Construction SDN BHD: Hazard Identification, Risk Assessment & Control
Construction SDN BHD: Hazard Identification, Risk Assessment & Control
PROJECT / HQ: DESCRIPTION OF JOB: PREPARED BY: (Name, Signature & Date)
F01 Working at Height REV. NO. 01
LOCATION: APPROVED BY: (Name, Signature & Date) PAGE 1 of 2
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT LEGAL HIERARCHY OPERATIONAL RESPONSIBILITY
& OF CONTROL
Probability Severity Risk Ranking OTHER CONTROL
Hazard Effect (A) (B) REQ’S (GROUP)
Score Level
Working at top most Falling from Fatality / major 2 4 8 H Scaffold with SHO, SS, SC,
1. 3
structural working floor heights injury netting one W
Fall through frame above
floor openings working floor
Barricade and
close floor
openings
Barricade
building
edges, if no
scaffold
PROJECT / HQ: DESCRIPTION OF JOB: PREPARED BY: (Name, Signature & Date)
F01 Working at Height REV. NO. 01
LOCATION: APPROVED BY: (Name, Signature & Date) PAGE 2 of 2
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT LEGAL HIERARCHY OPERATIONAL RESPONSIBILITY
& OF CONTROL
Probability Severity Risk Ranking OTHER CONTROL
Hazard Effect (A) (B) REQ’S (GROUP)
Score Level
rail at
staircases
2 Good SS, SC, W
housekeeping
and proper
material
arrangement
3. Working from external Falling from Fatality / major 3 4 12 H 3 Provide safe SHO, SS, SC,
scaffold heights injury working W
Falling objects platform –
scaffolding
metal deck
(catwalk),
planks as
approved
DOSH
Safe access to
working area
Install toe
boards, guard
rail (where
necessary)
CONSTRUCTION SDN BHD
HAZARD IDENTIFICATION, RISK ASSESSMENT & CONTROL Page 3 of 4
PROJECT / HQ: DESCRIPTION OF JOB: PREPARED BY: (Name, Signature & Date)
F01 Working at Height REV. NO. 01
LOCATION: APPROVED BY: (Name, Signature & Date) PAGE 3 of 2
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT LEGAL HIERARCHY OPERATIONAL RESPONSIBILITY
& OF CONTROL
Probability Severity Risk Ranking OTHER CONTROL
Hazard Effect (A) (B) REQ’S (GROUP)
Score Level
Install
overhead
protection
above working
area
4. Working at high ceiling or Falling from Major injury 3 3 9 H 3 Use scaffold SHO, SS, SC,
soffit area height (either static W
Collapse of or mobile).
working Install toe
platform board and
guard rails.
Falling objects
Install
outriggers for
CONSTRUCTION SDN BHD
HAZARD IDENTIFICATION, RISK ASSESSMENT & CONTROL Page 4 of 4
PROJECT / HQ: DESCRIPTION OF JOB: PREPARED BY: (Name, Signature & Date)
F01 Working at Height REV. NO. 01
LOCATION: APPROVED BY: (Name, Signature & Date) PAGE 4 of 2
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT LEGAL HIERARCHY OPERATIONAL RESPONSIBILITY
& OF CONTROL
Probability Severity Risk Ranking OTHER CONTROL
Hazard Effect (A) (B) REQ’S (GROUP)
Score Level
free standing
scaffold
Use ladders –
step ladders,
extension
ladders
Close floor
openings
Note:
1. Legend for Responsibility: PM – Project Manager, PE – Project Engineer, SS- Site Supervisor, SHO – Safety & Health Officer, SC - Subcontractor , W – Worker,
All – All personnel.
2. High risk – implement operational control(s) prior to commencement of work.
CONSTRUCTION SDN BHD
HAZARD IDENTIFICATION, RISK ASSESSMENT & CONTROL Page 5 of 4
PROJECT / HQ: DESCRIPTION OF JOB: PREPARED BY: (Name, Signature & Date)
F01 Working at Height REV. NO. 01
LOCATION: APPROVED BY: (Name, Signature & Date) PAGE 5 of 2
NO. JOB SEQUENCE / STEPS HAZARD IDENTIFICATION RISK ASSESSMENT LEGAL HIERARCHY OPERATIONAL RESPONSIBILITY
& OF CONTROL
Probability Severity Risk Ranking OTHER CONTROL
Hazard Effect (A) (B) REQ’S (GROUP)
Score Level