You are on page 1of 25

BUILDING

ESTIMATES
By: Ar. Gemar F. Emmanuel
LESSON 10:
METHOD OF ESTIMATION
LESSON 10:
METHOD OF ESTIMATION

METHODS OF
ESTIMATION

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION

WHY WE ESTIMATE ?
Estimation helps us knowing the quantity of work,
labour, materials and funds that will be required for
the entire project thus enabling us to be prepared
beforehand

To the owner, it provides a reasonable, accurate idea


of the costs. This will help him or her decide whether
the work can be undertaken as proposed, needs to be
modified, or should be abandoned.

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
CONSTRUCTION COST
OF A HOUSE IN THE PH

 Rates are rules of thumb only


 A lot of factors may impact the
cost, ie soil state, market
influence, labor, etc
 Rules of thumb are useful at the
early stages of design process
and managing expectations
 Ultra luxury houses can exceed
beyond the costs included here
AR 342: BU ILD IN G EST I M AT ES
LESSON 10:
METHOD OF ESTIMATION

Estimates reference book


By Max Fajardo

Estimates of quantities of
materials

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION

Construction cost handbook


By Langdon & seah Philippines

information contained herein should be


regarded as indicative and for general
guidance only

costs reflected in this handbook are


anticipated Manila costs in 4th Quarter
2015.

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
MINIMUM WAGE

ILOILO RATE

helper P 250 - 395


Skilled
(mason,
P 395-450
carpenter,
steel)
foreman P 450-700
As of 2021
AR 342: BU ILD IN G EST I M AT ES
LESSON 10:
METHOD OF ESTIMATION
CONSTRUCTION COST TRENDS FOR PH

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
KITHCEN EQUIPMENT COST FOR PH

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
FIT OUT COST FOR PH

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
FIT OUT COST FOR PH

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
M & E PLANT COST FOR PH

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
ANCILLARY FACILITIES COST FOR PH

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
CONSTRUCTION
COST FOR PH

UNITS EXPRESSED IN
US DOLLAR/ SQ.M

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
CONSTRUCTION
COST FOR PH

UNITS EXPRESSED IN
US DOLLAR/ SQ.M

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
M & E COST FOR PH

UNITS EXPRESSED IN
PH PESO/ SQ.M

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
M & E COST FOR PH

UNITS EXPRESSED IN
PH PESO/ SQ.M

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
RETAIL PRICES OF
BASIC
CONSTRUCTION
MATERIAL

PRICE PER BAG:


P 190-210

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
RETAIL PRICES OF
BASIC
CONSTRUCTION
MATERIAL

PRICE PER CU.M:


P 800-900 (SAND)

PRICE PER CU.M:


P 900-1,200 (GRAVEL)

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
RETAIL PRICES OF
BASIC
CONSTRUCTION
MATERIAL

PRICE PER PIECE:


P 12-15 (4”)

PRICE PER PIECE:


P 16-18 (6”)

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
RETAIL PRICES OF
BASIC
CONSTRUCTION
MATERIAL

PRICE PER BD. FT:


P 60-90 (softwood)

PRICE PER BD. FT :


P 90-180 (hardwood)

AR 342: BU ILD IN G EST I M AT ES


LESSON 10:
METHOD OF ESTIMATION
RETAIL PRICES OF
BASIC
CONSTRUCTION
MATERIAL

PRICE PER KG:


P 25-30 (16mm dia)

PRICE PER KG :
P 40-50 (32mm dia)

AR 342: BU ILD IN G EST I M AT ES


THANK YOU!
QUESTIONS?