FASE I
1 OBRAS PRELIMINARES
2 OBRAS CIVILES
Plan 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
2.1 REPLANTEO Y NIVELACION TOPOGRAFICA 40 2-Jun-21 14-Jul-21 4 1,900 5.24% Real 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Pron.
Plan 5.00 5.00 5.00 5.00 10.00 10.00 15.00 15.00 10.00 10.00 10.00
2.2 DEFORESTACION MEDIANA Y LIMPIEZA 9 6-Jun-21 16-Jun-21 6 800 2.21% Real 10.00 10.00 10.00 10.00 20.00 20.00 20.00
Pron.
Plan 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 5.00 5.00 5.00 5.00 5.00
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION
2.4 DE ACERO DE REFUERZO Fy= 4200 Kg/CM2 UTILIZANDO 30 2-Jun-21 1-Jul-21 8 1,920 5.30% Real 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
CABILLA # 4 AL # 7 PARA INFRAESTRUCTURA
Pron.
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION Plan 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 5.00 5.00 5.00 5.00 5.00
DE ACERO DE REFUERZO Fy= 4200 Kg/CM2 UTILIZANDO
2.5 30 2-Jun-21 1-Jul-21 4 960 2.65% Real 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
CABILLA IGUAL O MENOR DEL # 3 PARA
INFRAESTRUCTURAS Pron.
Plan 1.50 1.50 1.50 9.83 19.00 10.67 2.33 2.33 3.17 3.17 4.00 4.67 3.83 3.83 3.83 2.17
SUB-TOTAL FASE I
Real 0.50 0.50 0.50 4.67 8.00 11.33 8.83 8.00 9.67 9.67 7.17 3.83 3.83 3.83 0.50 0.50
Plan 0.30 0.30 0.30 1.97 3.80 2.13 0.47 0.47 0.63 0.63 0.80 0.93 0.77 0.77 0.77 0.43
SUB-TOTAL DEL PROYECTO
Real 0.10 0.10 0.10 0.93 1.60 2.27 1.77 1.60 1.93 1.93 1.43 0.77 0.77 0.77 0.10 0.10
FASE II
3 OBRAS MECANICAS
4 OBRAS ELECTRICAS
CONSTRUCCION FACILIDADES ELECTRICAS EN 115
KV PARA INTERCONEXION DE LINEAS TRAMO Corte 19/06/2021
PETROCEDEÑO- PETROPIAR
Plan 5.00 5.00 10.00 10.00 10.00 10.00 10.00 5.00 5.00 5.00 5.00
EXCAVACION, CON BARRENO PARA FUNDACIONES DE 15 7-Jun-21 21-Jun-21 5 600 1.66% Real 5.00 5.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 5.00 5.00
4.1
TORRES
Pron.
Plan 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION
4.3 30 7-Jun-21 10-Jul-21 4 960 2.65% Real 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
DE CONCRETO 250 Kg/M2 PARA FUNDACIONES DE TORRES
Pron.
Plan 25.00 25.00 25.00 25.00
4.4 REPLANTEO Y NIVELACION DE PORTICOS 4 10-Jun-21 13-Jun-21 4 128 0.35% Real 25.00 25.00 25.00 25.00
Pron.
Plan 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
4.5 REPLANTEO Y NIVELACION DE TORRES SD5 Y ATD90 30 7-Jun-21 10-Jul-21 4 960 2.65% Real 2.00 2.00 2.00 2.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Pron.
Plan 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
CLASIFICACION Y SELECCIÓN DE ESTRUCTURAS DE
4.7 20 8-Jun-21 28-Jun-21 8 1,280 3.53% Real 5.00 5.00 5.00 5.00 10.00 10.00 10.00 10.00 10.00 10.00
CELOSIAS DE 115 KV PARA PORTICOS
Pron.
Plan 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
CLASIFICACION Y SELECCIÓN DE ESTRUCTURAS DE
4.8 20 8-Jun-21 28-Jun-21 8 1,280 3.53% Real 5.00 5.00 5.00 5.00 10.00 10.00 10.00 10.00 10.00 10.00
CELOSIAS DE 115 KV PARA TORRES SD5 Y ATD90
Pron.
Plan 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
FABRICACION Y TRANSPORTE DE PERFILES METALICOS
4.9 20 8-Jun-21 28-Jun-21 7 1,120 3.09% Real 5.00 5.00 5.00 5.00 5.00 10.00 10.00 10.00 10.00 10.00
PARA TORRES TIPO SD-5 Y PORTICOS
Pron.
FASE III
Plan
2.3 EXCAVACION A MANO PARA FUNDACIONES 15 21-Jun-21 5-Jul-21 5 800 2.21% Real
Pron.
Plan
ARMADO DE PORTICO DE TRANSICION DE LINEA CON
3.1 15 28-Jun-21 12-Jul-21 21 2,520 6.95% Real
POSTES SUMINISTRADOS POR PDVSA
Pron.
Plan
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION
4.2 15 25-Jun-21 9-Jul-21 4 480 1.32% Real
DE CONCRETO 250 Kg/M2 PARA FUNDACIONES DE PORTICO
Pron.
Plan
RELLENO Y COMPACTACION PARA FUNDACIONES DE
4.6 7 25-Jun-21 1-Jul-21 6 120 0.33% Real
PORTICOS
Pron.
Plan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL FASE III
Real 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL DEL PROYECTO
Real 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FASE IV
Plan
INSTALACION DE CADENA DE AISLADORES DE AMARRE DE
4.11 5 7-Jul-21 11-Jul-21 7 280 0.77% Real
115 KV CON SUS HERRAJES
Pron.
Plan
INSTALACION DE CADENA DE AISLADORES DE
4.12 5 7-Jul-21 11-Jul-21 7 280 0.77% Real
SUSPENSION DE 115 KV CON SUS HERRAJES
Pron.
Plan
4.13 SUMINISTRO E INSTALACION DE VARRILLAS DE ARMADO 5
CONSTRUCCION FACILIDADES ELECTRICAS EN 115
KV PARA INTERCONEXION DE LINEAS TRAMO Corte 19/06/2021
PETROCEDEÑO- PETROPIAR
4.13 SUMINISTRO E INSTALACION DE VARRILLAS DE ARMADO 5 7-Jul-21 11-Jul-21 5 200 0.55% Real
Pron.
Plan
TENDIDO Y TENSADO DE CONDUCTOR DE ALUMINIO , TIPO
4.14 7 7-Jul-21 13-Jul-21 32 1,792 4.94% Real
ACAR CALIBRE 500 KCMIL.
Pron.
Plan
INSTALACION DE HERRAJES PARA CABLE DE GUARDA
4.15 5 7-Jul-21 11-Jul-21 5 200 0.55% Real
TIPO GUAYA DE ACERO GALVANIZADO 3/8" EN SUSPENSION
Pron.
Plan
TENDIDO Y FLECHADO DEL CABLE DE GUARDA TIPO
4.16 7 7-Jul-21 13-Jul-21 22 1,232 3.40% Real
GUAYA DE ACERO GALVANIZADO DE 3/8"
Pron.
Plan
INSTALACION DE AMORTIGUADORES TIPO STOCKBRIDGE
4.17 7 7-Jul-21 13-Jul-21 7 392 1.08% Real
PARA CONDUCTOR ACAR CALIBRE 700 KCMIL
Pron.
Plan
INSTALACION DE AMORTIGUADORES TIPO STOCKBRIDGE
4.18 PARA CABLE DE GUARDA TIPO GUAYA DE ACERO 7 7-Jul-21 13-Jul-21 7 392 1.08% Real
GALVANIZADO DE 3/8"
Pron.
Plan
SUMINISTRO E INSTALACION DE PLACAS DE NUMERACION
4.19 5 7-Jul-21 11-Jul-21 3 120 0.33% Real
DE TORRE
Pron.
Plan
4.20 SUMINISTRO E INSTALACION DE PLACAS DE PELIGRO 5 7-Jul-21 11-Jul-21 3 120 0.33% Real
Pron.
Plan
SUMINISTRO E INSTALACION DE PLACAS DE
4.21 2 7-Jul-21 11-Jul-21 3 48 0.13% Real
IDENTIFICACION DE FASES (R,S,T)
Pron.
Plan
SUMINISTRO E INSTALACION DE JABALINA PARA EL
4.22 7 7-Jul-21 13-Jul-21 5 280 0.77% Real
SISTEMA DE PUESTA A TIERRA
Pron.
Plan
4.23 MEDICIONES DE PUESTA A TIERRA 3 10-Jul-21 11-Jul-21 3 72 0.20% Real
Pron.
Plan
PRE-COMMISSIONING ARRANQUE Y PUESTA EN MARCHA
4.24 3 11-Jul-21 13-Jul-21 10 240 0.66% Real
DE LINEA ELECTRICA
Pron.
Plan 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 10.00 10.00 10.00 10.00 10.00
4.25 SUMINISTRO VEHICULO FLOTA LIVIANA 1 0 0.00% Real
Pron.
Plan
1.3 DESMOVILIZACION 2 13-Jul-21 14-Jul-21 8 128 0.35% Real
Pron.
Plan 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.63 0.63 0.63 0.63 0.63 0.00
SUB-TOTAL FASE IV
Real 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plan 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.09 0.00
SUB-TOTAL DEL PROYECTO
Real 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL Plan 0.00 0.35 0.35 0.35 2.01 3.85 2.71 1.66 1.86 3.16 3.16 3.68 4.83 3.48 3.48 3.07 2.44
36,244 100.00% Real 0.00 0.10 0.10 0.10 0.93 1.60 2.63 2.95 2.99 4.45 4.78 5.30 5.66 4.78 4.37 3.17 2.96
Pron.
Plan 0.00 0.35 0.69 1.04 3.05 6.90 9.61 11.27 13.14 16.29 19.45 23.12 27.95 31.43 34.91 37.98 40.42
Actual 0.00 0.10 0.20 0.30 1.23 2.83 5.47 8.42 11.41 15.86 20.64 25.94 31.59 36.37 40.73 43.90 46.87
Pron. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Desv. 0.00 -0.25 -0.49 -0.74 -1.82 -4.07 -4.14 -2.85 -1.72 -0.43 1.19 2.82 3.64 4.94 5.82 5.92 6.45
Jun-21 Jun-21 Jun-21 Jul-21 Jul-21
18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun 30-Jun 1-Jul 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul 10-Jul 11-Jul 12-Jul 13-Jul 14-Jul TOTAL
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
100.00
85.00
0.00
100.00
75.00
0.00
0.00
0.00
0.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 1.00 100.00
90.00
0.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 100.00
90.00
0.00
1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.33 1.33 1.33 1.33 1.33 0.33 0.33 0.33 0.33 0.33 0.33 0.17 0.17 0.17 0.00 0.00 0.00 0.00 100.00
0.50 0.50 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 82.83
0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.27 0.27 0.27 0.27 0.27 0.07 0.07 0.07 0.07 0.07 0.07 0.03 0.03 0.03 0.00 0.00 0.00 0.00 20.00
0.10 0.10 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.57
0.00
0.00
0.00
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 100.00
5.00 5.00 40.00
0.00
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 10.00 10.00 10.00 100.00
5.00 5.00 90.00
0.00
3.00 3.00 3.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 100.00
20.00
0.00
Jun-21 Jun-21 Jun-21 Jul-21 Jul-21
18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun 30-Jun 1-Jul 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul 10-Jul 11-Jul 12-Jul 13-Jul 14-Jul TOTAL
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
0.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.00 100.00
45.00
0.00
100.00
100.00
0.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.00 100.00
100.00
10.00 10.00 90.00
0.00
3.55 3.55 3.55 3.73 3.27 3.27 3.27 3.27 3.73 3.05 3.05 1.45 1.45 1.00 1.00 1.00 0.55 0.55 0.55 0.55 0.55 0.36 0.36 0.00 0.00 0.00 0.00 100.00
5.91 4.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 78.64
1.60 1.60 1.60 1.68 1.47 1.47 1.47 1.47 1.68 1.37 1.37 0.65 0.65 0.45 0.45 0.45 0.25 0.25 0.25 0.25 0.25 0.16 0.16 0.00 0.00 0.00 0.00 45.00
2.66 2.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.39
5.00 5.00 5.00 5.00 5.00 5.00 10.00 10.00 10.00 10.00 10.00 5.00 5.00 5.00 5.00 100.00
0.00
0.00
10.00 10.00 10.00 10.00 10.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 100.00
0.00
0.00
5.00 5.00 10.00 10.00 10.00 10.00 10.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 100.00
0.00
0.00
15.00 15.00 15.00 15.00 15.00 15.00 10.00 100.00
0.00
0.00
0.00 0.00 0.00 1.25 1.25 1.25 1.25 6.25 6.25 8.75 11.25 11.25 11.25 10.00 5.00 3.75 3.75 3.75 2.50 2.50 2.50 2.50 1.25 1.25 1.25 0.00 0.00 100.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.25 0.25 0.25 0.25 1.25 1.25 1.75 2.25 2.25 2.25 2.00 1.00 0.75 0.75 0.75 0.50 0.50 0.50 0.50 0.25 0.25 0.25 0.00 0.00 20.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0.00
10.00 10.00 10.00 20.00 20.00 20.00 10.00 100.00
0.00
0.00
20.00 20.00 20.00 20.00 20.00 100.00
0.00
0.00
10.00 10.00 10.00 20.00 20.00 20.00 10.00 100.00
0.00
0.00
0.00
0.00
10.00 10.00 10.00 20.00 20.00 20.00 10.00 100.00
0.00
0.00
25.00 50.00 25.00 100.00
0.00
0.00
25.00 50.00 25.00 100.00
0.00
0.00
100.00
0.00
0.00
50.00 50.00 100.00
0.00
0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.88 11.88 11.88 16.56 19.69 10.94 7.81 3.13 100.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.78 1.78 1.78 2.48 2.95 1.64 1.17 0.47 15.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.90 1.90 1.90 2.23 2.02 2.02 2.02 3.02 3.23 3.39 3.89 3.17 3.17 2.72 1.52 1.27 1.06 1.06 0.81 2.59 2.56 2.48 2.93 3.20 1.89 1.17 0.47 100.00
2.76 2.23 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.95
0.00
42.31 44.21 46.10 48.33 50.35 52.38 54.40 57.42 60.65 64.04 67.92 71.10 74.27 76.98 78.50 79.77 80.83 81.89 82.70 85.30 87.86 90.33 93.27 96.47 98.36 99.53 100.00
49.63 51.85
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7.31 7.64 -46.10 -48.33 -50.35 -52.38 -54.40 -57.42 -60.65 -64.04 -67.92 -71.10 -74.27 -76.98 -78.50 -79.77 -80.83 -81.89 -82.70 -85.30 -87.86 -90.33 -93.27 -96.47 -98.36 -99.53 -100.00
FECHA DE CORTE
ACUM DESV APORTE
100.00
85.00 -15.00 -0.05
0.00
100.00
75.00 -25.00 -0.09
0.00
100.00
100.00
40.00 -60.00 6.22
0.00
100.00
90.00 -10.00 9.24
0.00
100.00
20.00 -80.00 -11.12
0.00
FECHA DE CORTE
ACUM DESV APORTE
100.00
0.00
100.00
45.00 -55.00 -1.46
0.00
100.00
100.00 0.00 0.00
0.00
100.00
100.00
90.00 -10.00 -0.03
0.00
100.00
0.00 -100.00 -2.21
0.00
100.00
0.00 -100.00 -6.95
0.00
100.00
0.00 -100.00 -1.32
0.00
100.00
0.00 -100.00 -0.33
0.00
100.00
0.00 -100.00 -0.77
0.00
100.00
0.00 -100.00 -0.77
0.00
100.00
FECHA DE CORTE
ACUM DESV APORTE
100.00
0.00 -100.00 -1.08
0.00
100.00
0.00 -100.00 -1.08
0.00
100.00
0.00 -100.00 -0.33
0.00
100.00
0.00 -100.00 -0.33
0.00
100.00
0.00
0.00
CONSTRUCCION FACILIDADES ELECTRICAS EN 115 KV PARA INTERCONEXION DE LINEAS TRAM
100.00
90.00
80.00
70.00
% de Avance
60.00
55,85%
50.00
44,21%
40.00
30.00
20.00
10.00
0.00
n n n n n n n n n n n n n n n l l
Ju Ju Ju Ju Ju Ju Ju Ju Ju Ju Ju Ju Ju Ju Ju Ju Ju
2- 4- 6- 8- 0- 2- 4- 6- 8- 0- 2- 4- 6- 8- 0- 2- 4-
1 1 1 1 1 2 2 2 2 2 3
TERCONEXION DE LINEAS TRAMO PETROCEDEÑO- PETROPIAR
Plan
Actual
Pron.
n n n n l l l l l l l
Ju Ju Ju Ju Ju Ju Ju -Ju 2-Ju 4-Ju
6- 8- 0- 2- 4- 6- 8- 1 0 1 1
2 2 3