Width 20 ft
Thickness of wall = 0.75 ft
No of beam = 2 nos
width of beam = 1 ft
No of bay in slab = 3 nos
Width of three bay
Bay 1 = 8 ft
Bay 2 = 7 ft
Bay 3 = 8 ft
Clear Width of verandha = 8 ft
Thickness of Slab = 150 mm
Size of beam = width 1.166667 ft
Height 1.666667 ft
R/f in one beam = 2 nos 20 mm bar
6 nos 16 mm bar
0 nos 12 mm bar
stirrup nos 8 mm bar
Dia of Main R/f in slab = 10 mm bar
Dia of D/s R/f in Slab = 8 mm bar
Spacing of main bar = 150 mm
Spacing of D/s bar = 200 mm
Beam
Main Bar
length of one 20 mm bar = Clear span+Inclined length-Elongated length+bend length of bar
= 7.311138 mtr
Weight of one 20 mm bar = d^2*length of bar/162
= 18.05219 kg
Weight of 20 mm bar in one beam = 36.10439 kg
Wieght of 20 mm bar in one room = no. of beam*weight of 20 mm bar in one beam
= 72.20877 kg
IN Bay 3
Cut length of main R/f in slab = Clear span+Inclined Length -Elongation Length
= 2914.141 mm
Cut length of alternate main R/f in slab = 3645.849 mm
No of Main R/f in Bay 3 = Width of Room/main bar Spacing
= 20 nos
No of Alternate bar in Bay 3 = Width of Room/main bar Spacing
= 20 nos
Total Length of main bar in Bay 3 = 58.28283 mtr
Total length of alternate bar in Bay 3 = 72.91698 mtr
IN Bay 2
Cut length of main R/f in slab = Clear span+Inclined Length -Elongation Length
IN Verandha
Cut length of main R/f in slab = Clear span+Inclined Length -Elongation Length
= 2914.141 mm
Cut length of alternate main R/f in slab = 3645.849 mm
No of D/S R/f in Bay 1 = space for D/s bar placing/D/s bar Spacing
= 8 nos
No of Alternate bar in Bay 1 = space for D/s bar placing/D/s bar Spacing
= 8 nos
Total Length of D/S bar in Bay 1 = 52.61342 mtr
Total length of alternate bar in Bay 1 = 67.24757 mtr
No of D/s R/f in Bay 3 = space for D/s bar placing/D/s bar Spacing
= 8 nos
No of Alternate bar in Bay 3 = space for D/s bar placing/D/s bar Spacing
= 8 nos
Total Length of D/s bar in Bay 3 = 52.61342 mtr
Total length of alternate bar in Bay 3 = 67.24757 mtr
IN Bay 2
Cut length of D/sR/f in slab = Clear span+Inclined Length -Elongation Length
= 6576.678
Cut length of alternate main R/f in slab = 8405.946 mm
No of D/s R/f in Bay 2 = space for D/s bar placing/D/s bar Spacing
= 5 nos
No of Alternate bar in Bay 2 = space for D/s bar placing/D/s bar Spacing
= 5 nos
Total Length of D/s bar in Bay 2 = 32.88339 mtr
Total Length of alternate D/s bar in Bay 2 = 42.02973 mtr
IN Verandha
Cut length of D/s R/f in slab = Clear span+Inclined Length -Elongation Length
= 8101.068 mm
in one beam
108.5 mm
= 128 mm
2d length Rest length
868 mm
f beam-2*clear cover-stirrup dia-half of bar dia 4818.87804878049
bar 1
bar 2
0.15L
0.3L
0.25L
0.15L
0.3L
0.25L
e ht of beam
Clear Cover in beam/slab = 25 mm
d=dia. Of bar
20 mm bar
16 mm bar
gth 2d length
878049 mm