SOE210164 /NOV-KASAWARI

PLAN PROGRESS 100% Total QTY 100% 100%


ACTUAL PROGRESS 34% 3 100% 70%
PIPA FITTING

Liner/P QTY
NO No Spool Description DN Spec Plan Sisa Progress Plan Sisa Progress
N Order

1 LOOSE PART FLANGE SLONGSONG 1200 1,3 186 1 6-Sep 0.00 100% 28-Dec 0.2 80%
2 LOOSE PART FLANGE SLONGSONG 1200 1,3 186 1 7-Sep 0.00 100% 28-Dec 0.2 80%
3 LOOSE PART FLANGE SLONGSONG 1200 1,3 186 1 8-Sep 0.00 100% 28-Dec 0.5 50%
4
100% 100% 100% 100%
0% 0% 0% 0%
DRILL BUBUT FINISHING INSPECTION

Must Finish Rencana Aktual


Plan Sisa Progress Plan Sisa Progress Sisa Progress Day code Sisa Progress Plan
Date Selesai Selesai

2-Jan 1 0% 3-Jan 1 0% 5-Jan 1 1 0% 7-Jan 30-Dec 1 0% 8-Oct


2-Jan 1 0% 3-Jan 1 0% 5-Jan 1 1 0% 7-Jan 30-Dec 1 0% 8-Oct
2-Jan 1 0% 3-Jan 1 0% 5-Jan 1 1 0% 7-Jan 30-Dec 1 0% 8-Oct
100% 100%
0% 0%
PACKING DELIVERY
N
o
Packing List Actual Plan Actual C No SJ
O
C
30-Dec 11-Oct 30-Dec ### 30-Dec
30-Dec 11-Oct 30-Dec ### 30-Dec
30-Dec 11-Oct 30-Dec ### 30-Dec
Project Name Project Name :
NOV-FLANGE 48INC FOR KASAWARI PROJECT
PO Number PO Number : TLP0011090
Contractor PT. contraktor : PT.ORI POLYTEC COMPOSITES

Activities Mon Tue Wed Thu Fri Sat Sun man x day

Agustus Date 13 14 15 16 17 18 19
Production of Laminasi 4 4 4 4 4
Worker
high risk activities

#VALUE!
Thursday Resume :
Laminasi

No Pict
Problem :

Action :

Friday Resume :
Laminasi

No Pict
Problem :

Action :

Saturday Resume :
Laminasi

No Pict
Problem :

Action :
Sunday Resume :
Laminasi

Problem :
None

Action :

Monday Resume :

Problem :

Action :

Tuesday Resume :

No Pict
Problem :

Action :

Wednesday Resume :

No Pict
Problem :

Action :
man x day hr

20 140