This material request form is for the SGH Madinah Renovation Project (Project Code: 10129). It requests 360 square meters of steel structure ramp fabrication, supply, and installation according to drawings and specifications (Cost Code: 05-01-020). The request was made by Zahid Iqbal from Sec/Dept on February 16, 2019 and requires project manager approval.
This material request form is for the SGH Madinah Renovation Project (Project Code: 10129). It requests 360 square meters of steel structure ramp fabrication, supply, and installation according to drawings and specifications (Cost Code: 05-01-020). The request was made by Zahid Iqbal from Sec/Dept on February 16, 2019 and requires project manager approval.
This material request form is for the SGH Madinah Renovation Project (Project Code: 10129). It requests 360 square meters of steel structure ramp fabrication, supply, and installation according to drawings and specifications (Cost Code: 05-01-020). The request was made by Zahid Iqbal from Sec/Dept on February 16, 2019 and requires project manager approval.