JOB PACKAGE PAGE 1/2

REF # LSI - CAV - 022018 - JP008 DATE: 3-Feb-18

PROJECT: CAVITE UG FOC NETWORK


SCOPE OF WORKS:
HDD ✔ POLE OTHERS (PLS SPECIFY) ✔

MICROTRENCH ✔ FOC WORKS 1.) E/E JOINTING

HH/SB ✔ BRIDGE ATTACHMENT 2.) RESTORATION WORKS

LOCATION: TANZA, CAVITE

QUANTITY: see attached BOM BASELINE TARGET COMPLETION:

ATTACHMENT CHECKLIST:
PARTICULARS AVAILABLE REMARKS CONTACT PERSON

BGY PERMITS ✔ 15 Bgys Analyn - CP # 0917 824 4636

LGU PERMITS ON PROCESS TO BE PROVIDED AT SITE Analyn - CP # 0917 824 4636

PERMITS

DPWH PERMIT ON PROCESS TO BE PROVIDED AT SITE Analyn - CP # 0917 824 4637

OTHER PERMITS ON PROCESS TO BE PROVIDED AT SITE Analyn - CP # 0917 824 4638

area is critical : GPR support can be Leo - CP # 0906 008 3573 /


GPR GPR SCANN REPORT ✔
provided upon request Fiel - Cp # 0926 512 6480

BOQ SPAN TO SPAN PLANNED LENGTH ✔ MT / HDD / RESTORATION / HH / EE Tina - CP # 0915 199 0686

Micro Trenching, HH, EE Jointing,


MATERIALS BOM (BILL OF MATERIALS) ✔ HDD on Bridge Crossing & Restoration Tina - CP # 0915 199 0686
works

GEO PLAN ✔ Melai - CP # 0908 888 4521

ALL 24 WAY HDD MUST BE DONE BY


PLANS SCHEMATIC DRAWING ✔ SHALLOW DRILLING (MAX OF 0.80M NSB
DEPTH ONLY)

DETAILS ✔ HH DETAILS Tina - CP # 0915 199 0686

DOCUMENTATION CHECKLIST ✔ Tina - CP # 0915 199 0686

FORMS &
SITE INSTRUCTION FORM ✔ Tina - CP # 0915 199 0686
GUIDELINES

ACCEPTANCE FORMS (Physical Inspection


✔ MIKE - 0935 089 1035
Defficiency List)

COMPLETE GUIDE TO ACHIVED


MT GUIDELINES ✔ QUALITY MT WORKS AND NSB
OTHERS (PLS RESTORATION
INDICATE AS
REQUIRED)
JOB PACKAGE PAGE 2/2

SPECIAL INSTRUCTION:

ITEMS INSTRUCTION / NOTES

PROVIDE BOLLARDS, WARNINGS SIGNS, BARRICADES, & BLINKERS / EXCESS SOIL MUST BE DISPOSED ASAP.
SAFETY
INSTALL CAVITE TARPS TO ALL TRUCKS & BOARD UPS

COURTESY CALL PRIOR TO


TO ALL BGY CHAIRMAN & DPWH INSPECTOR PRIOR TO START (COORDINATE WITH ROW TEAM)
START

MD TO INSTALL 1 RUN 24 WAY (7/3.5) ALONG TANZA - TRECE RD / 2 RUN 7 WAY (14/10) ALONG ANTERO SORIANO RD.

WORKING HOURS AVOID NOISE ON RESIDENTIAL AREAS DURING NIGHT TIME / TRAFFIC FLOW MUST BE PROPERLY CONTROLL

Locations of HH / EE & Trench reflected on the Plan must be strictly followed, any diviation must be
OTHERS
coordinated to Engg / ROW Teams for proper approval of DPWH.

ENDORSEMENT & NOTES

ROW: ANN AGUILLON ENGINEERING: BODGY DANGA GPR: MIKE ALCORIZA

QUALITY: PREPARED BY: APPROVED BY:


(1.) MT DEPTH ON EARTH MUST BE AT MAX.
OF 450 MM;
(2.) SPECIFICATIONS OF CONCRETE =
3,500PSI @ 3 DAYS; TINA YUMUL
(3.) THICKNESS OF CHECKED BY:
RESTORATION = TO EXISTING THICKNESS OF
GUTTER OR ROAD PAVEMENT

NSBONGON D. VOIGT

RECEIVED BY:

PMO 2 NAME SIGNATURE DATE:

PROCUREMENT NAME SIGNATURE DATE:

NMC NAME SIGNATURE DATE:

NAME SIGNATURE DATE:

NAME SIGNATURE DATE:


IMPLEMENTATION
TEAM
NAME SIGNATURE DATE:

NAME SIGNATURE DATE:


TANZA, CAVITE

MICRO TRENCH ON SOIL (METERS) TRENCHLESS / HDD (METERS)


MT /
ALONG FROM TO
HDD 1 RUN 24 1 RUN 7 1 RUN - 24 2 RUN - 7 1 - RUN 7
TOTAL MT TOTAL HDD
WAY WAY WAY WAY WAY
HDD ANTERO SORIANO HIGHWAY HH1 EE 237.00 237.00
HDD ANTERO SORIANO HIGHWAY EE HH2 254.00 254.00
HDD ANTERO SORIANO HIGHWAY HH2 EE 250.00 250.00
HDD ANTERO SORIANO HIGHWAY EE HH3 130.00 130.00
HDD ANTERO SORIANO HIGHWAY HH3 HH4 135.00 135.00
HDD ANTERO SORIANO HIGHWAY HH4 EE 244.00 244.00
HDD ANTERO SORIANO HIGHWAY EE HH5 280.00 280.00
HDD ANTERO SORIANO HIGHWAY HH5 EE 214.00 214.00
HDD ANTERO SORIANO HIGHWAY EE HH6 280.00 280.00
HDD ANTERO SORIANO HIGHWAY HH6 HH7 145.00 145.00
HDD ANTERO SORIANO HIGHWAY HH7 EE 180.00 180.00
HDD ANTERO SORIANO HIGHWAY EE HH8 214.00 214.00
HDD ANTERO SORIANO HIGHWAY HH8 EE 228.00 228.00
HDD ANTERO SORIANO HIGHWAY EE HH9 220.00 220.00
HDD ANTERO SORIANO HIGHWAY HH9 EE 190.00 190.00
HDD ANTERO SORIANO HIGHWAY EE HH10 208.00 208.00
HDD ANTERO SORIANO HIGHWAY HH10 HH11 145.00 145.00
HDD ANTERO SORIANO HIGHWAY HH11 EE 250.00 250.00
HDD ANTERO SORIANO HIGHWAY EE EE 200.00 200.00
HDD ANTERO SORIANO HIGHWAY EE HH12 280.00 280.00
HDD ANTERO SORIANO HIGHWAY HH12 EE 200.00 200.00
HDD ANTERO SORIANO HIGHWAY EE HH13 200.00 200.00
HDD ANTERO SORIANO HIGHWAY HH13 HH14 110.00 110.00
HDD ANTERO SORIANO HIGHWAY HH14 EE 250.00 250.00
HDD ANTERO SORIANO HIGHWAY EE HH15 238.00 238.00
HDD ANTERO SORIANO HIGHWAY HH15 EE 250.00 250.00
HDD ANTERO SORIANO HIGHWAY EE HH16 300.00 300.00
HDD ANTERO SORIANO HIGHWAY HH16 EE 183.00 183.00
HDD ANTERO SORIANO HIGHWAY EE HH17 140.00 140.00
HDD ANTERO SORIANO HIGHWAY HH17 EE 232.00 232.00
HDD ANTERO SORIANO HIGHWAY EE HH18 150.00 150.00
HDD ANTERO SORIANO HIGHWAY HH18 EE 250.00 250.00
HDD ANTERO SORIANO HIGHWAY EE HH19 250.00 250.00
HDD ANTERO SORIANO HIGHWAY HH19 EE 250.00 250.00
HDD ANTERO SORIANO HIGHWAY EE HH20 254.00 254.00
HDD ANTERO SORIANO HIGHWAY HH20 EE 246.00 246.00
HDD ANTERO SORIANO HIGHWAY EE HH21 250.00 250.00
HDD ANTERO SORIANO HIGHWAY HH21 EE 250.00 250.00
HDD ANTERO SORIANO HIGHWAY EE HH22 238.00 238.00
HDD ANTERO SORIANO HIGHWAY HH22 EE 260.00 260.00

HDD ANTERO SORIANO HIGHWAY EE HH23 250.00 250.00

HDD ANTERO SORIANO HIGHWAY HH23 EE 250.00 250.00

HDD ANTERO SORIANO HIGHWAY EE HH (NAIC) 260.00 260.00


HDD TANZA-TRECE MARTIRES ROAD HH03 HH24 224.00 224.00
HDD TANZA-TRECE MARTIRES ROAD HH24 HH25 155.00 155.00
HDD TANZA-TRECE MARTIRES ROAD HH25 EE 248.00 248.00
HDD TANZA-TRECE MARTIRES ROAD EE HH26 207.00 207.00
HDD TANZA-TRECE MARTIRES ROAD HH26 HH27 231.00 231.00
HDD TANZA-TRECE MARTIRES ROAD HH27 HH28 269.00 269.00
MT TANZA-TRECE MARTIRES ROAD HH28 HH29 251.00 251.00
HDD TANZA-TRECE MARTIRES ROAD HH29 HH30 226.00 226.00
MT TANZA-TRECE MARTIRES ROAD HH30 EE 248.00 248.00
HDD TANZA-TRECE MARTIRES ROAD EE HH31 247.00 247.00
MT TANZA-TRECE MARTIRES ROAD HH31 EE 248.00 248.00
HDD TANZA-TRECE MARTIRES ROAD EE HH32 300.00 300.00
HDD TANZA-TRECE MARTIRES ROAD HH32 HH33 191.00 191.00
HDD TANZA-TRECE MARTIRES ROAD HH33 HH34 252.00 252.00
HDD TANZA-TRECE MARTIRES ROAD HH34 HH35 226.00 226.00
HDD TANZA-TRECE MARTIRES ROAD HH35 EE 230.00 230.00
HDD TANZA-TRECE MARTIRES ROAD EE HH36 200.00 200.00
HDD TANZA-TRECE MARTIRES ROAD HH37 HH37 240.00 240.00
HDD TANZA-TRECE MARTIRES ROAD HH37 EE 269.00 269.00
HDD TANZA-TRECE MARTIRES ROAD EE HH38 238.00 230.00
MT TANZA-TRECE MARTIRES ROAD HH38 HH39 253.00 253.00
MT TANZA-TRECE MARTIRES ROAD HH39 EE 105.00 105.00
HDD TANZA-TRECE MARTIRES ROAD EE EE 77.00 77.00
MT TANZA-TRECE MARTIRES ROAD EE HH40 500.00 500.00
MT TANZA-TRECE MARTIRES ROAD HH40 HH41 250.00 250.00
HDD TANZA-TRECE MARTIRES ROAD HH41 HH42 227.00 203.00
HDD TANZA-TRECE MARTIRES ROAD HH42 EE 226.00 250.00
HDD TANZA-TRECE MARTIRES ROAD EE HH43 218.00 218.00
HDD TANZA-TRECE MARTIRES ROAD HH43 EE 250.00 250.00
MT TANZA-TRECE MARTIRES ROAD EE HH44 250.00 250.00
MT TANZA-TRECE MARTIRES ROAD HH44 HH45 464.00 464.00
HDD TANZA-TRECE MARTIRES ROAD HH45 HH46 240.00 240.00
HDD TANZA-TRECE MARTIRES ROAD HH46 EE 260.00 260.00
HDD TANZA-TRECE MARTIRES ROAD EE HH47 260.00 260.00
HDD TANZA-TRECE MARTIRES ROAD HH47 EE 260.00 260.00
MT TANZA-TRECE MARTIRES ROAD EE HH48 250.00 250.00
MT TANZA-TRECE MARTIRES ROAD HH48 EE 140.00 140.00
HDD TANZA-TRECE MARTIRES ROAD EE HH49 140.00 140.00
MT TANZA-TRECE MARTIRES ROAD HH49 EE (TRECE) 468.00 468.00
0.00 3,427.00 3,427.00 0.00 9,545.00 6,111.00 15,648.00

DIMENSION (M) QTY AREA (SQ. M)


HH / EE
ON ON EARTH ON
WIDTH LENGTH ON EARTH
CONCRETE SHOULDER CONCRETE
HANDHOLES 1.4 1.4 11 38 21.56 74.48

E/E 1 1 7 26 7.00 26.00

VOLUME
CONCRETE RESTORATION WORKS UNIT QTY REMARKS
(CU.M)
HANDHOLES SET 38 11.4 3,500 PSI , 3 DAYS

E/E SET 26 7.8 3,500 PSI , 3 DAYS

TRENCH PROTECTION MEETRS 3,427.00 23.989 JOB MIX

BOM-008
PLANT UNIT SUMMARY

AREA TANZA, CAVITE

ITEM SCOPE OF WORKS

1 DUCT LAYING

1.1 HORIZONTAL DIRECTIONAL DRILLING 1 RUN 24w (SHALLOW DRIL

1.2 HORIZONTAL DIRECTIONAL DRILLING 1- 7w

1.3 HORIZONTAL DIRECTIONAL DRILLING 2 - 7w

1.4 MICRO TRENCHING 1 RUN 24W

1.5 MICRO TRENCHING 1 RUN 7W

2 HANDHOLE WORKS

2.1 FABRICATION

2.2 INSTALLATION ON SOIL

2.3 INSTALLATION ON CONCRETE

2.3 RESTORATION

ON CONCRETE (1.5X 1.5 x 0.30) - 3500 PSI

3 EE WORKS

3.1 DUCT JOINTING

3.2 BACKFILLING ON SOIL

3.3 BACKFILLING & RESTORATION ON CONCRETE - 3500 PSI

4 POI

4.1 HDD / DUCT LAYING

4.2 TRENCHING / DUCT LAYING

4.3 INSERTION TO HH

4.4 SERVICE BOX


4.5 POLE ERECTION

4.6 RISER PIPE & U - GUARD

5 CABLE WORKS

5.1 MANDRELL TESTING

14/10 TUBES - AIR, FOAM & BALL BEARING

3/7.5 TUBES - AIR ONLY

5.2 CABLE BLOWING

5.3 FOC SPLICING

6 RESTORATION OF MT

6.1 RESTORATION ON SOIL

SOIL BACKFILL

CONCRETE PROTECTION (0.06 X 0.10 X L) - JOB MIX

6.2 RESTORATION ON CONCRETE

SAND BACKFILL

CONCRETE - 3500 PSI


UNIT PLANNED QTY

meters 0.00

meters 6,111.00

meters 9,545.00

meters 0.00

meters 3,427.00

sets 49.00

sets 11.00

sets 38.00

cu. M 25.65

loc 33.00

loc 7.00

cu. M 7.80

meters

meters

SET

SET
PCS

SETS

TUBE - meters 200,396.00

TUBE - meters 0.00

TUBE - meters 19,083.00

core

meters 3,427.00

CU. M 20.56

meters 0.00

CU.M 0.00