EXAMPLE 1
START

ES=0
2 EF=2 4 ES=2 10 ES=6
EF=6 EF=16
A B C

6 4 7
ES=16 ES=22
ES=16
D EF=22 E EF=26 I EF=23

7 5
ES=22
ES=26 8
G EF=29
EF=31 ES=25
F J EF=33

9 4 5
ES=29
ES=31 ES=33
H EF=38 K EF=35
L EF=38
2
ES=38
M EF=40
6
N ES=38
EF=44

FINISH
EXAMPLE 2 -Sequence of Activities for House construction Project

Name Of the Starting and Finishing Description of activity Predecessor Time Duration
Activity event (Days)

A (0,1) Preaparing Working Drawings _____ 2 Weeks

B (1,2) Clean the Site A 2 Weeks

C (2,3) Excavate B 2 Weeks

D (3,4) Lay the Foundation C 5 Weeks

E (4,5) Column and Beam placement D 3 Weeks

F (5,6) Construction of rough wall E 3 Weeks

G (5,7) Put up the Slab/ roof E 3 Weeks

H (7,8) Plumbing Work G 2 weeks

I (6,9) Ceiling Work F 2 Weeks

J (9,10) , (7,10) Plastering Work G ,I 2 weeks

K (5,11) Do the electrical work E 1 Weeks

L (8,12) , (11,12) Put up the doors and Windows H ,K 1 Weeks

M (12,13) , (12,14) Install the flooring L 2 Week

N (13,16) , (14,16) Painting Work M 2 week

O (10,15) Compound fencing Work J 1 week

P (15,0) , (16,0) Complementry works N ,O 1 week


ES=0 ES=14 ES=19
S EF=0 ES=0 1 L 1 EF=20
2 EF=15
T 0 EF=2 12 ES=20
A 1 ES=2 11 2 EF=22
R
A 2 EF=4 ES=17
2 L M 14
T B EF=19
2
K 8 M N
ES=20 ES=22
ES=4
C ES=6 H EF=22 EF=23
EF=6 2 5 EF=11
3 ES=11 2 1
EF=14 3 ES=14 16
3 4 5 7 EF=17 13
D E G N
A. Prepare the Drawings
J P F
B. Clean the site F ES=14 I
EF=17 N
C. Excavate ES=19 ES=21 I
D. Lay the Foundation
6 3 ES=17 EF=21
1 EF=22 S
H
E. Column & Beam Placement I EF=19 2 15
F. Construction of Rough Wall 2 J P
G. Put up the slab / Roof
9 10 O
H. Plumbing Work
I. Ceiling Work
J. Plastering Work
K. Do the Electrical Work
L. Put up the Doors & Windows
M. Install the flooring
N. Painting Work
O. Compound Fencing Work
P. Complementary Works