This document provides an overview of remaining work items across multiple systems at a facility. It lists 21 remaining work items, including cleaning, door support installation, climate control machine installation and testing, electrical box installation, drawing completion, testing plans, network connections, missing parts, internal kit installation, O&M manual completion, as-built drawings, key handovers, showcase installations, drilling and mount installations, showcase redesigns and connections, moving and dismantling of showcases, bottom interior panel installation, and drawing completions. The status of each item is also noted as waiting on information, installation, testing, or payment.
This document provides an overview of remaining work items across multiple systems at a facility. It lists 21 remaining work items, including cleaning, door support installation, climate control machine installation and testing, electrical box installation, drawing completion, testing plans, network connections, missing parts, internal kit installation, O&M manual completion, as-built drawings, key handovers, showcase installations, drilling and mount installations, showcase redesigns and connections, moving and dismantling of showcases, bottom interior panel installation, and drawing completions. The status of each item is also noted as waiting on information, installation, testing, or payment.
This document provides an overview of remaining work items across multiple systems at a facility. It lists 21 remaining work items, including cleaning, door support installation, climate control machine installation and testing, electrical box installation, drawing completion, testing plans, network connections, missing parts, internal kit installation, O&M manual completion, as-built drawings, key handovers, showcase installations, drilling and mount installations, showcase redesigns and connections, moving and dismantling of showcases, bottom interior panel installation, and drawing completions. The status of each item is also noted as waiting on information, installation, testing, or payment.
Cleaning part 2 Manuel Door support Swing door upper lock 3 Climat Control Installation of CC machines and testing With Ahmed 2 new switcher 4 Xervon with Mohamed Xervon Boxes Installation CIRs of SC electical works Durlum control room- drawing Durlum Manuel 5 Durlum 2021 Durlum testing plan Durlum network connection (BOJV) Missing parts With PMC internal Kit 5001 Done 6 PMC Reply Location of 6.001 and 2.009 Internal Kit TEN 5.001 & 2.010 With PMC OMM after Vos installation 8 Record and as built drawings electrical- Piping 2010 New plinth With Mimoun 9 SC works 3.010 and 3.013 Renew graphic panel With Isabel 10 Keys Hand over Waiting For BOJV 11 Installation Installation of Object and the Shrines . 2021 Waiting For Statmenet from BOJV 12 VO 5 Plinth Drilling and Fixation of the Mounts adaptors Open not paid 13 VO 6 Redesign of showcase TUT_SC_5_002 14 VO7 Connection detail SC 5_003 and 5_016 With PMC 15 VO 8 SC 5_016 additional scope base plates + plinth 16 VO 9 Obelisk Showcase Ready for Installation / not paid 17 VO 10 Moving of SC 2_009; 3_024, 3_027, 3_029 dismanteling With PMC 18 VO 11 Bottom interior panel for 3_011 Cancelled 19 VO 12 New showcases 6_001 waiting for information Light Design with BOJV 20 VO 13 New showcases 3_036 B waiting for information With PMC Climate control drawings for 2009-6001 21 Drawings electrical- Piping/ Design and Shopdrawings