client Sinohydro Corporation Ltd Joint type Butt Joint
Name of Project Matarbari Coal Base Power Station Weld Preparation Single Vee
Acceptance standard ASME SEC VIII D1 Material M/S
Application Procedure ASME SEC VIII D1 Welding Process MIG Welding
Testing Standard ASME SEC 5,ART-7 Time of testing AC-18sec,DC-10sec
Tested Proportion 1:2 Surface Preparation Smooth
Viewing Condition Day Sun light, Night 1000 lux ,fluorescent Surface Temp. Normal Temp
method UV-black Light
Technic & Parameter
Instrument Type:Yoke-Type (Electromagnetic) Instrument NO: MNH13I91
Yoke Type: AC &HWDC both Lifting Power: AC-4.5KG,DC-18.5KG
Magnetizing Method: Electro magnetic Tested Sensitivity: ASTM BLOCK-6 line visible
Contrast paint: Orion WCP 61 Magnetic INK: Orion-60-BA
Method of Applying INK: Spraying Steel Rule: 150mm
01 Pile Pipe Boiler -01/P-1 PHN-BA126 600 mm N/A Welding ASME SEC VIII Accepted
D1
02 Pile Pipe Boiler- 01/P-2 PHN-BA126 600 mm N/A Welding ASME SEC VIII Accepted
D1
03 Pile Pipe Boiler- 01/P-3 PHN-BA126 600 mm N/A Welding ASME SEC VIII Accepted
D1
04 Pile Pipe Boiler- 01/P-4 PHN-BA126 600 mm N/A Welding ASME SEC VIII Accepted
D1
House# 64, (1st Floor), Road# 06, Block# A, Sec# 12, Mirpur, Dhaka-1216, Phone: +8804477972245, 01710134359,
01711834576, E-mail: iesbd2000@gmail.com, ahies.bd@gmail.comashik@iestechbd.com, amit@iestechbd.com,
Web: www.iestechbd.com
IES-INDUSTRIAL ENGINEERING SERVICES
House# 64, (1st Floor), Road# 06, Block# A, Sec# 12, Mirpur, Dhaka-1216, Phone: +8804477972245, 01710134359,
01711834576, E-mail: iesbd2000@gmail.com, ahies.bd@gmail.comashik@iestechbd.com, amit@iestechbd.com,
Web: www.iestechbd.com