Professional Documents
Culture Documents
CHEMICAL ELE.PANEL
400 WIDE DRAIN
SC-03 20W EMERGENCY FLUORESCENT WITH
E 02
FL-01 FL-04 FL-08 FL-12 FL-16 FL-20 FL-24 2 2 3 BUILT IN BATTERIES
STORAGE D1 E
FOR PACL CEILING FAN 00
NEUTRALIZATION POND
DISTRIBUTION BOARD 01
CONTRACTOR DRG NO
CML-MTD CONSTRUCTION LTD
NO:155, DHARMAPALA MAWATHA,COLOMBO - 07
CHEMICAL BUILDING
NWS&DB/CP/WIL/103/ME/14
CONTRACT NO
P&P/D&B/LBF/WILGAMUWA/2014 SMALL POWER PROJECT MANAGER PROJECT DIRECTOR
CML - MTD CONSTRUCTION NWS&DB
UP
400 WIDE DRAIN
+68 level
Ø32-NRV
10 OVER FLOW
EXTEND BACK TO
TANK
Ø32-PVC
+68 level A +150 level 11
Ø32
Ø50-PVC
UP
8
DUTY
LOP
STANDBY DUTY +68 level
PRE-LIME
DOSING UNIT
OVER FLOW
4 9
EXTEND BACK
over flow line is TO TANK
beneath 3 B 12
LINE TO BE
2450 1500 SLOPED DOWN
PT
2900
EMF 2
Ø50-
PVC EMF
STANDBY 7
2150 15 13
6
UP
+68 level PT +68 level
Ø32-
PVC
A 3 2 15 10
+150 level 5 Ø32-PVC
1
Ø50-PVC Ø32
4 1
1 Ø32-NRV
DUTY
OVER FLOW
14
5 EXTEND BACK TO
TANK
OVER FLOW DRAIN DRAIN
STANDBY
EXTEND BACK B
PACL-STANDBY
TO TANK Ø32-PVC
8
POST-LIME
DOSING UNIT 10 11
6 Ø32-PVC +68 level
PACL-DUTY
7 14 POST-LIME-STANDBY
9 12 13 Ø32-NRV POST-LIME-DUTY
EMF UP 32Ø SERVICE
WATER
+68 level PT Ø32-PVC
LOP
PS
4 Ø50 X 20 -PVC CLAMP SADDLE OR REDUCED FAUCETS TEE 4 2
PRESSURE
700
FOR FIXING SUCTION PRESSURE SWITCH
LOADING
468
VALVE 5 DIAPHRAGM DOSING PUMP 4 2
300
68
FLOOR
150
VIEW ON A - A 8
Ø32 X 20 -PVC CLAMP SADDLE OR REDUCED FAUCETS TEE FOR
FIXING DELIVERY PRESSURE GAUGE-FOR USE IN ADJUSTING PLV
4 2
15 Y-STRAINER Ø50 2 2
PS
700
OVERFLOW VALVE
300
FLOOR
150
150
LEVEL NOTE:
VIEW ON B - B 2. OVER FLOW VALVE, PRESSURE LOADING VALVE AND PULSATION DAMPER SHALL BE SELECTED TO SUIT
MANUFACTURER RECOMMENDATIONS AND FIXING SHALL BE DONE WITH NECESSARY FITTINGS
3. EMF CONNECTION DETAILS ARE TO BE OBTAINED FROM MANUFACTURER.
4. ALL THE PIPES TO BE SUPPORTED WITH CONCRETE COLUMNS ENCASED IN PVC PIPES
5. DRAIN PIPE WAS DN100 AND OVER FLOW PIPE WAS DN40 IN P&ID, BUT DUE TO THE COMMERCIAL
UN-AVAILABILITY OF SUCH SIZES WITH THE TANKS, THEY WERE CHANGED TO DN50 & DN32 RESPECTIVELY.
NOTE:
6. PUMP SHAPE MAY BE CHANGED WITH THE MANUFACTURER
1. SPACES BETWEEN FITTINGS CAN BE CHANGED TO SUIT THE 7. IN P&ID FOR ALUM ONLY ONE PULSATION DAMPER WAS GIVEN. BUT BY FOLLOWING MANUFACTURER
CONDITIONS AT SITE. RECOMMENDATIONS TWO PD WERE INTRODUCED.
2. SUPPORTS HAS NOT BEEN SHOWN FOR CLARITY.
3. INSTRUMENTATION-REFER P&ID
1505
1900
AGITATOR
570
SS304 PLATE
10mm THICK
SS304 C-CHANNEL
100x50x6
Ø12 HOLES FOR
M10 BOLTS
- PACL TANKS -
A LIME TANKS A
SCALE
PLAN
SCALE 1:25
FOR INFORMATION ONLY
CLIENT NATIONAL WATER SUPPLY AND DRAINAGE BOARD REV DESCRIPTION DATE SIGN DESIGNED ENG. DHANUSHKA APPROVED IN PRINCIPLE SUBJECT TO THE REV NO DATE
GALLE ROAD, RATHMALANA, SRI LANKA.
WILGAMUWA WATER SUPPLY PROJECT 0 1ST SUBMISSION 2017-11-16 DRAWN JAYASUNDARA
CONDITION THAT THE DESIGN & BUILD -2 2018-06-18
CONTRACTOR IS RESPONSIBLE FOR THE
DESIGN DRAWING TITLE -1 REVISED AS PER NWS&DB COMMENTS 2017-11-30 CHECKED ENG. WANW CONFORMITY OF THE DESIGN WITH SHEET SIZE SCALE
YUNICA ENGINEERS & CONSULTANT FUNCTIONAL & STRUCTURAL REQUIREMENTS.
NO:157/2, MUIBUN TOWERS DHARMAPALA MAWATHA ,COLOMBO - 07 -2 REVISED AS PER NWS&DB COMMENTS 2018-06-18 A3 AS SHOWN
CONTRACTOR CHEMICAL HOUSE BUILDING DRG NO
CML-MTD CONSTRUCTION LTD
NO:155, DHARMAPALA MAWATHA,COLOMBO - 07 DUST EXTRACTION HOPPER & ...................................................... ..............................................
NWS & DB /CP/WIL/103/ME/17
CONTRACT NO
P&P/D&B/LBF/WILGAMUWA/2014 DISSOLVING BASKET Sheet - 3 PROJECT MANAGER
CML - MTD CONSTRUCTION
PROJECT DIRECTOR
NWS&DB
1 2 3 4 5
10475
2015 2010 3725 2725
Ø140 PVC-YPE250
PIPE TO SUPPORTED
TO ROOF
Ø140 PVC-YPE250
20 Ø STOP TAP 20 Ø STOP TAP
AXIAL FAN SERVICE WATER
SERVICE WATER
SPRAY NOZLE PACL DISSOLVING
BASCKET
LEVEL SENSOR AGITATOR
1962 1567
SS304 C-CHANNEL
100x50x6
2550
2550
LIME PACL
TANKS TANKS
250
250
140
FABRICATED WITH SS304 FABRICATED WITH SS304
PLATE 3mm THICK PLATE 3mm THICK
150
150
1200
1200
90°
SS CHAIN
LOCK FABRICATED
HOLES Ø15 CENTER TO HOLES Ø15 CENTER TO 25 WITH SS304
550
CENTER 60mm CENTER 60mm 3mm PLATE
35
DOOR
150
500 500
70
FLANGE FABRICATED
WITH SS304 PLATE 6mm
THICK
FRONT
125
70
70
40
Ø1
500
125
640
640
Ø44 640
0
25
673
640
640 Ø 12 HOLES FOR M10
PLAN PLAN
673
DISSOLVING BASKET FOR DISSOLVING BASKET FOR
PACL - 2 NOS LIME - 2 NOS PLAN
SCALE 1:25 SCALE 1:25
PRE CL2-DUTY PG
2098
1932
POST CL2-DUTY
175
8
Ø32 PVC
1 POST CL2-STANDBY 1931
489
175
CHLORING BOOSTER PUMP CONNECTION DETAILS
SCALE 1:25
VIEW ON A - A VIEW ON B - B
SCALE 1:50 SCALE 1:50
WARNING LIGHTS
& HORNE
PUM-2 3 SCALE 2
Ø32 BY PASS 2m-TIN PLATED FLEXIBLE COPPER PIPES WITH
PANEL 4 4
CONNECTION VALVES
PUM-1
Ø50 PVC
5 COMMON HEADER 2