Test Record for A/C Installation

Project : Construction of a 30-Classroom Primary School at Tonkin Street, Cheung Sha Wan

Location: Room Temperature Before (°C) Dry: Wet: Room Temperature After Cooling (°C) Dry: Wet:
Date: Remarks: Room Temperature After Heating (°C) Dry: Wet:

Velocity Temperature
Louver size Running Current Mode Indoor Unit Indoor Unit Outdoor Unit Outdoor Unit
Equipment Indoor Unit Supply Indoor Unit Return
Supply Return Fresh Exhaust
(mm x mm) (A) (m/s) (°C)

Cooling
Split-type Unit 1
Heating

Cooling
Split-type Unit 2
Heating

Cooling
Split-type Unit 3
Heating

Cooling
Split-type Unit 4
Heating

Velocity Temperature
Louver size Starting Current Running Current FAP Indoor FAP Indoor FAP Outdoor FAP Outdoor
Equipment FAP Indoor Supply FAP Indoor Return
Supply Return Fresh Exhaust
(mm x mm) (A) (A) (m/s) (°C)

FAP 1

FAP 2