Professional Documents
Culture Documents
Section 1, Article IV, of the 1987 Philippine Constitution provides, “The state
shall promote the right of all citizens to quality education at all levels of education and
shall take appropriate steps to make such education accessible to all.” Both UNESCO
and the Department of Education believe that education is a human right for all through
life and that access must be matched with quality. Thus, all education providers must
gear towards achieving the Global Education 2030 agenda as comprehensively articulated
in Education 2030 Framework for Action (FFA) which serves as the roadmap towards
quality education for all. In this light, the aim of all education stakeholders towards
quality education is put as the top of the priorities and administrative agenda in Liloan
with the joint leadership of Honorable Mayor Ma. Esperanza Christina C. Frasco,
Honorable Congressman Vincent Franco “Duke” D. Frasco, and Public School District
Arcelo Memorial National High School with 4 teachers as starters to provide education to
a more or less than 300 students officially enrolled during the said year. After two
decades, Liloan National High School has been growing fast with current working force
of 129 teaching and 3 non-teaching personnel with a total enrollment of 4, 961 students.
Curriculum with complete programs for Junior and Senior High School brought about
several challenges at the same time opportunities to the school. Currently, progress and
2
uphold its commitment in the delivery of quality education for the Liloanon.
Education transforms lives and is at the heart of educative mission to build peace,
eradicate poverty and drive sustainable development where Philippine education policies
and programs are anchored from. However, the success of attaining the goal on quality
resource to pursue its educational objectives and the design of school funding policies
plays a key role in ensuring that resources are directed to where they can make the most
difference. After the series of education summits with collated feed backing through the
quarterly and annual evaluation using School’s Monitoring Evaluation and Assessment,
quality delivery of instruction is affected by school governance and leadership with its
leadership is now an education policy priority around the world. Increased school
autonomy and a greater focus on schooling and school results have made it essential to
reconsider the school structure and funding. Article 3 in The United Nation International
Covenant on Economic, Social and Cultural Rights of 1966 states that education shall be
made equally possible to all by every appropriate means, and in particular by the
prompted the creation of Republic Act No. 7160 cited as the “Local Government Code of
1991.” Section 2 stipulated that the territorial and political subdivisions of the State shall
enjoy genuine and meaningful local autonomy to enable them to attain their fullest
3
development as self-reliant communities and make them more effective partners in the
attainment of national goals. As a large number of developing towns like Liloan and
cities all over the country embarked on some form of decentralizations program, this
transformation is coupled with the growing interest in seeking new ways of better public
service to include basic education services in which the independence of Liloan National
High School matters. On these bases, this study was conducted for the following
objectives:
1.2 number of sections per grade level as of the school year 2020 – 2021;
1.7 school’s actual MOOE budget in the year 2020 and the proposed MOOE
within the context of a free and democratic system, maximum contribution of the
development and social progress (Republic Act No. 232). Henceforth, it is proposed that
Liloan National High School be granted with fiscal autonomy and become a separate
Liloan National High School has been improving for the past three years.
The rise of new buildings is visible. In fact, 12 classrooms were added in the year 2017-
2018 from its existing 40 classrooms in the year 2016-2018. These classrooms have been
used as evacuation centers when the needs arise. Multimedia per classroom and
computers have been added, and the school library is supplied with books. Moreover,
the school offers Alternative Learning System for out of school youth as Mr. Claudio
Jugalbot as ALS Coordinator. Indeed, Liloan National High School has gone a long way
in its quest for quality and relevant education because of the undying support coming
But with the increasing number of students, these achievements for the past three
years would not equate to the ballooning school population from 3,509 in the S.Y. 2016-
2017; 4,291 in the S.Y. 2017-2018; to 4,501 in the S.Y. 2018-2019, with an average
increase of about 22.29%. To answer this, classroom has been divided to cater these
As the number of students increases, a high demand for teachers also increases.
The number of teachers being hired for the last three years would still not suffice the
need of the school. Data from the School Improvement Plan of 2018 show that the
5
teacher –learner ratio is 1:35, above the planning of size per class. But currently, the six
teachers have been deployed in Catarman Integrated School and one in Liloan National
High School – Don Bosco Campus .There might be a conclusion that this would be
enough to produce excellent students. Despite this, the school is still far behind the 75%
NAT MPS. This is reflected in the school’s NAT result in 2017-2018 which is 44.76%,
far below the standard. Checking on teachers’ profile would give the idea that most
teachers who are handling subjects that are not of their expertise may result to teachers’
poor attitude toward the subject (Haselkorn and Harris, 1998). It could also be attributed
The dropout rate is alarming with an increase of 2% per year. This is because of
the two prevailing factors which are the Economic and Environmental. Economic factors
include jobless parents and insufficient budget for schooling. They are thinking that
satisfying ones’ stomach is more important than satisfying the need for the brain. In
addition, environmental factors cause students to drop schooling since they can’t feel
comfort in school with too crowded classroom and unavailable comfort rooms plus the
Moreover, the problem on literacy alongside with the numeracy skills pose a
great challenge to the school. Being keen in providing solutions of the needs for physical
facilities and instructional materials and equipment is the need for a distinct effort in the
competencies.
6
school facilities that have impacts on students’ behavior and attendance (O’Neil, 2000).
Department of Education provides school textbooks but this would not be enough since
our textbook ratio to learner is 1:3 or even none. Although the fact that different
instructional materials such as television and projector per classroom are provided, still,
this would never replace the printed materials that the learners can easily access to and
A. Enrolment
Table 1. Five Consecutive Scholastic Year Enrolment in Liloan National High School
GRADE
LEVEL SY 2016-2018 SY 2017-2018 SY 2018-2019 SY 2019-2020 SY 2020-2021
VII 788 943 1047 828 736
VIII 677 750 1006 900 713
IX 632 681 810 874 996
X 516 613 736 745 940
XI 206 368 575 617 977
XII 0 199 341 421 599
TOTAL 2819 3554 4515 4385 4961
Table 1 shows the enrolment in Liloan National High in five consecutive school
years. Evidently, the enrolment of Grade 7 to 12 from 2016-2017 until the current year
2020 – 2021 has been continuously increasing. The school’s total population of 2,819 in
Table 2 shows that there is a total 74 sections that Liloan National High School
currently has. Grade IX has the most number with 19 sections while Grade 7, 11 and 12
have the least number with 12 sections each. The opening of the high school program in
Liloan National High School since the former has started to operate its Grade 7 and
Grade levels.
composed of 129 personnel in which 124 are classified as teaching personnel which
includes SPST I to Master Teacher I and 3 are non-teaching which includes the
Figure 1 shows that there are 14 buildings within the school premise in which 10
are used as classrooms while 4 one-storey buildings are used as computer laboratory,
administration and other essential offices. The total lot area of the school vicinity is
9,214 square meter. There proposed new structural projects: 20 classroom building
9
demolished and a two storey building intended for additional classrooms and science
E. Classroom Inventory
NO. OF
No BUILDING CLASSROOMS REMARKS
.
Table 4 shows that there are 10 buildings used as classrooms. The school has a
total of 42 classrooms in which majority needs major repair and 3 rooms for demolition
10
due to major structural damage based on the assessment conducted by the Municipal
Table 5. Actual Personal Services in the Year 2020 and the Projected Personal
Services from the Year 2020 to 2021
Civilian
Cash Gift-Civilian 5010215001 495,000.00 495,000.00 680,000.00
Productivity 5010299012 495,000.00 495,000.00 680,000.00
Enhancement
Incentive –
Civilian
TOTAL 40,191,812.54 42,678,032.32 61,287,864.82
Table 5 shows the actual personal services in the year 2020 and the projected
personal services from the year 2021 to 2022. It is shown that the personal services have
been increasing due to the increasing salary of personnel. Annex 6 provides the details of
G. School’s Actual MOOE Budget in the Year 2020 and the Proposed MOOE
Budget from 2021 to 2021
Table 6. School’s Actual MOOE Budget in the Year 2020 and the Proposed MOOE
Budget from 2021 to 2021
PROPOSED
PAST YEAR CURRENT
Unified Account BUDGET
OBJECT OF (2020) YEAR (2021)
Code Structure (2022)
EXPENDITURES Actual Estimated
(UACS) Estimated
Expenses Expenses
Expenses
Repair and Maintenance-
5021304002 150,000.00
School Building
Repair and Maintenance-
5021304099 85,000.00
Other Structures
Repair and Maintenance –
Other Machineries & 5021305099 25,000.00
Equipment
Repair and Maintenance- 134640
5021307000 132,000.00
Furniture and Fixtures
102000
Traveling Expenses 5020101000 25,000.00 100,000.00
47940
Training Expenses 5020201000 40,000.00 47,000.00
1861500
Office Supplies Expenses 5020301000 200,000.00 1,825,000.00
Other Supplies and 5020399000 180,000.00 144,000.00 146880
12
Materials Expenses
47940
Water Expenses 5020401000 47,000.00
47940
Electricity Expenses 5020402000 47,000.00
Telephone Expenses- 12240
5020502000 132,000.00 12,000.00
Landline
Internet Subscription 48960
5020503000 48,000.00
Expenses
12240
Representation Expenses 5029903000 12,000.00
Transportation and 62220
5029904000 61,000.00
Delivery Expenses
Janitorial Services 5021202000 288,000.00
Other Maintenance and
5029999002 493,450.00
Operating Expenses
Security Services 5021203000 432,000.00
Postage and Courier
5020501000 11,000.00
Expenses
Printing and Publication
5029902000 155,000.00
Expenses
Semi-expendable Other
Machinery and 5020321099 85,000.00
Equipment Expenses
Semi- expendable Office
5020321002 30,000.00
Equipment
Semi-expendable ICT
5020321003 80,000.00
Equipment
Semi-expendable Sports
5020321012 50,000.00
Equipment
2524500
TOTAL
2,461,450.00 2,475,000.00
Table 6 shows the school’s actual MOOE budget in the year 2020 and the
proposed MOOE budget from 2021 to 2022. From 2020 to 2021 there is 0.55% increase
and 2% projected increase because of the probable enrolment surge and inflation.
13
Based on the data presented and the collated School Monitoring, Evaluation, and
Assessment Survey Report and Conferences conducted in school from previous School
Year 2019-2020 with the First Quarter Report of SMEA on School Year 2020 – 2021, the
following concerns, issues and recommendations are raised by major stakeholders such as
a. The enrolment in five consecutive years from School Year 2016 – 2017
accommodate the total number of 74 sections from Grade VII to Grade XII;
c. The total working force of Liloan National High School as of the school year
2020-2021 is 129. There are 4 non-teaching and 125 teaching staff. Based on the
basic formula in computing the teacher-learner ratio, the school’s current ratio is
1:41, and it is within the given DepEd class size standard. However, in reality, the
average class size is 55 to 70 which is beyond the ideal class size. Primarily, this
is due to the ancillaries that many teachers have, and are not assigned as advisers.
14
Some hired teachers are not in line with the actual need of the school because
the plantilla of items for teachers. In most cases, a new plantilla is granted only
d. The land area of Liloan National High School is 9, 214 square meters. Based on
school has 2,001 to 3,000 students should have 30, 000 square meters.
Considering the school’s land area, it is too small to accommodate 4, 961 learners
e. Most of the school buildings need major repair to make them functional and
f. It is projected that the school will also have increasing personal services due to
the salary and other benefit increase provided by the government. Thus, if the
school is granted with fiscal autonomy, it will be easy for the school personnel to
update and claim their salary and benefits. The school with its fast growing
population and classified as Urban Mega School has only 1 Master Teacher
because of the absence of plantilla making slim chances for promotion compared
to implementing schools. Moreover, the lack of teachers and the slow processing
continuously increase. If the school is granted with fiscal autonomy, the long
15
bureaucratic procedure in granting the MOOE will be shortened and the school
V. RECOMMENDATIONS
1. Provision of sufficient budget for the minor and major repair of classrooms to
make the school learning environment more functional and conducive to effective
learning, and for the additional buildings preferably high rise considering the limited lot
area of the school, and personal services for the teaching and non-teaching salaries and
benefits;
facilities where the youth are able to learn a range of core competencies;
4. Initiating the move for the separation from the mother school in accordance
with DepEd guidelines to speed up the budget allocation for personal services and
VI. REFERENCES
https://www.deped.gov.ph/wp-content/uploads/2019/08/DO_s2019_021.pdf
https://www.seameo-innotech.org/portfolio_page/k-to-12-toolkit/
https://en.wikipedia.org/wiki/Education_in_the_Philippines
https://www.un.org/sustainabledevelopment/education/
https://en.unesco.org/themes/education
https://www.unicef.org/education
https://www.undp.org/content/undp/en/home/sustainable-development-goals/goal-4-
quality-education.html
https://www.deped.gov.ph/wp-content/uploads/2014/08/DO_s2014_040.pdf
https://www.oecd-ilibrary.org/docserver/9789264276147-en.pdf?
expires=1615387471&id=id&accname=guest&checksum=51309D7AB02992671D6
D00B9F22ECF79
https://newsinfo.inquirer.net/256394/liloan-summit-hears-school-
concerns#ixzz6oiiuIOrb
17
CONCERNS/ TIME
PROPOSED
ISSUES/ CAUSE OF PROPOSED CORRECTIVE FRAME TO
AREA OF PREVENTIVE
GAPS/ OCCURRENCE: ACTION RESOLVE/
CONCERN MEASURE/S
PROBLEMS ADDRESS
(CIGPS)
1. Classroom Instruction
1.1. Some Too many Retooling, revisiting, Before the Review the
Curriculum competencies competencies revision/modification of DepEd start of every curriculum guide and
Management of the quarter curriculum quarter/ have it horizontal
in the academic and vertical
Curriculum year articulation between
Guides were learning areas and
not carried-out year level
and the quality Insufficient time Manage time wisely through Daily Before the Reconsider and
of carried allotment Lesson Plan start of the revised time
competencies Academic allotment
50 minutes per Year
session 3 sessions
for AP, weekly 2
sessions for EsP,
weekly
Lack of basic micro Integrate activities that improve Quarterly Proper and thorough
skill among students the basic macro skills planning of daily
lesson plans that suit
on the learning style
of the 21st century
learners
Class Interruptions Plan, limit & modify extra- Regular Strategic pre-
(School Activities, curricular activities and focus Faculty planning of monthly
18
Unsuitable Using of one-fit-all Create opportunities for authentic As soon as Planned for seminar-
used of strategy learning possible/ workshop on learning
method/ Search for new and active learning Quarterly delivery strategy and
strategy method/strategy method
Inattentiveness Too many Make lesson delivery more Throughout Use of ICT and
short attention distractions, interactive and interesting the School employ teaching
span of unconducive learning Year strategies that
students environment catches student
(limited space and interest
poor ventilation)
1.3 Limited to no Limited to no Look for alternative learning As soon as Identify LMs with
Learning available available LM resources possible inadequate number
Resources Learning delivered to the (A good and secured Internet of copies to no
Materials, school Connection is of great help) available copies
(LMs, Tools & Request & follow-up
Equipment, the Learners material
Projector, LCD) from Division Office
and usage of Lack of learning Include on the SOB on purchasing Drafting of Identify Tools &
Functional resources budget of tools & equipment among SOB and SIP Equipment,
Learning allocation others suggested by the Key Quarterly Projector, LCD and
Facilities persons the like to purchase .
(Laboratories,
classrooms
Limited number of Make-shifts As soon as Follow-up on the
classroom with possible proposed to-
immense number of construct classroom
learners buildings
Outdated LM Added new and Annotate the updates in the books As soon as Research
19
CONCERNS/ TIME
PROPOSED
ISSUES/ CAUSE OF PROPOSED CORRECTIVE FRAME TO
AREA OF PREVENTIVE
GAPS/ OCCURRENCE: ACTION RESOLVE/
CONCERN MEASURE/S
PROBLEMS ADDRESS
(CIGPS)
2. 90% learned Traditional way of Update Teaching strategies Quarterly Provide varied
Learning concepts teaching learning activities
Outcomes through rote
for the First learning and
Quarter only 10%
showed Higher
Order Skills
10% - 15% of Lack of Parent-Teacher-Student Throughout Intervention
the students interest/ focus Conference the Academic (Remedial
failed in First in learning Positive Discipline (PosDi) Year or/and Tutorial
Quarter Poor Study Classes
Habits, Regular follow-
Students up on student
Absenteeism, Academic
Tardiness, Status
cutting classes Inculcate
Non- GMRC in the
compliance of curriculum
Learning Tasks
6. Best Practices which ought to be replicated and adopted (this may be verbally done during FGD or during LAC
sessions)
6.1 Classroom Management (emphasis on physical environment/ classroom plant, classroom routine -
supervised recess/lunch break, getting in and out of the classroom for flag ceremony and participation in any
school initiated activity, orderliness and cleanliness of the classroom, good grooming and personal hygiene,
etc.)
Constant monitoring of the students most especially those who are failing
Application of lesson in real-life (contextualization)
Conduct a systematic class & classroom monitoring $ supervision (attendance, classroom cleanliness,
discipline)
Maintaining learning conducive classroom - well ventilated, clean and orderly.
Implementation of zero garbage policy
Empowering group leaders before, during and after classes
Giving of incentives for good deeds
Practicing the 10-minute habit, setting the classroom mood
6.2 Teaching Strategy (emphasis on critical content, preparation of LP/DLP/iPlan for newly hired)
Designing a student-centered learning activities which encourage collaboration and critical thinking
Give emphasis on individual board work and sample computations
Engage students to perform the task by means of cooperative learning and collaborative learning in
achieving specific goals
Exposure of learning through exhibits
Use of technology in lesson delivery/classroom instruction and presentation
Emphasis on actual hands-on and demonstration specially in science and TVL subjects
6.3 Forging Stakeholders (emphasis on attendance during classroom/school PTA meetings, planned homeroom projects,
student discipline, etc.)
Give appreciation to students whose parents always present during the Homeroom meeting or other
school related activities
Involvement of parents in school activities (feeding)
Giving of communications to parents ahead of time that is stipulated in the communication notebook
of the students
21
6.4 Student Discipline (emphasis on positive/constructive discipline, greetings utterances and gestures, etc.)
Knowing the students(their strengths and weakness) and building trust to carry-out PosDi
Established and implement strictly the house rules of every classroom at the beginning of classes
Constant parents, students and teacher conference as well as the close adoption of home visitation
High spirit in participation and involvement in social and academic programs
6.5 Other related activities to support attainment of the desired learning outcomes. (newly hired teachers -preparation of
records and forms of the learners, computation of grades, supplies and materials, etc.)
TIME
CONCERNS/ FRAME
ISSUES/ PROPOSED TO PROPOSED
AREA OF CAUSE OF
GAPS/ CORRECTIVE RESOLV PREVENTIVE
CONCERN OCCURRENCE
PROBLEMS ACTION E/ MEASURE/S
(CIGPS) ADDRES
S
1. SCHOOL MANAGEMENT
TIME
CONCERNS/ FRAME
ISSUES/ PROPOSED TO PROPOSED
AREA OF CAUSE OF
GAPS/ CORRECTIVE RESOLV PREVENTIVE
CONCERN OCCURRENCE
PROBLEMS ACTION E/ MEASURE/S
(CIGPS) ADDRES
S
1.2. Records
ADMINISTRA 1. Slow Limited number of Recommend to As soon The School Head has
TIVE processing Division Personnel to the Division Office as to address to the
LEADERSHIP and process documents to hire more possible Division Office
24
Have a transparency
Close monitoring As soon board on teachers’
of teachers’ load. as load.
possible/
Next
School
Year
1.3. Competency
CURRICULUM Managemen
INSTRUCTIO t School/ District/ Project monthly Monthly/ School Calendar has
N AND 1. Some Division activities, School/ District/ SY 2020- to be crafted by the
ASSESSMENT competenci programs and Division activities, 2021 school and for the
(competency es are not tasks/works programs and school for the
management, carried out tasks/works and teachers to budget
learning be cascaded in the competencies
resources, faculty meetings efficiently
assessment of
learning, Assessment
learning of Learning Addressing Before
delivery, critical 2. Students’ The Spiral learning gaps of the start
content) poor Progression Nature learners through of Recommend a
connection of the K-12 special/ remedial SY 2020 - feedback on the
from the Curriculum classes 2021 implementation of
previous Lack of interest the current
lessons and among learners curriculum from
the poor because they School to Division/
retention of already know that Region/ Central
25
1.4 Trainings/
HUMAN Seminars Subject/ Year-level
RESOURCE 1. Specialized Non-availability of Subject/ Year- Semi- coordinator propose
AND TEAM Skills training program and Level coordinators annually a plan of training
DEVELOPMEN Training budget collaborates with plan for his/her
T should be its subordinates of subordinates as
(trainings, made trainings needed approved by SH.
hiring of available
personnel, per
inset, ancillary Department
services) (subject/ Send some Every
department Persons [some] sent to teachers who may District/ Monitoring on
) attend the seminars also fit in the Division teachers who have
are believed to be seminars. sponsore and have not
2. Seminars fitted to be there. d attended special
are seminars seminars and
attended & Feedback on seminar
only by few Trainings attended.
persons
repetitively
TIME
CONCERNS/ FRAME
ISSUES/ PROPOSED TO PROPOSED
AREA OF CAUSE OF
GAPS/ CORRECTIVE RESOLV PREVENTIVE
CONCERN OCCURRENCE
PROBLEMS ACTION E/ MEASURE/S
(CIGPS) ADDRES
S
Cont… INSET
3. Topics Redundant/overlapping Try to ask As soon Craft a strategic plan
1.4 tailored not of topics teachers of as for INSET that
HUMAN on teachers possible topics possible focuses on new
RESOURCE and they want to have trends in effective
AND TEAM students’ for the INSET and and efficient
DEVELOPMEN need for recommend it to teaching for
T learning the District/ meaningful teaching-
(trainings, engagemen Division Office learning process.
hiring of t
personnel, Ancillaries are given to
inset, ancillary Ancillary those who are known SY 2020 -
services) Services to be qualified in the Designate one 2021 Determine qualified
4. Some position ancillary per teachers to hold an
teachers teacher ancillary and
have two or motivate him/her to
more take the position.
ancillaries
26
1.5 Canteen
FINANCE AND 1. Some foods No monitoring on the School Head and As soon Create an action plan
RESOURCE served in food and beverages canteen staff as for food and
MANAGEMEN the canteen sold in the canteen. have to comply possible beverages to be sold
T AND are not with the in the canteen and
MOBILIZATIO healthy guidelines Regular Monitoring
N stipulated in the and evaluation of the
(PTA, Canteen, DepEd Order # 13 plan.
Authorized series of 2017
Contributions, Budget is not enough
School MOOE, School to cover school’s Monthly
Donations) MOOE operating expenses Determine the Proper and effective
2. Allocation school’s monthly planning in allocating
of the expenses and the MOOE.
budget is proportionate the
inefficient budget. Maximize
the allocated
budget for each
determined
expense. Unused
budget from a
particular expense
must not be used
and must be
added to the next
budget allotted
budget. In case of
insufficiency of
budget, get from
emergency/
contingency fund.
Strengthen
linkages with
other private and
public sectors
TIME
CONCERNS/ FRAME
ISSUES/ PROPOSED TO PROPOSED
AREA OF CAUSE OF
GAPS/ CORRECTIVE RESOLV PREVENTIVE
CONCERN OCCURRENCE
PROBLEMS ACTION E/ MEASURE/S
(CIGPS) ADDRES
S
Cont…
Rest Rooms
4. Lack of Toilet bowls are Allocate budget Assign teachers to
1.6 functional damaged and for comfort oversee cleanliness
LEARNING clean rest water drainages are room and orderliness of
ENVIRONMEN rooms clogged maintenance rest rooms
T No regular Regular (rotational tasks)
28
2. Promotion
SCHOOL Rate Focus on traditional Update on new INSET/ Provide varied
PERFORMANC 1. From those way of teaching Teaching trends, LAC/ As learning activities
E who are strategies and soon as
INDICATORS promoted methodologies possible
(emphasis on 90% of through LAC,
enrolment, them INSET and/or
promotional learned related seminar to
rate, failures, concepts be sponsored by
LARDOs, through the school
numeracy, rote
reading learning Intervention
proficiency and only (Remedial
10% or/and Tutorial
showed Classes
Higher Regular follow-
Order Skills up on student
Academic
Lack of interest/ Status
focus in learning Parent- Througho Inculcate
Poor Study Teacher- ut the GMRC in the
Habits, Student Academic curriculum
Students Conference Year
Failures Absenteeism, Positive
2. 10% - 15% Tardiness, cutting Discipline
of the classes (PosDi)
students Non-compliance The school should
failed in of Learning Tasks conduct a parental
Second seminar quarterly
Quarter especially to those
parents of
LARDOs.
Poor parental follow- As need Constant follow-up
up on students Motivate and arises on students and
attendance inspire learners sending of
Numeracy Family economic to carry on in communication
and Reading status life letters to parents
Proficiency Peer factor/pressure Organize
3. Student’s Improper use of parental
irregular technology seminar Upon enrolment
attendance Sending of (incoming Grade
communication 7), identify those
letters to students who are
parents SY 2020- having numeracy
2021 and reading
proficiency
Numeracy Mass promotion and problems.
and Reading no child left behind Assign teacher/s Math and English
Proficiency concept to address these Department will
30
3. Best Practices which ought to be replicated and adopted (this may be verbally done during FGD or during LAC
sessions)
3.1 Classroom Management (emphasis on physical environment/ classroom plant, classroom routine -
supervised recess/lunch break, getting in and out of the classroom for flag ceremony and participation in any
school initiated activity, orderliness and cleanliness of the classroom, good grooming and personal hygiene,
etc.)
Constant monitoring of the students most especially those who are failing
Application of lesson in real-life (contextualization)
Conduct a systematic class & classroom monitoring $ supervision (attendance, classroom cleanliness,
discipline)
Maintaining learning conducive classroom - well ventilated, clean and orderly.
Implementation of zero garbage policy
Empowering group leaders before, during and after classes
Giving of incentives for good deeds
Practicing the 10-minute habit, setting the classroom mood
3.2 Teaching Strategy (emphasis on critical content, preparation of LP/DLP/iPlan for newly hired)
Designing a student-centered learning activities which encourage collaboration and critical thinking
Give emphasis on individual board work and sample computations
Engage students to perform the task by means of cooperative learning and collaborative learning in
achieving specific goals
Exposure of learning through exhibits
Use of technology in lesson delivery/classroom instruction and presentation
Emphasis on actual hands-on and demonstration specially in science and TVL subjects
3.3 Forging Stakeholders (emphasis on attendance during classroom/school PTA meetings, planned homeroom projects,
student discipline, etc)
Give appreciation to students whose parents are always present during the Homeroom meeting or
other school related activities
Involvement of parents in school activities (feeding)
Giving of communications to parents ahead of time that is stipulated in the communication notebook
of the students
3.4 Student Discipline (emphasis on positive/constructive discipline, greetings utterances and gestures, etc.)
Knowing the students(their strengths and weakness) and building trust to carry-out PosDi
Establish and implement strictly the house rules of every classroom at the beginning of classes
Constant parents, students and teacher conference as well as the close adoption of home visitation
High spirit in participation and involvement in social and academic programs
31
3.5 Other related activities to support attainment of the desired learning outcomes. (newly hired teachers
-preparation of records and forms of the learners, computation of grades, supplies and materials, etc.)
TIME
CONCERNS/ FRAME
ISSUES/ PROPOSED TO PROPOSED
AREA OF CAUSE OF
GAPS/ CORRECTIVE RESOLV PREVENTIVE
CONCERN OCCURRENCE
PROBLEMS ACTION E/ MEASURE/S
(CIGPS) ADDRES
S
1. SCHOOL MANAGEMENT
TIME
CONCERNS/ FRAME
ISSUES/ PROPOSED TO PROPOSED
AREA OF CAUSE OF
GAPS/ CORRECTIVE RESOLV PREVENTIVE
CONCERN OCCURRENCE
PROBLEMS ACTION E/ MEASURE/S
(CIGPS) ADDRES
S
1.2. Records
ADMINISTRA 4. Slow Limited number of Recommend to As soon The School Head has
TIVE processing Division Personnel to the Division Office as to address to the
LEADERSHIP and process documents to hire more possible Division Office
33
Have a transparency
Close monitoring As soon board on teachers’
of teachers’ load. as load.
possible/
Next
School
Year
1.3. Competency
CURRICULUM Managemen
INSTRUCTIO t School/ District/ Project monthly Monthly/ School Calendar has
N AND 3. Some Division activities, School/ District/ SY 2020- to be crafted by the
ASSESSMENT competenci programs and Division activities, 2021 school and for the
(competency es are not tasks/works programs and school for the
management, carried out tasks/works and teachers to budget
learning be cascaded in the competencies
resources, faculty meetings efficiently
assessment of
learning, Assessment
learning of Learning Addressing Before
delivery, critical 4. Students’ The Spiral learning gaps of the start
content) poor Progression Nature learners through of Recommend a
connection of the K-12 special/ remedial SY 2020 - feedback on the
from the Curriculum classes 2021 implementation of
previous Lack of interest the current
lessons and among learners curriculum from
the poor because they School to Division/
retention of already know that Region/ Central
34
1.4 Trainings/
HUMAN Seminars Subject/ Year-level
RESOURCE 5. Specialized Non-availability of Subject/ Year- Semi- coordinator propose
AND TEAM Skills training program and Level coordinators annually a plan of training
DEVELOPMEN Training budget collaborates with plan for his/her
T should be its subordinates of subordinates as
(trainings, made trainings needed approved by SH.
hiring of available
personnel, per
inset, ancillary Department
services) (subject/ Send some Every
department Persons [some] sent to teachers who may District/ Monitoring on
) attend the seminars also fit in the Division teachers who have
are believed to be seminars. sponsore and have not
6. Seminars fitted to be there. d attended special
are seminars seminars and
attended & Feedback on seminar
only by few Trainings attended.
persons
repetitively
TIME
CONCERNS/ FRAME
ISSUES/ PROPOSED TO PROPOSED
AREA OF CAUSE OF
GAPS/ CORRECTIVE RESOLV PREVENTIVE
CONCERN OCCURRENCE
PROBLEMS ACTION E/ MEASURE/S
(CIGPS) ADDRES
S
Cont… INSET
7. Topics Redundant/overlapping Try to ask As soon Craft a strategic plan
1.4 tailored not of topics teachers of as for INSET that
HUMAN on teachers possible topics possible focuses on new
RESOURCE and they want to have trends in effective
AND TEAM students’ for the INSET and and efficient
DEVELOPMEN need for recommend it to teaching for
T learning the District/ meaningful teaching-
(trainings, engagemen Division Office learning process.
hiring of t
personnel, Ancillaries are given to
inset, ancillary Ancillary those who are known SY 2020 -
services) Services to be qualified in the Designate one 2021 Determine qualified
8. Some position ancillary per teachers to hold an
teachers teacher ancillary and
have two or motivate him/her to
more take the position.
ancillaries
35
1.5 Canteen
FINANCE AND 3. Some foods No monitoring on the School Head and As soon Create an action plan
RESOURCE served in food and beverages canteen staff as for food and
MANAGEMEN the canteen sold in the canteen. have to comply possible beverages to be sold
T AND are not with the in the canteen and
MOBILIZATIO healthy guidelines Regular Monitoring
N stipulated in the and evaluation of the
(PTA, Canteen, DepEd Order # 13 plan.
Authorized series of 2017
Contributions, Budget is not enough
School MOOE, School to cover school’s Monthly
Donations) MOOE operating expenses Determine the Proper and effective
4. Allocation school’s monthly planning in allocating
of the expenses and the MOOE.
budget is proportionate the
inefficient budget. Maximize
the allocated
budget for each
determined
expense. Unused
budget from a
particular expense
must not be used
and must be
added to the next
budget allotted
budget. In case of
insufficiency of
budget, get from
emergency/
contingency fund.
Strengthen
linkages with
other private and
public sectors
TIME
CONCERNS/ FRAME
ISSUES/ PROPOSED TO PROPOSED
AREA OF CAUSE OF
GAPS/ CORRECTIVE RESOLV PREVENTIVE
CONCERN OCCURRENCE
PROBLEMS ACTION E/ MEASURE/S
(CIGPS) ADDRES
S
Cont…
Rest Rooms
10. Lac Toilet bowls are Allocate budget Assign teachers to
1.6 k of damaged and for comfort oversee cleanliness
LEARNING functional water drainages are room and orderliness of
ENVIRONMEN clean rest clogged maintenance rest rooms
T rooms No regular Regular (rotational tasks)
(school plant, monitoring of monitoring of
crucial comfort rooms’ comfort room
resources, condition conditions
repair works, Spot site viable
rest rooms, No more space to for comfort
laboratories, construct new room
hand washing comfort rooms construction. As soon
facilities, Internet as Upgrade internet
internet 11. Slo Many teachers use the possible connectivity
connections) w internet Internet Upgrade internet
connection connectivity
As soon Prioritize
Laboratorie No budget or no as science/computer
s allocation of budget Prioritized possible laboratories to
12. No science/computer acquire air-
air- laboratories to conditioned unit
condition acquire air-
unit for conditioned unit
some
Computer/
Science
laboratories
1.7.
GOVERNANCE School
AND Property The school is so big Appoint assistant As soon Appoint assistant
ACCOUNTABI 5. Safety, and 1 property property as property custodians
LITY security & custodian couldn’t do custodians possible to monitor in
(GAD, MOOE, accountabili all the monitoring of different areas
PTA, SGC, ty on the school property’s (classrooms, offices,
37
2. Promotion
SCHOOL Rate Focus on traditional Update on new INSET/ Provide varied
PERFORMANC 5. From those way of teaching Teaching trends, LAC/ As learning activities
E who are strategies and soon as
INDICATORS promoted methodologies possible
(emphasis on 90% of through LAC,
enrolment, them INSET and/or
promotional learned related seminar to
rate, failures, concepts be sponsored by
LARDOs, through the school
numeracy, rote
reading learning
proficiency and only
10%
showed
Higher
Order Skills
38
3. Best Practices which ought to be replicated and adopted (this may be verbally done during FGD or during LAC
sessions)
3.1 Classroom Management (emphasis on physical environment/ classroom plant, classroom routine -
supervised recess/lunch break, getting in and out of the classroom for flag ceremony and participation in any
school initiated activity, orderliness and cleanliness of the classroom, good grooming and personal hygiene,
etc.)
Constant monitoring of the students most especially those who are failing
Application of lesson in real-life (contextualization)
39
Conduct a systematic class & classroom monitoring $ supervision (attendance, classroom cleanliness,
discipline)
Maintaining learning conducive classroom - well ventilated, clean and orderly.
Implementation of zero garbage policy
Empowering group leaders before, during and after classes
Giving of incentives for good deeds
Practicing the 10-minute habit, setting the classroom mood
3.2 Teaching Strategy (emphasis on critical content, preparation of LP/DLP/iPlan for newly hired)
Designing a student-centered learning activities which encourage collaboration and critical thinking
Give emphasis on individual board work and sample computations
Engage students to perform the task by means of cooperative learning and collaborative learning in
achieving specific goals
Exposure of learning through exhibits
Use of technology in lesson delivery/classroom instruction and presentation
Emphasis on actual hands-on and demonstration specially in science and TVL subjects
3.3 Forging Stakeholders (emphasis on attendance during classroom/school PTA meetings, planned homeroom projects,
student discipline, etc)
Give appreciation to students whose parents are always present during the Homeroom meeting or
other school related activities
Involvement of parents in school activities (feeding)
Giving of communications to parents ahead of time that is stipulated in the communication notebook
of the students
3.4 Student Discipline (emphasis on positive/constructive discipline, greetings utterances and gestures, etc.)
Knowing the students(their strengths and weakness) and building trust to carry-out PosDi
Establish and implement strictly the house rules of every classroom at the beginning of classes
Constant parents, students and teacher conference as well as the close adoption of home visitation
High spirit in participation and involvement in social and academic programs
3.5 Other related activities to support attainment of the desired learning outcomes. (newly hired teachers
-preparation of records and forms of the learners, computation of grades, supplies and materials, etc.)
1.School Management
1.1 Coaching & • The • Coordinator As soon as • Coordinators
Mentoring Coordinators s have to possible need to have a
Instructional have no look for planned
Leadership No Coaching/ ample time. means how schedules for
(coaching, Mentoring • not updated to coach mentoring and
mentoring, has org structure and mentor coaching for
observing classes, happened • Limited teachers teachers’
leading LAC Slight participants commendation
sessions, confusion during the • Immediate and
development and with some discussion actions by recommendati
reproduction of changes in on few SGOD, ons
IMs) the org changes School
structure • Not Head • Clear
Lack of comprehensi stipulation of
information ve re- the term of
disseminatio echoing of office
n information
• Fast turn-
over of
responsibiliti
es
Leading LAC Non- Reach out and Second to Invite government
Sessions collaboration collaborate with Fourth agencies that may
Third Party with other Government Quarter help in
resources Government Agencies understanding fully
Speakers of Agencies (D/MSWD, DAR, the topics that are
the LAC PNP, PDEA, related to their
sessions DENR, etc.) work as applied in
teaching
Development • Too • Acquisi January – • Earlier
and many pages tion of February projection on
Reproduction of modules more 2021 the limit of
of IMs • Lack of efficien pages for
Risograph t modules used
Lagging Machine machin within the
behind on • High es resources
the printing Expenses on • Edit the capacity of
of modules Resources lay-out schools
Needed to
( bondpaper, booklet • Target
ink, type Setting on
machines ) • Provide Printing
• The printers Schedule
budget per
subsidy from workin • Establish a
LGU to be g Equipment
used on the station Preventive
purchase of Maintenance
additional Program and
42
• Constant
Follow-Up
Development
Program
Trainings/ • Ongoing Re-echoing January • Monitoring on
Seminars Pandem of 2021 teachers who
ic Significant onwards have and have
Very Limited • Limited Inputs not attended
Trainings organiz from special
and ed seminars seminars and
Seminars seminar attended to feedback on
s be part of seminar
the LAC attended.
Session or • Take further
other initiatives in
meetings searching for
organized
seminars/trai
nings
s, School
MOOE,
Donations)
(Cont.)1.School Management
Internet Many Upgrade As soon as Upgrade internet
teachers use internet possible connectivity
Slow internet the Internet connectivity
connection
2. Performance Indicators
SCHOOL • Lack of • Earlier As soon as Constant Follow-Up
PERFORMAN Enrollment teachers Pre- possible
CE • Slow enrollment
INDICATORS Teacher- hiring Period
(emphasis on Learner Ratio procedure ( for early
enrolment, does not projection,
promotional follow the earlier request
rate, failures, given DepEd for additional
LARDOs, standard teachers )
numeracy, 1:60 / 1:70 • Speed
reading up hiring
proficiency procedure
3. Best Practices which ought to be replicated and adopted (this may be verbally
done during FGD or during
LAC Session)
SOURCES OF SCHOOL
FUNDS/APPROPRIATIONS
PTCA
DepEd LGU ,
Outlays/ SEF Inc. TOTAL
Account Account Name MOOE Projects/ 20% GF /
Code and Particulars Grants DF SPH
2017-
Personal Services
SOB- 001
001-01 Plantilla Item Teachers
001-02 Non-Teaching Staff:
001-03 Administrative Officer
001-04 ADAS
001-05 Registrar
Trainings/Seminars/Confere
002-04 nces, etc
40,000.00 40,000.00
School Vehicle
002-06 Maintenance and Parts
30,000.00 30,000.00
Telephone Bill/Internet
002-07 Bills
132,000.00 132,000.00
Printing, Production of
002-12 Testing Materials, 100,000.00 100,000.00
Documentation
Procurement of , Fire
002-13 Extinguisher and DRRM 25,000.00 25,000.00
Equipments
Improvement of Electrical
002-16 Shop.
25,000.00 25,000.00
Procurement of Sports
002-17 Equipments and DLBC 50,000.00 50,000.00
Instruments
Procurement of Additional
002-18 PCs, Printer & External 30,000.00 30,000.00
drive
Procurement of
002-19 Instructional Materials / 50,000.00 50,000.00
LED TV/ Projectors
Procurement of TLE
002-20 Equipment
40,000.00 40,000.00
and Medicines
Repair of Urinals/ Comfort
002-22 rooms
20,000.00 20,000.00
Production of reading
002-23 materials/PHIL IRI
25,000.00 25,000.00
Procurement of Air
002-24 Conditioning Unit for 30,000.00 30,000.00
Computer Labs
Production of Testing
002-25 materials/NAT review 30,000.00 30,000.00
materials
PHP
Total for MOOE
2,168,000.00
2020-
SOB-003
Curriculum Implementation & Co-Curricular
School Programs
003-01 Filipino/ Buwan ng Wika 25,000.00 25,000.00
Press
003-09 Conference/Publication
20,000.00 20,000.00
Education Stakeholders
003-13 Summit
23,450.00 23,450.00
Department of Education
Division of Cebu Province
District of Lilo-an
LILOAN NATIONAL HIGH SCHOOL
Poblacion, Liloan, Cebu
ANNUAL PROCUREMENT PLAN (JHS )
(Calendar Year: 2020)
Source of
Funds: MOOE
PROGRAMS, I T E M S ESTIMATED COST
PROJECTS and/or
ACTIVITIES Qty. Unit Description Unit Total
1. PHYSICAL ENVIRONMENT
1.1 Purchase/Repair/Repainting or Maintenance
1.1.1 Classrooms
Ordinary Plywood, 1/4 X 4'
50 pcs. 260.00 13,000.00
X 8'
300 pcs. Good Lumber, 1/2 X 3 X 8' 60.00 18,000.00
Quick Drying Enamel, Nile
50 gal. 510.00 25,500.00
Green
30 gal. Flatwall Enamel, White 450.00 13,500.00
28 gals. Elastomeric Paint, Travertine 600.00 16,800.00
Paint Roller with tray, 7
15 pcs. 80.00 1,200.00
inches
20 kl. Common Wire Nail # 1 60.00 1,200.00
25 pcs. Sand Paper # 120 18.00 450.00
1 lit. White Glue 150.00 150.00
3 gal Paint Thinner 300.00 900.00
2 roll barbed wire 1,300.00 2,600.00
1.1.2 School Building
50 gals. Elastomeric Paint, Travertine 600.00 30,000.00
15 qtz Polyester Body Filler 166.00 2,490.00
Paint Roller with tray, 7
6 pcs 80.00 480.00
inches
1 sack skim coat powder 400.00 400.00
1 lot labor 9,891.00 9,891.00
1.1.3 Concreting , Fencing of the Area from Side Gate (Improvement)
200 bags Cement (Portland) 253.00 50,600.00
65
2. INSTRUCTIONAL/SPORTS MATERIALS/EQUIPMENT
2.1 Purchase/Reproduction/Repair of Instructional Materials and/or
Equipment
2.1.1 Review/Testing Materials
ream
300 Memeogrpahing, Long 200.00 60,000.00
s
2.1.2 Work/Activity Sheets
ream
300 Memeogrpahing, Long 200.00 60,000.00
s
2.1.3 Math and/or Science Equipment
Cleaning/Lubricant/Anti 1,000.00
Oxidation Materials
2.1.4 EPP/GPP
150 bags Portland Cement 253.00 37,950.00
6 bags Gravel 51.00 306.00
6 bags Sand 51.00 306.00
10 pcs. Bamboo Stump 60.00 600.00
2 kgs. Common Nail # 3 1/2 55.00 110.00
1 kgs. Common Nail # 1 60.00 60.00
1 gal. Nile Green 510.00 510.00
4 pcs. Paint Brush 45.00 180.00
1 gal. Coal Tar 450.00 450.00
14,165.2
1 lot Labor 14,165.20
0
500 pcs. Seedling Bag 4 X 6 2.00 1,000.00
0.5 kg. Chinese Kangkong Seeds 400.00 200.00
23 pcks. Assorted Vegetable Seeds 50.00 1,150.00
3 pcs. Grub Hoe 250.00 750.00
2 pcs. Small Pickmattock 250.00 500.00
5 pc. Claw Hammer, Big 230.00 1,150.00
5 pc. Claw Hammer, Small 209.00 1,045.00
66
14,500.0
2 Overhead Projector 29,000.00
unit 0
60,000.0
1 CCTV 60,000.00
unit 0
1 lot
Purchase of Worn Out Part/s 5,000.00 5,000.00
Uninteruptible Power Supply
4 5,000.00 20,000.00
unit (UPS)
2.3.3Purchase/Repair/Maintenance of Water and Electrical
0.00
System
30,000.0
1 Water Distribution System 30,000.00
0
Electrical Installation and 50,000.0
1 Maintenance 50,000.00
0
570,302.20
3. STUDENT DEVELOPMENT 0.00
3.3 Quarterly Test
Materials
300 rms. Marine Mimeo Paper, Long 150.00 45,000.00
Printer Ink, Dye, 100 ml,
30 btls. 120.00 3,600.00
Black
Printer Ink, Dye, 100 ml,
30 btls. 120.00 3,600.00
Cyan
Printer Ink, Dye, 100 ml.,
30 btls. 120.00 3,600.00
Magenta
Printer Ink, Dye, 100 ml.,
30 btls. 120.00 3,600.00
Yellow
25 units RISO INK KZ Type 4 1,200.00 30,000.00
30 units RISO Master KZ Type 4 1,300.00 39,000.00
3.4 Participation to Academic and Related Activities
Purchase of needed/required contest
28,000.00
Supplies Materials
Meals and Transportation Allowance for
30,000.00
participating delegates
3.5 School Monthly/Quarterly Programs/Activities
Ribbon, 2", Satin, Assorted
25 mts 4.00 100.00
Color
50 pcs. Cartolina, White 4.00 200.00
50 pcs. Cartolina, Assorted Color 7.00 350.00
200 shts. Parchment Paper, Short 1.50 300.00
50 pcs. Glue Stick, Small 3.50 175.00
50 pcs. Satin Silk Photo Paper, A4 5.00 250.00
20 pcs. Styrofoam, 1/2 X 2 X 4 35.00 700.00
3.6 Reproduction of School
Forms
68
400
shts. Velum Board, 8 1/2 X 11 5.00 20,000.00
0
20 rms. Bond Paper, Long, Subs. 21 190.00 3,800.00
20 rms. Bond Paper, Short, Sub. 21 160.00 3,200.00
3.7 Reproduction of PHIL IRI
Forms
150 rms. Bond Paper, Long, Subs. 21 190.00 28,500.00
150 rms. Bond Paper, Short, Sub. 21 160.00 24,000.00
Plastic Folder, Trsprtn, Asstd
50 pcs. 7.50 375.00
color
3.8 Reproduction/ Photocopy of form 137
Photocopy of Form 137
20,000.00
(CAV)
3.8 School Organizations/Clubs Management
30 rms. Bond Paper, Long, Subs. 20 165.00 4,950.00
50 shts. Parcment Paper, 8.5 X 11 1.90 95.00
6 rolls Masking Tape, # 1 35.00 210.00
50 shts. Manila paper 2.50 125.00
6 pcs. Marking Pen, Black 35.00 210.00
3.9 Moving Up Ceremony 0.00
student Moving Up ceremony
800 s 250.00 200,000.00
expenses
493,940.00
4. TRAININGS/TRAVELS
4.1 INSET/SBTP
INSET (Pre & Mid-year) 100,000.0
2 times 200,000.00
Transpo 0
& other Allowable Expenses
Going to and from Division
Office for School/District-
4.2 Official
related Transactions and/or
Travel
Trainings/Workshops/Semina
rs, etc. 20,000.00
for School/District-related
Transactions
and/or
Trngs./Workshops/Conf. etc.
220,000.00
5. SCHOOL OPERATION/MAINTENANCE
Electricity Bill (Ave. @ ₱
5.1 Electricity 12 mos.
2,250.00/ mo.)
5.2 Water 12 mos. Water Bill ( 3000 / month)
5.3 Postage Fee for Registered
1,500.00
Communications Mail
69
Landline Bill
12 mos. 1,624.00 19,488.00
(1624.00/month)
Internet bill( 8700.00
12 mos. 8,700.00 104,400.00
/month)
5.4 Security
3 security guards at 30,000.0
12 mos. 360,000.00
10000/month 0
5.5 Utility
4 Job Order Utility Worker 24,000.0
12 mos. 288,000.00
( 6000/month) 0
5.6 Office
Supplies
300 rms. Bond Paper, Long, Subs. 20 195.00 58,500.00
200 rms. Bond Paper, Short, Subs. 20 143.00 28,600.00
48 rolls Masking Tape, # 1 35.00 1,680.00
48 rolls Transparent Tape # 1 35.00 1,680.00
48 rolls Double-Sided Tape # 1 35.00 1,680.00
15 pcs. Marking Pen 35.00 525.00
250 pcs. Folder, long, Board 6.00 1,500.00
200 pcs. Folder, long, Hard Plastic 12.00 2,400.00
boxe
6 Fastener 15.00 90.00
s
boxe
4 Paper Clips 6.00 24.00
s
Ballpen, Black, Good
50 pcs. 10.00 500.00
Quality
50 pcs. Ballpen, Red, Good Quality 10.00 500.00
89 shts. Manila Paper 2.50 222.50
1 ream Laminating Film 500.00 500.00
50 shts. Satin Silk Sticker Paper, A4 10.00 500.00
2 liters White Glue 87.40 174.80
872,464.30
6. HEALTH/ DRR PROGRAMS
(Paracetamol, Mefinamic
8,000.50
Acid,
Ferrous Sulfate, Vitamen C,
etc.)
2 unit BP Aparatus 3,000.00 6,000.00
8 pcs bathroom scale 600.00 4,800.00
DRR Equipments 10,000.0
11,000.00
Apparatuses 0
29,800.50
Grand ₱2,461,450.0
70
Total: 0